ML072670001
| ML072670001 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 09/25/2007 |
| From: | Wang A NRC/NRR/ADRO/DORL/LPLIV |
| To: | Hiltz T NRC/NRR/ADRO/DORL/LPLIV |
| Wang, A B, NRR/DORL/LPLIV, 415-1445 | |
| References | |
| Download: ML072670001 (4) | |
Text
September 25, 2007 MEMORANDUM TO: Thomas G. Hiltz, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Alan B. Wang, Project Manager
/RA by JNDonohew for/
Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING CLOSED MEETING WITH OMAHA PUBLIC POWER DISTRICT (OPPD)
DATE & TIME:
Wednesday, October 3, 2007 8:30 a.m. - 12:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission Westinghouse Washington Operations Office 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 PURPOSE:
OPPD will discuss a new approach for a measurement uncertainty uprate (see enclosed agenda).
CATEGORY 1:
- This is a Category 1 Meeting. Proprietary information will be discussed at meeting. The meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC OPPD Westinghouse W. Kemper W. Lyon T. Matthews Steve Lurie A. Mendiola I. Ahmed J. Gasper Chuck Molnar G. Cranston A. Wang, et al.
Chip French Mike Gancarz Docket No. 50-285
Enclosure:
Agenda (ADAMS Accession No. ML072670001) cc w/encl: See next page MEETING CONTACTS:
Alan B. Wang, NRR Jack N. Donohew, NRR 301-415-1445 301-415-1307 abw@nrc.gov jnd@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings," (67 FR 36920), May 28, 2002
September 2007 Ft. Calhoun Station, Unit 1 cc:
Winston & Strawn ATTN: James R. Curtiss, Esq.
1700 K Street, N.W.
Washington, DC 20006-3817 Chairman Washington County Board of Supervisors P.O. Box 466 Blair, NE 68008 Mr. John Hanna, Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 310 Fort Calhoun, NE 68023 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services R & L Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Mr. David J. Bannister, Site Director Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. Joe L. McManis Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550 Fort Calhoun, NE 68023-0550 Ms. Melanie Rasmussen Radiation Control Program Director Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319 Mr. R. T. Ridenoure Vice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 550 Fort Calhoun, NE 68023-0550
ML072670001) cc w/encl: See next page MEETING CONTACTS:
Alan B. Wang, NRR Jack N. Donohew, NRR 301-415-1445 301-415-1307 abw@nrc.gov jnd@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings," (67 FR 36920), May 28, 2002 DISTRIBUTION:
PUBLIC LPLIV Reading RidsAcrsAcnwMailCenter RidsNrrAdro RidsNrrDorl RidsNrrDorlLpl4 RidsNrrLAJBurkhardt RidsNrrPMAWang RidsNrrPMJDonohew RidsOgcMailCenter RidsOpaMail RidsRgn4MailCenter DPelton, EDO RIV VDricks, OPA RIV TLiu, NRR AMendiola, NRR W. Kemper, NRR GCranston, NRR IAhmed, NRR WLyon, NRR ADAMS ACCESSION NUMBER: ML072670001 NRC-001 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME AWang JBurkhardt THiltz DATE 9/24/07 9/24/07 9/25/07 MEETING AGENDA OMAHA PUBLIC POWER DISTRICT MEASUREMENT UNCERTAINTY UPRATE (MUR)
OCTOBER 3, 2007 8:30 a.m. to 12:00 p.m.
8:30 a.m.
Introductions
8:40 a.m.
Purpose 8:45 a.m.
Background
9:00 a.m.
Revised MUR License Amendment Requests from OPPD 9:30 a.m.
CROSSFLOW Ultrasonic Flow Measurement Calibration Approach 11:00 a.m.
Maintenance of Calibration During Operation 11:30 a.m.
Schedule 11:45 a.m.
Summary