Notice of End-of-Cycle Meeting with Omaha Public Power District - Fort Calhoun Station to Present and Discuss the Performance Results for the Fort Calhoun Station for the Period of January 1 Though December 31, 2008ML090960775 |
Person / Time |
---|
Site: |
Fort Calhoun |
---|
Issue date: |
04/06/2009 |
---|
From: |
Replogle G NRC/RGN-IV/DRP/RPB-E |
---|
To: |
|
---|
References |
---|
Download: ML090960775 (3) |
|
|
---|
Category:Meeting Notice
MONTHYEARPMNS20240378, NRC Meeting with Omaha Public Power District to Discuss Submittal of Final Status Surveys for the Decommissioning of Fort Calhoun Station, Unit 12024-03-15015 March 2024 NRC Meeting with Omaha Public Power District to Discuss Submittal of Final Status Surveys for the Decommissioning of Fort Calhoun Station, Unit 1 PMNS20220653, License Termination Plan Public Meeting2022-06-28028 June 2022 License Termination Plan Public Meeting ML15084A1652015-03-25025 March 2015 Public Meeting with Omaha Public Power District (OPPD) ML14251A5662014-09-0808 September 2014 Public Meeting Notice with Omaha Public Power District (Oppd)To Discuss Status of Fort Calhoun Performance Improvements Activities ML14129A4452014-05-12012 May 2014 5/13/2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Cooper Nuclear Station and Fort Calhoun Station, Unit 1 ML14122A2482014-05-0606 May 2014 Notice of Forthcoming Closed Meeting to Discuss Possible Interim Actions Associated with Flooding Hazard Reevaluations for Cooper Nuclear Station and Fort Calhoun Station, Unit 1 ML14115A3502014-04-25025 April 2014 Notice of Forthcoming Public Meeting with OPPD to Discuss the Status of Fort Calhoun'S Performance Improvement Activities ML14044A0382014-02-13013 February 2014 Notice of Meeting (Public) with Omaha Public Power District (OPPD) Discuss the Status of Fort Calhoun Station'S Performance Improvement Activities, Including Status of Actions Described in the December 17, 2013 Confirmatory Action Letter ML13346A0822013-12-12012 December 2013 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Cooper Nuclear Station and Fort Calhoun Station, Unit 1 ML13312A8522013-11-0808 November 2013 Meeting Notice with Public to Discuss Fort Calhoun Station ML13255A2502013-09-12012 September 2013 Notice of Meeting with OPPD to Discuss the Status of Fort Calhoun Stations Recovery Activities ML13227A2662013-08-15015 August 2013 Meeting Notice to Discuss Their Plan for Sustained Improvement ML13192A3992013-07-11011 July 2013 Notice of Category 1 Public Meeting with Omaha Public Power District (OPPD) to Discuss the Status of Fort Calhoun Station'S Recovery Activities ML13123A3842013-05-0606 May 2013 Notice of Category Public Meeting with Omaha Public Power District (OPPD) to Discuss the Results of the Manual Chapter 0350 Inspection Conducted at Fort Calhoun Station ML13102A1892013-04-15015 April 2013 4/22/12 Notice of Closed Meeting with Omaha Public Power District to Discuss Flooding Issues Associated with Fort Calhoun, Unit 1 ML13101A2232013-04-11011 April 2013 Meeting Notice with Omaha Public Power District - Potential License Amendment Requests for Fort Calhoun, Unit 1 Related to Flood Protection for Raw Water System, Tornado Missile Protection, Piping/Code Use, and Alternate Seismic Criteria ML13105A0152013-04-11011 April 2013 Revised 4/22/13 Meeting with Omaha Public Power District - Potential License Amendment Requests for Fort Calhoun, Unit 1 Related to Flood Protection for Raw Water System, Tornado Missile Protection, Piping/Code Use,And Alternate Seismic Cri ML13066A4912013-03-0707 March 2013 3/27/2013 - Notice of Meeting with the Omaha Public Power District to Discuss the Status of Fort Calhoun'S Recovery Activities, Including Status of Actions Described in the Recently Revised Confirmatory Action Letter and Restart Checklist ML13046A3212013-02-19019 February 2013 Notice of Closed Meeting with Fort Calhoun to Discuss Safeguards Information, Proprietary, or Other Sensitive Information ML12345A2702012-11-30030 November 2012 Revised 12/12/2012 Notice of Forthcoming Meeting with Omaha Public Power District to Discuss Containment Internal Structures Issues to Support Restart of Fort Calhoun Station, Unit 1 ML12335A1652012-11-30030 November 2012 Forthcoming Meeting with Omaha Public Power District to Discuss Containment Internal Structures Issues to Support Restart of Fort Calhoun Station, Unit 1 ML12300A2592012-10-25025 October 2012 Notice of Meeting with OPPD to Discuss the Status of Fort Calhoun Station Performance Improvement Activities, Including Status of Actions Described in the June 11, 2012, Confirmatory Action Letter ML12236A3052012-08-23023 August 2012 Notice of Meeting with OPPD to Discuss the Status of Fort Calhoun Station Performance Improvement Activities ML12181A1552012-06-29029 June 2012 Public Meeting Notice - Fort Calhoun Station to Discuss the Current Status of Inspection Manual Chapter (IMC) 0350 Oversight ML12124A0312012-05-0202 May 2012 Notice of Public Meeting to Discuss the Nrc'S Current Regulatory Oversight Status of Fort Calhoun Station ML1207901262012-03-16016 March 2012 4/4/2012 - Notice of Public Meeting with Omaha Public Power District to Discuss the Nrc'S Regulatory Oversight of Fort Calhoun Station ML1200405152012-01-0404 January 2012 Notice of Meeting with Omaha Public Power District Specifics of of the Transition of Fort Calhoun Station to Regulatory Oversight Under NRC Inspection Manual Chapter ML1119503422011-07-14014 July 2011 Notice of Public Meeting with Omaha Public Power District, to Discuss Post-Flooding Recovery Actions for Fort Calhoun Station ML1113306432011-05-16016 May 2011 Notice of Forthcoming Prelicensing Teleconference on 5/26/11 with Omaha Public Power District Related to Fort Calhoun Station, Unit 1's License Amendment Submittal Related to Transition to Risk-Informed NFPA-805 ML1108106952011-03-23023 March 2011 Notice of Forthcoming Pre-Licensing Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML11077A0262011-03-17017 March 2011 Notice of Meeting with Omaha Public Power District to Discuss the Performance Results for the Fort Calhoun Station for the Period of January 1 Through December 31, 2010 ML1104808672011-02-18018 February 2011 03/2/2011 Notice of Forthcoming Closed Pre-Licensing Teleconference with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Control Rod Withdrawal at Power ML1035605482010-12-23023 December 2010 Notice of Forthcoming Pre-Licensing Meeting with Omaha Public Power District to Discuss Fort Calhoun Station'S Extended Power Uprate, Spent Fuel Pool Criticality, and Proposed License Amendment Request Modeled After TSTF-493 ML1021606482010-08-0404 August 2010 Meeting Notice: Regulatory Conference with Omaha Public Power District Re Inadequate External Flood Protection Procedure ML1016205062010-06-14014 June 2010 Notice of Forthcoming Teleconference Meeting with Omaha Public Power District to Discuss NRC Staff Request for Additional Information Dated 2/12/2010 on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 ML1009604372010-04-0606 April 2010 Notice of Meeting with Omaha Public Power District to Discuss the Performance Results for the Fort Calhoun Station for the Period of January 1 Through December 31, 2009 ML1004302742010-02-12012 February 2010 Notice of Forthcoming Teleconference with Omaha Public Power District to Discuss NRC Staff Request for Additional Information on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 ML0929400802009-10-22022 October 2009 Forthcoming Prelicensing Meeting with Omaha Public Power District, to Discuss Plans for Extended Power Uprate License Amendment Request for Fort Calhoun Station, Unit 1 ML0909607752009-04-0606 April 2009 Notice of End-of-Cycle Meeting with Omaha Public Power District - Fort Calhoun Station to Present and Discuss the Performance Results for the Fort Calhoun Station for the Period of January 1 Though December 31, 2008 ML0901504382009-01-16016 January 2009 Notice of Forthcoming Meeting with Omaha Public Power District, to Discuss Oppd'S Plans to Submit an Extended Power Uprate Request for the Fort Calhoun Station, Unit 1 ML0901603362009-01-16016 January 2009 Notice of Forthcoming Meeting with Omaha Public Power District, to Discuss the Fort Calhoun Station'S Transition to National Fire Protection Association (NFPA) 805 ML0828403562008-10-10010 October 2008 Meeting Notice, Public Meeting Between the NRC and Omaha Public Power District to Present and Discuss the Licensee'S Performance Improvement Initiatives Associated with a Substantive Crosscutting Issue in the Human Performance Area ML0816107132008-05-0808 May 2008 Notice of Public Meeting to Discuss Inspection Findings of Annual Integrated Assessment of Nuclear Power Plant Performance for Fort Calhoun Station ML0812704532008-05-0606 May 2008 Notice of End-Of-Cycle Meeting with Omaha Public Power District to Present and Discuss Plant Performance Results of Fort Calhoun Station for Period of January 1 Through December 31, 2007 ML0810300152008-04-11011 April 2008 Notice of Cancellation of End-of-cycle Public with Omaha Public Power District to Present and Discuss Performance Results of the Fort Calhoun Station for the Period of January 1 Though December 31, 2007 ML0807904702008-03-19019 March 2008 Notice of End-of-Cycle Meeting with Omaha Public Power District Regarding Performance Results of the Fort Calhoun Station for the Period of January 1 Through December 31, 2007 ML0804206832008-02-11011 February 2008 Notice of Forthcoming Meeting with Omaha Public Power District to Discuss Preparations for Upcoming 95002 Inspection ML0734101722007-12-0606 December 2007 Notice of Category 1 Meeting with Omaha Public Power District to Discuss Current Improvement Plan Action Matrix Status and Preparations for Upcoming 95002 Inspection ML0729807142007-10-25025 October 2007 Notice of Regulatory Conference with Omaha Public Power District to Discuss Significance, Causes, & Corrective Actions Associated with Two Apparent Violations Involving Improper Electrical Maintenance Activities on Emergency Diesel Generato ML0726700012007-09-25025 September 2007 Notice of Forthcoming Closed Meeting with Omaha Public Power District (OPPD) to Discuss a New Approach for a Measurement Uncertainty Update 2024-03-15
[Table view] Category:Memoranda
MONTHYEARML24107B1272024-04-22022 April 2024 Ft. Calhoun Meeting Summary of March 27, 2024 Meeting with Omaha Public Power District on Submittal of Phase 1 Final Status Surveys ML22333B0922022-12-21021 December 2022 FY22 Nmss/Duwp Operating Experience Report ML21271A5992021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 8, 12, Omaha Public Power District, FCS-SAF-103, FCS Deconstruction Health and Safety Plan CAC2 ML21055A4022021-05-14014 May 2021 Memorandum: Final Environmental Assessment and Finding of No Significant Impact of Initial and Updated Decommissioning Funding Plans for the Cooper, Fort Calhoun and Virgil C. Summer Independent Spent Fuel Storage Installations ML21271A1492021-04-13013 April 2021 License Amendment Request (LAR) 21-01, Chapter 1 9 Haley & Aldrich, Inc. Memorandum to Energysolutions, File No. 0127960-006, Fort Calhoun Nuclear Power Statio~1 ML20056E4872020-02-26026 February 2020 Staff Review of Fort Calhoun Independent Spent Fuel Storage Installation Physical Security Plan, Security Training and Qualification Plan, and Safeguard Contingency Plan, Revision 0 and the Verification of Additional Security Measures (ASM) ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML18108A1212018-04-11011 April 2018 American Nuclear Insurers - Notification of Change in the Number of Power Reactors in the Secondary Financial Protection (SFP) Program ML17275A2642017-11-21021 November 2017 Safety Evaluation Input on Fort Calhoun Station Request for Approval of Permanently Defueled Emergency Plan and Emergency Action Level Scheme, Docket No. 50-285 ML16057A1232016-02-26026 February 2016 Cy 2015 Baseline Completion ML16007A4942016-01-11011 January 2016 Review of the Updated Final Safety Analysis Report for the Period June 14, 2014 Through December 4, 2015 ML14163A0022014-06-16016 June 2014 Summary of Audit Conducted March 5-9, 2012, Request to Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML14129A4452014-05-12012 May 2014 5/13/2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Cooper Nuclear Station and Fort Calhoun Station, Unit 1 ML14114A7012014-04-24024 April 2014 Task Interface Agreement - Concurrence on Fort Calhoun Tornado Missile Protection Licensing Basis (TIA 2013-07) ML14085A1842014-03-28028 March 2014 Final Fort Calhoun Gothic TIA Response ML14016A2602014-01-28028 January 2014 Fc Final Containment Structural TIA ML13351A4762013-12-16016 December 2013 Recommendation for NRC to Close Confirmatory Action Letter EA-13-020 Supporting the Restart of Fort Calhoun Station and Recommendation to Issue Post-Restart Confirmatory Action Letter ML13346A0822013-12-12012 December 2013 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Cooper Nuclear Station and Fort Calhoun Station, Unit 1 ML13312A8522013-11-0808 November 2013 Meeting Notice with Public to Discuss Fort Calhoun Station ML13253A3542013-09-27027 September 2013 Letter to R. Morris Information Exchange Pertaining to Health Issues Related to Crow Butte Resources Uranium Mine and Ft. Calhoun Nuclear Generating Station ML13102A1892013-04-15015 April 2013 4/22/12 Notice of Closed Meeting with Omaha Public Power District to Discuss Flooding Issues Associated with Fort Calhoun, Unit 1 ML13101A2232013-04-11011 April 2013 Meeting Notice with Omaha Public Power District - Potential License Amendment Requests for Fort Calhoun, Unit 1 Related to Flood Protection for Raw Water System, Tornado Missile Protection, Piping/Code Use, and Alternate Seismic Criteria ML13066A8772013-03-0707 March 2013 Issuance of Revised U.S. Nuclear Regulatory Commission Manual Chapter 0350 Panel Fort Calhoun Station Restart Checklist Basis Document ML13046A3212013-02-19019 February 2013 Notice of Closed Meeting with Fort Calhoun to Discuss Safeguards Information, Proprietary, or Other Sensitive Information ML12345A2702012-11-30030 November 2012 Revised 12/12/2012 Notice of Forthcoming Meeting with Omaha Public Power District to Discuss Containment Internal Structures Issues to Support Restart of Fort Calhoun Station, Unit 1 ML12335A1652012-11-30030 November 2012 Forthcoming Meeting with Omaha Public Power District to Discuss Containment Internal Structures Issues to Support Restart of Fort Calhoun Station, Unit 1 ML12318A3192012-11-13013 November 2012 Issuance of U.S. Nuclear Regulatory Commission Manual Chapter 0350 Panel Fort Calhoun Station Restart Checklist Basis Document ML12251A3172012-09-0707 September 2012 Manual Chapter 0350 Oversight Panel Charter - Revision ML12066A0302012-03-29029 March 2012 Closure Memorandum: Issue for Resolution 2011-001 Fort Calhoun - Failure to Maintain External Flooding Procedures. ML12229A1842012-03-0606 March 2012 Backfit Panel Regarding Fort Calhoun Flooding ML1134707162011-12-13013 December 2011 Memo to M.S.Virgilio Notification of Change to Regulatory Oversight of Fort Calhoun Station ML11293A1982011-10-19019 October 2011 Charter for Backfit Panel on Postulated Failure of Upstream Dams Affecting Fort Calhoun Station ML1118811312011-07-0707 July 2011 Docketing of Nonproprietary Information Provided by Omaha Public Power District (OPPD) Personnel Following the June 2, 2011, Regulatory Conference ML13106A1702011-07-0101 July 2011 Proposed Adequate Protection Backfit Exception ML11174A2322011-06-21021 June 2011 for the Record-06-21-2011: NRC Ensures Public Safety Through Rigorous Oversight of Nuclear Power Plant Safety Standards ML1113807322011-05-18018 May 2011 Regulatory Conference with Omaha Public Power ML1113306432011-05-16016 May 2011 Notice of Forthcoming Prelicensing Teleconference on 5/26/11 with Omaha Public Power District Related to Fort Calhoun Station, Unit 1's License Amendment Submittal Related to Transition to Risk-Informed NFPA-805 ML1109103272011-04-0505 April 2011 Verbal Authorization, Request for Relief from Code Case N-722 Visual Examination of the Reactor Vessel Hot-Leg Nozzle-to-Safe-End Dissimilar Metal Welds, 4th 10-Year Inservice Inspection Interval ML1108106952011-03-23023 March 2011 Notice of Forthcoming Pre-Licensing Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML1104808672011-02-18018 February 2011 03/2/2011 Notice of Forthcoming Closed Pre-Licensing Teleconference with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Control Rod Withdrawal at Power ML1035605482010-12-23023 December 2010 Notice of Forthcoming Pre-Licensing Meeting with Omaha Public Power District to Discuss Fort Calhoun Station'S Extended Power Uprate, Spent Fuel Pool Criticality, and Proposed License Amendment Request Modeled After TSTF-493 ML1020701262010-08-30030 August 2010 the Nuclear Regulatory Commission Staff Spot-Check Review of Fort Calhoun Station Unit 1, June 30, 2010 - Finding of No Potential Issues in Bank Statements ML1016205062010-06-14014 June 2010 Notice of Forthcoming Teleconference Meeting with Omaha Public Power District to Discuss NRC Staff Request for Additional Information Dated 2/12/2010 on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 ML1006010322010-03-0101 March 2010 Cy 2009 Baseline Inspection Completion ML1004302742010-02-12012 February 2010 Notice of Forthcoming Teleconference with Omaha Public Power District to Discuss NRC Staff Request for Additional Information on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 ML0909607752009-04-0606 April 2009 Notice of End-of-Cycle Meeting with Omaha Public Power District - Fort Calhoun Station to Present and Discuss the Performance Results for the Fort Calhoun Station for the Period of January 1 Though December 31, 2008 ML0901504382009-01-16016 January 2009 Notice of Forthcoming Meeting with Omaha Public Power District, to Discuss Oppd'S Plans to Submit an Extended Power Uprate Request for the Fort Calhoun Station, Unit 1 ML0901603362009-01-16016 January 2009 Notice of Forthcoming Meeting with Omaha Public Power District, to Discuss the Fort Calhoun Station'S Transition to National Fire Protection Association (NFPA) 805 ML0814100052008-06-0303 June 2008 Summary of Conference Call with Omaha Public Power District (OPPD) Regarding OPPD Emergency Relief Request Submitted May 15, 2008 for Fort Calhoun Station (Tac No. MD8722) ML0809404512008-04-18018 April 2008 Summary of 12/6/2006 Meeting with Omaha Public Power District, Regarding Water Management Strategies for Resolution of GSI-191 (Tac No MD5780) 2024-04-22
[Table view] |
Text
UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU ITE 400 AR LIN GTON , TEXAS 76011-4125 April 6, 2009
SUBJECT:
Meeting with Omaha Public Power District FACILITY: Fort Calhoun Station DOCKET: 50-285 DATE & TIME: Monday, April 27, 2009 6:00 p.m. (CDT)
LOCATION: Omaha Marriott 10220 Regency Circle Omaha, NE 68114 PURPOSE: This is the end-of-cycle public meeting between the NRC and the Omaha Public Power District to present and discuss the performance results for the Fort Calhoun Station for the period of January 1 though December 31, 2008.
CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the Nuclear Regulatory Commission after the business portion, but before the meeting is adjourned.
The Nuclear Regulatory Commission provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript of other information from the meeting in another format (e.g. Braille or large print), please notify the Nuclear Regulatory Commissions meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
PARTICIPANTS: NRC Dwight Chamberlain, Director, Division of Reactor Projects Jeff Clark, Chief, Projects Branch E John Kirkland, Senior Resident Inspector UTILITY Dave Bannister, Vice President, Chief Nuclear Officer Jeff Reinhart, Site Vice President Tim Nellenbach, Manager, Fort Calhoun Station MEETING CONTACT: George Replogle, Senior Project Engineer Project Branch E (817) 860-8249 George.Replogle@nrc.gov
Omaha Public Power District cc: Clare Duda, Douglas County Commissioner Jeff Reinhart Douglas County Board Vice President of Commissioners, District 7 Omaha Public Power District Civic Center Fort Calhoun Station FC-2-4 1819 Farnam LC2 P. O. Box 550 Omaha, NE 68183 Fort Calhoun, NE 68023-0550 Paul W. Johnson, Director Mr. Thomas C. Matthews Douglas County Emergency Manager - Nuclear Licensing Management Agency Omaha Public Power District Civic Center, EOC, Room 114 Fort Calhoun Station FC-2-4 Adm. 1819 Farnam Street P.O. Box 550 Omaha, NE 68183 Fort Calhoun, NE 68023-0550 Larry Oliver Winston & Strawn Emergency Management Agency Attn: David A. Repke, Esq. Harrison County 1700 K Street, NW 111 South 1st Avenue Washington, DC 20006-3817 Logan, IA 51546-1305 Chairman Mr. Pat Sears, Sheriff Washington County Board of Supervisors Harrison County Sheriffs Department P.O. Box 466 111 South 1st Avenue Blair, NE 68008 Logan, IA 51546 Ms. Julia Schmitt, Manager Larry King, Chairman Radiation Control Program Harrison County Board of Supervisors Nebraska Health & Human Services R & L 111 North 2nd Avenue Public Health Assurance Logan, IA 51546 301 Centennial Mall, South P.O. Box 95007 The Honorable Clint Sargent Lincoln, NE 68509-5007 Mayor of Missouri Valley City Hall Ms. Melanie Rasmussen 223 E. Erie Radiation Control Program Officer Missouri Valley, IA 51555 Bureau of Radiological Health Iowa Department of Public Health Mr. Terry Hummel, Coordinator Lucas State Office Building, 5th Floor Pottawattamie County Emergency 321 East 12th Street Management Coordinator Des Moines, IA 50319 227 S. 6th Street, Court House Council Bluffs, IA 51501 Chief, Radiological Emergency Preparedness Section Roger Williams, Chairman FEMA, Region VII Pottawattamie County Board of 9221 Ward Parkway Supervisors Suite 300 227 South 6th Street Kansas City, MO 64114-3372 Council Bluffs, IA 51501 Timothy F. Dunning, Sheriff Mike Robinson, Sheriff Douglas County Sheriffs Department Washington County Courthouse 3601 N. 156th Street 1535 Colfax Street Omaha, NE 68116 Blair, NE 68008
Omaha Public Power District Keith Christiansen Amen Sheridan Council President Chairperson Blair City Council, Ward 2 Omaha Tribal Council 218 South 16th Street P.O. Box 368 Blair, NE 68008 Macy, NE 68039-0368 The Honorable Paul Oestmann Al Berndt, Assistant Director Mayor of Fort Calhoun Nebraska Emergency Management Agency 110 South 1st Avenue 1300 Military Road Fort Calhoun, NE 68023 Lincoln, NE 68508-1090 David Genoways Ron McCabe Sewer Commissioner Chief, Radiological Emergency Fort Calhoun City Council Preparedness 110 South 14th Street FEMA Region VII Fort Calhoun, NE 68023 9221 Ward Parkway, Suite 300 Kansas City, MO 64114 Bill Pook, Director Region 5/6 Emergency Management David Miller, Administrator 435 N. Park Avenue, Suite 404 Iowa Homeland Security and Emergency Fremont, NE 68025 Management 7105 NW 70th Avenue Arthur Freeman, Regional Administrator Camp Dodge Bldg. W-4 Federal Emergency Management Agency Johnston, IA 50131-282 Region VII 9221 Ward Parkway, Suite 300 The Honorable Jim Realph Kansas City, MO 64114-3372 Mayor of Blair 218 South 15th Street Darrell Hanson, Chairperson Blair, NE 68008 Department of Commerce Utilities Division Phil Green Iowa Utilities Board Assistant City Administrator 350 Maple Street Emergency Manager Des Moines, IA 50319-0069 218 South 16th Street Blair, NE 68008 Melanie Rasmussen, Bureau Chief Bureau of Radiological Health LeRoy nelson Iowa Department of Public Health Fort Calhoun City Council Lucas State Office Building, 6th Floor Street Commissioner 321 East 12th Street 110 South 14th Street Des Moines, IA 50319 Ft. Calhoun, NE 68023 Dr. Joann Schaefer, Director Darin Wilson Nebraska Health and Human Services Fort Calhoun City Council Division of Public Health Assurance Water Commissioner 301 Centennial Mall, South 110 South 14th Street Lincoln, NE 68509-5026 Ft. Calhoun, NE 68023 Mathew Pilcher Mike Smith Tribal Chairman Fort Calhoun City Council Winnebago Tribal Council Park Commissioner P.O. Box 687 110 South 14th Street Winnebago, NE 68071-0687 Ft. Calhoun, NE 68023
Omaha Public Power District Electronic Distribution:
NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Chuck Casto, DRA Dwight Chamberlain, D:DRP Roy Caniano, D:DRS Anton Vegel, DD:DRP Troy Pruett, DD:DRS Bernard Stapleton, C:DRS/OB Sue Bogle (OEWEB Resource)
Shawn Williams, OEDO RIV Coordinator Eugene.Guthrie, OEDO RIV Backup Coordinator OEMAIL, D/OE Amy Powell, OCA Kevin Williams, NSIR/DPR/EP Robert Kahler, NSIR/DPR/EP mortensengk@INPO.org Lynnea Wilkins, Project Manager, NRR Jeff Clark, Branch Chief, PB/E George Replogle, Senior Project Engineer, PB/E John Hanna, Senior Resident Inspector John Kirkland, Senior Resident Inspector Victor Dricks, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC William Jones, Region IV ACES Lucy Owen, Region IV RA Secretary Judy Kilcrease, Region IV RA Secretary Anita Tannenbaum, Region IV DRP Secretary Dana Lackey, Region IV DRP Secretary Berni Madison, Site Secretary Kimberly Brewton, Region IV DRS Secretary Tracy Karl, Region IV DRS Secretary Deborah Harrison, Region IV DRS Secretary Earnestine Clay, DRMA, TL Denise Freeman, Region IV DNMS Secretary Harold McKelvey, IRMB Phil Longdo, Receptionist Ann Mattila, Security Advisor R:\_REACTORS\EOC and Midcycle\EOC Meeting Notices\2009\FCS MN 4-27-09.doc ADAMS ML090960775 SUNSI Rev Compl. :Yes No ADAMS :Yes No Reviewer Initials GR Publicly Avail :Yes No Sensitive Yes : No Sens. Type Initials GR RIV/SPE:DRP/E PAO RSLO C:DRP/E GDReplogle VLDricks WAMaier JAClark
/RA/ /RA/ /RA/ /RA GReplogle for/
04/06/2009 04/06/2009 04/06/2009 04/06/2009 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax