Notice of Meeting with OPPD to Discuss the Status of Fort Calhoun Station Performance Improvement Activities, Including Status of Actions Described in the June 11, 2012, Confirmatory Action Letter
ML12300A259
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/25/2012
From:
NRC/RGN-IV/DRP
To:
Hay M
References
Download: ML12300A259 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 October 25, 2012

SUBJECT:

PUBLIC MEETING NOTICE LICENSEE: Omaha Public Power District (OPPD)

FACILITY: Fort Calhoun Station DOCKET: 50-285 DATE & TIME: November 15, 2012 6:00 p.m. - 9:00 p.m. (CST)

LOCATION: Dana College, Gardner-Hawks Center (gymnasium) 2848 College Dr Blair, Nebraska PURPOSE: The U.S. Nuclear Regulatory Commission (NRC) will meet with OPPD to discuss the status of Fort Calhoun Stations performance improvement activities, including status of actions described in the June 11, 2012, Confirmatory Action Letter.

CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

PARTICIPANTS: NRC Tony Vegel, Director, Division of Nuclear Material Safety, Region IV, and Inspection Manual Chapter 0350 Chairman Louise Lund, Deputy Director, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing Michael Markley, Chief, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing Michael Hay, Chief, RIV, Division of Reactor Projects, Region IV John Kirkland, Senior Resident Inspector, Fort Calhoun Station Jacob Wingebach, Resident Inspector, Fort Calhoun Station LICENSEE Lou Cortopassi, Site Vice President Mike Prospero, Plant Manager Ron Short, Recovery Manager Kerry Ihnen, Nuclear Oversight Manager Jay Cate, Engineering Recovery Lead

Omaha Public Power District MEETING CONTACT: Mike Hay (817) 200-1147 Documents related to the meeting are posted on this website devoted to the special oversight at Fort Calhoun Station, available at http://www.nrc.gov/info-fnder/reactor/fcs/special-oversight.html.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. braille, large print),

please notify the NRC's meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at:

http://www.nrc.gov/readingrm/adams.html.

To receive a summary of future meetings and other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Omaha Public Power District DISTRIBUTION:

Electronic distribution by RIV:

NRC Attendees PMNS Resource, Meeting Announcement Coordinator (PMNS_Resource@nrc.gov)

RIV Regional Administrator (Elmo.Collins@nrc.gov)

RIV Deputy Regional Administrator (Art.Howell@nrc.gov)

RIV DRP Director (Kriss.Kennedy@nrc.gov)

RIV Acting DRP Deputy Director (Barry.Westreich@nrc.gov)

RIV Acting DRS Director (Tom.Blount@nrc.gov)

RIV Acting DRS Deputy Director (Jeff.Clark@nrc.gov)

RIV Senior Resident Inspector (John.Kirkland@nrc.gov)

RIV Resident Inspector (Jacob.Wingebach@nrc.gov)

RIV Branch Chief, DRP/F (Michael.Hay@nrc.gov)

RIV Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov)

RIV Senior Reactor Engineer, DRS/OB (Kelly.Clayton@nrc.gov)

RIV Project Engineer, DRP/F (Chris.Smith@nrc.gov)

RIV Project Engineer, DRP/F (Jesse.Rollins@nrc.gov)

RIV Public Affairs Officer (Victor.Dricks@nrc.gov)

RIV Public Affairs Officer (Lara.Uselding@nrc.gov)

RIV Project Manager (Lynnea.Wilkins@nrc.gov)

RIV Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RIV RITS Coordinator (Marisa.Herrera@nrc.gov)

RIV Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource OEWEB Resource (Sue.Bogle@nrc.gov)

RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

MC 0350 Panel Chairman (Anton.Vegel@nrc.gov)

MC 0350 Panel Vice Chairman (Louise.Lund@nrc.gov)

MC 0350 Panel Member (Michael.Balazik@nrc.gov)

MC 0350 Panel Member (Michael.Markley@nrc.gov)

S:\DRP\_REACTORS\FCS\2012\FCS Mtg Notice 11-15-12 ML12300A259 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials RWD Publicly Avail Yes No Sensitive Yes No Sens. Type Initials RWD RIV/C:DRP/F PAO RSLO D:DRP D:DNMS MHay VLDricks WAMaier KKennedy AVegel

/RA/ /RA/ /RA via E/ /RA/ /RA/

10/23/12 10/23/12 10/23/12 10/25/12 10/25/12 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax