ML20044E822
ML20044E822 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 05/18/1993 |
From: | Beckham J GEORGIA POWER CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
HL-3299, NUDOCS 9305260178 | |
Download: ML20044E822 (2) | |
Similar Documents at Hatch | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217D2901999-10-13013 October 1999
[Table view]Forwards SER Accepting Licensee 990305 Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation ML20217G0401999-10-0707 October 1999 Forwards Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823-27.One Violation Occurred Being Treated as NCV ML20217G2631999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Hatch Plant & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Regional Initiative Insps to Observe Const Activities Will Be Conducted ML20216G0251999-09-24024 September 1999 Concludes That All Requested Info of GL 98-01 & Supplement 1 Provided & Licensing Action for GL 98-01 & Supplement 1 Complete for Plant ML20216H3641999-09-20020 September 1999 Forwards NRC Form 536 in Response to AL 99-03, Preparation & Scheduling of Operator Licensing Exams HL-5839, Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-5731999-09-16016 September 1999 Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-573 ML20217B5271999-09-16016 September 1999 Forwards Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted ML20212A6411999-09-13013 September 1999 Forwards Safety Evaluation of Relief Request RR-V-16 for Third Ten Year Interval Inservice Testing Program HL-5837, Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification1999-09-13013 September 1999 Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification HL-5832, Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC1999-09-0101 September 1999 Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl HL-5825, Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations1999-08-20020 August 1999 Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations HL-5827, Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d)1999-08-19019 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d) HL-5788, Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 141999-08-19019 August 1999 Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 14 HL-5824, Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.111999-08-18018 August 1999 Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.11 ML20210T6421999-08-17017 August 1999 Discusses Licensee 950814 Initial Response to GL 92-01, Rev 1,Supp 1, Rv Structural Integrity (Rvid), Issued on 950519 to Plant.Staff Revised Info in Rvid & Being Released as Rvid Version 2 ML20210V3311999-08-13013 August 1999 Provides Synposis of NRC OI Report Re Alleged Untruthful Statements Made to NRC Re Release of Contaminated Matl to Onsite Landfill.Oi Unable to Conclude That Untruthful state- Ments Were Provided to NRC ML20210Q4821999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr,As Listed,Identifying Individual to Take Exam,Thirty Days Before Exam Date ML20210L7581999-08-0404 August 1999 Forwards Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20210J9501999-08-0202 August 1999 Forwards SER Finding Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9021999-08-0202 August 1999 Forwards SER Finding Licensee Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5814, Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-5281999-07-30030 July 1999 Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-528 05000366/LER-1999-007, Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown1999-07-27027 July 1999 Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown ML20210E1601999-07-20020 July 1999 Forwards Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Noted Being Treated as Ncv.Team Identified Lack of Procedural Guidance for Identification & Trending of Repetitive Instrument Drift & Calibr Problems HL-5810, Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions1999-07-15015 July 1999 Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions HL-5808, Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage1999-07-15015 July 1999 Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage HL-5807, Estimates That Seventeen (17) Submittals Will Be Made During Fy 2000 & Two (2) Submittals Will Be Made During Fy 2001,in Response to Administative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-14014 July 1999 Estimates That Seventeen (17) Submittals Will Be Made During Fy 2000 & Two (2) Submittals Will Be Made During Fy 2001,in Response to Administative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants HL-5804, Informs NRC That on or After 991018,SNOC Plans to Begin Storing Spent Fuel in Ei Hatch ISFSI IAW General License Issued,Per 10CFR72.2101999-07-0909 July 1999 Informs NRC That on or After 991018,SNOC Plans to Begin Storing Spent Fuel in Ei Hatch ISFSI IAW General License Issued,Per 10CFR72.210 HL-5796, Forwards Response to NRC 990331 Request for Supplemental Info Re SNC Earlier GL 95-07 Responses.Gl 95-07 Evaluation Sheets for Units 1 & 2 RHR Torus Spray Isolation Valves Are Encl1999-07-0909 July 1999 Forwards Response to NRC 990331 Request for Supplemental Info Re SNC Earlier GL 95-07 Responses.Gl 95-07 Evaluation Sheets for Units 1 & 2 RHR Torus Spray Isolation Valves Are Encl HL-5801, Forwards New Relief Requests for Third 10-Yr Interval ISI Program for Ei Hatch Nuclear Plant.New Relief Requests RR-25 & RR-26 Were Developed to Propose Alternate Repair Techniques IAW ASME Code N-562 & N-561,respectively1999-07-0909 July 1999 Forwards New Relief Requests for Third 10-Yr Interval ISI Program for Ei Hatch Nuclear Plant.New Relief Requests RR-25 & RR-26 Were Developed to Propose Alternate Repair Techniques IAW ASME Code N-562 & N-561,respectively ML20209E4801999-06-30030 June 1999 Confirms 990630 Telcon Between M Crosby & DC Payne Re Arrangements Made for Administration of Licensing Exam at Plant During Weeks of 991018-1101 ML20196H8811999-06-25025 June 1999 Forwards Insp Repts 50-321/99-03 & 50-366/99-03 on 990418- 0529.No Violations Occurred.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations & Sound Engineering & Maint Practices HL-5790, Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants1999-06-21021 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20207E7561999-06-0303 June 1999 Informs of Completion of Review & Evaluation of Info Provided by Southern Nuclear Operating Co by Ltr Dtd 980608, Proposing Changes to Third 10-Yr Interval ISI Program Plan Requests for Relief RR-4 & R-6.Requests Acceptable HL-5763, Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel1999-05-20020 May 1999 Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel HL-5785, Forwards New Relief Requests RR-V-16 for Third 10-yr Interval Inservice Testing Program for Ei Hatch Nuclear Plant.Relief Request Was Developed to Propose Alternate Schedule for Replacement of HPCI Rupture Disks1999-05-18018 May 1999 Forwards New Relief Requests RR-V-16 for Third 10-yr Interval Inservice Testing Program for Ei Hatch Nuclear Plant.Relief Request Was Developed to Propose Alternate Schedule for Replacement of HPCI Rupture Disks ML20206Q0751999-05-0606 May 1999 Forwards Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted ML20206G1611999-05-0404 May 1999 Forwards SER Approving Util 990316 Revised Relief Request RR-P-14,for Inservice Testing Program for Pumps & Valves Pursuant to 10CFR50.55a(a)(3)(ii) ML20206P6921999-04-27027 April 1999 Discusses 990422 Public Meeting at Hatch Facility Re Results of Periodic Plant Performance Review for Hatch Nuclear Facility for Period of Feb 1997 to Jan 1999.List of Attendees & Copy of Handouts Used by Hatch,Encl HL-5777, Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed1999-04-26026 April 1999 Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed HL-5758, Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant1999-04-0909 April 1999 Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant ML20205T1831999-04-0909 April 1999 Informs That on 990316,S Grantham & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Ei Hatch NPP for FY00.Initial Exam Dates Are 991001 & 2201 for Approx 12 Candidates.Chief Examiner Will Be C Payne ML20205M3181999-04-0707 April 1999 Confirms Telcon Between D Crowe & Ph Skinner Re Mgt Meeting Scheduled for 990422 in Conference Room of Maint Training Bldg.Purpose of Meeting to Discuss Results of Periodic PPR for Plant for Period of Feb 1997 - Jan 1999 ML20205M3011999-04-0202 April 1999 Forwards Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non-cited Violation Identified HL-5761, Forwards Revised Ei Hatch Nuclear Plant Psp,Effective 990331,per 10CFR50.54(p)(2).Justification & Detailed Instructions Encl.Plan Withheld,Per 10CFR73.211999-03-31031 March 1999 Forwards Revised Ei Hatch Nuclear Plant Psp,Effective 990331,per 10CFR50.54(p)(2).Justification & Detailed Instructions Encl.Plan Withheld,Per 10CFR73.21 HL-5750, Forwards Status of Decommissining Funding,Per Requirements 10CFR50.75(f)(1),on Behalf of Licensed Owners of Ei Hatch Nuclear Plant1999-03-30030 March 1999 Forwards Status of Decommissining Funding,Per Requirements 10CFR50.75(f)(1),on Behalf of Licensed Owners of Ei Hatch Nuclear Plant ML20205H1491999-03-25025 March 1999 Forwards Info for OLs DPR-7 & NPF-5 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors,Per 10CFR50.75(f)(1).Municipal Electric Authority of Georgia Is One of Licensed Owners of Ei Hatch,Owning 17.7% of Facility ML20205D3211999-03-24024 March 1999 Informs That Safety Sys Engineering Insp Previously Scheduled for 990405-09 & 19-23,rescheduled for 990607-11 & 21-25 1999-09-24 Category:INCOMING CORRESPONDENCE MONTHYEARML20216H3641999-09-20020 September 1999
[Table view]Forwards NRC Form 536 in Response to AL 99-03, Preparation & Scheduling of Operator Licensing Exams HL-5839, Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-5731999-09-16016 September 1999 Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-573 HL-5837, Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification1999-09-13013 September 1999 Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification HL-5832, Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC1999-09-0101 September 1999 Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC HL-5825, Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations1999-08-20020 August 1999 Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations HL-5827, Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d)1999-08-19019 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d) HL-5788, Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 141999-08-19019 August 1999 Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 14 HL-5824, Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.111999-08-18018 August 1999 Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.11 HL-5814, Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-5281999-07-30030 July 1999 Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-528 05000366/LER-1999-007, Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown1999-07-27027 July 1999 Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown HL-5810, Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions1999-07-15015 July 1999 Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions HL-5808, Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage1999-07-15015 July 1999 Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage HL-5807, Estimates That Seventeen (17) Submittals Will Be Made During Fy 2000 & Two (2) Submittals Will Be Made During Fy 2001,in Response to Administative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-14014 July 1999 Estimates That Seventeen (17) Submittals Will Be Made During Fy 2000 & Two (2) Submittals Will Be Made During Fy 2001,in Response to Administative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants HL-5801, Forwards New Relief Requests for Third 10-Yr Interval ISI Program for Ei Hatch Nuclear Plant.New Relief Requests RR-25 & RR-26 Were Developed to Propose Alternate Repair Techniques IAW ASME Code N-562 & N-561,respectively1999-07-0909 July 1999 Forwards New Relief Requests for Third 10-Yr Interval ISI Program for Ei Hatch Nuclear Plant.New Relief Requests RR-25 & RR-26 Were Developed to Propose Alternate Repair Techniques IAW ASME Code N-562 & N-561,respectively HL-5796, Forwards Response to NRC 990331 Request for Supplemental Info Re SNC Earlier GL 95-07 Responses.Gl 95-07 Evaluation Sheets for Units 1 & 2 RHR Torus Spray Isolation Valves Are Encl1999-07-0909 July 1999 Forwards Response to NRC 990331 Request for Supplemental Info Re SNC Earlier GL 95-07 Responses.Gl 95-07 Evaluation Sheets for Units 1 & 2 RHR Torus Spray Isolation Valves Are Encl HL-5804, Informs NRC That on or After 991018,SNOC Plans to Begin Storing Spent Fuel in Ei Hatch ISFSI IAW General License Issued,Per 10CFR72.2101999-07-0909 July 1999 Informs NRC That on or After 991018,SNOC Plans to Begin Storing Spent Fuel in Ei Hatch ISFSI IAW General License Issued,Per 10CFR72.210 HL-5790, Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants1999-06-21021 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants HL-5763, Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel1999-05-20020 May 1999 Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel HL-5785, Forwards New Relief Requests RR-V-16 for Third 10-yr Interval Inservice Testing Program for Ei Hatch Nuclear Plant.Relief Request Was Developed to Propose Alternate Schedule for Replacement of HPCI Rupture Disks1999-05-18018 May 1999 Forwards New Relief Requests RR-V-16 for Third 10-yr Interval Inservice Testing Program for Ei Hatch Nuclear Plant.Relief Request Was Developed to Propose Alternate Schedule for Replacement of HPCI Rupture Disks HL-5777, Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed1999-04-26026 April 1999 Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed HL-5758, Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant1999-04-0909 April 1999 Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant HL-5761, Forwards Revised Ei Hatch Nuclear Plant Psp,Effective 990331,per 10CFR50.54(p)(2).Justification & Detailed Instructions Encl.Plan Withheld,Per 10CFR73.211999-03-31031 March 1999 Forwards Revised Ei Hatch Nuclear Plant Psp,Effective 990331,per 10CFR50.54(p)(2).Justification & Detailed Instructions Encl.Plan Withheld,Per 10CFR73.21 HL-5750, Forwards Status of Decommissining Funding,Per Requirements 10CFR50.75(f)(1),on Behalf of Licensed Owners of Ei Hatch Nuclear Plant1999-03-30030 March 1999 Forwards Status of Decommissining Funding,Per Requirements 10CFR50.75(f)(1),on Behalf of Licensed Owners of Ei Hatch Nuclear Plant ML20205H1491999-03-25025 March 1999 Forwards Info for OLs DPR-7 & NPF-5 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors,Per 10CFR50.75(f)(1).Municipal Electric Authority of Georgia Is One of Licensed Owners of Ei Hatch,Owning 17.7% of Facility ML20205H1411999-03-24024 March 1999 Forwards Info for OLs DPR-7 & NPF-5 Re Financial Assurance Requirement for Decommissioning Nuclear Power Reactors,Per 10CFR50.75(f)(1).Oglethorpe Power Corp Is One of Licensed Owners of Ei Hatch,Units 1 & 2,owning 30% of Facility HL-5754, Forwards Ei Hatch Nuclear Plant Unit 2 Extended Power Uprate Startup Test Rept for Cycle 15, IAW Regulatory Commitments.Testing Identified No Major Problems.Startup Testing for Unit 1 Is Scheduled for Spring 1999 RFO1999-03-22022 March 1999 Forwards Ei Hatch Nuclear Plant Unit 2 Extended Power Uprate Startup Test Rept for Cycle 15, IAW Regulatory Commitments.Testing Identified No Major Problems.Startup Testing for Unit 1 Is Scheduled for Spring 1999 RFO ML20205H1381999-03-22022 March 1999 Forwards Info for OLs DPR-7 & NPF-5 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors,Per 10CFR50.75(f)(1).Georgia Power Is One of Licensed Owners of Ei Hatch,Units 1 & 2,owning 50.1% of Facility ML20205H1581999-03-16016 March 1999 Forwards Info for OLs DPR-5 & NPF-7 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors,Per 10CFR50.75(f)(1).Dalton Utilities Is One of Licensed Owners of Ei Hatch,Units 1 & 2,owning 2.2% of Facility HL-5753, Submits Response to Five Criteria Described in NUREG/CR-6396 Section 3.3.2.Attachment Contains Relief Request RR-P-14, Which Has Been Revised & Enhanced to Include Addl Info to Justify Proposed Alternative1999-03-16016 March 1999 Submits Response to Five Criteria Described in NUREG/CR-6396 Section 3.3.2.Attachment Contains Relief Request RR-P-14, Which Has Been Revised & Enhanced to Include Addl Info to Justify Proposed Alternative HL-5757, Informs That SNC Withdraws SNC Proposed Rev to Plant Hatch QA Program Submitted 9901271999-03-15015 March 1999 Informs That SNC Withdraws SNC Proposed Rev to Plant Hatch QA Program Submitted 990127 HL-5756, Submits Summary Rept of Present Level & Source of Onsite Property Damage Insurance Coverage for Ei Hatch Nuclear Plant,Units 1 & 21999-03-12012 March 1999 Submits Summary Rept of Present Level & Source of Onsite Property Damage Insurance Coverage for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5751, Forwards Change to Hatch EP for Review & Approval,Per Requirements of 10CFR50,App E,Section Iv.B.Bases for Proposed EALs & Statements of Agreement from State & Local Governmental Authorities1999-03-0505 March 1999 Forwards Change to Hatch EP for Review & Approval,Per Requirements of 10CFR50,App E,Section Iv.B.Bases for Proposed EALs & Statements of Agreement from State & Local Governmental Authorities HL-5735, Provides NRC with Update Status of Progress Util Is Making Toward Development of Product That Was Originally Identified in to NRC1999-03-0202 March 1999 Provides NRC with Update Status of Progress Util Is Making Toward Development of Product That Was Originally Identified in to NRC HL-5737, Forwards Part of Table (Table 1) Util Provided in 980728 Response to RAI for GL 92-01,Rev 1,Suppl 1,reflecting Lower Shell Axial Welds Identified as C-4-A Through C-4-C & Lower Intermediate Axial Welds Identified as C-3-A Through C-3-C1999-02-0505 February 1999 Forwards Part of Table (Table 1) Util Provided in 980728 Response to RAI for GL 92-01,Rev 1,Suppl 1,reflecting Lower Shell Axial Welds Identified as C-4-A Through C-4-C & Lower Intermediate Axial Welds Identified as C-3-A Through C-3-C HL-5733, Forwards Rev 17A to Ei Hatch FSAR & Rev 14A to Fire Hazards Analysis & Fire Protection Program, for Plant.Encl Reflects Changes Made Since Previous Submittal.With Instructions1999-01-29029 January 1999 Forwards Rev 17A to Ei Hatch FSAR & Rev 14A to Fire Hazards Analysis & Fire Protection Program, for Plant.Encl Reflects Changes Made Since Previous Submittal.With Instructions HL-5729, Submits Proposed Rev to Plant QA Program as Described in Chapter 17 of Unit 2 Fsar,Per 10CFR50.54(a)(3).Rev Would Relocate to Controlled Document Other than Fsar,Units 1 & 2 Lists of SR SSC Comprising Items Covered Under QA Program1999-01-27027 January 1999 Submits Proposed Rev to Plant QA Program as Described in Chapter 17 of Unit 2 Fsar,Per 10CFR50.54(a)(3).Rev Would Relocate to Controlled Document Other than Fsar,Units 1 & 2 Lists of SR SSC Comprising Items Covered Under QA Program HL-5728, Requests That RPV Shell Weld Ultrasonic Exams Be Performed Using Techniques & Procedures,Iaw ASME Section Xi,App Viii, 1992 Edition,1993 Addendum,In Lieu of ASME Section XI,1989 Edition Exam Techniques & Procedures1999-01-19019 January 1999 Requests That RPV Shell Weld Ultrasonic Exams Be Performed Using Techniques & Procedures,Iaw ASME Section Xi,App Viii, 1992 Edition,1993 Addendum,In Lieu of ASME Section XI,1989 Edition Exam Techniques & Procedures HL-5712, Forwards Ehnp Intake Structure License Rept, to Provide Example of Technical Content & Level of Detail Planned for Application for License Renewal,For NRC Review1999-01-0707 January 1999 Forwards Ehnp Intake Structure License Rept, to Provide Example of Technical Content & Level of Detail Planned for Application for License Renewal,For NRC Review HL-5725, Informs That SNC Intends to Examine Approx Dozen Weld Overlays During Unit 1 Spring 1999 Outage That to Date Have Not Been Examined Three Times Since Weld Overlay Was Supplied1999-01-0707 January 1999 Informs That SNC Intends to Examine Approx Dozen Weld Overlays During Unit 1 Spring 1999 Outage That to Date Have Not Been Examined Three Times Since Weld Overlay Was Supplied 05000366/LER-1998-004, Forwards LER 98-004-01 Re Personnel Error Which Resulted in Condition Prohibited by Ts.Rev Is Necessary Because Original LER Reported Inadvertent Criticality Could Have Occurred1999-01-0404 January 1999 Forwards LER 98-004-01 Re Personnel Error Which Resulted in Condition Prohibited by Ts.Rev Is Necessary Because Original LER Reported Inadvertent Criticality Could Have Occurred HL-5710, Requests Approval of Alternative Reactor Vessel Weld Exam for Ehnp,Unit 1,per 10CFR50.55a(g)(6)(ii)(A)(5) for Permanently Excluding Exam of RPV Circumferential Shell Welds1998-12-0202 December 1998 Requests Approval of Alternative Reactor Vessel Weld Exam for Ehnp,Unit 1,per 10CFR50.55a(g)(6)(ii)(A)(5) for Permanently Excluding Exam of RPV Circumferential Shell Welds HL-5708, Provides Updated Response to RAI for GL 96-06, Waterhammer in Containment Coolers1998-11-20020 November 1998 Provides Updated Response to RAI for GL 96-06, Waterhammer in Containment Coolers HL-5573, Withdraws Requesting Exemption from Requirements of GDC 56 with Respect to Ei Hatch,Unit 2 Reactor bldg-to- Suppression Chamber Vacuum Relief Sys Design Due to Listed Reasons1998-10-19019 October 1998 Withdraws Requesting Exemption from Requirements of GDC 56 with Respect to Ei Hatch,Unit 2 Reactor bldg-to- Suppression Chamber Vacuum Relief Sys Design Due to Listed Reasons HL-5687, Forwards Required 120-day Response to GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment1998-10-19019 October 1998 Forwards Required 120-day Response to GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment HL-5686, Informs That Corrective Actions Relative to Thermo-Lag 330-1 Issues Are Complete1998-10-16016 October 1998 Informs That Corrective Actions Relative to Thermo-Lag 330-1 Issues Are Complete HL-5697, Requests Delay of Insp of RPV Circumferential Shell Welds for Two Operating Cycles as Outlined in NRC Info Notice 97-63,Suppl 1 & That Proposed Alternative Be Authorized Per 10CFR50.55a(a)(3)(i),per1998-10-16016 October 1998 Requests Delay of Insp of RPV Circumferential Shell Welds for Two Operating Cycles as Outlined in NRC Info Notice 97-63,Suppl 1 & That Proposed Alternative Be Authorized Per 10CFR50.55a(a)(3)(i),per HL-5689, Forwards Request for NRC Finding of Exigent Circumstance Re License Amend for Extended Power Update Operation.Changes Would Be Made While Plant Is Operating,Which as Stated,Has Potential to Create Unnecessary Plant Transients1998-09-30030 September 1998 Forwards Request for NRC Finding of Exigent Circumstance Re License Amend for Extended Power Update Operation.Changes Would Be Made While Plant Is Operating,Which as Stated,Has Potential to Create Unnecessary Plant Transients HL-5673, Informs NRC That Util Intends to Load Four Lead Use Assemblies Into Unit 2 Core as Part of Reload 14/Cycle 15 During Fall 1998 Refueling Outage.Proprietary Info Encl. Proprietary Info Withheld,Per 10CFR2.7901998-09-18018 September 1998 Informs NRC That Util Intends to Load Four Lead Use Assemblies Into Unit 2 Core as Part of Reload 14/Cycle 15 During Fall 1998 Refueling Outage.Proprietary Info Encl. Proprietary Info Withheld,Per 10CFR2.790 HL-5680, Informs NRC of Util Plans & Schedule for Exam of Unit 1 RPV Shell Welds.Util Anticipates Having Final Relief Request Submitted to NRC for Review by 9907011998-09-18018 September 1998 Informs NRC of Util Plans & Schedule for Exam of Unit 1 RPV Shell Welds.Util Anticipates Having Final Relief Request Submitted to NRC for Review by 990701 1999-09-20 |
Text
Georg a Power Cortpary
- - 00 hvernest Center Pa4 way Post Omce Box 1295 Sumngham, Alabama 35201 .
Telephona 205 677-7279 i 4
m A T. Beckham. Jr. Georgias Power ;
vce Prer.d.nt - Nsc4ae I.
Hatch Pro;tect :% : :u".e? r ee:: $ ," w May 18, 1993 Docket Nos. 50-321 50-366 !
U.S. Nuclear Regulatory Commission -
11L-3299 NITN: Document Control Desk Washington, D.C. 20555 t
Edwin I. Hatch Nuclear Plant Operating Licenses DPR-57, NPF-5 i Plant Hatch Physical Security Plan Revision Gentlemen:
In accordance with the requirements of 10 CFR 50.54(p)(2), Georgia Power l Company (GPC) hereby submits a repon of changes to the Physical Security Plan ,
(PSP) for the Edwin I. Hatch Nuclear Plant - Units 1 and 2. The changes are administrative and editorial in nature, clarifying and enhancing wording to achieve ,
consistency with actual plant conditions and programs.
Georgia Power Company has determined the enclosed changes do not decrease the effectiveness of the Plant Hatch Physical Security Plan. The changes and a ,
justification for the determination of no decrease in Safeguards effectiveness are presented as Enclosure 1. Enclosure 2 contains the revised Physical Security Plan pages.
i The information contained in Enclosures 1 and 2 is Safeguards information, and in accordance with the requirements of 10 CFR 73.71 and Section 147 of the Atomic Energy Act of 1954, as amended, should not be placed in the NRC Public Document Room.
Sincerely,
+/Jq J. T. Beckham, Jr.
SIU'/sp
Enclosures:
i
- 1. Description of Changes and Justification for the Determination of No l Decrease in Safeguards Effectiveness. l'
- 2. Revised Physical Security Plan Pages. m,%m Eb(1O()3 sofeguardsinformation end,snoe c: (See next page.) j pRannn 9305260178 930518 deseched,the is dooontrolled. / severlueurer
< mei PDR ADOCK 05000321 g 7 n f2 C1 - '{ l
t- 1
- TGeorgia Power A .f
- U.S. Nuclear Regulatory Commission Page 2 j
'May 18, 1993 c: Georeia Power Company (w/o encl)
Mr. H. L. Sumner, General Manager - Nuclear Plant l NORMS t 4
b'udearlegulatory Commission. Washineron. D.C. (w/o encl)
Mr. K. Jabbour, Licensing Project Manager - Hatch :
11.5. Nuclear Reculatorv Commission. Reelon 11 Mr. S. D. Ebneter, Regional Administrator (2 copies)
Mr. L. D. Wert. Senior Resident Inspector - Hatch (w/o encl) j t f
I i
i i
[
Attechments or enclosures contain [
. sofoguerds irdormot'en and, once .
detoched,the soverloner or meme H b3299 lgM