ML20057A768

From kanterella
Revision as of 03:29, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 93-3 to Catawba Nuclear Station Emergency Plan. Rev Effective 930831
ML20057A768
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/31/1993
From: Rehn D
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20057A769 List:
References
NUDOCS 9309150287
Download: ML20057A768 (6)


Text

.. .,. .. .. - . .

Il I ,

'~

  • 'l~ Duke (touer Commy D L luns l rotousa %cIcar Generaton Department Mce 1+csident 4Wh 0mord Ruad (Ki36313205 0%ce York, SC2;i43 (M13)h31342t;Thr i DUKEPOWER l

August 31.1993

~

Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 '

i

SUBJECT:

Catawba Nuclear Station Docket Nos.: .50-413 and 50-414 1 Emergency Plan, Revision 93-3 l

Dear Sir:

Enclosed for NRC staff use and review is Revision 93-3 to the Catawba Nuclear Station Emergency Plan. This revision is effective August 31,1993.

This revision is being submitted in accordance with 10CFR50.54(q) and does not decrease the effectiveness of the Emergency Plan. A summary of the changes and bases for this determination is provided as Attachment 1. All changes have been specifically highlighted (side-barred) to facilitate review.

4 Two copies of this letter are being provided to the NRC Region II, Regional Administrator.

Sincerely.

D. L. Rehn -

Site Vice President Catawba Nuclear Generation Department l PNM/tkp i Attschments: 1 - Change Summary 2 - Plan Update Instructions i 3 - Plan Changes '

1400yy 9

9309150287 930831 3 i PDR ADOCK 0000 l s

/

c ,- , , v n ,- .,

- . . . . _ = . . ._ .. =.

,  ; ,. i i

U. S. Nuclear _ Regulatory Commission .

August 31,1993 Page Two

)  !

xc: w/2 cooies of attachment  ;

i Mr. Stewart D. Ebneter, Regional Administrator U.S. Nuclear Regulatory Commission  ;

Region 11  !

101 Marietta Street, NW, Suite 2900

Atlanta, Georgia 30323 '

4 i

w/o attachment l 1

NRC Resident Inspector Catawba Nuclear Station .

, t y Saluda River illectric Corporation I

a P. O. Box 929

]

Laurens, SC 29630 [

1 i North Carolina Municipal Power Agency No. I  !

P. O. Box 29513 l i

< Raleigh, NC 27626-0513 i

NC Electric Membership Corporation i 3333 North Blvd.

P. O. Box 27306 i Raleigh, NC 27611  !

l

  • i 1 Piedmont Municipal Power Agency i 121 Village Drive ,

Greer, SC 29651 l

Morris Sample l 3

P. N. McNamara  :

CN-750.25 ,

i -)

i

~

l

l 1

Attachment 1 Page 1 of 2 ]

This revision is being submitted in accordance with 10CFR50 54(q) and does not decrease the effectiveness of the Emergency Plan, and the Plan as revised will continue to meet the requirements of 10CFR50.47 and 10CFR50, Appendix E. The bases for this determination are as follows:

A. Changes made to Section D, Emercency Classification System, INITIATING

! CONDITIONS AND EMERGENCY ACTION LEVELS TECllNICAL BASIS result j from discussions with members of Region 11 staff to update and ensure consistency between certain EAL's and their technical bases statement. I

?

1. Page D-12, Figure D-1. Technical Basis for Event Category # 4.1.1, PRlhiARY j j COOLANT LEAK, ALERT, IC # 3, S/G TUBE LEAK WITH AN .

UNISOLABLE STEAh! LINE BREAK OUTSIDE CONTAINMENT, was

{

changed to remove the sentence, "The steam line break may or may not be on the l ruptured S/G steam line" because it was in conflict with the EAL. l 3

2. Page D-58, Figure D-1, Technical Basis for Event Category # 4.1.5, LOSS OF i SIIUTDOWN FUNCTIONS, SITE AREA EhiERGENCY, IC # 1 COMPLETE  :

I LOSS OF ANY FUNCTION NEEDED FOR llOT SHUTDOWN CONDITIONS IN h10 DES 1 TliROUGII 4, was changed to replace the word "to" with the word  !

" approaching" to reflect anticipation of saturated conditions. l

3. Page D-111, Figure D-1, Technical Basis for Event Category # 4,1.9 NATURAL  !

DISASTERS AND OTilER IIAZARDS, SITE AREA EhiERGENCY, IC # 4, l

RELEASE OF TOXIC OR FLAMMABLE GAS IN MODES 1 THROUGH 4, d

was changed to replace the word "to" with the word " approaching" to reflect .

anticipation of saturated conditions.  !

j '

B. Emernency Facilities and Equipment

)  !

l Page H-5, Section H.5.c, was revised to provide additional information regarding TSC l plant parameter display capabilities and retitle Figure 1-1 as Figure H-9. l I

C. Accident Awessment )

! l Page 1-2, Section 1.5, Meteorological Information Availability, was revised because of  !

retitling Figure 1-1 as Figure H-9.

D. Protective Response Pages J-18, J-19, and 3-20, Figures 3-5d, J-5e, and J-5f, Winter Weekday, Winter Weeknight, and Summer Weekend Vehicle Demand Summaries by Subarea were added to l '

describe popuhtion distribution as a result of recently revised Evacuation Time Study estimates.

l

.I C

3

  • *e 1 Attachment 1 l Page 2 of 2 ,

E. Radiolocical Emercency Response Trainine L 1

Pages 0-23 and 0-24, Figure O-2 6, Plant Data Transmission / Retrieval Training l Objectives and Training Outline, were revised to reflect changes in the duties of the Data j Coordinator position as a result of changes in expectations and recently added equipment [

(i.e., ERDS, personal computers, etc.).

F. Annendices l Appendix 5, Agreement Letters were renewed with two offsite support agencies.  !

G. Additional changes correcting minor editorial or typographical errors include: l

1. Page 7 (List of Figures): Changed Figure titles and page number. [

i

2. Page i-1 (Section A): Changed the word " Station" to " Site". I
3. Page C-1 (Section C.I.c): Changed the word " Station" to " Site".

l 4. Page C-2 (Section C.3): Changed the word " Station" to " Site". j

5. Page J-4 (Section J.10.b): Changed Figure number. l 5

j 6. Page K-5 (Section K.5.b): Changed procedure title and nomenclature. j 4

t

7. Page P-6 (Figure P-3): Changed Emergency Plan and EPIP distribution list.

. I' I

l

< t l

l l

l a

]

l t

4 a

t Please update your copy of the Catawba Nuclear Station Emergency Plan as follows:

O Remove ,

Add Approval Page, Rev. 93-2 Approval Page, Rev. 93-3 0:ted 6/10/93 Dated August 31,1993 List of Figures, Page 7 List of Figures, Page 7 l Dated December,1992, Rev. 92-3 Dated August,1993 Rev. 93-3 Page i-1, Rev. 92-2 Page i-1, Rev. 93-3 Daied June,1992 Dated August,1993 j Page C-1, Rev. 92-2 Page C-1, Rev. 93-3 Dated June,1992 Dated August,1993 Page C-2, Rev. 92-2 Page C-2, Rev. 93-3 Dated June,1992 Dated August,1993 Page D-12, Rev. 92-3 Page D-12, Rev. 93-3 Dated December,1992 Dated August,1993 I

Page D-58, Rev. 92-3 Page D-58, Rev. 93-3 Dated December,1992 Dated August,1993 Page D-111 Rev. 92-3 Page D-111, Rev. 93-3 Dated December,1992 Dated August,1993 Page H-5, Rev. 92-2 Page H-5, Rev. 93-3 Dated June,1993 Dated August,1993 Figure H-9, pages H-15, H-16, H-17, H-18, Dated August,1993 Page I-2, Rev. 92-2 Page I-2, Rev. 93-3 Dated June,1992 Dated August,1993 Figure I-1, pages I-4,1-5, I-6, I-7, Rev. 92-3, Dated December,1992 Page J-4, Rev. 93-1 Page J-4, Rev. 93-3 Dated March,1993 -

Dated August,1993 Figure J-5d, J-Se, J-5f (Pages J-18, J-19,3-20)

Rev. 93-3, Dated August,1993

e Remove Add O Page K-4, Rev. 92-2 Page K-4, Rev. 93-3 Dated June,1992 ,, ,

Dated August,1993 Page K-5, Rev. 92-2 Page K-5, Rev. 93-3 Dated June,1992 Dated August,1993 i

)

Page 0-23, Rev. 92-2 Page O-23. Rev. 93-3 i Dated June,1992 Dated August,1993 Page O-24, Rev. 92-2 Page 0-24, Rev. 93-3 Dated June,1992 Dated August,1993 1

~

Figure P-3, (Page P-6) Figure P-3, (Page P-6)

Rev. 93-1, Dated March,1993 Rev. 93-3, Dated August,1993 Appendi . 5. Agreement Letter Appendix 5, Agreement Ietter ,

Bethel Volunteer Fire Dept. Bethel Volunteer Fire Dept.

Dated October 23,1990 Dated June 30,1993 '

Rev. 904, October,1990 Rev. 93-3, August,1993 Appendix 5 Agreement Letter Appendix 5, Agreement Ixtter '

Gaston County, Dated August 14, 1990 Gaston County, Dated Jnly 30,1993 O Rev. 90-4, October,1990 Rev. 93-3, August,15M  !

i I

f t

i t

O i

- _ . _ _ _ _ _ __ __ _ __ _ -__ _-__________