ML14251A566

From kanterella
Jump to navigation Jump to search
Public Meeting Notice with Omaha Public Power District (Oppd)To Discuss Status of Fort Calhoun Performance Improvements Activities
ML14251A566
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/08/2014
From: Hay M
NRC/RGN-IV/DRP
To:
Hay M
References
Download: ML14251A566 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 September 8, 2014

SUBJECT:

PUBLIC MEETING NOTICE LICENSEE: Omaha Public Power District (OPPD)

FACILITY: Fort Calhoun Station DOCKET: 50-285 DATE & TIME: September 25, 2014 6:00 p.m. - 9:00 p.m. (CST)

LOCATION: Omaha Marriott 10220 Regency Circle Omaha, Nebraska PURPOSE: The U.S. Nuclear Regulatory Commission (NRC) will meet with OPPD to discuss the status of Fort Calhoun Stations performance improvement activities, including status of actions described in the December 17, 2013 Confirmatory Action Letter.

CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

PARTICIPANTS: NRC Marc Dapas, Regional Administrator, Region IV Tony Vegel, Director, Division of Nuclear Material Safety, Region IV, and Inspection Manual Chapter 0350 Chairman Louise Lund, Deputy Director, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing Michael Hay, Chief, RIV, Division of Reactor Projects, Region IV Max Schneider, Senior Resident Inspector, Fort Calhoun Station Nick Taylor, Senior Project Engineer, Region IV LICENSEE Lou Cortopassi- Site Vice President / CNO Sonny Dean- Plant Manager Scot Swanson- Director of Site Operations Harry Goodman- Engineering Director Kerry Ihnen- Manager of Nuclear Oversight Amy Hansen- Supervisor, Performance Improvement

Omaha Public Power District MEETING CONTACT: Mike Hay, Branch Chief NRC Region IV (817) 200-1147 Michael.Hay@nrc.gov This meeting will be recorded and made available online at http://video.nrc.gov. Documents related to the meeting are posted on this website devoted to the special oversight at Fort Calhoun Station, available at http://www.nrc.gov/info-fnder/reactor/fcs/special-oversight.html.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. braille, large print),

please notify the NRC's meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at:

http://www.nrc.gov/readingrm/adams.html.

To receive a summary of future meetings and other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

ML14251A566 SUNSI Review ADAMS Publicly Available Non-Sensitive By: Yes No Non-Publicly Available Sensitive OFFICE DRP:PBF RIV:PAO RIV:RSLO DRP:PBF/BC NAME NTaylor VDricks WMaier MHay SIGNATURE /RA/ /RA/LUselding /RA/ /RA/

DATE 9/3/14 9/3/14 9/4/14 9/8/14