ML20045E720

From kanterella
Revision as of 19:08, 11 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Application for Amends to Licenses DPR-57 & NPF-5, Revising TS to Allow One or More Suppression Chamber - Drywell Vacuum Breakers to Open During Surveillance Testing
ML20045E720
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/28/1993
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045E721 List:
References
HL-3359, NUDOCS 9307020356
Download: ML20045E720 (2)


Text

. . Goorgia Power Company 40 inverness Center Parkway Post Office Box 1295 Dirmirvpam, Alabama 35201 Telephone 205 B7747279 J. T. Beckham, Jr.

m Vice Prosident - Nuclear Georgia Power Hatch Project the southern cle:mc sguem June 28, 1993 Docket Nos. 50-321 HL-3359 50-366 005705 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Edwin I. Hatch Nuclear Plant Request to Revise Technical Specifications Suppression Chamber - Drywell Vacuum Breakers Gentlemen:

In accordance with the provisions of 10 CFR 50.90, as required by 10 CFR 50.59(c)(1), Georgia Power Company (GPC) hereby proposes a change to the Plant Hatch Units 1 and 2 Technical Specifications, Appendix A to Operating Licenses DPR-57 and NPF-5. Specifically, GPC requests a revision to Unit 1 Technical Specification 3.7.A.4 and Unit 2 Technical Specification 3.6.4.1 to allow one or more suppression chamber - drywell vacuum breakers to open during surveillance testing or when performing their intended function without considering the vacuum breakers inoperable.

Enclosure 1 provides a detailed description of the proposed changes and the circumstances necessitating the change request.

Enclosure 2 details the basis for GPC's determination the proposed changes do not involve a significant hazards consideration.

Enclosure 3 provides page change instructions for incorporating the proposed changes. Following enclosure 3 are the proposed Technical Specifications pages and the associated markups of the existing pages.

To allow time for procedure revisions and orderly incorporation into copies of the Technical Specifications, GPC requests the proposed amendment, once approved by the Nuclear Regul atory Commission (NRC), be issued with an effective date to be no later than 60 days from the date of issuance of the amendment.

In accordance with the requirements of 10 CFR 50.91, a copy of this letter and all applicable enclosures will be sent to the designated State official of the Environmental Protection Division of the Georgia Department of Natural Resources.

1

' 0 0\

fi 9 0 0 9 C.

9307020356 930628 L g

\

l 1

DR ADOCK 0500

Georgia Power d  !

U.S. Nuclear Regulatory Commission Page Two June 28, 1993 i

Mr. J. T. Beckham, Jr. states he is duly authorized to execute this oath on behalf of Georgia Power Company, and to the best of his knowledge and belief, the facts set forth in this letter are trice.

Sincerely,  ;

1- m v J.[Beckham, T. Jr. <

Sworn to and subscribed before me this g day of d tortf- - 1993.

Gt NA $/

hopryPublic My Commission Expires: '# /6 HCM/cr 005705

Enclosure:

f i cc: Georaia Power Company Mr. H. L. Sumner, General Manager - Nuclear Plant 1 NORMS j U.S. Nuclear Reaulatory Commission. Washinoton. D.C.

Mr. K. Jabbour, Licensing Project Manager - Hatch U.S. Nuclear Reaulatory Commission. Reaion II l Mr. S. D. Ebneter, Regional Administrator '

, Mr. L. D. Wert, Senior Resident Inspector - Hatch State of Georaia Mr. J. D. Tanner, Commissioner - Department of Natural Resources.

- - -