Fourth Ten-Year Inservice Inspection Plan Request for Relief No. 11-ON-002
ML12066A175
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/29/2012
From: Gillespie T
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML12066A175 (308)


Text

PkDuke T. PRESTON GILLESPIE, JR.

EEnergy Vice President Oconee Nuclear Station Duke Energy ONO] VP / 7800 Rochester Hwy.

February 29, 2012 Seneca, SC 29672 864-873-4478 U.S. Nuclear Regulatory Commission 864-873-4208 fax Document Control Desk T.Gillespie@duke-energy.com Washington, DC 20555

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station Units 2 and 3 Docket No. 50-270, -289 Fourth Ten-Year Inservice Inspection Plan Request for Relief No. 11-ON-002 Pursuant to 10 CFR 50.55a(g)(5)(iii), attached is a Request for Relief from the requirement to examine 100% of the volume specified by the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, 1998 Edition with 2000 Addenda (as modified by Code Case N-460).

The attached Request for Relief 11-ON-002 is to allow Duke Energy to take credit for the enclosed Table 1 list of limited ultrasonic examinations on welds associated with various systems and components during Unit 2 EOC23 and Unit 3 EOC24 and Unit 3 EOC25 refueling outages. The ultrasonic examination coverage of the subject Unit 1,and 2 welds did not meet the 90% examination requirements of Code Case N-460. The obtainable volume coverage for weld examination is indicated on Attachments A, B and C of the relief request. Achievement of greater examination coverage for these welds is impractical due to piping/valve geometry and interferences. Therefore, Duke Energy requests that the NRC grant relief as authorized under 10 CFR 50.55(g)(6)(i).

If there are any questions or further information is needed you may contact Corey Gray at (864)-873-6325.

Sincerely, T Preston Gillespie Jr.,

Site Vice President Attachment A Attachment B Attachment C www. duke-energy.corn

U. S. Nuclear Regulatory Commission February 29, 2012 Page 2 Xc w/att: Victor Mcree Region II Administrator U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 John Stang Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop 0-8 G9A Washington, DC 20555 Xc w/o attachment Andy Sabisch NRC Senior Resident Inspector Oconee Nuclear Station Susan Jenkins Section Manager Division of Waste Management Bureau of Land and Waste Management SC Dept. of Health & Environment Control 2600 Bull St.

Columbia, SC 29201

Relief Request 11 ON 002 1.0 Scope of Relief Request Relief is requested pursuant to 10 CFR 50.55a(g)(5)(iii) for welds listed in Table 1.

These welds were required to be examined in accordance with Inservice Inspection Plans for the following Units.

Oconee Nuclear Station - Unit 2 Fourth 10-Year Inservice Inspection Interval Interval Start Date: 09/09/2004 Oconee Nuclear Station - Unit 3 Fourth 10-Year Inservice Inspection Interval Interval Start Date: 1/2/2005 Table 1 Relief Oconee Examination Weld ID Item/Summary Examination Request Unit Performed Number Number Data Section Number (Refuelingq Number Outaqe) 2.0 2 2EOC23 2-PZR- 02.B3.110.0012 See Attachment WP26-7 A Pages 1-10 3.0 2 2EOC23 2-PIB2-8 02.B9.111.0031 See Attachment A Pages 11-16 4.0 2 2EOC23 2-PIB1-8 02.B9.11.0058 See Attachment A Pages 17-24 5.0 2 2EOC23 2-53A-10-3 02.B9.11.0067 See Attachment A Pages 25-30 6.0 2 2EOC23 2LP-1 50- 02.C5.11.0005 See Attachment 17 A Pages 31-36 7.0 2 2EOC23 2LP-217-8 02.C5.11.0021 See Attachment A Pages 37-40 8.0 2 2EOC23 2-53A-9-16 02.C5.11.0025 See Attachment A Pages 41-46 9.0 2 2EOC23 2LP-189- 02.C5.11.0034 See Attachment 14 A Pages 47-53 Page 1 of 71

Relief Request 11 ON 002 10.0 2 2EOC23 2LP-215-17 02.C5.11.0036 See Attachment A Pages 54-58 11.0 2 2EOC23 2LP-218-23 02.C5.11.0067 See Attachment A Pages 59-62 12.0 2 2EOC23 2-51A 02.C5.21.0027 See Attachment 15 A Pages 63-68 13.0 2 2EOC23 2-51A 02.C5.21.0029 See Attachment 21 A Pages 69-72 14.0 2 2EOC23 2HP-222-2 02.C5.21.0031 See Attachment A Pages 73-75 15.0 2 2EOC23 2-51A 02.C5.21.0055 See Attachment 93 A Pages 76-79 16.0 2 2EOC23 2HP-221- 02.C5.21.0256 See Attachment 22 A Pages 80-81 17.0 3 3EOC24 3-PZR- 03.B3.110.0006 See Attachment WP26-4 B Pages 1-9 18.0 3 3EOC24 3-PZR- 03.B3.110.0007 See Attachment WP26-5 B Pages 10-18 19.0 3 3EOC24 3-PZR- 03.B3.110.0008 See Attachment WP26-6 B Pages 19-27

,20.0 3 3EOC24 3-LDCA-IN- 03.B3.150.0001 See Attachment 2V B Pages 28-36 21.0 3 3EOC24 3-LDCA- 03.B3.150.0002 See Attachment OUT-5V B Pages 37-45 22.0 3 3EOC24 3-PDAI-1 03.B9.11.0068 See Attachment B Pages 46-51 23.0 3 3EOC24 3-PDB2-1 03.B9.11.0074 See Attachment B Pages 52-57 24.0 3 3EOC24 3-51A 03.C5.21.0024 See Attachment 44 B Pages 58-61 25.0 3 3EOC25 N32389-3 PSI See Attachment WJ-32 C Pages 1-7 26.0 3 3EOC25 N32389-3 PSI See Attachment WJ-33 C Pages 8-15 27.0 3 3EOC25 N32389-3 PSI See Attachment WJ-35 C Pages 16-22 Page 2 of 71

Relief Request 11 ON 002 28.0 3 3EOC25 N32389-3 PSI See Attachment WJ-36 C Pages 23-29 29.0 3 3EOC25 3-PIA2-8 03.B9.11.0056 See Attachment C Pages 30-39 30.0 3 3EOC25 3-PIB1-8 03.B9.11.0060 See Attachment C Pages 40-49 31.0 3 3EOC25 3-PIB2-8 03.B9.11.0064 See Attachment C Pages 50-59 32.0 3 3EOC25 3-PDA2-1 03.B9.11.0070 See Attachment C Pages 60-69 33.0 3 3EOC25 3-PDBI-1 03.B9.11.0072 See Attachment C Pages 70-79 34.0 3 3EOC25 3HP-365- 03.C5.21.0034 See Attachment 40 C Pages 80-87 35.0 3 3EOC25 3HP-498- 03.C5.21.0066 See Attachment 14 C Pages 88-93 Page 3 of 71

Relief Request 11 ON 002 2.0 Weld #2-PZR-WP26-7 2.1. ASME Code Component(s) Affected Unit 2 Pressurizer Heater Belt Shell to Sampling Nozzle Weld, Weld #2-PZR-WP26-7, Summary Number 02.B3.1110.0012 2.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 2.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-D, Item Number B3.110 Fig. IWB-2500-7 (a), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H-I 2.4. Impracticality of Compliance The pressurizer Heater Belt shell material is carbon steel and the sampling nozzle material is carbon steel. This weld has a diameter of 5.750 inches and a wall thickness of 6.187 inches.

Because of the weld configuration, the requirements of ASME Section V, Article 4, T-441.1.2(a), T-441.1.3, T-441.1.4, T-441.1.5 and T-441.1.6 could not be met. The aggregate coverage was calculated from the following base and weld metal scan results:

Weld coverage using 350, 450& 600 shear waves for axial scans (S1, S2), and 35° & 450 shear waves for circ. scans (CW, CCW) obtained 17.2% coverage.

Base material coverage using 350, 450& 600 shear wave for axial scans (SI) and 35°& 450 shear waves for circ. scans (CW, CCW) obtained 54.0% coverage.

  • 00 scan coverage obtained 37.5% coverage.
  • The aggregate coverage was calculated to be (17.2% + 54.0% +

37.5%)/3 = 36.2%.

The limitation was caused by the weld taper configuration created by the attachment of the sampling nozzle to the Heater Belt shell not allowing scanning from Surface 2. In order to scan all of the required volume for this weld, the upper shell to sampling nozzle attachment weld would have to be redesigned to allow scanning from both sides of the weld, which is impractical.

Page 4 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. The achieved coverage did not meet the acceptance criteria of this Code Case.

2.5. Proposed Alternative and Basis for Use No substitution alternative for this weld is available which would provide better coverage.

2.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

2.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.B3.110.0012 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section XI, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 5 of 71

Relief Request 11 ON 002 3.0 Weld #2-PIB2-8 3.1. ASME Code Component(s) Affected Unit 2 Reactor Coolant Pump 2B2 Casing Nozzle to Safe-End Weld, Weld

  1. 2-PIB2-8, Summary Number 02.B9.11.0031 3.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 3.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.11 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 3.4. Impracticality of Compliance This item is a cast stainless steel pump casing nozzle welded to a stainless steel safe end. This weld has a diameter of 33.50 inches and a wall thickness of 2.33 inches.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv) (A)(1). The aggregate coverage was calculated from the following:

  • 600 shear waves obtained 0% coverage in one axial direction (S1 -

nozzle) 0 600 shear waves obtained 50% coverage in one axial direction (S2 -

pipe) 0 450 shear waves obtained 50% coverage in one circ. directions (S3 -

CW) 0 450 shear waves obtained 50% coverage in one circ. directions (S4 -

CCW)

  • The aggregate coverage was calculated to be (0% + 50% + 50% +

50%)/4 = 37.5%.

0 60' longitudinal waves obtained 47.3% supplemental coverage beyond the weld centerline in one axial direction (S2 - pipe). This is not included in the aggregate coverage.

0 In addition, a best effort examination was performed in two axial directions (S1, S2) using 600 and 700 longitudinal waves to the extent possible in the upper 2/3 area of interest.

The individual scan results are recorded on the form labeled "Determination of Percent Coverage for UT Examinations - Pipe. The limitation was caused by the cast stainless material and the weld taper configuration created by the attachment of the nozzle to safe end configuration. In order to scan all of the required volume for this weld, the pump would have to be replaced with Page 6 of 71

Relief Request 11 ON 002 forged stainless steel and would have to be redesigned to allow scanning from both sides of the weld, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. The achieved coverage did not meet the acceptance criteria of this Code Case.

3.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

3.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

3.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.B9.11.0031 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this B9.11 item. The result from the surface examination was acceptable.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 7 of 71

Relief Request 11 ON 002 4.0 Weld #2-PIB1-8 4.1. ASME Code Component(s) Affected Unit 2 Reactor Coolant Pump 2B1 Casing Nozzle to Safe-End Weld, Weld

  1. 2-PIB1-8, Summary Number 02.B9.11.0058 4.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 4.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.11 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 4.4. Impracticality of Compliance This item is a cast stainless steel pump casing nozzle welded to a stainless steel safe end. This weld has a diameter of 33.50 inches and a wall thickness of 2.33 inches.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv) (A)(1). The aggregate coverage was calculated from the following:

0 600 shear waves obtained 0% coverage in one axial direction (S1 -

nozzle)

  • 600 shear waves obtained 50% coverage in one axial direction (S2 -

pipe)

  • 450 shear waves obtained 50% coverage in one circ. directions (S3 -

CW)

  • 450 shear waves obtained 50% coverage in one circ. directions (S4 -

CcW)

  • The aggregate coverage was calculated to be (50% + 0% + 50% +

50%)/4 = 37.5%.

  • 600 longitudinal waves obtained 47.3% supplemental coverage beyond the weld centerline in one axial direction (S2 - pipe). This is not included in the aggregate coverage.
  • In addition, a best effort examination was performed in two axial directions (S1, S2) using 600 and 70° longitudinal waves to the extent possible in the upper 2/3 area of interest.

The individual scan results are recorded on the form labeled "Determination of Percent Coverage for UT Examinations - Pipe. The limitation was caused by the cast stainless material and the weld taper configuration created by the attachment of the nozzle to safe end configuration. In order to scan all of the required volume for this weld, the pump would have to be replaced with Page 8 of 71

Relief Request 11 ON 002 forged stainless steel and would have to be redesigned to allow scanning from both sides of the weld, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than, 90% volumetric coverage of examination volume C-D-E-F. The achieved coverage did not meet the acceptance criteria of this Code Case.

4.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

4.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

4.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.B9.11.0058 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section XI, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this B9.11 item. The result from the surface examination was acceptable.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 9 of 71

Relief Request 11 ON 002 5.0 Weld #2-53A-1 0-3 5.1. ASME Code Component(s) Affected Unit 2 Pipe to Valve 2LP-1 Weld, Weld #2-53A-10-3, Summary Number 02.B9.11.0067 5.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 5.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.11 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 5.4. Impracticality of Compliance This item is a cast stainless steel valve welded to stainless steel pipe. This weld has a diameter of 12.0 inches and a wall thickness of 1.125 inches.

Scanning requirements are described in10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

0 600 shear waves obtained 0% coverage in one axial direction (S1 -

valve) 0 600 shear waves obtained 50% coverage in one axial direction (S2 -

pipe)

  • 450 shear waves obtained 50% coverage in one circ. direction (S3 -

CW) 0 450 shear waves obtained 50% coverage in one circ. direction (S4 -

CCW) 0 The aggregate coverage was calculated to be (0% + 50% +50% +

50%)/4 = 37.5%

  • 600 longitudinal waves obtained 50% supplemental coverage beyond the weld centerline in one axial direction (S2 - pipe). This is not included in the aggregate coverage.

In order to scan all of the required volume for this weld, the valve would have to be replaced with forged stainless steel, and be redesigned to allow scanning from both sides of the weld, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 10 of 71

Relief Request 11 ON 002 5.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

5.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

5.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.1B9.111.0067 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section XI, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this B9.11 item. The result from the surface examination was acceptable.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 11 of 71

Relief Request 11 ON 002 6.0 Weld #2LP-150-17 6.1. ASME Code Component(s) Affected Unit 2 Pipe to Valve 2LP-48 Weld, Weld #2-LP-150-17, Summary Number 02.C5.11.0005 6.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 6.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-I, Item Number C5.1 1 Figure IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 6.4. Impracticality of Compliance This item is a cast stainless valve welded to stainless steel pipe. This weld has a diameter of 10.0 inches and a wall thickness of 1.125 inches.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

  • 450 shear waves obtained 0% coverage in one axial direction (S1 -

valve) 0 450 shear waves obtained 50% coverage in one axial direction (S2 -

pipe)

  • 450 shear waves obtained 50% coverage in one circ. direction (S3 -

CW)

  • 450 shear waves obtained 50% coverage in one circ. direction (S4 -

CCW)

  • The aggregate coverage was calculated to be (0% + 50% +50% +

50%)/4 = 37.5%

In order to scan all of the required volume for this weld, the valve would have to be replaced with forged stainless steel and be redesigned to allow scanning from both sides of the weld, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 12 of 71

Relief Request 11 ON 002 6.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

6.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

6.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.C5.11.0005 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.11 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1; Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this*

weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 13 of 71

Relief Request 11 ON 002 7.0 Weld #2LP-217-8 7.1. ASME Code Component(s) Affected Unit 2 Pipe to Valve 2LP-178 Weld, Weld #2-LP-217-8, Summary Number 02.C5.11.0021 7.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 7.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.11 Figure IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F.

7.4. Impracticality of Compliance This item is a stainless steel valve welded to stainless steel pipe. This weld has a diameter of 10.0 inches and a wall thickness of 1.0 inches.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

0 600 shear waves obtained 50% coverage in one axial direction (SI -

pipe)

  • 600 shear waves obtained 0% coverage in one axial direction (S2 -

valve)

  • 450 shear waves obtained 50% coverage in one circ. direction (S3 -

CW)

  • 450 shear waves obtained 50% coverage in one circ. direction (S4 -

CCW)

  • The aggregate coverage was calculated to be (50% + 0% +50% +

50%)/4 = 37.5%

In order to scan all of the required volume for this weld, the valve would have to be redesigned to allow scanning from both sides of the weld, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage.Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 14 of 71

Relief Request 11 ON 002 7.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

7.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

7.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.C5.11.0021 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.11 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1; Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 15 of71

Relief Request 11 ON 002 8.0 Weld #2-53A-9-16 8.1. ASME Code Component(s) Affected Unit 2 Pipe to Valve 2LP-48 Weld, Weld #2-53A-9-16, Summary Number 02.C5.11.0025 8.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 8.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.11 Figure IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 8.4. Impracticality of Compliance This item is a cast stainless steel valve welded to Stainless steel pipe. This weld has a diameter of 10.0 inches and a wall thickness of 1.0 inches.

Scanning requirements are described in 10CFR.50.55a (b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

  • 450 shear waves obtained 50% coverage in one axial direction (S1 -

pipe)

  • 450 shear waves obtained 0% coverage in one axial direction (S2 -

valve)

  • 450 shear waves obtained 50% coverage in one circ. direction (S3 -

CW)

  • 450 shear waves obtained 50% coverage in one circ. direction (S4 -

CCW)

  • The aggregate coverage was calculated to be (50% + 0% +50% +

50%)/4 = 37.5%

In order to scan all of the required volume for this weld, the valve would have to be replaced with forged stainless steel, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 16 of 71

Relief Request 11 ON 002 8.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such a's thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

8.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

8.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.C5.11.0025 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.11 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1; Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 17 of 71

Relief Request 11 ON 002 9.0 Weld #2LP-189-14 9.1. ASME Code Component(s) Affected Unit 2 Pipe to Elbow Weld, Weld #2LP-189-14, Summary Number 02.C5.11.0034 9.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 9.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.11 Figure IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 9.4. Impracticality of Compliance This item is stainless steel seamless pipe welded to a stainless steel elbow.

This weld has a diameter of 10.0 inches and a wall thickness of 1.0 inches.

During the ultrasonic examination of this weld, 76% coverage of the required examination volume was obtained. Scanning requirements are described in 10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

600 shear waves obtained (61.5% + 19.25%) = 80.75 coverage in one axial direction (S1 - pipe) 600 shear waves obtained (61.5% + 0.00%) = 61.5% coverage in one axial direction (S2 - elbow)

  • 450 shear waves obtained (61.5% + 19.25%) = 80.75% coverage in one circ. direction (S3 - CW)
  • 450 shear waves obtained (61.5% + 19.25%) = 80.75% coverage in one circ. direction (S4 - CCW)
  • The aggregate coverage was calculated to be (80.75% + 61.5% +

80.75% + 80.75%)/4 = 76.0%

In order to scan all of the required volume for this weld, the permanent hanger would have to be removed, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 18 of 71

Relief Request 11 ON 002 9.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

9.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

9.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.C5.11.0034 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.11 item The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1; Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 19 of 71

Relief Request 11 ON 002 10.0 Weld #2LP-215-17 10.1. ASME Code Component(s) Affected Unit 2 Pipe to Flow Restrictor Weld, Weld #2LP-215-17, Summary Number 02.C5.11.0036 10.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 10.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-I, Item Number C5.11 Figure IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 10.4. Impracticality of Compliance This item is a cast stainless steel flow restrictor welded to stainless steel seamless pipe. This weld has a diameter of 10.0 inches and a wall thickness of 1.0 inches.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

  • 600 shear waves obtained 0% coverage in one axial direction (S1 -

flow restrictor)

  • 600 shear waves obtained (45.5% + 1.70%) = 47.2% coverage in one axial direction (S2 - pipe) 450 shear waves obtained 50% coverage in one circ. direction (S3 -

CW)

  • 450 shear waves obtained 50% coverage in one circ. direction (S4 -

CCW)

  • The aggregate coverage was calculated to be (0% + 47.2% +50% +

50%)/4 = 36.8%

In order to scan all of the required volume for this weld, the flow restrictor would have to be replaced with forged stainless steel to allow scanning from both sides of the weld, and the coupling would have to be removed, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 20 of 71

Relief Request 11 ON 002 10.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

10.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

10.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.C5.11.0036 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section XI, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.11 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1; Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 21 of 71

Relief Request 11 ON 002 11.0 Weld #2LP-218-23 S1.1. ASME Code Component(s) Affected Unit 2 Pipe to Valve 2LP-176 Weld, Weld #2LP-218-23, Summary Number 02.C5.11.0067 11.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 11.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.11 Figure IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 11.4. Impracticality of Compliance This item is a forged stainless steel valve welded to stainless steel seamless pipe. This weld has a diameter of 10.0 inches and a wall thickness of 1.0 inches.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

  • 600 shear waves obtained 50% coverage in one axial direction (S1 -

pipe)

  • 600 shear waves obtained 0% coverage in one axial direction (S2 -

valve)

  • 450 shear waves obtained 50% coverage in one circ. direction (S3 -

CW)

  • 450 shear waves obtained 50% coverage in one circ. direction (S4 -

CCW)

  • The aggregate coverage was calculated to be (50% + 0% +50% +

50%)/4 = 37.5%

In order to scan all of the required volume for this weld, the valve would have to be redesigned to allow scanning from both sides of the weld, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage.Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 22 of 71

Relief Request 11 ON 002 1 1.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

11.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

11.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.C5.11.0067 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.11 item.. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1; Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 23 of 71

Relief Request 11 ON 002 12.0 Weld #2-51A-28-15 12.1. ASME Code Component(s) Affected Unit 2 Pipe to Flange Weld, Weld #2-51A-28-15, Summary Number 02.C5.21.0027 12.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 12.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.21 Fig. IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 12.4. Impracticality of Compliance This item is a forged stainless steel flange welded to stainless steel seamless pipe. This weld has a diameter of 4.0 inches and a wall thickness of .531 inches.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

  • 450 shear waves obtained 50% coverage in one axial direction (S1 -

pipe)

  • 450 shear waves obtained 0% coverage in one axial direction (S2 -

flange) 0 450 shear waves obtained 50% coverage in one circ. direction (S3 -

CW) 0 450 shear waves obtained 50% coverage in one circ. direction (S4 -

CCW)

  • The aggregate coverage was calculated to be (50% + 0% +50% +

50%)/4 = 37.5%

In order to scan all of the required volume for this weld, the flange would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 24 of 71

Relief Request 11 ON 002 12.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

12.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

12.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.C5.21.0027 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.21 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1; Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section XI, and the continuing periodic leakage inspections, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 25 of71

Relief Request 11 ON 002 13.0 Weld #2-51A-28-21 13.1. ASME Code Component(s) Affected Unit 2 Pipe to Valve 2HP-135 Weld, Weld #2-51A-28-21, Summary Number 02.C5.21.0029 13.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 13.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.21 Fig. IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 13.4. Impracticality of Compliance This item is a forged stainless steel valve welded to stainless steel seamless pipe. This weld has a diameter of 4.0 inches and a wall thickness of .531 inches.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

  • 600 shear waves obtained 100% coverage in one axial direction (S1 -

valve) 0 600 shear waves obtained 100% coverage in one axial direction (S2 -

pipe) 0 450 shear waves obtained 50% coverage in one circ. direction (S3 -

CW)

  • 450 shear waves obtained 50% coverage in one circ. direction (S4 -

CCW)

  • The aggregate coverage was calculated to be (100% + 100% + 50%

+ 50%)/4 = 75.0%

In order to scan all of the required volume for this weld, the valve would have to be redesigned to allow scanning from both sides of the weld, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 26 of 71

Relief Request 11 ON 002 13.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

13.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

13.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.C5.21.0029 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.21 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1; Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section XI, and the continuing periodic leakage inspections, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 27 of 71

Relief Request 11 ON 002 14.0 Weld #2HP-222-2 14.1. ASME Code Component(s) Affected Unit 2 High Pressure Injection System Elbow to Valve 2HP-26 Weld, Weld

  1. 2HP-222-2, Summary Number 02.C5.21.0031 14.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 14.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.21 Fig. IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 14.4. Impracticality of Compliance This item is a cast stainless steel valve welded to a stainless steel elbow.

This weld has a diameter of 4.0 inches and a wall thickness of .674 inches.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

  • 600 shear waves obtained 50% coverage in one axial direction (S1 -

elbow)

  • 600 shear waves obtained 0% coverage in one axial direction (S2 -

valve)

  • 420 shear waves obtained 50% coverage in one circ. direction (S3 -

CW)

  • 420 shear waves obtained 50% coverage in one circ. direction (S4 -

CCW) 0 The aggregate coverage was calculated to be (50% + 0% +50% +

50%)/4 = 37.5%

In order to scan all of the required volume for this weld, the valve would have to be replaced with forged stainless steel, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 28 of 71

Relief Request 11 ON 002 14.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

14.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

14.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.C5.21.0031 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section XI, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.21 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1; Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section XI, and the continuing periodic leakage inspections, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 29 of 71

Relief Request 11 ON 002 15.0 Weld #2-51A-17-93 15.1. ASME Code Component(s) Affected Unit 2 Pipe to Tee Weld, Weld #2-51A-17-93, Summary Number 02.C5.21.0055 15.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 15.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.21 Fig. IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 15.4. Impracticality of Compliance This item is a forged stainless steel tee welded to stainless steel seamless pipe. This weld has a diameter of 2.5 inches and a wall thickness of .375 inches.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

600 shear waves obtained 78% coverage in one axial direction (S1 -

pipe)

  • 600 shear waves obtained 56% coverage in one axial direction (S2 -

tee)

  • 450 shear waves obtained 100% coverage in one circ. direction (S3 -

CW) 450 shear waves obtained 100% coverage in one circ. direction (S4 -

CCW)

The aggregate coverage was calculated to be (78% + 56% + 100% +

100%)/4 = 83.5%

In order to scan all of the required volume for this weld, the tee would have to be redesigned to allow scanning from both sides of the weld, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 30 of 71

Relief Request 11 ON 002 15.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

15.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

15.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.C5.21.0055 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section XI, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.21 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1; Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section Xl, and the continuing periodic leakage inspections, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 31 of 71

Relief Request 11 ON 002 16.0 Weld #2HP-221-22 16.1. ASME Code Component(s) Affected Unit 2 Elbow to Valve 2HP-410 Weld, Weld #2HP-221-22, Summary Number 02.C5.21.0256 16.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 16.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-I, Item Number C5.21 Fig. IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 16.4. Impracticality of Compliance This item is a cast stainless steel valve welded to stainless steel seamless pipe. This weld has a diameter of 4.0 inches and a wall thickness of .531 inches.

Scanning requirements are described in 10CFR.50.55a(b)(2)(xv)(A)(1). The aggregate coverage was calculated as follows:

  • 600 shear waves obtained 50% coverage in one axial direction (51 -

elbow) 0 600 shear waves obtained 0% coverage in one axial direction (S2 -

valve)

  • 450 shear waves obtained 50% coverage in one circ. direction (S3 -

CW)

  • 450 shear waves obtained 50% coverage in one circ. direction (S4 -

CCW)

  • The aggregate coverage was calculated to be (50% + 0% +50% +

50%)/4 = 37.5%

In order to scan all of the required volume for this weld, the valve would have to be replaced with forged stainless steel, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 32 of 71

Relief Request 11 ON 002 16.5. Proposed Alternative and Basis for Use No alternative examinations are planned for the weld during the current inspection interval. Radiography (RT) is not a desired option because RT is limited in the ability to detect expected degradation mechanisms such as thermal fatigue cracking and stress corrosion crack initiating at the pipe inside surface. Additionally, radiography has not been qualified through performance demonstration.

16.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

16.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 02.C5.21.0256 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.21 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1; Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section Xl, and the continuing periodic leakage inspections, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 33 of 71

Relief Request 11 ON 002 17.0 Weld #3-PZR-WP26-4 17.1. ASME Code Component(s) Affected Unit 3 Pressurizer Upper Shell to Sampling Nozzle Weld #3-PZR-WP26-4, Summary Number 03.B3.110.0006 17.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 17.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-D, Item Number B3.110 Fig. IWB-2500-7 (a), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H-I 17.4. Impracticality of Compliance

  • Surface 1: Upper Shell - Carbon steel
  • Surface 2: Sampling nozzle - Carbon steel
  • Diameter: 5.750 in.
  • Thickness: 6.187 in.

The ultrasonic examination of this weld obtained 34.7% coverage of the required examination volume. Because of the weld configuration, the requirements of ASME Section V, Article 4, T-441.1.2(a), T-441.1.3, T-441.1.4, T-441.1.5 and T-441.1.6 could not be met. The aggregate coverage was calculated from the following base and weld metal scan results:

Weld coverage using 350, 450& 600 shear waves for axial scans (S1, S2), and 350 & 450 shear waves for circ. scans (CW, CCW) obtained 15.4% coverage.

Base material coverage using 350, 450& 600 shear wave for axial scans (Si) and 35°& 450 shear waves for circ. scans (CW, CCW) obtained 54.8% coverage.

  • 00 scan coverage obtained 33.9% coverage.
  • The aggregate coverage was calculated to be (15.4% + 54.8% +

33.9%)/3 = 34.7%.

The limitation was caused by the weld taper configuration created by the attachment of the sampling nozzle to the upper shell not allowing scanning from Surface 2. In order to scan all of the required volume for this weld, the upper shell to sampling nozzle attachment weld would have to be redesigned to allow scanning from both sides of the weld, which is impractical.

Page 34 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. The achieved coverage did not meet the acceptance criteria of this Code Case.

17.5. Proposed Alternative and Basis for Use No substitution alternative for this weld is available which would provide better coverage.

17.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

17.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 03.B3.110.0006 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump rate monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component tothe maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 35 of 71

Relief Request 11 ON 002 18.0 Weld #3-PZR-WP26-5 18.1. ASME Code Component(s) Affected Unit 3 Pressurizer Upper Shell to Sampling Nozzle Weld #3-PZR-WP26-5, Summary Number 03.B3.110.0007 18.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 18.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-D, Item Number B3.110 Fig. IWB-2500-7 (a), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H-I 18.4. Impracticality of Compliance

  • Surface 1: Upper Shell - Carbon steel
  • Surface 2: Sampling nozzle - Carbon steel
  • Diameter: 5.750 in.
  • Thickness: 6.187 in.

The ultrasonic examination of this weld obtained 34.7% coverage of the required examination volume. Because of the weld configuration, the requirements of ASME Section V, Article 4, T-441.1.2(a), T-441.1.3, T-441.1.4, T-441.1.5 and T-441.1.6 could not be met. The aggregate coverage was calculated from the following base and weld metal scan results:

Weld coverage using 350, 45°& 600 shear waves for axial scans (S1, S2), and 350 & 450 shear waves for circ. scans (CW, CCW) obtained 15.4% coverage.

Base material coverage using 350, 45%&600 shear wave for axial scans (51) and 35°& 450 shear waves for circ. scans (CW, CCW) obtained 54.8% coverage.

  • 00 scan coverage obtained 33.9% coverage.
  • The aggregate coverage was calculated to be (15.4% + 54.8% +

33.9%)/3 = 34.7%.

The limitation was caused by the weld taper configuration created by the attachment of the sampling nozzle to the upper shell not allowing scanning from Surface 2. In order to scan all of the required volume for this weld, the upper shell to sampling nozzle attachment weld would have to be redesigned to allow scanning from both sides of the weld, which is impractical.

Page 36 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. The achieved coverage did not meet the acceptance criteria of this Code Case.

18.5. Proposed Alternative and Basis for Use No substitution alternative for this weld is available which would provide better coverage.

18.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

18.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 03.B3.110.0007 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump rate monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 37 of 71

Relief Request 11 ON 002 19.0 Weld #3-PZR-WP26-6 19.1. ASME Code Component(s) Affected Unit 3 Pressurizer Upper Shell to Sampling Nozzle Weld, Weld #3-PZR-WP26-6, Summary Number 03.B3.110.0008.

19.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda.

19.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-D, Item Number B3.110 Fig. IWB-2500-7 (a), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H-I 19.4. Impracticality of Compliance

  • Surface 1: Upper Shell - Carbon steel
  • Surface 2: Sampling nozzle - Carbon steel
  • Diameter: 5.750 in.
  • Thickness: 6.187 in.

The ultrasonic examination of this weld obtained 34.7% coverage of the required examination volume. Because of the weld configuration, the requirements of ASME Section V, Article 4, T-441.1.2(a), T-441.1.3, T-441.1.4, T-441.1.5 and T-441.1.6 could not be met. The aggregate coverage was calculated from the following base and weld metal scan results:

Weld coverage using 350, 450& 600 shear waves for axial scans (S1, S2), and 350 & 450 shear waves for circ. scans (CW, CCW) obtained 15.4% coverage.

Base material coverage using 350, 450& 600 shear wave for axial scans (51) and 350& 450 shear waves for circ. scans (CW, CCW) obtained 54.8% coverage.

  • 00 scan coverage obtained 33.9% coverage.

° The aggregate coverage was calculated to be (15.4% + 54.8% +

33.9%)/3 = 34.7%.

The limitation was caused by the weld taper configuration created by the attachment of the sampling nozzle to the upper shell not allowing scanning from Surface 2. In order to scan all of the required volume for this weld, the upper shell to sampling nozzle attachment weld would have to be redesigned to allow scanning from both sides of the weld, which is impractical.

Page 38 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. The achieved coverage did not meet the acceptance criteria of this Code Case.

19.5. Proposed Alternative and Basis for Use No substitution alternative for this weld is available which would provide better coverage.

19.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

19.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 03.B3.110.0008 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump rate monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 39 of 71

Relief Request 11 ON 002 20.0 Weld #3-LDCA-IN-2V 20.1. ASME Code Component(s) Affected Unit 3 Letdown Cooler 3A Nozzle to Channel Body Weld #3-LDCA-IN-2V, Summary Number 03.B3.150.0001.

20.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda.

20.3. Applicable Code Requirement Table IWB-2500-1, Examination Category B-D, Item Number B3.150 Figure IWB-2500-7(c), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H.

20.4. Impracticality of Compliance

  • Surface 1: Channel Body - Stainless Steel
  • Surface 2: Inlet Nozzle - Stainless Steel
  • Diameter: 3.0 in.
  • Thickness: 0.875 in.

The ultrasonic examination of the Inlet Nozzle to Channel Body weld obtained 53.1% coverage of the required examination volume. ASME Section XI, Appendix III, 111-4420 requires coverage of the examination volume in two beam path directions and Appendix II1, 111-4430 requires scanning on the weld crown in two directions. Because of the weld configuration, these requirements could not be met. The aggregate coverage was calculated from the following base and weld metal scan results:

Base material coverage: 450 shear waves and 450, 600, and 700 longitudinal waves for the axial scans (S1)and 45 0shear waves for the circ scans (CW, CCW) obtained an aggregate coverage of 56.4%.

Weld metal coverage: 450 shear waves and 45°, 600, and 70° longitudinal waves for the axial scans(S1, 32) and 45 0shear waves for the circ scans (CW, CCW) obtained an aggregate coverage of 49.8%.

The aggregate coverage was calculated to be (56.4% + 49.8% =

106.2%)/2 = 53.1%.

The limitation was caused by the design of the nozzle weld taper configuration created by the attachment of the channel body connection to the nozzle not allowing for scanning from Surface 2. In order to scan all of the required volume for this weld, the inlet nozzle would have to be redesigned to allow scanning from both sides of the weld, which is impractical.

Page 40 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. The achieved coverage did not meet the acceptance criteria of this Code Case.

20.5. Proposed Alternative and Basis for Use No substitution alternative for this weld is available which would provide better coverage.

20.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

20.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 03.B3.150.0001 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump rate monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 41 of 71

Relief Request 11 ON 002 21.0 Weld #3-LDCA-OUT-5V 21.1. ASME Code Component(s) Affected Unit 3 Letdown Cooler 3A Nozzle to Channel Body Weld #3-LDCA-OUT-5V, Summary Number 03.B3.150.0002.

21.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda.

21.3. Applicable Code Requirement Table IWB-2500-1, Examination Category B-D, Item Number B3.150 Figure IWB-2500-7(c), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H.

21.4. Impracticality of Compliance

  • Surface 1: Channel Body - Stainless Steel
  • Surface 2: Outlet Nozzle - Stainless Steel
  • Diameter: 3.0 in.
  • Thickness: 0.875 in.

The ultrasonic examination of the Outlet Nozzle to Channel Body weld obtained 53.1% coverage of the required examination volume. ASME Section Xl, Appendix III, 111-4420 requires coverage of the examination volume in two beam path directions and Appendix III, 111-4430 requires scanning on the weld crown in two directions. Because of the weld configuration, these requirements could not be met. The aggregate coverage was calculated from the following base and weld metal scan results:

Base material coverage: 450 shear waves and 45°, 60°, and 70*

longitudinal waves for the axial scans (S1)and 45 0shear waves for the circ scans (CW, CCW) obtained an aggregate coverage of 56.4%.

Weld metal coverage: 450 shear waves and 450, 600, and 70' longitudinal waves for the axial scans(S1, S2) and 45 0shear waves for the circ scans (CW, CCW) obtained an aggregate coverage of 49.8%.

The aggregate coverage was calculated to be (56.4% + 49.8% =

106.2%)/2 = 53.1%.

The limitation was caused by the design of the nozzle weld taper configuration created by the attachment of the channel body connection to the nozzle not allowing for scanning from Surface 2. In order to scan all of the required volume for this weld, the inlet nozzle would have to be redesigned to allow scanning from both sides of the weld, which is impractical.

Page 42 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. The achieved coverage did not meet the acceptance criteria of this Code Case.

21.5. Proposed Alternative and Basis for Use No substitution alternative for this weld is available which would provide better coverage.

21.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

21.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 03.B3.150.0002 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump rate monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be, detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 43 of 71

Relief Request 11 ON 002 22.0 Weld #3-PDA1-1 22.1. ASME Code Component(s) Affected Unit 3 Reactor Coolant Pump 3A1 Casing Outlet Nozzle to Safe-End Piping Weld

  1. 3-PDA1-1, Summary Number 03.B9.11.0068.

22.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section X1, 1998 Edition through the 2000 Addenda.

22.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.1 1 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 22.4. Impracticality of Compliance Component configuration:

  • Surface 1: Stainless steel safe end
  • Surface 2: Cast stainless steel pump casing
  • NPS: 33.50 in.
  • Thickness: 2.330 in.

Scanning requirements are described in 10CFR.50.55a (b)(2)(xv)(A)(1). The aggregate coverage was calculated from the following:

  • 600 shear waves obtained 50% coverage in one axial direction (S1 -

safe end)

  • 600 shear waves obtained 0.0% coverage in one axial direction (S2 -

pump casing)

  • 450 shear waves obtained 50% coverage in one circ. direction (CW).
  • 450 shear waves obtained 50% coverage in one circ. direction (CCW).
  • The aggregate coverage was calculated to be (50% + 0% + 50% +

50%)/4 = 37.5%.

  • In addition, a best effort examination was performed using 600 and 700 longitudinal waves to the extent possible in the upper 2/3 area of interest.

The limitation was caused by the pump casing material. In order to scan all of the required volume for this weld, the pump casing would have to be redesigned, which is impractical.

Page 44 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

22.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section Xl, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval.

Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

22.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

22.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 03.B9.11.0068 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this B9.11 item. The result from the surface examination was acceptable.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 45 of 71

Relief Request 11 ON 002 23.0 Weld #3-PDB2-1 23.1. ASME Code Component(s) Affected Unit 3 Reactor Coolant Pump 3B2 Casing Outlet Nozzle to Safe-End Piping Weld

  1. 3-PDB2-1, Summary Number 03.B9.11.0074.

23.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda.

23.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.11 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 23.4. Impracticality of Compliance Component configuration:

  • Surface 1: Stainless steel safe end
  • Surface 2: Cast stainless steel pump casing
  • NPS: 33.50 in.
  • Thickness: 2.330 in.

Scanning requirements are described in 10CFR.50.55a (b)(2)(xv)(A)(1). The aggregate coverage was calculated from the following:

600 shear waves obtained 50% coverage in one axial direction (S1 -

safe end) 600 shear waves obtained 0.0% coverage in one axial direction (S2 -

pump casing)

  • 450 shear waves obtained 50% coverage in one circ. direction (CW).
  • 450 shear waves obtained 50% coverage in one circ. direction (CCW).
  • The aggregate coverage was calculated to be (50% + 0% + 50% +

50%)/4 = 37.5%.

In addition, a best effort examination was performed using 600 and 700 longitudinal waves to the extent possible in the upper 2/3 area of interest.

The limitation was caused by the pump casing material. In order to scan all of the required volume for this weld, the pump casing would have to be redesigned, which is impractical.

Page 46 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

23.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section XI, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval.

Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

23.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

23.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 03.B9.11.0074 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section XI, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this B9.11 item. The result from the surface examination was acceptable.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 47 of 71

Relief Request 11 ON 002 24.0 Weld #3-51A-52-44 24.1. ASME Code Component(s) Affected Unit 3 Pipe to Valve 3HP-105 Weld # 3-51A-52-44, Summary Number 03.C5.21.0024.

24.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda.

24.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.21 Figure IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 24.4. Impracticality of Compliance Component configuration:

  • Surface 1: Forged stainless steel valve
  • Surface 2: Stainless steel pipe
  • NPS: 3.0 in.
  • Thickness: 0.438 in.

Scanning requirements are described in 10CFR.50.55a (b)(2)(xv)(A)(1). The aggregate coverage was calculated from the following:

600 shear waves obtained 100% coverage in one axial direction (S1 -

valve) 600 shear waves obtained 100% coverage in one axial direction (S2 -

pipe)

  • 450 shear waves obtained 50% coverage in one circ. direction (CW).
  • 450 shear waves obtained 50% coverage in one circ. direction (CCW).
  • The aggregate coverage was calculated to be (100% + 100% + 50%

+ 50%)/4 = 75.0%.

The limitation was caused by the valve configuration. In order to scan all of the required volume for this weld, the valve would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 48 of 71

Relief Request 11 ON 002 24.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section XI, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval.

Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

24.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

24.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 03.C5.21.0024 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this C5.21 item. The result from the surface examination was acceptable.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1; Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations performed during this outage, the pressure testing (VT-2) examinations required by Section XI, and the continuing periodic leakage inspections, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 49 of 71

Relief Request 11 ON 002 25.0 Weld #N32389-3 WJ32 25.1. ASME Code Component(s) Affected Unit 3 Letdown Cooler Inlet Channel Body to Chemical Connector Weld #

N32389-3 WJ32, Summary Number PSI.

25.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda.

25.3. Applicable Code Requirement Table IWB-2500-1, Examination Category B-B, Item Number B2.51, Figure IWB-2500-1, 100% Volume Coverage of Examination Volume A-B-C-D.

25.4. Impracticality of Compliance

  • Surface 1: Inlet Channel Body - Stainless Steel
  • Surface 2: Chemical Connector - Stainless Steel
  • Diameter: 8.625 in.
  • Thickness: 0.875 in.

The ultrasonic examination of the Inlet Channel Body to Chemical Connector weld obtained 87.7% coverage of the required examination volume. ASME Section XI, Appendix III, 111-4420 requires coverage of the examination volume in two beam path directions and Appendix III, 111-4430 requires scanning on the weld crown in two directions. Because of the weld configuration, these requirements could not be met. The aggregate coverage was calculated from the following base and weld metal scan results:

Axial scan coverage: 450 shear waves and 450, 600, and 700 longitudinal waves in the S1 and S2 direction obtained an aggregate coverage of 97.2%.

  • Circ scan coverage: 450 shear waves obtained an aggregate coverage of 78.1%.
  • The total aggregate coverage was calculated to be (97.2% + 78.1% =

175.3%)/2 = 87.7%.

The component limitation was caused by the taper configuration of the chemical connector and the proximity of a nozzle within the scan area from the channel body. In order to scan all of the required volume for this component, the chemical connector and location of the adjacent nozzle would have to be redesigned to allow complete scanning from both sides of the weld, which is impractical.

Page 50 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. The achieved coverage did not meet the acceptance criteria of this Code Case.

25.5. Proposed Alternative and Basis for Use No substitution alternative for this weld is available which would provide better coverage.

25.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

25.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number PSI was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump rate monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 51 of 71

Relief Request 11 ON 002 26.0 Weld #N32389-3 WJ33 26.1. ASME Code Component(s) Affected Unit 3 Letdown Cooler Inlet Nozzle to Channel Body Weld # N32389-3 WJ33, Summary Number PSI.

26.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda.

26.3. Applicable Code Requirement Table IWB-2500-1, Examination Category B-D, Item Number B3.150 Figure IWB-2500-7(c), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H.

26.4. Impracticality of Compliance

  • Surface 1: Channel Body - Stainless Steel
  • Surface 2: Inlet Nozzle - Stainless Steel
  • Diameter: 3.0 in.
  • Thickness: 0.875 in.

The ultrasonic examination of the Inlet Nozzle to Channel Body weld obtained 60.6% coverage of the required examination volume. ASME Section Xl, Appendix III, 111-4420 requires coverage of the examination volume in two beam path directions and Appendix III, 111-4430 requires scanning on the weld crown in two directions. Because of the weld configuration, these requirements could not be met. The aggregate coverage was calculated from the following base and weld metal scan results:

Axial scan coverage: 450 shear waves and 450, 600, and 700 longitudinal waves in the S1 direction obtained an aggregate coverage of 52.6%.

Circ scan coverage: 450 shear waves obtained an aggregate coverage of 68.6%.

The aggregate coverage was calculated to be (68.6% + 52.6% =

121.2%)/2 = 60.6%.

The limitation was caused by the design of the nozzle weld taper configuration not allowing for scanning from Surface 2. In order to scan all of the required volume for this weld, the inlet nozzle would have to be redesigned to allow scanning from both sides of the weld, which is impractical.

Page 52 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. The achieved coverage did not meet the acceptance criteria of this Code Case.

26.5. Proposed Alternative and Basis for Use No substitution alternative for this weld is available which would provide better coverage.

26.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

26.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number PSI was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump rate monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 53 of 71

Relief Request 11 ON 002 27.0 Weld #N32389-3 WJ35 27.1. ASME Code Component(s) Affected Unit 3 Letdown Cooler Outlet Channel Body to Chemical Connector Weld #

N32389-3 WJ35, Summary Number PSI.

27.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda.

27.3. Applicable Code Requirement Table IWB-2500-1, Examination Category B-B, Item Number B2.51 Figure IWB-2500-1, 100% Volume Coverage of Examination Volume A-B-C-D.

27.4. Impracticality of Compliance

  • Surface 1: Channel Body - Stainless Steel
  • Surface 2: Chemical Connector - Stainless Steel
  • Diameter: 8.620 in.
  • Thickness: 0.875 in.

The ultrasonic examination of the Outlet Channel Body to Chemical Connector weld obtained 87.7% coverage of the required examination volume. ASME Section Xl, Appendix III, 111-4420 requires coverage of the examination volume in two beam path directions and Appendix III, 111-4430 requires scanning on the weld crown in two directions. Because of the weld configuration, these requirements could not be met. The aggregate coverage was calculated from the following base and weld metal scan results:

Axial scan coverage: 450 shear waves and 450, 60', and 70' longitudinal waves in the S1 and S2 direction obtained an aggregate coverage of 97.2%.

Circ scan coverage: 450 shear waves obtained an aggregate coverage of 78.1%.

The total aggregate coverage was calculated to be (97.2% + 78.1% =

175.3%)/2 = 87.7%.

The component limitation was caused by the taper configuration of the chemical connector and the proximity of a nozzle within the scan area from the channel body. In order to scan all of the required volume for this component, the chemical connector and location of the adjacent nozzle would have to be redesigned to allow complete scanning from both sides of the weld, which is impractical.

Page 54 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. The achieved coverage did not meet the acceptance criteria of this Code Case.

27.5. Proposed Alternative and Basis for Use No substitution alternative for this weld is available which would provide better coverage.

27.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

27.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number PSI was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump rate monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 55 of 71

Relief Request 11 ON 002 28.0 Weld #N32389-3 WJ36 28.1. ASME Code Component(s) Affected Unit 3 Letdown Cooler Outlet Nozzle to Channel Body Weld # N32389-3 WJ36, Summary Number PSI.

28.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda.

28.3. Applicable Code Requirement Table IWB-2500-1, Examination Category B-D, Item Number B3.150 Figure IWB-2500-7(a), 100% Volume Coverage of Examination Volume A-B-C-D-E-F-G-H-I.

28.4. Impracticality of Compliance

  • Surface 1: Channel Body - Stainless Steel
  • Surface 2: Outlet Nozzle - Stainless Steel
  • Diameter: 3.0 in.
  • Thickness: 0.875 in.

The ultrasonic examination of the Inlet Nozzle to Channel Body weld obtained 60.6% coverage of the required examination volume. ASME Section Xl, Appendix III, 111-4420 requires coverage of the examination volume in two beam path directions and Appendix III, 111-4430 requires scanning on the weld crown in two directions. Because of the weld configuration, these requirements could not be met. The aggregate coverage was calculated from the following base and weld metal scan results:

Axial scan coverage: 450 shear waves and 450, 600, and 700 longitudinal waves in the S1 direction obtained an aggregate coverage of 52.6%.

Circ scan coverage: 45' shear waves obtained an aggregate coverage of 68.6%.

The aggregate coverage was calculated to be (68.6% + 52.6% =

121.2%)/2 = 60.6%.

The limitation was caused by the design of the nozzle weld taper configuration not allowing for scanning from Surface 2. In order to scan all of the required volume for this weld, the outlet nozzle would have to be redesigned to allow scanning from both sides of the weld, which is impractical.

Page 56 of 7l

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. The achieved coverage did not meet the acceptance criteria of this Code Case.

28.5. Proposed Alternative and Basis for Use No substitution alternative for this weld is available which would provide better coverage.

28.6. Duration of Proposed Alternative This request is for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

28.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number PSI was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump rate monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 57 of 71

Relief Request 11 ON 002 29.0 Weld #3-PIA2-8 29.1. ASME Code Component(s) Affected Unit 3 Reactor Coolant Pump 3A2 Casing Nozzle to Safe-End Weld #3-PIA2-8, Summary Number 03.B9.11.0056 29.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 29.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.11 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 29.4. Impracticality of Compliance Component configuration:

  • Surface 1: Cast Stainless Steel Pump Casing
  • Surface 2: Stainless Steel Safe-end
  • NPS: 33.50 in.
  • Thickness: 2.330 in.

Scanning requirements are described in IOCFR.50.55a (b)(2)(xv)(A)(1). The aggregate coverage was calculated from the following:

60° shear waves obtained 0% coverage in one axial direction (S1 -

pump casing) 600 shear waves obtained 50% coverage in one axial direction (S2 -

safe-end)

  • 450 shear waves obtained 50% coverage in one circ. direction (CW).
  • 450 shear waves obtained 50% coverage in one circ. direction (CCW).
  • The aggregate coverage was calculated to be (0% + 50% + 50% +

50%)/4 = 37.5%.

In addition, a best effort examination was performed using 60' and 70' longitudinal waves to the extent possible in the upper 2/3 area of interest.

The component limitation was caused by the cast stainless pump casing material. In order to scan all of the required volume for this weld, the component would have to be redesigned, which is impractical.

Page 58 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

29.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section XI, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval.

Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

29.6. Duration of Proposed Alternative This request is proposed for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

29.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 03.1B9.11.0056 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 59 of 71

Relief Request 11 ON 002 30.0 Weld #3-PIB1-8 30.1. ASME Code Component(s) Affected Unit 3 Reactor Coolant Pump 3B1 Casing Nozzle to Safe-End Weld #3-PIB1-8, Summary Number 03.B9.111.0060 30.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 30.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.11 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 30.4. Impracticality of Compliance Component configuration:

  • Surface 1: Cast Stainless Steel Pump Casing
  • Surface 2: Stainless Steel Safe-end
  • NPS: 33.50 in.
  • Thickness: 2.330 in.

Scanning requirements are described in 10CFR.50.55a (b)(2)(xv)(A)(1). The aggregate coverage was calculated from the following:

60° shear waves obtained 0% coverage in one axial direction (S1 -

pump casing) 600 shear waves obtained 50.0% coverage in one axial direction (S2 -

safe-end)

  • 450 shear waves obtained 50% coverage in one circ. direction (CW).
  • 450 shear waves obtained5 0% coverage in one circ. direction (CCW).
  • The aggregate coverage was calculated to be (0% + 50% + 50% +

50%)/4 =37.5%.

In addition, a best effort examination was performed using 600 and 700 longitudinal waves to the extent possible in the upper 2/3 area of interest.

The component limitation was caused by the cast stainless steel pump casing material. In order to scan all of the required volume for this weld, the component would have to be redesigned, which is impractical.

Page 60 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

30.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section XI, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval.

Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

30.6. Duration of Proposed Alternative This request is proposed for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

30.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 03.B9.11.0060 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section XI, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 61 of 71

Relief Request 11 ON 002 31.0 Weld #3-PIB2-8 31.1. ASME Code Component(s) Affected Unit 3 Reactor Coolant Pump 3B2 Casing Nozzle to Safe-End Weld #3-PIB2-8, Summary Number 03.B9.11.0064 31.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 31.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.11 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 31.4. Impracticality of Compliance Component configuration:

  • Surface 1: Stainless Steel Safe-end
  • Surface 2: Cast Stainless Steel Pump Casing
  • NPS: 33.50 in.
  • Thickness: 2.330 in.

Scanning requirements are described in 10CFR.50.55a (b)(2)(xv)(A)(1). The aggregate coverage was calculated from the following:

600 shear waves obtained 50% coverage in one axial direction (S1 -

safe-end) 600 shear waves obtained 0% coverage in one axial direction (S2 -

pump casing)

  • 450 shear waves obtained 50% coverage in one circ. direction (CW).
  • 450 shear waves obtained 50% coverage in one circ. direction (CCW).
  • The aggregate coverage was calculated to be (50% + 0% + 50% +

50%)/4 = 37.5%.

In addition, a best effort examination was performed using 60' and 700 longitudinal waves to the extent possible in the upper 2/3 area of interest.

The component limitation was caused by the cast stainless steel pump casing material. In order to scan all of the required volume for this weld, the component would have to be redesigned, which is impractical.

Page 62 of 71

AITACHMENT h PAGE 2 -7 OF 91 ApDuke UT Pipe Wt 1d Examination Site/Unit: Oconee / 2 Procedure: PDI-UT-2 Outage No.: 02-23 Summary No.: 02.B9.11.0067 Procedure Rev.: C Report No.: UT-08-141 Workscope: ISl Work Order No.: 01794421 Page: 1 of 4 Code: 1998 Cat./Item: B-J /B9.11 Location:

Drawing No.: 2-53A-10

Description:

Valve 2LP-1 to Pipe System ID: 53A Component ID: 2-53A-10-3 Size/Length: N/A Thickness/Diameter: 1.125/12.0 SS Limitations: Yes - See Attached Limitation Report Start Time: 1401 Finish Time: 1430 Examination Surface: Inside F- Outside 21 Surface Condition: AS FOUND.

Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07125 Temp. Tool Mfg,: D.A.S Serial No.: MCNDE32825 Surface Temp.: 66.3 °F Cal. Report No.:. CAL-08-147 cAL 49 Angle Used 0 45 45T 60 60L j Scanning dB 43,4 43.4 81.2 Indication(s): Yes ] No [] Scan Coverage: Upstream [ Downstreamf[] CW 0./ CCW/

Comments:

FC 08-01, 08-04 Results: Accept ,E Reject [] Info r] Initial Section XI Exam Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No

ATIACRMWl PA6E -2S-0F ?,

DUKE ENERGY COMPANY ISI LIMITATION REPORT Summary #: 02.B9.11.0067 Component ID 2-53A-10-3 remarks:

[ NO SCAN SURFACE BEAM DIRECTION Due to Valve Configuration El LIMITED SCAN Z 1 E3 2 El 1 [] 2 N cw 5ý ccw FROM L N/A to L N/A INCHES FROM WO CL to Beyo,,,_

ANGLE: 0 0 0 45 Dl 60 other FROM o DEG to 360 DEG ._i

] NO SCAN SURFACE BEAM DIRECTION Due to Valve Configuration

-LIMITEDSCAN i1 -2 - 1 EE 2 [] cw - ccw FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: El0 E 45 El 60 other 60L FROM 0 DEG to 360 DEG El NO SCAN SURFACE BEAM DIRECTION

-LIMITED SCAN i1 -l2 1 El2-El cw [ ccw FROM L to L INCHES FROM WO to _

ANGLE: El0 l 45 E3 60 other FROM DEG to DEG El NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN 01lFI E2 [1 1 E- 2 0- cw - ccw FROM L to L INCHES FROM WO to S ketch(s) attached ANGLE: El 0 El 45 El 60 .. other FROM _ DEG to DEG Z yes -- No f

- X:

Prepared By: Garland 11-13-2008 . Sheet '2 of 4 Reviewed By: Date: Aut ze Insg c Date :

  • /1/I7/,4fr C.

- I L/

Determination of Percent Coverage for UT Examinations - Pipe Site/Unit: Oconee / 2 Procedure: PDI-UT-2 Outage No.: 02-23 Summary No.: 02.19.11.0067 Procedure Rev.: C Report No.: UT-08-141 Workscope: ISI Work Order No.: 01794421 Page: 3- of 4 45 deg Scan 1  % Length X  % volume of length / 100 =  % total for Scan 1 Scan 2  % Length X  % volume of length / 100 =  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by # scans 50.000  % total for 45 deg Other deg - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1 100.000  % Length X 0.000  % volume of length / 100 = 0.000  % total for Scan 1 Scan 2 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 2 Scan 3  % Length X  % volume of length / 100 =  % total for Scan 3 Scan 4  % Length X  % volume of length / 100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor Site Field Supervisor: Date:

Date: / ~

Supplem, al Report AITACRMEN1 U -,j8-141 L-.jke Rhelvy Page'. 4 of 4 Summary No.: 02.69.11.0067 Examiner: Johnson, Garland Level: Il-N Reviewerd ___

___ ___ ___ ___ c~e ___ __

Examiner Level: -N Site Review Other: N/A Level: N/A Date ____

ANII Rvtewe Comments:

Sketch or Photo: Z:\UT\lDOEALTProfileLine2.jpg PIPE - '::,7- I VuA LvL-

-FLOW, hýL,-!T cv <

A.

r-11:>

is U

S/

I

UT Pipe WV,,d Examination PAC E E6 PtiDuke Site/Unit: Oconee I 2 Procedure: PDI-UT-2 Outage No.: :02-23 Summary No.: 02.C5.11.0005 Procedure Rev,: 9C Report No.: UT-08-139 Work Order No.: 01794758 Page: 1 of 6 Workscope: IS.

Code: 1998 Cat./Item: C-F-1/C5.11 Location:

Drawing No.: 2LP-150

Description:

Pipe to Valve 2LP-48 System ID: 53A Component ID: 2LP-150-17 Size/Length: N/A Thickness/Diameter: 1.125/10.0 SS Limitations: Yes - See Attached Limitation Report Start Time: 1056 Finish Time: 1117 Examination Surface: Inside 7 Outside Fv] Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07125 Temp. Tool Mfg.: D.A.S Serial No.: MCNDE32825 Surface Temp.: 63 ýF Cal. Report No.: CAL-08-,141, CAL-08-142, CAL-08a`143 Angle Used 0 45 45T 60 60L I Scanning dB 34.3 34.3 49.4 62.8 Indication(s): Yes C No 7 Scan Coverage: Upstream

  • Downstream F- CW 3 CCW Comments:

FC 08-01, 08-04 Results: Accept D Reject EJ Info _-_ _

Percent Of Coverage Obtained> 90%: No Reviewed Previous Data: Yes Examiner Level Ili-N .ý. r" IrS-gnat Date Reviewer Signature Date Stauffer, Lester, E. - 11/11/2008 .

Examiner Level Ii-N '- Signature Date Site Review Signature Date Howard, Dean M. t1111/2008 N/A O5ther Level N/A Signature Date JANIIe1w Sig Date N/A 11/11120081 ew1

A11ACHmEFI, A PASE 3 -,- OF 91 Ultrasonic hiuication Report Duke OEner-_qy--

,JW Site/Unit: Oconee Procedure: PDI-UT-2 Outage No.: 02-23 02.0C5.11.0005 Procedure Rev.: C Report No.: UT-08-139 Summary No.:

Workscope: IS' Work Order No.: 01794758 Page: 2 ot 6 Search Unit Angle: 60L Ce) Piping Welds C'L W1 MV2 Wo Location: Weld Centerline C) Ferritic Vessels > 2"T 7 I nI rc.tiinn" Q1 1 1 C" Other MP Metal Path Wmax Distance From Wo To S.U. At Maximum Response .............U~

RBR Remaining Back Reflection WI Distance From Wo At Of Max (Forward)

I

___Lo L Distance From Datum W2 Distance From Wo At Of Max (Forward) 132 1 Comments: FC 08-01, 08-04 I' NV2 Indication  % W Forward Backward Li L L2 RBR Remarks Angle No. Of Max Of Max Of Max Of Max Of Amp.

DAC W MP W. MPI W2 MP Max Max 60L 1 125 .80 2.027 N/A N/A N/A N/A N/A 350 N/A N/A Geometry-360' Continuous

..... ' " I, " IJ ' . . . . ..

Examiner Levl! ii'kN. Signature. Date Reviewer i Signature Date Stauffer, Lester. E. -"-, 11/-2008 // /Date-"

Examiner Level 11.14 Signature Date Site Revi 4' Signature Date Howard, Dean M.

  • _11/,11/2008. N/A Other Level N/A Signature Date ANL Review gnature Date N/A 11/11/2008 lg/~~ntre

ATTACHMENT A PA6E33 Of (

DUKE ENERGY COMPANY ISI LIMITATION REPORT Summary #: 02.C5.11.0005 Component ID 2LP-150-17 remarks:

Z NO SCAN SURFACE BEAM DIRECTION No scan due to valve Li LIMITED SCAN { 1 7i 2 Li 1 [ 2 Z cw 0 ccw SurfaceI FROM L N/A to L :N/A INCHES FROM WO 0 to Beyond ANGLE: Li 0 [ 45 PQ60other 60L FROM o DEG to 360 DEG Li NO SCAN SURFACE BEAM DIRECTION LIMITED SCAN -1 Lj 2 1 [j2 ] cwi] ccw FROM L to L INCHES FROM WO to _

ANGLE: [3 0 Fl 45 Li 60 other FROM DEG to DEG i NO SCAN SURFACE BEAM DIRECTION LIMITED SCAN "1 E 22 1 i [-1 cw ] ccw FROM L to L INCHES FROM WO to ANGLE: Fi 0 [] 45 [3 60 other FROM DEG to DEG Li NO SCAN SURFACE BEAM DIRECTION Li LIMITED SCAN 1ii Li 2 1 l- 2 i cw c.cw FROM L to L INCHES, FROM WO to Sketch(s) attached ANGLE: [L 0 L] 45 Li 60 other FROM DEG to DEG 0 yes L No Prepared By: L. Staufeevel: Date: 11-11-2008 Sheet q of 6 Reviewed By: 6 Date: / , Authorized Inspector: - - , Date:

..... g (J ýj

ATTACHMEN1 A PASE 3q Of g Duke Supplemental Report Report No.: UT-08-139 Page: 4 of 6 Summary No.: 02.C5.11.0005 Examiner: Stauffer, Lester, Level: IlI-N Reviewer:

Level: II-N Examiner: Howard, Dean M. Site Review: N/A ,e4 4z Da Dae Other: NIA Level:. NA, ANtI Review: A 4-k

  • A iL Date:

Comments: Ind. #1 60L - Geometry Sketch or Photo,.UAT'0q,", I Vf-q -ý,VC.

-- -ý.-VACZ I-T> "nC.

A~

Supplemee . Report PABE 35 UF 3 1 Repon No.: U7T 39 Page. 5 of 6 Summary No. 02-C5.1 1.0005 Examiner: Stautfer, Lester,~<i~'~. i Level: JIMN Reviewer:

Exami-ner, Hloward; Dean M Level: I1-N Site Review: N/A-Date, _____

Other: NIA Level: N/A ANIt Review:

Pate:

(~I 4, A~D - 1 0r2~

Z- C \d

ýe 61 N(D ,--OL-ezýeA Z3:-

.Z~Yt5r'-

Q~~~ C 30k 6O i

ukDie Determination of Percent Coverage for UT Examinations - Pipe Site/Unit: Oconee ! 2 Procedure: PDI-UT-2 Outage No.: 02-23 Summary No.: 02.C5.11,0005 Procedure Rev.: C Report No.: UT-08-139 Workscope: ISI Work Order No.: 01794758 Page: 6 ot 6 45 deg Scan 1 100,000  % Length X 0.000  % volume of length / 100 = 0.000  % total for Scan 1 Scan 2 100.000  % Length X 50.000  % volume ot length / 100 = 50.000  % total for Scan 2 to Scan 3 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 37.500  % total for 45 deg Other deg - _ (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans, Scan 1  % Length X  % volume of length /100 =  % total for Scan 1 Scan 2  % Length X  % volume of length / 100 =  % total for Scan 2 Scan 3  % Length X  % volume of length / 100 =  % total for Scan 3

,Scan 4  % Length X  % volume of length / 100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor: SieFil Sprisr Dio Da (e.- I I ýj 'f 10 ?

AITAC MM EN 'T PAfiE31 OF 81 UT Pipe Wt-id Examination Site/Unit: Oconee / 2, Procedure: PDI-UT-2 Outage No.: 02-23 Summary No.: 02.C5.11.0021 Procedure Rev.: C Report No.: UT-08-156 Workscope: ISI Work Order No.: 01795191 Page: 1 of 4 Code: 1998 Cat./Item: C-F-1/C5.11 Location:

Drawing No.: 2LP-217

Description:

Valve 2LP-178 to Pipe System ID: 53A Component ID: 2LP-217-8 Size/Length: N/A Thickness/Diameter: 1.0/10.0SS Limitations: Yes - See Attached Limitation Report Start Time: 0940 Finish Time: 1014 Examination Surface: Inside D Outside ., Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07125 Temp. Tool Mfg.: D.A.S Serial No.: MCNDE32824 Surface Temp.: 69 °F Cal. Report No.: CAL-08-1:64, CAL-08-165, CAL-08-166 Angle Used 0 t45 45T 60t 60L 1 Scanning dB E 31.0 31.0 51.0 58 Indication(s): Yes [.1 No j Scan Coverage: Upstream j Downstream LJ CW S) CCW 0 Comments:

FC 08-01, 08-04 Results: Accept E Reject F Into J.7 Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level Siaiure uIl-N - Date Reqyiver A Signature Date D

11/ 13/ 2 8 q St a u ff e r , Le s t e r, E .

Examiner Level It-N . Sianature Date Site Review Signature Date Hollis, Jacob 1/ 11/13/2008 N/A -

Other Level N/A Signature Date ANII Rev ew ,,.., Signpi ure Date N/A 11/13/2008 - J 5ZA~/K~~4>d4~LC /

Limitation Record

&M.

SiteiUnit: Oconee I 2 Proceduro: PDI-IUT-2 Outage No.: 02-23 nary No.: 02.CS.11.0021 Procedure Rev.: Report No.: UT-08-1 55 Workscopeý 1S Work Order No.: 01795191 Page: 2. of 4 Description ol Limitation:

Limitation due to valve configuration.

LU-f I

  • .! belch ol Limitation: I t- C.--J L

- Q~o~

a

/10 CiW - 0 t

I.:

Limitations removal requirements:

Radiation lield:

Examiner Level 111-N Signature Date Fevi. r Signature

.ate Stauffer, Lester, E. Fl.

Date..1I1I~o Signture Examiner Level II-N Signatur Date Sile Review Signature Date Hisot, J,,ob 111131200 8 I wA Other Level NIIA Signature Date ANtI Ieview Sgn aI N/A 1111312008 / Ck$44 ~ ~ ifi-

WOuke Determination of Percent Coverage for r&Energy- UT Examinations - Pipe Site/Unit: Oconee / 2 Procedure: PDl-UT-2 Outage No.: 02-23 Summary No.: 02.C5.11.0021 Procedure Rev.: .C Report No.; UT-08-156 Workscope: ISI Work Order No.. 01795191 Page' 3 of 4 45 deg Scan 1  % Length X  % volume of length 1 100 =  % total for Scan 1 Lý! C=3

% Length X  % volume of length / 100 =  % total for Scan 2 Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length 1100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length 1100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50,000  % total for 45 deg Other denq - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan I 100.000.  % Length X 50.000  % volume of length /100 = 50.000 %total for Scan 1 Scan 2 1.00.000  % Length X 0.000  % volume of length /100 = .000 .% total for Scan 2 Scan 3  % Length X  % volume of length /100 =  % total for Scan 3

% volume of length /100 =  % total for Scan 4 Scan 4 .... __% Length X Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam ii I//I,,.. Dale: .L14LI~tQ.~

Site Field Supervisor: Site Field Supervisor: Date: /I q /0

AIIACHMENT A PA6E /4O OF Y/

DUKE ENERGY COMPANY ISI LIMITATION REPORT _

Summary #: 02.C5.11.0021 Component ID 2LP-217-8 remarks:

Z NO SCAN SURFACE BEAM DIRECTION [N- Sca* duc I) VaJve Fl LIMITED SCAN El 1 [ 2 [ 1 El 2 N cw ccw Conf-iourauon FROM L N/A to L N/A INCHES FROM WO CL to: Bcond ANGLE: 0 i 0l 45 Z 60 other 60L FROM o DEG to 36o DEG El NO SCAN SURFACE BEAM DIRECTION I El LIMITED SCAN El E 2 El1 El 2 cw El ccw FROM L to L INCHES FROM WO to _ _

ANGLE: El 0 El 45 El 60 other FROM DEG to 'DEG LI NO SCAN SURFACE BEAM DIRECTION 1.

-LIMITED SCAN E] 1 E2 El-1 L2 cw [ccw I FROM L to. L INCHES FROM WO to .. _

ANGLE: ED 0 El 45 El 60 other FROM DEG to DEG El NO SCAN SURFACE BEAM DIRECTION

'- LIMITED SCAN l1 -- 2 Eli 2l Elcw E- ccw FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: El 0 [E 45 El 60 other FROM DEG to DEG C yes El No Prepared By: Stauff. .L-,el: LL. ii, Date: 11-)3-2008 Sheet 4 of 4 Reviewed By: Dale: Authorize Inspector: Date .

AITACHMENT A UT Pipe WVd Examination PABE41 OF 81 Duk Site/Unit: Oconee / 2 Procedure: P'DI-UT-2 Outage No.: 0.2-23.

Procedure Rev.: C Report No.: UT-08-138 Summary No.: 02.C5.11.0025 is[ Work Order No.: 0 1794767 Page: 1 of 6 Workscope:

Code: 1998 Cat./Item: C-F-1/C5.11 Location:

Drawing No.: 2-53A-9

Description:

Pipe to Valve 2LP-48 System ID: 53A Component ID: 2-53A-9-16 Size/Length: N/A Thickness/Diameter: 1.00/10.0 SS Limitations: Yes - See Attached Limitation Report Start Time: 1038 Finish Time: 1055 Examination Surface: Inside E Outside [ Surface Condition: AS GROUND Lo Location: 9.111.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07125 0

Temp. Tool Mfg.: D.A.S Serial No.: MCNDE32825 Surface Ten P.: 63 F Cal. Report No.: CAL-08i 41, CAL-08142. CAL;:08-143 Angle Used .0 45 45T1 60 60L "

Scanning dB 34,3 34.3 49.4 1 62.8. ..

Indication(s): Yes 17 No 7 Scan Coverage: Upstream[ ] Downstrearr R CW E CCWIZ Comments:

FC 08-01, 08-04 Results: Accept F] Reject F info 3 Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

A71ACHMEN1 A Ultrasonic i1,lication Report PASE #L2 OF P~uke (rnergy PDI-UT-2 Outage No.: 02-23 Site/Unit: Oconee / 2 Procedure:

Summary No.: 02.Cl5.11.0025 Procedure Rev.: C097 Report No.: UT-08-138 Workscope: ISI Work Order No.: 01794767 Page: 2 of 6 Wo %lyax Search Unit Angle: 60L (ý) Piping Welds CL W1 W2 Wo Location: Weld Centerlilne 0 Ferritic Vessels > 2"T L A, r'.*tic~n" 0 1 1 1 (Th Other


~------ -ý--OIV, MP Metal Path Wmax Distance From Wo To S.U. At Maximum Response RBR Remaining Back Reflection W1 Distance From Wo At Of Max (Forward) -- A L Distance From Datum W2 Distance From Wo At Of Max (Forward)

Comments: FC 08-01, 08-04 lien~

Indication  % W Forward Backward LI L L2 RBR Remarks Angle No. Of Max Of Max Of Max Of Max Of Amp.

DAC W MP WI MP W2 MP Max Max 60L 1 125 .80 2.10 N/A N/A N/A N/A N/A 360 N/A N/A Geometry -360 Continuous NIA 1/1 J208 I ý-

Stauffer, Lester, E. 1/120 Howard, Dean M. 1/120 /

Leel NA Othe Sgnature Date* ANII Reve S io{iure Date6

AT TACHMEN1 A MAE Z/3 OF 9I V Energy. Supplemt-,al Report Reporl No.: UT-08-138 Page: 3 of 6 Summary No.: 02.C5,11.0025 Examiner: Stauffer, Lest ' Level: IlI-N Reviewer: PUL~4111MO Date:/ (6 Examiner: Howard, Dean M.. Level: I1-N Site Review: ,N/A, 4, Dale:______

Other: N/A Level: N/A ANII Review: Dale: ________2 Comments: Ind. #1 60L - Geometry -

Sketch or Photo: Z:\UT\ICODEAL\ProieLine2.ipg ccc.

ri-~

~ - -

V A LýO

£ ~- -

'4)

~ 0

.. ,¶ r

ATIACHMENT A ANN -AWj* Suppleme I Report #4I 1 OF Report No.: U 138 Page: 4 of 6..

Summary No.: 02.C5.11.0025 Examiner: Stauffer, Lse Level: I1l-N Reviewer: Date: 0 Examiner: Howard, Dean Level: li-N Site Review: NIA Date:

Other: NIA Level: N/A ANII Review: Dale:

Comments:

AJ'5o rI~tAx nEAc~ -'r~

5

- Jo nQ 4~~

S? -\'Al~/

L$~&O~J(IO&) ~ *0 4 ' -)7 C :5, 1/, CCV- -

A~AC* d~ftf~ *(-) mv 9~ ~j e.

ý Iýý " -ta (I 4"r

Al IACHMI1A PAFE qS OF ý t DUKE ENERGY COMPANY ISI LIMITATION REPORT Summary #: 02.C5.11.0025 Component ID 2-53A-9-16 remarks:

Z NO SCAN SURFACE BEAM DIRECTION No scan due to valve on El LIMITED SCAN 0'- 1 2 Z 1 [-] 2 Z cw Z ccw surface2.

FROM L N/A to L N/A INCHES FROM WO0 to Beyond ANGLE: El 0 Z 45 Z 60 other 60L FROM o DEG to 360 DEG El NO SCAN SURFACE BEAM DIRECTION E] LIMITED SCAN Eli El 2 -- 1 E 2 El cw El ccw FROM L to L INCHES FROM WO to ._.!

ANGLE: El 0 Fl 45 Fl 60 other FROM DEG to DEG El NO SCAN SURFACE BEAM DIRECTION ElLIMITED SCAN l2 El 1 1 2 Elc w 0 ccw FROM L to L INCHES FROM WO to ANGLE: El 0 El 45 l 601 other FROM., DEG to DEG El NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN Fi 1 [12 El 1 El 2 El cw El ccw to L INCHES FROM WO to Sketch(s) attached FROM L ANGLE: 0 45 Fý 60 0 ther FROM __ DEG to_ DEG, E yes El No

Deter mination of Percent Coverage for UT Examinations - Pipe Site/Unit' 'Oconee I 2 Procedure: PDI-UT-2 Outage No.: 02-23

  • Summary No.: 02.C5.11.0025 Procedure Rev,: C Report No.: UT-08-138

--tWorkscope: ISt Work Order No.: 01794767 Page: 6 of 6 45 de1%

Scan 1 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 1 Scan 2 100.000  % Length X 0.000  % volume ol length /100 = 0.000  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length 1100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 37.500  % total for 45 deg Other deg - (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1  % Length X  % volume of length / 100 =  % total for Scan 1 Scan 2 _% Length X  % volume of length / 100 =  % total for Scan 2 Scan 3  % Length X  % volume of length / 100  % total for Scan 3 Scan 4  % Length X  % volume of length / 100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor: ?i~ J/07~* Date:

Note- 600 RL scan not included in percentage coverage due to requirements of 10CFR50.55a(b)(2)(xv)(A)(1). Best effort scan with 60° RL obtained 50% coverage in or~e axial direction.

UT Base Met . amination A11ACHMNt~

W En A-,fke ergy. PA6E ýJOf 81 Site/Unit: Oconee / 2 Procedure: NDE-640 Outage No.: N/A Summary No.: 02.C5.11.0034 Procedure Rev.: 04 Report No.: BOP-UT-08-036 Work Order No.: 01795187 Page: 1 of 2 Workscope: ISI / 2EOC23 Code: 1998/2000 Addenda Cat./Item: N/A Location: N/A Drawing No.: 2LP-189

Description:

Pipe to Elbow System ID: 53A Component ID: 2LP-189-14 Size/Length: N/A Thickness/Diameter: 1.0 / 10.0 SS Limitations: None Start Time: 1034 Finish Time: 1038 Examination Surface: Inside 3 Outside 1 Surface Condition: GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07125 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32795 Surface Temp.: 63 OF Scanning dBi 50 Cal. Report No.: CAL-08-160

% Amplitude Position One Position Max Position Two Ind.

No. Loss  % -. Remarks Back Wall Full Screen Li W1 W2 MP LM Wi W2 MP L2 W1 W2 MP NRI Comments:

Results: Accept or Reject L] Info [ Initial Section XI Exam Percent Of Coverage Obtained > 90%: Yes Reviewed Previous Data: No-..

Leeper, Winfred Level C. 11-N >.3gnure DaExaminer Date Reviewer 11/17/2008 Signature . ',.( Date De Examiner Level U.N . .. / lu. e Date Site Review Signature Date, Howard, Dean M. 11/1712008 N/A Other Level N/A Signature Date AW Review ignature Date N/A 11/1712008 . / -. / // yC<

AIIACHMEN, A Duke uppleme,,lal Report PA 6E0Z *'1 OF Report No.: BOP-UT-08-036 Page: 2 of 2 Summary No.: 02.C5.11.0034 Examiner: Leeper, Winfred C. ")JIA,> " Level: It-N Reviewer: Date: I1" Examiner: Howard, Dean M.Y;t7 Level: I1-N Site Review: N/A Date:

Other: N/A Level: N/A ANII Review: / yZ " Date:

Comments:

Sketch or Photo: Z:\UT'IDDEAL\ProfileLine2.jpg

-1% .--- ,0 O o0>C >O , ) e0 z

A11AttMk UT Pipe Weid Examination PAE 1/9 OF 8 Site/Unit: Oconee / 2 Procedure: PDI-UT-2 Outage No.: 02-23 Summary No.: 02.C5.11.0034 Procedure Rev.: C Report No.: UT-08-155 Workscope: ISt Work Order No.: 01795187 Page: 1 of 5 Code: 1998 Cat/Item: C-F-1/C5.11 Location:

Drawing No,: 2LP-189

Description:

Pipe to Elbow System ID: 53A Component ID: 2LP-189-14 Size/Length: N/A Thickness/Diameter: 1.0 / 10.0 SS Limitations: Yes - See Attached Limitation Report: Start Time: 1040 Finish Time: 1110 Examination Surface: Inside - Outside [ Surface Condition: GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld .... Couplant: ULTRAGEL II Batch No.: 07125 Temp. Tool Mfg.: Lutron Serial No.: M.CNDE32795 Surface Temp.: 63 °F Cal. Report No.: "CAL-08-161, CAL-08-162. CAL-68-163.

Angle Used 0 45 .45T 60 60L. l Scanning dB 36 36 52 49.

Indication(s): Yes ] No E/) Scan Coverage: Upstream [ Downstream L CW 0/ CCW Comments:

FC 08-01, 08-04 Results: Accept "] Reject [] Info Initial Section XI Exam Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No Examiner Level Il-N Signalure Date Reviewer Signature fate

/17/200.8 /Sr11 Howard, Dean M.

Examiner Level Il-N 2..tgn ure Date Site Review Signature Date Leeper, Winfred C. IA- /" -. - 11/17/2008 N/A Other Level N/A Signatdre Date ANII R view .,, .. <,-Sgnau$. ,. Date N/A 11/17/2008 .. A--t*y Q (-.Y ,--- , i/"'

AIIACHMEN /1 PA r rl6 A Fi~(

DUKE ENERGY COMPANY ISf LIMITATION REPORT Summary#: 02.C5.11.0034 Component ID 2LP-189-14 remarks:

j NO SCAN SURFACE BEAM DIRECTION i Due to Permancn, H'ngecr D LIMITED SCAN [1 112 []1 2 [cw ccw .

FROM L -3.0" to L +3.0" INCHES FROM WO 5' to Beyond _ _ _

ANGLE: fl 0 Z 45 Z 60 other FROM N/A DEG to N/A DEG.

[ NO SCAN SURFACE BEAM DIRECTION Due to Perament Hanger

[] LIMITED SCAN [1 22 Z cw [] ccw FROM L 14.875 to L 21 87 INCHES FROM WO " to Beyond ANGLE: [1 0 Z 45

  • 60 other FROM N/A DEG to N/A DEG 17 NO SCAN SURFACE BEAM DIRECTION LI LIMITED SCAN r- 1 -2 Ei 1 2 Dcw fj]ccw FROM L to L INCHES FROM WO 'to ANGLE:..- 0 E] 45 [3 60 other FROM _ DEG to6 DEG NO SCAN SURFACE BEAM DIRECTION

[- LIMITED SCAN r--1 1 - 2 0 1 [1 2 D cw [] ccw FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: 10[1 45 11 60 other__ FROM _ DEG to _ DEG Z yes [] No Prepared By: Winfred Leeper Reviewed By:

AI IACHMENT A Supplemn-..tal Report PABEg5"/ OF 31 Reportl N .: UT-08-155 rO-Ene.igy- Page: 3 of 5:

Summary No.ý 02.C5.11.0034 Examiner, Howard, Dean M. * - Level: ti-N Reviewer: 2,.,

Date Examiner Leeper, Winfred C. Level: Il-N Site Review: N/A Othec N/A Z Level: N/A AN II Review: A .Dae:'

Comments:

Sk~etchi or Pholo: ZAUT'iDDEALProfiils~ne2.jpg PLýZ WLAA/& AlT 4A&A~6ftZ'.

gL. C3-f&L~iA 0

I I II

ATTACHMENT ,

PA6E 51 OF gI Supplemental Report Report No. UT-08-155 Page: 4 of 5 Summary No.: 02,C5.11.0034 Reviewer:

  • I-Examiner: Howard, Dean M. .A '. . Level: Il-N Daie.

Examiner Leeper, Winfred C. . Level: I1-N Site Review: N/A . , Date.

Other: N/A Level: N/A ANtI Review:

Date .______

-- {.

Comments:

A Wý-(-a R r/ ?Z(( h,<2 -/ (/

Sketch or Pholo:

-. z I

':3, VI "A

I.

Determination of Percent Coverage for, UT Examinations- Pipe Site/Unit: Oconee I 2 Procedure: PDI-UT-2 Outage No.: 02-23

" Summary No.: 02.C5.11.0034 Procedure Rev.: C Report No.: UT.08-155 Workscope: ISI Work Order No.: 01795187 Page: 5 of 5 45dea Scan A' 61.500  % Length X 100.000  % volume of length /100 = 61.500  % total for Scan 1 Scn- ' d ScanZ3 61.500  % Length X 100.000  % volume of length /100 = 61.500 %total for Scan 2 Scan 3 38.500  % Length X 50.000  % volume of length / 100 = 19.250  % total for Scan 3 Scan 4 38.500  % Length X 50.000  % volume of length / 100 = 19.250 0/ total for Scan 4 Add totals and divide by # scans = 40.375  % total for 45 deg Other den - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1 61.500  % Length X 100.000  % volume of length / 100 = 61.500 %total for Scan 1 Scan 2 61.500  % Length X 100.000  % volume of length / 100 = .61.500  % total for Scan 2 Scan 1' 38.500  % Length X 0.000  % volume of length 100 = 0.000  % total for Scan 3 Scanf 38.500  % Length X 50.000  % volume of length / 100 = 19.250  % total for Scan 4 Percent complete coveraqe Add totals for each scan required and divide by # of scans to determine; r ...969..  % Total for complete exam Site Field Supervisor: 1/4,at Date: S.& K f

AI1ACHMENT PAGE_5q OPE)

UT Pipe W-vid Examination Site/Unit: Oconee / 2 Procedure: N DE-600 Outage No.: 02-23 Summary No.: 02.C5.11.0036 Procedure Rev.: 17 Report No.: UT-08-164 Workscope: ISI Work Order No.: 01794767 Page: 1 of 5 Code: 1998 Cat./Item: C-F-1/C5.11 Location:

Drawing No.: 2LP-215

Description:

Pipe to Flow Restrictor System ID: 53A Component ID: 2LP-215-17 Size/Length: N/A Thickness/Diameter: 1.0/10.0SS SizeLenta N/A ThiknesshTimeter: 105 Limitations: Yes - See Attached Limitation Report Examination Surface: Inside [ Outside Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07125 0

Temp. Tool Mfg.: Lutron Serial No.: MCNDE32795 Surface Temp.: 51 F Cal. Report No.: C.AL-08-182, CAL-081 83, CAL-08-184 Angle Used 0 45 45T 60 60L Scanning dB 45 60 40 Indication(s): Yes Ml No 7v Scan Coverage: Upstream []j Downstream D CW [] CCW Comments:

FC 08-03 Results: Accept E Reject Into  !--I _

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Hou se r, Gayle Level E. ti-N Signature 1.1 /2Date 0 , -;*,v Reviewer M F ' ,t - :* at r I - o *D<ate,:..

Examiner Level N/A Signature Date *Site Reiewv..Siatiie Date N/A 11/19/2008 N/A Other Level N/A Signature Dat e ANII ReaI yS'te N/A..11/19/2008 ale.

AlTTACHMENT A PAUE S5 OF ý31 DUKE ENERGY COMPANY ISI LIMITATION REPORT __

Summary#: 02.C5.11.0036 Component ID 2LP-215-17 remarks:

Z NO SCAN SURFACE BEAM DIRECTION No scan due :o cast D LIMITED SCAN 1 ED 2 1 N 2 Z cw [E ccw flow constrictor.

FROM L N/A to L N/A INCHES FROM WO to _I ANGLE: El 0 0 45 Z 60 other 60L FROM o DEG to 360 DEG

[ NO SCAN SURFACE BEAM DIRECTION No scan due to I

- LIMITED SCAN 0 1 Z 2 l 1 7 2 El cw " ccw coupling welded in FROM L 6.35" to L 9.35" INCHES FROM WO 2.5 to N/A the area of interest.

ANGLE: fl 0 E] 45 B60 other 60L FROM N/A DEG to N/A DEG D] NO SCAN SURFACE BEAM DIRECTION DLIMITED SCAN 0 1 1 22 i 1 727cw ccw FROM L to L INCHES FROM WO to___

ANGLE: [1 0 [] 45 0 60 other___ FROM __ DEG to DEG

-- NO SCAN SURFACE BEAM DIRECTION IZ LIMITED SCAN [11 02 E- 1 7 2 r cw 7 ccw FROM L to L INCHES FROM WO to Sketch(s) attached 7 0 IE 45 [ yes -' No ANGLE: 0,160 /qther ... .FROM DEG to ..... DEG Prepared By: Gayle Houser I

Reviewed By:

ATTACHMENT A Suppleme,,tal Report Report No.: PAGE !9(P OFýý PLDUke 4Wrg UT-08-164 Page: 3 of 5; Summary No.: 02.C5.11.0036 Examiner: Houser, Gayte E. Level: Il-N Reviewer: ~5 y,,-4-4~Dale:

Examiner: N/A Level: N/A Site Review: N/A /. Date_

Other: N/A Level: N/A ANI, Review: Xa Date:

Comments:

M&W c *# rc*0*

tr-;i7Aýý' 7ý II.-K, I")(r - S' ýý, -,

. ," -q Sketch or Photo:

o "-ý5 3,L

.x' C,

ATIA~hMENi A PA6E,57 OF 9 Suppleme..,al Report Dike 0zhergy-A%

Report No,: U. jA-164 Page: 4 of 5 Sumnmary No.: 02.CS.11t0036 Exarnine.' Houser, Gayle E. Level: t'-N .Reviewer: fw-/. Date: /o-us~

E.xarmner N/A Level: N/A Sile Review: NADate:______

O:*ne,: N/A Level: N/A ANiIRviw Dale:_____

Commentls-

- 7 ~i.

Sketch or Photo:

V ~ 6o

  • 1* '4.

- ~m (~4(r6L.Ž2j'L,

~5 ~8/O7 I-C' 1.- -

KY).!

I /

~ /

11

".-- D~uke Deter mination of Percent Coverage for 0 E~nery UT Examinations - Pipe

'.,, Vn Site/Unit: Oconee I 2 Procedure: NDE-600 Outage No- 02-23

-- u=,Summary No.: 02.C5.11.0036 Procedure Rev.: 17 Report No.: UT-08-1 64

" Workscopeo ISI Work Order No.: 01794767 Page: 5 olf 45 degi Scan 1  % Length X  % volume ol length I 100 z  % total for Scan 1 Scan 2  % Length X  % volume ol length / 100 =  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length / 100 = 50.000 %total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length I 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg Other deq - 60 (to be used lor supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1 100.000  % Length X 0.000  % volume of length / 100 = 0.000 totalIto Scab 1 Scan 2 91.000  % Length X 50.000  % volume ol length / 100 = 45.500  % total [of Scan 2:

Scan,32 9.000  % Length X 19.300  % volume ol length / 100 = 1.737  % total lor Scan 3 Scan 4  % Length X  % volume of length / 100 =  % total lo: Scan Percent complete coverage Add totals for each scan required and divide by t ol scans to determine; 2-o44:7 %Total for complete exam Site Field Supervisor: .6 Date:

AT IAt~khl UT Pipe Wtvd Examination PAH5Ef OF S[

Duke Site/Unit: Oconee / 2 Procedure: PDI-UT-2 Outage No.: 02-23 Summary No.: 02.C5.11.0067 Procedure Rev,: Report No.: UT-08-157 Workscope: ISI Work Order No.: 01795191 Page: 1 of 4 Code:. 1998 Cat./Item: C-F-1/C5.11 Location:

Drawing No.: 2LP-218

Description:

Pipe to Valve 2LP-176 System ID: 53A Component ID: 2LP-218-23 Size/Length: N/A Thickness/Diameter: 1.0/10.0 SS Limitations: Yes - See Attached Limitation Report Start Time: 1022 Finish Time: 1044 Examination Surface: Inside L- Outside ov Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07125 Temp. Tool Mfg.: D.A,S Serial No.: MCNDE32824 Surface Temp.: 63 ýF Cal. Report No.: CAL-08-164, CAL,08-165, CAL-08-166 AngleUsed 0. 45 45T 60 60L, Scanning dB 35.7 .35.7 46.4 52 indication(s): Yes ] No No[ Scan Coverage: Upstream 0] Downstream [J CW W CCW [/

Comments:

FC 08-01, 08-04 Results: Accept [ Reject R Info D__,

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level 1. N S' Date Reviewer Signature Date Hollis, Jacob 11/13/2008: . A ' .. .

Examiner Level ill-N . Siqnature Date Site Review / Signature Date

.-'

  • 11/13/2008 N/A Stauffer, Lester, E, Other Level N)*A Signature Date ANII eview - . (" Sigýre W 6ate N/A 1/3/208'/&

Limitation Record

&M-W.

Sile(uriit: Oconee 1 2 Procedure: PDI-UT-2 Outage No,: 02-23 iiary No.. D2.CS. 11.0067 Procedure Rev.- C Report No.: UT-08-157 Wockscope: Work Order No.: 01795191 Page: 2 of 4 Description of Limitation:

Limitation due to valve configuration.

,-&- =

F ii __

Sketch ol Limilation:

/

13 0 ..

'W

.AR9-,Ik n1 <1 fhf'S I~A&E1L~iL Radiation lield:

Examiner -Level 11-N Si atuf -- Date Reviewero Signate "Date Examiner Leve l Z r. . . Signature -Date Site 'Re'view Signature Dale S.. r o .Lte . . 11t'31200B N'A Other Level I Signature sign re Date Staufr Leser,'MA2008 r.4AiAIL ate 'lie

M& Duke Determination of Percent Coverage for P-0-Energy. UT Examinations - Pipe Site/Unit Oconee 1 2 Procedure: PDI-UT-2 Outage No.: 02-23 Summary No,; 02.C5.11.0067 PrauidUre Rev. C Report No.: UT-08-157 Workscope: ISI Worfk Order No- 01795191 Page: 3 of 4 U"-C 45 deg Scan I  % Length X  % volume of length 100 =  % total for Scan 1 Scan 2  % Length X  % volume of length / 100 =  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length/ 100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg Other deg - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1 100.000  % Length X 50.000 " volume of length I 100 = 50.000  % total for Scan 1 Scan 2 -100.000  % Length X 0.000 " volume of length /100 = 0.000.-  % total for Scan 2 Scan 3  % Length X " volume of length 1 100 = " total for Scan 3 Scan 4 " Length X " volume of length /100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500 %Total for complete exam

,-2 Site Field Supervisor: Date. (JIIt 160F j

PA6E O'-fF DUKE ENERGY COMPANY _

ISI LIMITATION REPORT __

Summary #: 02.C5.11.0067 Component ID 2LP-218-23 remarks:

[ NO SCAN SURFACE BEAM DIRECTION No Scandue to Valve r- LIMITED SCAN [ 1 [l 2 [- 1 (E 2 0 cw 0 ccw Configuration FROM L N/A to L N/A INCHES FROM WO CL to Beyond  !

ANGLE: D 0 45 [ 60 other 6oL FROM o DEG to 360 DEG El NO SCAN SURFACE BEAM DIRECTION _______

El LIMITED SCAN E] 1 - 2 Eli 2 7 ecw [ccw FROM L to L INCHES FROM WO to _.

ANGLE: D 0 R 45 Fl 60 other FROM DEG to .-. DEG E- NO SCAN SURFACE BEAM DIRECTION Dl LIMITED SCAN i1 ]' 2 E"1 2 Dcw L*ccw FROM L to.L____ _ INCHES FROM WO to ANGLE: El 0 rl 45 El 60 other ... FROM DEGto __ DEG El NO SCAN SURFACE: BEAM DIRECTION El- LIMITED SCAN Di"1E2 Di1 72D7cw 7 ccw FROM L _0 [4 6 ttoLer INCHES FROM WO .to Sketch(s) attached ANGLE: DODý 45 Dý60 other FROM ... DEG to DEG Z yes F-1 No Prepared By: L. Stauff w: F * . .. . * !'"

I

Al IACHMEN *A MAE &5~OF F I Duke, UT Pipe Wed Examination Site/Unit: Oconee / 2 Procedure: PD I-UT-2 Outage No.: 02-23 Summary No.: 02.C5.21.0027 Procedure Rev.: C Report No.: UT-08-127 Workscope: ISI Work Order No.: 01795251 Page: 1 of 6 Code: 1998 Cat./item: C-F-1/C5.21 Location:

Drawing No.: 2-51A-28 (1)

Description:

Pipe to Flange System ID: 51A Component ID: 2-51A-28-15 Size/Length: N/A Thickness/Diameter: 0.531/ 4.0" Limitations: Yes - See Attached Limitation Report Start Time: 0940 Finish Time: 1030 Examination Surface: Inside [ Outside [] Surface Condition: GROUND FLUSH Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07125 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32795 Surface Temp.: 78 -F Cal. Report No.: CAL-08-125. CAL-08-126, CAL-08-127 Angle Used 0 5 45T 60I 650 Scanning dB 30 30 44 55 Indication(s): Yes j No Scan Coverage: Upstream L Downstream L CW j] CCW D Comments:

FC 08-01, 08-04 Results: Accept I Reject [] Info F]

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

PAGE 6:q OF ý? I Duke Ultrasonic h.dication Report 4~Eneryy. Outage No.: 02-23 Site/Unit: Oconee 2, Procedure: PDD!-UT-2 Summary No.: 02.,C 5.21.0027 Procedure Rev.: Report No.: UT-08-127 Workscope: ISI Work Order No.: 01795251 Page: 2 Of 6 Wo \Vn; Search Unit Angle: 45 & 60 (' Piping Welds CL WI N1.12 Wo Location: Weld Centerline Ferritic Vessels > 2"T r , I ocation' 0 1 I - Other MP Metal Path Wmax Distance From Wo To S.U. At Maximum Response K . ---------- DATIM RBR Remaining Back Reflection W1 Distance From Wo At Of Max (Forward) lit Lo L Distance From Datum W2 Distance From Wo At Of Max (Forward) 1-knx Comments: FC 08-01, 08-04 Root Geometry previously recorded.

Indication  % W Forward Backward Li L L2 RBR Remarks Angle No. Of Max Of Max Of Max Of Max Of Amp.

DAC W I MP WV MP W2 MP Max Max 45 1 100 .60' .80" N/A N/A N/A N/A N/A N/A N/A N/A Geometry- Root seen 360' 60 2 100 1.0" 1.1' N/A N/A N/A N/A N/A NIA NIA N/A Geometry - Root seen 360' Examiner Level li-N Signature Date ReviewerIh Signature Dt Howard, Dean M. 7) ' ~ {11/4/2008}/' -6 Examiner Level ti-N SinareDt1SieRvw Signature Date Hatchett, Jay M. 11/4/2008 N/A Othaminer Level N Signature Date ANSiReview V , Siature Date N/A e.'11/4/2008'

  • o~e N* . .~gaare Othe' : ...... ate*"*ev~e.

N, A

  • .... *, ,atro i!k/sl/

DUKE ENERGY COMPANY ISI LIMITATION REPORT Summary #: 02.C5.2 L0027 Component ID 2-51A-28-15 remarks:

[ NO SCAN SURFACE BEAM DIRECTION No scan on surface #1 LIMITED SCAN L" 1 [ 2 LI 1 L- 2 M Cw ccW due to flange configuration.

FROM L N/A to L N/A INCHES FROM WO CL to Beyond See attached sketch. J ANGLE: D 0 0 45 N 60 other FROM 0 DEG to 360 DEGI LI NO SCAN "SURFACE. BEAM DIRECTION LILIMITED SCAN E' 1 -21 [- 2 - cw ccw FROM L to L INCHES FROM WO to _

ANGLE: D 0I 45 EL 60 other FROM DEG to DEG LI NO SCAN SURFACE BEAM DIRECTION T LI LIMITED SCAN El 1 [' 2 :M 1 D 2 - cw- ccw FROM L to L INCHES FROM WO to _

ANGLE: El 0 *I 45 LI 60 other FROM DEG to DEG LI NO SCAN SURFACE BEAM DIRECTION

-ccw 4 LILIMITED SCAN E" LI12 E I ] 2 L0 cw FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: D 0LI 45 LI 60 other FROM DEG to _ DEG LI yes LI No Prepared By: Dean Hp ard Leve:042 Sheet 3 of 6 RevieWed By: Date: ( Authorized Inspector Date:

,V v*

AT TACHMENT A PASE &(o Of gl Zhuke Supplemental Report Report No.: UT-08-127 Page: 4 of 6 Summary No.: 02.C5.21.0027 Examiner: Howard, DeanM. Level: II-N Reviewer: A Date:

Examiner: Hatchett,JayM. Level: I1-N Site Review: NIA Date ýZZ~S Other: NIA Level: N/A ANtI Review: .. .. ,

Comments: Indication #1 & #2 - 360' geometric reflectors due to root.

Sketch or Photo: Z:\UT'.PJDEAL\ProfileLine2.jpg FL .,LJ . .FLAA1&e r*

AIACHME*V A PA6E 67 OF 91 Supplemental Report UT-08-127 Report No.:

Page: 5 of 6 Summary No.: 02.C5.21.0027 Examiner: Howard, Dean M. " .4 '.d/L v Level: I-N Reviewer: Date: .- is- o*

Examiner: Hatchett, Jay M. Level: II-N Site Review: NA 42 Date:

Level: N/A ANtI Review: Date:

Other N/A Comments: __ I~i~ _ __ e. c _ _

AZ EIF ~4~.2- 17 .22- (1 Cio)~s

,AY r-.D' ý,  %,.21-(%,1 Sketch oir Photo: 2:\kLiTkIDDEAL\ProtileLin,2,lpg A0 42; ,CZi /~*

  • 2 1/J 0 6~uw.

21 .'4(

5P

-  !~tU

Determination of Percent Coverage for UT Examinations - Pipe Site/Unit: Oconee / 2 Procedure: PDI-UT-2 Outage No.: 02-23 Summary No.: 02.C5.21.0027 Procedure Rev.: C Report No.: UT-08-127 Workscope: ISI Work Order No,: 01795251 Page: 6 of 6 Wk:F 45 deg ME4 Scan 1 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 1 Scan 2 100.000  % Length X 0.000  % volume of length / 100 = 0.000  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total lor Scan 4 Add totals and divide by # scans = 37.500  % total for 45 deg Other deq - _ (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1  % Length X  % volume of length / 100 =  % total for Scan 1 Scan 2  % Length X . .%

volume of length / 100 =  % total for Scan 2 Scan 3  % Length X  % volume of length / 100 =  % total for Scan 3 Scan 4  % Length X  % volume of length / 100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor: Site Field Supervisor: Date Date: / /I/z 2ý/o _g

AT 1ACHMENT A UT Pipe Wt 1 d Examination PAS6E Inq 0F E'/

Site/Unit: Oconee 2 Procedure: PDI-UT-2 Outage No.: 02-23 Summary No.: 02.C5.21.0029. Procedure Rev.: 0C95 Report No.: UT-08-129 Work Order No.: 01795251 Page: 1. of 4 Workscope: iSI Code: 1998 Cat./Item: C-F-1/C5.21 Location:

Drawing No.: 2-51A-28 (1)

Description:

Pipe to Valve 2HP-135 System ID: 51 A Component ID: 2-51A-28-21 Size/Length: N/A Thickness/Diameter: 0.53 /4.0 SS Limitations: Yes - See Attached Limitation Report Start Time: :0940 Finish Time: 1030 Examination Surface: Inside D Outside

  • Surface Condition: GROUND FLUSH Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEIL II Batch No.: 07125 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32795 Surface Temp.: 78 -F Cal. Report No.: .CAL-08-125, CAL-08-126 Angle Used i0 45 45T 60 Scanning dB 30 30 44 Indication(s): Yes E3 No F Scan Coverage: Upstream [ Downstream f CW E] CCW []

Comments:

FC 08-01, 08-04 Results: Accept H Reject R Into __

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level Il-N Signature Date Revie Signature Da Howard, Dean M. 11/4/2008 Examiner MLevel

.,S i-N alure Date Site Rvw SigatureD Hatchett, Jay M. 14(2008 11(.X.~~ N/A Other Level N/A Signature Date ANiI F~view Dategr~

N/A 11/4/2008 c ~ $-&L4t/.J, 'i/ 1 t'), L..J

AIIACHMENI'H/

PA6E 70 OF '

DUKE ENERGY COMPANY ISI LIMITATION REPORT Summary #: 02.C5.21.0029 Component ID 2-51A-28-21 remarks:

[ NO SCAN SURFACE BEAM DIRECTION No scan on surface #2 Li LIMITED SCAN ED 1 F-" 2 [1 [1 2 Z cw 0 ccw. due to valve configuration.

FROM L N/A to L N/A INCHES FROM WO Toe to Beyond See attached sketch.

ANGLE: 010 D2 45 [] 60 other FROM o DEG to 360 DEG

"- NO SCAN SURFACE BEAM DIRECTION _ _ _

-LIMITED SCAN f-I. 2 E- 1 [ 2 [:1 cw i cw FROM L to L INCHES FROM WO to ANGLE: Li 0 Ml 45 El 60 other FROM DEG to _ DEG Li NO SCAN SURFACE BEAM DIRECTION DLIMITED SCAN 1 E1- 22 L] 1 i2[] cw -ccw FROM L to L INCHES FROM WO to _

ANGLE: Li 0 Li 45 EL 60 other FROM DEG to DEG Li NO SCAN SURFACE BEAM DIRECTION I. -I EL LIMITED SCAN [1 1 li2 F1 1 02 0 cw Ficcw to L INCHES FROM WO to Sketch(s) attached FROM L ANGLE: Li 0 Li 45 Li 60 other FROM DEG to DEG Li yes LI No V"

Supplem.ntal Report ATTACHMENT /

PASE-71/ OF ?) Report No.: '-08-129 Page: 3 of 4 Summary No.: 02.C5.21.0029 t

L Examiner: Howard, Dean M. - z ,* _ Level: Il-N S: te R evievv' 2 1,'i Ca:e N/A W

Examiner: Hatchett, Jay M.

  • ( f

,_,'<e//.i'..6 Level:

Level:

II-N N/A AýNJ ei e Fe t4z+/-

Other:

(-)

Comments: AV..D - k.V*1/2sici~ *~~g~S~z SI- E6(D>

VJA'6s*75\ .1\M ':Z2~ ,'4 (10) OO>0O3 6\2-AK -00 W___, o _)S Sketch or Photo: Z:\UnIDDEAL\ProfiteUne2,jpg j FLow VALVE ZýP t~s-ii S PýAc r-

0M. Deteri mination of Percent Coverage for UT Examinations - Pipe Site/Unit: Oconee / 2 Procedure: PDI-UT-2 Outage No.:. 02-23

'-* Summary No.: 02.C5.21.0029 Procedure Rev.: C Report No,: UT,08-129

, Workscope: ISt Work Order No.: 01795251 Page: 4 of 4 45 deo Scan 1  % Length X  % volume of length / 100 =  % total for Scan I Scan 2  % Length X %volume of length /100 =  % total for Scan 2 Scan 3 100.000  % Length X .50.000  % volume of length / 100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 dog Other deg - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1 100.000  % Length X 100.000  % volume of length / 100 = 100.000  % total for Scan I Scan 2 100.000  % Length X 100.000  % volume of length 1100 = 100,000  % total for Scan 2 Scan 3  % Length X  % volume of length / 100 =  % total for Scan 3 Scan 4  % LengthX  % volume of length / 100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 75.000  % Total for complete exam 9;;-

Site Field Supervisor: SiteField Supervisor: Date:

Date: /LLA~AI 4 d'6s-

AMTACHME.f A UT Pipe WV .,d Examination PAGE 73 OF ?I 1 Duke 9hOWj Site/Unit: Oconee / 2 Procedure: PDI-UT-2 Outage No.: 02-23 Summary No.: 02.CS.21.0031 Procedure Rev.: C Report No.: UT-08-088 Workscope: ISI Work Order No.: 01796690 Page: 1 of 3 Code: 1998 Cat./item: C-F-1/C5.21 Location:

Drawing No.: 2HP-222

Description:

Valve 2HP-26 to Elbow System ID: 51A Component ID: 2HP-222-2 Size/Length: N/A Thickness/Diameter: 0.674 I 4.000 Limitations: Yes - See Attached Limitation Report Start Time: 1040 Finish Time: 1050 Examination Surface: Inside [- Outside F.] Surface Condition: GROUND Lo Location: 9.1.1.1 Wo Location: Weld Centerline Couplant: ULTRAGEL II Batch No.: 07125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE 27219 Surface Temp.: 107 'F Cal. Report No.: CAL0,8-096, CAL-08-097, CAL-08-098. CAL-08-114 Angle Used df 45 1 45T 60 60L, 42T Scanning dB 35.4 47.9 66.7 35.1 Indication(s): Yes [ No & Scan Coverage: Upstream E Downstream ] CW CCW D Comments:

-Original inspection performed on 7/29/08 for 45' Ax/Circ, 42'T, and 600 Axial. Ref. Cal Sheets, CAL-08-096, 097 and 098.

60°L performed on 11/3/08 to correct transducer size used on previous inspection-Results: Accept L-[ Reject F.. Info F]

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

AIIACHMENI AF 1)A~ 79 aF F1 I DUKE ENERGY COMPANY J _

ISI LIMITATION REPORT __

Summary #: 02.C5.21.0031 Component ID 2HP-222-2 remarks:

f NO SCAN SURFACE BEAM DIRECTION No scan due to Cast r-] LIMITED SCAN LI 1 N 2 Z 1 D- 2 Z cw N ccw Valve configuration.

FROM L N/A to L N/A INCHES FROM WO N/A to N/A ANGLE: El 0 [] 45 Z 60 other 60L FROM o DEG to 360 DEG

-I NO SCAN SURFACE BEAM DIRECTION

-' LIMITED SCAN E- 1 [I 2 D 1 E] 2 -- cw ' ccw FROM L to L INCHES FROM WO to _ _

ANGLE: LI 0 E 45 Li 60 other FROM _ DEG to DEG LI NO SCAN SURFACE BEAM DIRECTION _

LI LIMITED SCAN L]1 L 2 El 1 L 2 L cw L ccw 1 FROM L ,_. to L INCHES FROM WO to i ANGLE: [] 0 LI 45 LI 60 other FROM DEG to DEG FL NO SCAN SURFACE BEAM DIRECTION LI LIMITED SCAN ElI1-I2 El 1 LI 2 [L cw LI ccw FROM L to L INCHES FROM WO ,to Sketch(s) attached

[1L0 FI 45 [-]60 o [ yes LI No

- ItemNo. 02.C5.21.0031 Weld No. 2IP-222-2 6I(I,.WANtve 60W Shear 'alve S2 Scale: 1"= ,,

Material)

'SI No Coverage Claimed Coverage Claimed = 50% Supplerrental coverage with 60' RL Wave Only See Note:

Note: 60' RL scan not included in percentage coverage due to requirements of IOCFR50.55a(b)(2)(xv)(A)(1). Best effort scan with 600 RL obtained 50% coverage in one axial direction.

% Coverage Calculations S =Elbow = 50% (100% of the length x 50% of the volume)

S2 =Valve = 0% (0% of the length x 0% of the volume)

S3 = CW = 50% (100% of the length x 50% of the volume)

S4 = CCW 50% (100% of the length x 50% of the volume)

Total = 150 / 4 = 37.5 % Aggregate Coverage Inspector / Date: Page 3 of ý

ATTACHMENT MAE -,7k,9F ?'I UT Pipe Wela Examination Site/Unit: Oconee / 2 Procedure: NDE-600 Outage No.: 02-23 Summary No.: 02.4C5.21.0055 Procedure Rev.: 17 Report No.: UT-08-087 Workscope: Is[ Work Order No.: 01796692 Page: 1 of 4 Code: 1998 Cat./Item: C-F-1/C5.21 Location:

Drawing No.: 2-51A-17 (2)

Description:

Tee to Pipe System ID: 51A Component ID: 2-51A-17-93 Size/Length: N/A Thickness/Diameter: 0.375/ 2.500 Limitations: Yes - See Attached Limitation Report: Start Time: 0955 Finish Time: 1003 Examination Surface: Inside Outside v Surface Condition: GROUND Lo Location: 9.1.1.3 Wo Location: Weld Centerline Couplant: ULTRAGEL It Batch No.: 07125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE 27219 Surface Temp.: 107 -F Cal. Report No.: CAL-08-093, CAL-08-094, CAL-08-095 Angle Used 0 45 45T 60 70 Scanning dB 45 50 52'.

Indication(s): Yes No n/, Scan Coverage: Upstream v Downstream v CW V CCW ;V Comments:

Results: Accept Reject v Info Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level I,.N ,"ig"nature, Date Review r. Signature Date Leeper, Winfred C. 7/22/2008 r Examiner Level N/A "ignature Date Site eview Signatu*e Date 7/22/2008 N/A N/A Other Level N/A Signature Date ANIJ ýeiew Date LN/A 7/22/2008 C. /<LCU4L(&-'i- // r

Item No. 02.C5.21.0055W Weld No.2-51A-17-93 I'-t

~-U

"*L th I

70' Shear Wave Tee Scale: "= 1" S2 I

I Coverage Claimed = 50% No Coverage Claimed Supplemental coverage with 700 Shear Wave Only. See Note:

Note: 700 Shear Wave scan not included in percentage coverage due to requirements of IOCFR50.55a(b)(2)(xv)(A)(1). Best effort scan with 70' Shear obtained 50% coverage in one axial direction.

Side View - Not to Scale

- Limited Area Weld No. 2=5 IA- 17-93 Limited 2" in throat area each side of Tee for a total of 4" on Surface 2. Limited area from Lo.+ 1.3" to Lo + 3.3" and from Lo + 5.8" to L + 7.8".

Inspector / Date: ___ __Ix o8 Page

,1z3___ z of__

% Coveracie Calculations DoJC=

Z1/2 Item No. : 02.C5.21.0055 Weld No. : 2-51A-17-93 Pipe 0 = 2.5

" = 0.375" Weld Length = 9.11" Limited scan on Surface 2 due to the throat of the tee for 4" of the weld length Limited scan on Surface 1 due to adjacent pipe for 2" of the weld length

% of Length at throat of Tee = 4 / 9.1 x 100 = 44.0%.

% of Length examined 100% = 100 - 44.0 = 56.0%.

Aggregate Coverage Calculation S1 = Pi pe 56 % (56.0% of the Length x 100% of the Volume)

S1 = P!pe 22 % (44.0% of the Length x 50% of the Volume)

TcoaM S1 78.0 %

S2 = Tiee 56 % ( 56.0% of the Length x 100% of the Volume)

S2= Tiee 0 % ( 44.0% of the Length x 0% of the Volume)

Tiotal S2 56.0 %

S3 = 100 % ( 100% of the Length x 100% of the Volume )

S4 = 100 % ( 100% of the Length x 100% of the Volume )

Total = 334.0 4= 83.5% Aggregate Coverage Inspector / Date: s o't Page J? of_!

<Ci-L[MrrED EXAMINATION COVERAGE CRECKLUST

[SI Summacy No: O C:.Zi.

C5. OQ @

Bý (UT) Verify search unit wedge index to nose dimension;

[3" (UT) Draw the examination volume showing beam paths.

[* (ALL) Draw the examination volume or area with obstructions including dimensions on the Supplemental Report, or if the drawing is too large, attach it to the Supplemental Report; (Marked-up drawings and/or digital photos are acceptable if dimensioned)

,[ (ALL) Note the scale of the drawing; (ALL) Calculate coverage in a detailed and orderly method; Note: Does not apply to hangers, snubbers, restraints or supports ii (ALL) Complete IDDEAL forms: "Limitation Work Sheet" and "Supplemental Report".

EI' (ALL) Check the "Reject" box on the examination data sheet.

[WS NDE Level III? Date " 3 MMP NDE Level 11 Date 7 Z ...

Figure 13 Limited Examination Coverage Checklist VERIFY HARD COPY WITH NEDI. VERSION IMMEDIATELY PRIOR TO INITIAL USE AND EVERY 14 DAYS THEREAFTER WHILE THE PROCEDURE IS IN USE q

A17AC~H~tiA UT Pipe Wt .d Examination PA6E YD OF Ei t Duke Site/Unit: Oconee / 2 Procedure: NDE-600 Outage No.:. 02-23 Summary No.: 02.C5.21.0256 Procedure Rev.: 17 Report No.: UT-08-086 Workscope: ISI Work Order No.: 01796700 Page: 1 of 2 Code: 1998/2000A Cat./Item:,. C-F-1/C5.21 Location:

Drawing No.: 2HP-221

Description:

Valve 2HP-410 to Elbow System ID: 51A Component ID: 2HP-221-22 Size/Length: N/A Thickness/Diameter: 0.531 /4.000 Limitations: Yes - See Attached Limitation Report Start Time: 1029 Finish Time: 1039 Examination Surface: Inside _j Outside F, Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: WELD CENTERLINE Couplant: ULTRAGEL II Batch No,; 07125 Temp. Tool Mfg.: FISHER Serial No.: MCNDE 27219 Surface Temp.: 88 ýF Cal. Report No.: CAL-08-090, CAL-08-091, CAL-08'092 Angle Used 0 45 45Tj 60 601L Scanning dB 45 50 52 Indication(s): Yes . No .] Scan Coverage: Upstream -I Downstream ,1' CW )*1 CCW *)

Comments:

Results: Accept f-l Reject *1 InfOo)

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level II-N Sign Date Reviewe(I Signature Date Leeper, Winfred C. ,7/292008 ,-:1 R0 7 Examiner Level N/A " Signature 7- Date Site Review Signature Date N/A 7/29/2008 N/A Other Level N/A Sicnature Date. ANIItReview , .,j (, 'iarnature Date N/A 7/29/2008 /\. L-ký C q';J & ý / L3/4/

Item No. 02.C5.21.0256 Weld No. 2BP-221-22

1 600 RLWave Scale: 1= I" rial)

No Coverage Claimed Coverage Claimed = 50% Supplemental coverage with 600 RL Wave Only See Note:

Note: 600 RL scan not included in percentage coverage due to requirements of 10CFR50.55a(b)(2)(xv)(A)(1). Best effort scan with 600 RL obtained 50% coverage in one axial direction.

% Coverage Calculations S1 =Elbow 50% (100% of the length x 50% of the volume)

S2 = Valve 0% (0% of the length x 0% of the volume)

S3 = CW = 50% (100% of the length x 50% of the volume)

S4 = CCW 50% (100% of the length x 50% of the volume)

Total = 150 / 4 = 37.5 % Aggregate Coverage Lnspector / Date : I-M., / a-e:lo5_ Page a, of *,

AIIACHMENT 13 UT Vessel Examination PA6E, / r OF6 Site/Unit: Oconee / 3 Procedure: NDE-640 Outage No.: 03-24 Summary No.: 03.B3.110.0006 Procedure Rev.: 5 Report No.: UT-09-210 Workscope: is[ Work Order No.: 813802 Page: 1 of Code: 1998 Cat./item: B-D 1B3.110 Location:

Drawing No.: ISI-OCN3-002

Description:

Nozzle to Shell System ID: 50 Component ID: 3-PZR-WP26-4 Size/Length: N/A Thickness/Diameter: 6.18715.750/CS Limitations: See report # UT-09-213 for limitations calculations Start Time: 1000 Finish Time: 1040 Examination Surface: Inside E] Outside n.1 Surface Condition: GROUND SMOOTH Lo Location: 9.2.3 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07225 Temp. Tool Mfg.: D.A.S Serial No.: MCNDE32825 Surface Temp.: 82 -F Cal. Report No.: CAL-09-255 Angle Used 1 0 45 45T 660 PT JOT Scanning dB 35.5 Indication(s): Yes Ii No f] Scan Coverage: Upstream RI Downstream R] CW El CCW El Comments:

None Results: Accept E] Reject W Info E _

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level II-N P..... Date Reviewer, Signature Date.

T u c ke r, D a v id K . 5ig 09 n atue20 X Examiner Level Il-N _. __e ture Date Site .Review Signature Date Dean, Steven 51,412009 _ _ _............

Other Level N/A Signature Date. ANIIReview 'DaeI N/A 7S .c/L '(~44

WA11 MUEW 6 PAGE 2 OF ý I UT Vessel Examination Site/Unit: Oconee / 3 Procedure: NIDE-820 Outage No.: 03-24 Summary No.: 03.B3.1110.0006 Procedure Rev.: 4 Report No.: UT-09-213 Workscope: iSI Work Order No.: 813802 Page: 1 of 8 Code: 1998 Cat./Item: B-D /B3.110 Location:

Drawing No.: ISI-OCN3-002

Description:

Nozzle to Shell System ID: 50 Component ID: 3-PZR-WP26-4 Size/Length: Thickness/Diameter: 6.18715.750/CS Limitations: Due to nozzle configuration - See supplemental reports Start Time: 1000 Finish Time: 1056 Examination Surface: Inside D1 Outside [] Surface Condition: GROUND SMOOTH Lo Location: 9.2.3 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07225 Temp. Tool Mfg.: D.A.S Serial No.: MCNDE32825 Surface Temp.: 82 "F Cal. Report No.: CAL409-256 thrutCAL-09-259 Angle Used 0 451 45T 60 60T 60RL Scanning dB 57.6 57.6 73.5 72.2 Indication(s): Yes D No [ Scan Coverage: Upstream [] Downstream [] CW [ CCW 21 Comments:

35° - 57.8dB; 35T* - 57.8 dB Additional Examiner - Jo.*,n Q L [1 5/4/2009 Results: Accept E] Reject W] Info E_

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level II-N , signS Date ReviewI.er Signature Date Tucker, David K. 514/2009 5"- jg.,aj Examiner Level II-N . re Date ieR Signature Dean, Steven . 5/4/2009 _

Other Level Il-N Signature Hollis, Jacob Date ANII Review 54/42009 Z5~at 4gat

/4/L.4Vd Date]

A11ACHMEH E PAGE 2 QF,/

DUKE POWER COMPANY ISI LIMITATION REPORT ComponentlWeld ID: 3PZR-WP26-4 Item No: 03.B3.110.0006 remarks:

[ NO SCAN SURFACE BEAM DIRECTION 35 & 6ORL angles LIMITED SCAN Z 1 0 2 0 1 9 2 0 cw 0 ccw Nozzle configuration CLto FROM L N/A to L N/A INCHES FROM WO -1" to Beyond ANGLE: Z 0 [ 45 [D 60 other

  • FROM o DEG to 360 DEG L] NO SCAN SURFACE BEAM DIRECTION L-] LIMITED SCAN [-I 1l 2 -i L[] 2 0 cw EL ccw FROM L to L INCHES FROM WO to ANGLE: El 0 [] 45 El 60 other FROM. DEG to DEG Li NO SCAN SURFACE BEAM DIRECTION

-LIMITED SCAN I- ] 22 1- L]2E)cw L ccw FROM L to L INCHES FROM WO to ......

ANGLE: E] 0 El 45 E] 60 other FROM _ DEG to .... DEG El NO SCAN SURFACE BEAM DIRECTION

-LIMITED SCAN I- Li 2 ] I R 2 ]cw i ccw FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: Li 0 [] 45 E] 60 other FROM DEG to DEG ,* yes i No Prepared By: David Tucker *. 1-- Date: 05/04/20 09 Sheet -- 2- of - 8.

Reviewed By: Date:tA reds."* *c' . .te DateP...

PZR Sampling Nozzle to Shell % of Coverage

ýALC:

Item No.: 03.B3.110.0006 Weld No. :.WP26-4 Weld Coverane Scan Angle  % Coverage Obtained Si 350,450 & 600 61.46 S2 350,450 & 600 0 Cw 350 & 450 0 CCW 350 & 450 0 Total 61.46 61.46 +4= 15.4  % Coverage Base Material Coverage S1 350,450 & 600 67.2 Cw & CCw 450&3 50 42.4 Total 109.6 109.6 2= 54.8  % Coverage 60OScan Coverage 33.9  % Coverage Aggregate Coverage = Weld + Base Material + 00 - 3 34.7  % Coverage Inspector / Date : t DPo Page _L of _6

ATIACHMEHI

  • PAGE_5 OF Item No. : 03.B3.110.0006 Pressuflz Sampling Nozzle to Shell Weld No.: WP26-4 Inspector/Date : David Tucker 0514109,40/'Z STotal Base Metal Examined with at least 2 angles from one direction.

A combination of 350,45', and 60' angles were used to obtain coverage.

% Examined = (24.45 + 5.705) / 44.87 x 100 = 67.2%.

350 600 450 24.45 sq. in.

Shell Stwface 1

\ N N \ N \ NN N NN N N NN\N N\ N \N N N N N N N NN N N N N NNN\\\

N N 5.705 sq. in. - -

14 og

MAE 6 OF J, Item No.: 03.B3.110.0006 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-4 Inspector/Date : David Tucker 05/04/09 Noz le Total Weld Metal Examined with at least 2 angles from one direction. Surfac e 2 A combination of 350,450, and 600 angles were used to obtain coverage.

% Examined from Surface 1 = 7.015 / 11.413 x 100 = 61.46%.

% Examined from Surface 2, CW, and CCW = 0%.

350..

Shell Surface 1 7.015 sq. in. ,

5 "Pp

AI1ACHMENi PA6E 7 OF ,

Item No.: 03.B33.110.0006 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-4 Inspector/Date: David Thcker 05/04/09

]Base Metal Examined with 350 and 450 angles.

% Examined 35 0and 450 = 19.03 / 44.87 x 100 = 42.4%.

35'and 450 Circ. scan 19.03 sq. in.

Shell Surface 1 f

ATTACHMER1 1 MAE 9 OF /

Item No. : 03.B3.110.0006 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-4 Inspector/Date : David lucker 05/04/09 Nozzle Surface 2 I'm" Base and Weld Metal Examined with 00 angle.

%Examined 0' = 19.03 / 56.16 x 100 = 33.9%.

00 .

19.03 sq. in.

Shell Surface I 7 or

AIIACHMENTL-PAGE 9 OF 1 Item No.: 03.B3.110.0006 Presslri- *er Sampling Nozzle to Shell Weld No.: WP26-4 Inspector/Date : David Tucker 5/4/09 zý01-Nozzle Surface 2 LIII 600 60° RL Shell Surface I

AI IACMENfl 2)

PA6E ID aF / "

UT Vessel Examination Site/Unit: Oconee I 3 Procedure: NDE-640 Outage No.: 03-24 Summary No.: 03.B3.110.0007 Procedure Rev.: 5 Report No.: UT.09-211 Workscope: ISI Work Order No.: 813802 Page: 1 of I Code: 1998 Cat./tem: B-D /83.110 Location:

Drawing No.: ISI-OCN3-002

Description:

Nozzle to Shell System ID: 50 Component ID: 3-PZR-WP26-5 Size/Length: Thickness/Diameter: 6.18715.7501CS Limitations: See report # UT-09-214 for limitations calculations Start Time: 1043 Finish Time: 1103 Examination Surface: Inside LI Outside j] Surface Condition: GROUND SMOOTH Lo Location: 9.2.3 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07225 Temp. Tool Mfg.: D.A-S Serial No.: MCNDE32825 Surface Temp.: 82 °F Cal. Report No.: CAL-09-255 Angle Used 10 45 45T 60 60T Scanning dB 35.5 Indication(s): Yes 1J No [] Scan Coverage: Upstream [ Downstream [] CW 0 CCW LI Comments:

None Results: Accept [ Reject W Info __

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level 11-N Si e Date Review6e Signaturei Oaw Tucker, David K. 5/4/2009 Examiner Level II-N Date SiteRview, Signature Date Dean, Steven 5/4/2009 Other Level N/A Signature Date ANII Review ' Date N/A 14C 06 i 5C910Z

ATTACHMENT PASE it OF UT Vessel Examination Site/Unit: Oconee / 3 Procedure: NDE-820 Outage No.: 03-24 Summary No.: 03.B 3.110.0007 Procedure Rev.: 4 Report No.: UT-09-214 Work Order No.: 813802 Page: 1 of 8 Workscope: ISI Code: 1998 Cat./ltem: B-D 183.110 Location:

Drawing No.: ISI-OCN3-002

Description:

Nozzle to Shell System ID: 50 Component ID: 3-PZR-WP26-5 Size/Length: Thickness/Diameter: 6.18715.750/CS Limitations: Due to nozzle configuration - See supplemental reports Start Time: 1016 Finish Time: 1056 Examination Surface: Inside [] Outside n- Surface Condition: GROUND SMOOTH Lo Location: 9.2.3 Wo Location: Centerline of Weld Couplant: ULTRAGEL, II Batch No.: 07225 Temp. Tool Mfg.: D.A.S Serial No.: MCNDE32825 Surface Temp.: 82 -F Cal. Report No.: CAL-09-256 thru CAL-09-259 Angle Used 0 45 45T 60 60T j 6ORL Scanning dB 57.6 57.6 73.5 72.2 Indication(s): Yes fj No [] Scan Coverage: Upstream [] Downstream [] CW 91 CCW 21 Comments:

350 - 57.8dB, 35T° - 57.8dB Additional Examiner: John C. Day, Lpmql II, 0510412009 Results: Accept El Reject [] Infio __

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level 11.N _ Date Reviewer Signature Date Tucker, David K.. 514/20.09 ew __ ____ . ,__-_/_,- _

Examiner Level II-N Si at e Date Site Review ( Signature Date Da Dean, Steven 5/412009 Other Level N .. S ... Date ANI, Review t Date Hollis, Jacob pg "5/412009 5710 41 //

Al 1ACHMAENT PA6E /2- 0F DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 3PZR-WP26-5 Item No: 03.13.110.0007 remarks:

[ NO SCAN SURFACE BEAM DIRECTION *35 &6ORL angles

[i LIMITED SCAN 1I 1 2 [1 [M 2 [ cw ccw Nozle configuration CLto FROM L N/A to L N/A INCHES FROMWO -1" to Beyond ANGLE: [ 0 [9 45 N 60 other

  • FROM a DEG to 360 DEG

[] NO SCAN SURFACE BEAM DIRECTION L-' LIMITED SCAN E]'I [1 2 i 1 [] 2 [] cw ]ccw FROM L to L INCHES FROM WO to ANGLE: [] 0 El 45 n] 60 other FROM DEG to DEG L] NO SCAN SURFACE BEAM DIRECTION LI LIMITED SCAN LI L] 2 1 [L] 2 El cw D ccw FROM L to L INCHES FROM WO to ANGLE: E] 0 L] 45 E] 60 other FROM DEG to DEG LI NO SCAN SURFACE BEAM DIRECTION LI LIMITED SCAN LII [-I 2 ll [ L -2 cw i-ccw FROM L to L INCHES FROM WO t0 Sketch(s) attached ANGLE: EIi 0 EI 45 r-1 690 other FROM . DEG to DEG yes El No Prepared By: David Tucker%, . 05/04/2009 1 Sheet -,2. of Insl Date:

V

<V PZR Sampling Nozzle to Shell % of Coverage L~J

2z~ Item No. : 03.B3.110.0007 Weld No. : WP26-5 Weld Coverage Scan An3le  % Coverage Obtained S1 350,450 & 60- 61.46

- $S2 350450 &600 0 Cw 350 & 450 0 CCw 350 &450 0 Total 61.46 61.46 .-4= 15.4  % Coverage Base Material Coverage S1 350,450 & 600 67.2 cw&CCw 45T&3o5t 42.4 Total 109.6 109.6 + 2 = 54.8  % Coverage 00 Scan Coverage 33.9  % Coverage Aggregate Coverage = Weld + Base Material + 00 - 3 34.7 %Goverap-e Inspector / Date : t Page P 3 oJof g

A11 ACHMENT PA E Iq Of Item No. : 03.B3.110.0007 Pressurize r Sampling Nozzle to Shell Weld No.: WP26-5 Inspector/Date: David Tucker 05/04/09 /,-

E 1 Base Metal Examined with 350 and 450 angles.

% Examined 35 0and 45' = 19.03 / 44.87 x 100 = 42.4%.

35°and 450 Circ. scan -I 19.03 sq. in.

Shell Surface 1

      • \\\\\ \

Item No.: 03.B3.110.0007 Pressurizer Sampling Nozzle to Shell MA6E [5 LFo Weld No.: WP26-5 Inspector/Date: David Tucker 05/04/09 Nozzle Total Weld Metal Examined with at least 2 angles from one direction. Surface 2 A combination of 350,450, and 600 angles were used to obtain coverage.

%Examined from Surface 1 = 7.015 / 11.413 x 100 =61.46%.

% Examined from Surface 2, CW, and CCW = 0%.

5350 0600 459-Shell Surface 1 S ~~~~

N\ 777=

7.015 sq. in.

Al1ACHMENT 1 PAGE /, OF 6/

Item No. : 03.B3.110.0007 Pressurizer Sampling Nozzle to Shell Weld No.: WP26-5 Inspector/Date: David Tucker 5/4/09 Nozzle Surface 2 Li 600 RL 600 Shell Surface 1

W1ACHMENT PASE /'7 Of ~

Item No.: 03.B3.110.0007 PressukAu Sampling Nozzle to Shell ý Weld No.: WP26-5 Inspector/Date: David Tucker 05/04/09.- -

] Base and Weld Metal Examined with 00 angle.

%Examined 0' = 19.03 / 56.16x 100 =33.9%.

1:9.03 sq. in.

Shell Surface I 7 oP8

AIIACHMENT g PAGE /I OF (,I Item No.: 03.B3.110.0007 Pressuriz,er Sampling Nozzle to Shell Weld No. : WP26-5 Inspector/Date: David Tucker 05/4/09 Z4 WI Total Base Metal Examined with at least 2 angles from one direction.

A combination of 35',450, and 600 angles were used to obtain coverage.

% Examined = (24.45 + 5.705) / 44.87 x 100 = 67.2%.

350 600 450 "

24.45 sq. in.

Shell Surface 1

~\

\ NN N \ \ NN \N \ N N NN \N N 7 \7NiX7 5.705 sq. in oFr8

Al 1ACHMENT L PAHEq0 ~F UT Vessel Examination Site/Unit: Oconee I 3 Procedure: NDE-640 Outage No.: 03-24 Summary No.: 03.B3.110.0008 Procedure Rev.: 5 Report No.: UT-09-212 Workscope: ISI Work Order No.: 813802 Page: 1 of I Code: 1998 Cat./Item: B-D /B3.110 Location:

Drawing No.: ISI-OCN3-002 Descriptfon: Nozzle to Shell System ID: 50 Component ID: 3-PZR-WP26-6 Size/Length: Thickness/Diameter: 6.18715.750/CS Limitations: See report # UT-09-215 for limitations calculations Start Time: 11105 Finish Time: 1145 Examination Surface: Inside [] Outside [] Surface Condition: GROUND SMOOTH Lo Location: 9.2.3 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07225 Temp. Tool Mfg.: D.A.S Serial No.: MCNDE32825 Surface Temp.: 82 °F Cal. Report No.: CAL-09-255 Angle Used 0 45 45T 60 60T "

Scanning dB 35.5 Indication(s): Yes FI No 2 Scan Coverage: Upstream RJ Downstream [] CW E) CCW L1 Comments:

None Results: Accept LI Reject [] Info M_

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level I-N Sin S. Date Reviewer Signature Date Tucker, David K. ,4 * ....... 51412009 ,./-.'c Examiner Level li-N j Sg',ure Date Site Review Signature Date Dean, Steven 2 5/4/2009 Other Level NIA Signature Date ANII Review ,u Date N/AAca6CC Date

A11ACHMENT PAE QI)rc OF UT Vessel Examination Site/Unit: Oconee 1 3 Procedure: NDE-820 Outage No.: 03-24 Summary No.: 03.B3.110.0008 Procedure Rev.: 4 Report No.: UT-09-215 Workscope: ISI Work Order No.: 813802 Page: 1 of 8 Code: 1998 Cat./item: B-D /B3.110 Location:

Drawing No.: ISI-OCN3-002

Description:

Nozzle to Shell System ID: 50 Component ID: 3-PZR-WP26-6 Size/Length: _ Thickness/Diameter: 6.18715.750/CS Limitations: Due to nozzle configuration - See supplemental reports Start Time: '1016 Finish Time: 1145 Examination Surface: Inside E) Outside n./ Surface Condition: GROUND SMOOTH Lo Location: 9.2.3 Wo Location: Centerline of Weld Couplan4: ULTRAGEI+/- II Batch No.: 07225 0

Temp. Tool Mfg.: D.A.S Serial No.: MCNDE32825 Surface Temp.: 82 F Cal. Report No.: CAL409-256thru CAL-09-259 Angle Used 0 145 145T 6I60T 60RL Scanning dB 57.6 57.6 73.5 72.2 Indication(s): Yes [J No [ Scan Coverage: Upstream I] Downstream f] CW [] CCW [

Comments:

35° - 57.8dB, 35T° - 57.8dB Additional Examiner: John C. Day, Level II, 0510412009 Results: Accept EJ Reject W Info E_

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level li-N y*9 .j______ Date Review 4/) Signature Date Tucker, David K. 514/2009 .I*7-/.. 0 Examiner Level II-N S'gnature Date SiteReview Y Signature Date 5/412009 Dean, Steven Other Level iI-N SrntrDate ANII Review 19 3'uata Date Hollis, Jacob 5/,4/2009,.i~$C5 ~tf~t>Ae'6 4-~

AItIACHMENI DUKE POWER COMPANY ISI LIMITATION REPORT ComponentlWeld ID: 3PZR-WP26-6 Item No: 03.B3.110.0008 remarks:

{ NO SCAN SURFACE BEAM DIRECTION *35 &6ORL angles I LIMITED SCAN Z 1 [ 2 0 1 JZ 2 0 cw 0 ccw Nozle configuration CLto FROM L N/A to L N/A INCHES FROM WO -1" to Beyond ANGLE: [ 0 [ 45 [ 60 other

  • FROM 0 DEG to 36o DEG

- NO SCAN SURFACE BEAM DIRECTION

-LIMITED SCAN I1 1 2 -i 1 - 2 I cw Il ccw FROM L to L INCHES FROM WO to ANGLE: E] 0 El 45 [1 60 other FROM DEG to _ DEG I- NO SCAN SURFACE BEAM DIRECTION LIMITED SCAN 'I 1 2 Ei 1 j 2 [] cw F- ccw FROM L to L INCHES FROM WO to ANGLE: F] 0 U 45 U 60 other FROM DEG to DEG L- NO SCAN SURFACE BEAM DIRECTION

-LIMITED SCAN l I El 22 1 El 2 -I cw ccw FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: El 0 EU 45 nl 60 other FROM DEG to DEG Z yes U-"l No Prepared By: David Tucker, ý *Level: 1, Date: 05/04/2009 Sheet - .2. of -

  • Reviewed By: Date: -/ - Autho'd t Date:_5 7.

PZR Sampling Nozzle to Shell % of Coverage LAh C=%

Item No. : 03.B3.110.0008 Weld No.: WP26-6 Weld Coverage Scan Angle  % Coverage Obtained S1 350,450 & 600 61.46 S2 350,450 & 60Q 0 Cw 350 & 450 0 CCw 350 & 450 0 Total 61.46 61.46 +4= 15.4  % Coverage Base Material Coverage S1 350,450 & 600 67.2 Cw & CCw 450&350 42.4 Total 109.6 109.6 + 2 = 54.8  % Coverage 0' Scan Coverage 33.9  % Coverage Aggregate Coverage = Weld + Base Material + 00 - 3 34.7  % Coverage Inspector / Date : 3/0ý Page _ of e

Item No.: 03.B3.110.0008 Pessurizer Sampling Nozzle to Shell A Weld No.: WP26-6 Inspector/Date: David Tucker 05/4/09 14W . ..... Nozzle"-

Total Base Metal Examined with at least 2 angles from one direction. SuNface 2 A combination of 350 ,450, and 600 angles were used to obtain coverage.

% Examined = (24.45 + 5.705) / 44.87 x 100 = 67.2%.

35 0 600 450P 24.45 sq. in...

Shell Surface 1

,"\.\

N N \N \N N

\\\ N N N \

N.\ \\\N N N\ \ N \\

N\ N \N

\ N Ný N N N \ "-,\ N N\ N NN N N

,N N N N

,"" \\\

N N

" \

N

\

NN N\

N N N

5.705 sq. in,,

A11ACHMEN1 B PAGE,.2 / Of I.

Item No. : 03.B3.110.0008 Pressuit ,er Sampling Nozzle to Shell Weld No.: WP26-6 Inspector/Date : David Tucker 05/04/09,4?--

IW Total Weld Metal Examined with at least 2 angles from one direction.

A combination of 35°,45 0 , and 60' angles were used to obtain coverage.

% Examined from Surface I = 7.015 / 11.413 x 100 = 61.46%.

% Examined from Surface 2, CW, and CCW = 0%.

350 6045°6 I

Shell Surface 1

,\ \ \ -ý, N \ \ \ \ \ N \ \ \ \ N ", \ \ \ \ \ N \ N \ \ -\ \ N \ \ "ý \ N --,-ý\ \ \ \ N N \ \ \ -ý N N \ N I \ X - '-

7.015 sq. in.

PAýE?. F Item No. : 03.133.110.0008 Il -essurizer Sampling Nozzle to Shell Weld No.: WP26-6 Inspector/Date: David Tucker 05/04/09 Nozzle Surface 2 EZI Base Metal Examined with 350 and 450 angles.

% Examined 35°and 45' = 19.03 / 44.87 x 100 = 42.4%.

350 and 45°Circ. scan 19.03 sq. in.

Shell Surface 1

A11ACHMAENT 5' PAGE ?_(o F (6O I Item No.: 03.B3.110.0008 PresSurize]r Sampling Nozzle to Shell Weld No.: WP26-6 Inspector/Date : David Tucker 05/04/09/>/ --

] Base and Weld Metal Examined with 00 angle.

% Examined 0' = 19.03 / 56.16 x 100 = 33.9%.

19.03 sq.in.

Shell Surface I I

+ I f '7 or-

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

31.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section XI, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval.

Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

31.6. Duration of Proposed Alternative This request is proposed for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

31.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 03.B9.11.0064 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this B9.11 item. The result from the surface examination was acceptable.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations, the pressure testing (VT-

2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 63 of 71

Relief Request 11 ON 002 32.0 Weld #3-PDA2-1 32.1. ASME Code Component(s) Affected Unit 3 Reactor Coolant Pump 3A2 Casing Nozzle to Safe-End Weld #3-PDA2-1, Summary Number 03.B9.11.0070 32.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through the 2000 Addenda 32.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.11 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 32.4. Impracticality of Compliance Component configuration:

  • Surface 1: Stainless Steel Safe-end
  • Surface 2: Cast Stainless Steel Pump Casing
  • NPS: 33.50 in.
  • Thickness: 2.330 in.

Scanning requirements are described in 10CFR.50.55a (b)(2)(xv)(A)(1). The aggregate coverage was calculated from the following:

700 shear waves obtained 50% coverage in one axial direction (S1 -

safe-end) 700 shear waves obtained 0% coverage in one axial direction (S2 -

pump casing)

  • 450 shear waves obtained 50% coverage in one circ. direction (CW).
  • 450 shear waves obtained 50% coverage in one circ. direction (CCW).
  • The aggregate coverage was calculated to be (50% + 0% + 50% +

50%)/4 = 37.5%.

In addition, a best effort examination was performed using 600 and 700 longitudinal waves to the extent possible in the upper 2/3 area of interest.

The component limitation was caused by the cast stainless steel pump casing material. In order to scan all of the required volume for this weld, the component would have to be redesigned, which is impractical.

Page 64 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

32.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section Xl, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval.

Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

32.6. Duration of Proposed Alternative This request is proposed for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

32.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 03.B9.11.0070 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

In addition to the volumetric examination with limited coverage, Duke performed a surface examination (code required) on this B9.11 item. The result from the surface examination was acceptable.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric, surface, and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the acceptable results of the surface examinations, the pressure testing (VT-

2) examinations required by Section XI, and the leakage monitoring, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 65 of 71

Relief Request 11 ON 002 33.0 Weld #3-PDB1-1 33.1. ASME Code Component(s) Affected Unit 3 Reactor Coolant Pump 3B1 Casing Nozzle to Safe-End Weld #3-PDBI-1, Summary Number 03.B9.11.0072 33.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 33.3. Applicable Code Requirement IWB-2500, Table IWB-2500-1, Examination Category B-J, Item Number B9.11 Figure IWB-2500-8 (c), 100% Volume Coverage of Examination Volume C-D-E-F 33.4. Impracticality of Compliance Component configuration:

  • Surface 1: Pump Casing
  • Surface 2: Safe-end
  • NPS: 33.50 in.
  • Thickness: 2.330 in.

Scanning requirements are described in 10CFR.50.55a (b)(2)(xv)(A)(1). The aggregate coverage was calculated from the following:

0 600 shear waves obtained 0% coverage in one axial direction (S1 -

pump casing)

  • 600 shear waves obtained 50% coverage in one axial direction (S2 -

safe-end)

  • 450 shear waves obtained 50% coverage in one circ. direction (CW).

0 450 shear waves obtained 50% coverage in one circ. direction (CCW).

The aggregate coverage was calculated to be (0% + 50% + 50% +

50%)/4 = 37.5%.

The component limitation was caused by the cast stainless steel pump casing material. In order to scan all of the required volume for this weld, the component would have to be redesigned, which is impractical.

The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

Page 66 of 71

Relief Request 11 ON 002 33.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section Xl, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval.

Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

33.6. Duration of Proposed Alternative This request is proposed for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

33.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 03.1B9.11.0072 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), Reactor Building Normal Sump monitoring provides additional assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the leakage monitoring, it is Duke's position that the combination of examinations providess a reasonable assurance of quality and safety.

Page 67 of 71

Relief Request 11 ON 002 34.0 Weld #3HP-365-40 34.1. ASME Code Component(s) Affected Unit 3 Valve 3HP027 to Elbow Weld #3HP-365-40, Summary Number 03.C5.21.0034 34.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 34.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.21 Figure IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 34.4. Impracticality of Compliance Component configuration:

  • Surface 1: Elbow/Stainless
  • Surface 2: Valve/Cast Stainless
  • NPS: 4.0 in.
  • Thickness: 0.674 in.

Scanning requirements are described in 10CFR.50.55a (b)(2)(xv)(A)(1). The aggregate coverage was calculated from the following:

  • 600 shear waves obtained 50% coverage in one axial direction (S1 -

elbow)

  • 600 shear waves obtained 0% coverage in one axial direction (S2 -

valve)

  • 450 shear waves obtained 50% coverage in one circ. direction (CW).
  • 450 shear waves obtained 50% coverage in one circ. direction (CCW).

The aggregate coverage was calculated to be (50% + 0% + 50% +

50%)/4 = 37.5%.

The limitation of the component was caused by the taper of the valve configuration and cast stainless steel material. In order to scan all of the required volume for this weld, the component would have to be redesigned, which is impractical.

Page 68 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

34.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section XI, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval.

Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

34.6. Duration of Proposed Alternative This request is proposed for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

34.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 03.C5.21.0034 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section Xl, 1998 Edition with the 2000 Addenda.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1; Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section Xl, and the continuing periodic leakage inspections, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 69 of 71

Relief Request 11 ON 002 35.0 Weld #3HP-498-14 35.1. ASME Code Component(s) Affected Unit 3 Pipe to Reducer Weld #3HP-498-14, Summary Number 03.C5.21.0066 35.2. Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1998 Edition through the 2000 Addenda 35.3. Applicable Code Requirement IWC-2500, Table IWC-2500-1, Examination Category C-F-i, Item Number C5.21 Figure IWC-2500-7(a), 100% Volume Coverage of Examination Volume C-D-E-F 35.4. Impracticality of Compliance Component configuration:

  • Surface 1: Pipe
  • Surface 2: Reducer
  • NPS: 2.0 in.
  • Thickness: 0.436 in.

Scanning requirements are described in 10CFR.50.55a (b)(2)(xv)(A)(1). The aggregate coverage was calculated from the following:

600 shear waves obtained 50% coverage in one axial direction (Si -

pipe)

  • 60° shear waves obtained 30.25% coverage in one axial direction (S2

- reducer)

  • 30° shear waves obtained 50% coverage in one circ. direction (CW).
  • 300 shear waves obtained 50% coverage in one circ. direction (CCW).

The aggregate coverage was calculated to be (50% + 30.25% + 50%

+ 50%)/4 = 70.10%.

The limitation of the component was caused by the taper configuration of the reducer. In order to scan all of the required volume for this weld, the component would have to be redesigned, which is impractical.

Page 70 of 71

Relief Request 11 ON 002 The Oconee Inservice Inspection Plan allows the use of Code Case N-460, which requires greater than 90% volumetric coverage. Therefore, the available coverage will not meet the acceptance criteria of this Code Case.

35.5. Proposed Alternative and Basis for Use This weld was examined using procedures, equipment, and personnel qualified in accordance with ASME Section XI, Appendix VIII. No alternative examinations are planned for the weld during the current inspection interval.

Radiography (RT) is not a desired option because RT is limited in the ability to detect service induced flaws. Additionally, radiography has not been qualified through performance demonstration.

35.6. Duration of Proposed Alternative This request is proposed for the duration of the fourth inservice inspection interval, currently scheduled to end on July 15, 2014.

35.7. Justification for Granting Relief Ultrasonic examination of the weld for the item number 03.C5.21.0066 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section XI, 1998 Edition with the 2000 Addenda.

The system leakage test performed each inspection period in accordance with Table IWC-2500-1; Examination Category C-H requires a VT-2 visual examination to detect evidence of leakage. This test and VT-2 examination provides additional assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), visual observations performed during operator rounds provide additional assurance that in the event leakage did occur through this weld, it would be detected and proper action taken.

Duke has examined the weld/component to the maximum extent possible utilizing approved examination techniques and equipment. Based on the acceptable results for the coverage completed by the volumetric examination, the pressure testing (VT-2) examinations required by Section XI, and the continuing periodic leakage inspections, it is Duke's position that the combination of examinations provides a reasonable assurance of quality and safety.

Page 71 of 71

AT TACHMENJ UT Vessel LAamination PASE I OF ýý ft uke Site/Unit: Oconee I 2 Procedure: NDE-640 Outage No.: O2-23 Summary No.: 02.8 3.110.0012 Procedure Rev: 4 Report No.: UT-08-169 Workscope: ISI Work Order No.: 01793547 Page: 1 of I Code: 1998 Cat./Item: B-D 113.110 Location:

Drawing No.: ISI-OCN2-002

Description:

Nozzle to Shell System ID: 50 Component ID: 2-PZR-WP26-7 Size/Length: N/A Thickness/Diameter:* 6.187/5.75 CS Limitations: Yes - See Report UT-08-170 For Coverage Calculations Start Time: 0920 Finish Time: 1220 Examination Surface: Inside D1 Outside [] Surface Condition: 0GROUND Lo Location: 9.2.3 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07225 Temp. Tool Mfg.: D.A.S Serial No.: OCQUA33079 Surface Temp.: 60 °F Cal. Report No.: CAL-08-1 92 Angle Used 30 . 45 45T 60 60TJ Scanning dB 33 Indication(s): Yes D- No C] Scan Coverage: Upstream [] Downstream LI CW[E]' CCWJ Comments:

Results: Accept -- Reject [] Info C]

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level 11-N Date Reviewe,. , ' Signatur Date Tucker, David K. 11 /24/2008 4 /1 4 /K(A /,2$ýo Examiner Level 11,N _. Signature Date Site Review Y Signature Date Dean, Steven 11/24/2008 N/A Other Level N/A Signature Date ANII Review DatatUe Da N/A 11/24/2008 0

AI1ACHMENTA UT Vessel LAamination PA 6E Z OF ý(

Site/Unit: Oconee /. 2 Procedure: NDE-820 Outage No.: 02-23 Summary No.: 02.B3.110.0012 Procedure Rev.: 3 Report No.: UT-08-1 70 Workscope: ISI Work Order No.: 01793547 Page: 1 of 2 Code: 1998 Cat./Item: B-D /B3.110 Location:

Drawing No.: ISI-OCN2-002

Description:

Nozzle to Shell System ID: 50 Component ID: 2-PZR-WP26-7 Size/Length: N/A Thickness/Diameter: 6.18715.75 CS Limitations: Yes - See Attached Limitation Report Start Time: 0920 Finish Time: 1220 Examination Surface: Inside [ Outside [ Surface Condition: GROUND Lo Location: 9.2.3 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No, 07225 Temp. Tool Mfg.: D.A.S Serial No.: OCQUA33079 Surface Temp.: 60 °F Cal. Report No.: CAL-08-193, CAL-08-194, CAL-08-195, CAL-08-196 Angle Used 0 ,45 45T 60 60T 35135T Scanning dB 63.5 63.5 72.'0 57.8 Indication(s): Yes D No g Scan Coverage: Upstream EVJ Downstream [_vJ CW [v CCW R Comments:

    • 70' Axial Scan - 72.0 scan dB**

Results: Accept D Reject [ Info J _

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level I-N Date Reviewer Signature Date Tucker, David K. 111f24/2008 Rsd'~/ /-: ~~

Examiner Level Il-N S";ignature f Date Site Review Signature Date Dean, Steven 11/24/2008 N/A Other Level N/A Signature Date ANlI*Review ",, /,Signature Date N/A 111/24/20.08, vf - I. (1, *t.&,--.

M1tFA6E AF*

DUKE ENERGY COMPANY ISI LIMITATION REPORT Summary #: 02.B3.110.0012 Component ID 2-PZR-WP26-7 remarks:

[ NO SCAN SURFACE BEAM DIRECTION Nozzle Configurition El LIMITED SCAN El 1 Z2 E 1 (E 2 Z cw ccw FROM L N/A to L N/A INCHES FROM WO 1.25 to Beyond ANGLE: 0 [ 45 E 60 other 35' FROM 0 DEG to 360 DEG El NO SCAN SURFACE BEAM DIRECTION D] LIMITED SCAN El- 1 [ 2 El 1 2 F- cw 7 ccw FROM L to L INCHES FROM WO to ANGLE: E- 0 El 45 El 60 other FROM DEG to DEG

-- NO SCAN SURFACE BEAM DIRECTION D] LIMITED SCAN 1 E)l2 El 1 F- 2 - cw 7 ccw FROM L to L INCHES FROM WO to ANGLE: El 0 El 45 El 60 other FROM. DEG to DEG El NO SCAN SURFACE BEAM DIRECTION ElLIMITED SCAN 1 E2 E 1 E] 2 E cw El ccw FROM L to L INCHES FROM Wo to Sketch(s) attached ANGLE: El 0 E] 45 El 60 other FROM. DEG to DEG yes El No Prepared By: Dave Tucker 1 ?ie:

eDae II Date: I 1/24/2008 Sheet 2 of 2 Reviewed By: Date-: Aut.rized Ins Date'. .

opc I A o e .

S// 0

LU-L:J 4- .- Oconee 2 PZR Shell to Sampling Nozzle Item No. 02.B3.110.0012 Weld No. 2-PZR-WP26-7 Weld Coverage Scan Angle  % Coverage Obtained 35, 45, 60 68.9 52 35, 45, 60 0.0 Cw 35,45 0.0 CCw 35, 45 0.0 68.9/4 = 17.2%

Base.Metal Coverage Scan Angle %Coverage Obtained Si 35, 45, 60 70X63 Cw, CCw 35,45 37.45 108.08/2 = 54.0%

0 Degree Scan  % Coverage Obtained i7.5%

Aggregate Coverage = Weld + Base + 0 Degree = 108.72/3 = 36.2%

Inspector/Date: n cPI r/s/O0 Attachment I of 7

t2 -A~~~_ ATTA.C HENT A PASEE ~

£~O.A/*~" C~.NSIA'G /SA~p1pLmg /% zLt6

-' -~. ~-z.

e~. L I)

I N

~~7< "1 I,;-,.

1. di TII I

it

'I I

g~A~

x4&~  ;~ ,.,~- 2

ATTACHMENT A PASt (, AF 'X)

S*.:*- -" 7*,-r"

/S7LIA'c~ /Y

/YOZ:Zc6 c~

- '0' -

LJcriAI** .J~.N$IA'&

~

____ - Cr~,

-.

--- ;'~2;z~

- I ~ ~A (~pj2

/

I I.,

Alt"AC;OEINI A,

-~PASE e O 3Lq, - 6 L)~$NG /, Pthv" A'Sx I'YIZ ,z6e 17'~~ 'Z- 7 6-"f"L .I ý "6,ýL" F-A';

~A. I Ii.

I !ij I

?.~.

I ~ p7.~ /Ai~cD,?

s p ,4WýE

( ZL/

h/~

SAV~(-

(x/*ii*r1~ -~* 4 d$ ~ AI AT AK RT PASE 0~OF 1i A frt ý77 S.(4

~

oCuigh6> (i JI$/VC S,? t'PLIAIG ZZ4

~ r-Sc P uý

~~** I '

1ý1-4

PA6E/O F '

AFuACYNCC:-A(7 7C A/ z-NG

~25cI~Z~~/77 A

!I i~ft/k ~

siMcc~h -p

UT Pipe W,,d Examination PABE IJ OF ~

Site/Unit: Oconee / 2 Procedure: NDE-600 Outage No.: 02-23 Summary No.: 02.89.11.0031 Procedure Rev.: 17 Report No.: UT-08-132 Workscope: ISI Work Order No.: 01794228 Page: 1 of 4 Code: 1998 Cat./Item: B-J /B9.11 Location:

Drawing No.: ISI-OCN2-010

Description:

Casing to Safe End System ID: 50 Component ID: 2-PIB2-8 Size/Length: N/A Thickness/Diameter: 2.780/33.5 SS Limitations: Yes - See Attached Limitation Report Start Time: 1138 Finish Time: 1207 Examination Surface: Inside 7 Outside [ Surface Condition: GROUND Lo Location: 9.1.1.2 Wo Location: Centerline of Weld Couplant: ULTRAGEL. I Batch No.: 07125 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32795 Surface Temp.: 86 'F Cal. Report No.: CAL-08-128, CAL.08-O 29, CAL-08-1 30 Angle Used 0 45 45T 60 60L Scanning dB 60 60 62 Indication(s): Yes 7 No W Scan Coverage: Upstream [ Downstream D CW W CCW DV Comments:

FC 08-03 Results: Accept 0 Reject R Info J_

9 Percent Of Coverage Obtained > 0%: No Reviewed Previous Data: Yes-n.t.Da t es ig re .

E xa m in er L eve l 1 l-N

(/620 Signat eate Leeper, Winfred C.

Examiner Level I1-N Signatur Date Site Review Signature, Date Griebel, David M. 11/6/2008 N/A Other Level N/A Date AMl IR'view . 4Y // /, Date N/A _.=~~~ ..

~~~~~~11/6/2008 U . ,a.. .e.

/& .

I 4'Z e 7

AlT1ACHMiHl , /

PAUE /2ý OF 071 DUKE ENERGY COMPANY ISI LIMITATION REPORT Summary #: 02,B9,11.0031 Component ID 2-PIB2-8 i remarks:

Z NO SCAN SURFACE BEAM DIRECTION o RCP 0Due Configuration

-LIMITED SCAN 1 -] 2 1--] cw E] ccw _

FROM L N/A to L N/A INCHES FROM WO i.0" to Beyond ANGLE: E 0 E] 45 N 60 other FROM 0 DEG to 360 DEGj

-- NO SCAN SURFACE BEAM DIRECTION

[] LIMITED SCAN 1 2 D1 2 F cw F ccw FROM L to L INCHES FROM WO to ANGLE: M 0 Li 45 11 60 other FROM DEG to DEG

-- NO SCAN SURFACE BEAM DIRECTION

-LIMITED SCAN El 1 2 l--1 D2 cw ccw FROM L to L INCHES FROM WO to ANGLE: fl 0 fl 45 [] 60 other FROMý DEG to DEG

, NO SCAN SURFACE BEAM DIRECTION LIMITED SCAN [1i 1 12 0 1lD2 ElcW Fccw FROM L to L INCHES FROM WO to, Sketch(s) attached Z yes - No ANGLE: [1 0 F-1 445 11 60 other FROM DEG to DEG Prepared By: Winfred Leeper Reviewed By:

s upplemnital Report AIIACOIENI A ,ý N 18-132 PAUE /3 OF 91 Page: 3 of 4 Summary No.: 02.69,11.0031

- Ce.e: ! io Examiner: Leeper, Winfred Level: 1l-N Reviewer:

Exammer: Griebel,.David:M. Level: If.N Site Review: .

0ther: N/A Leve): NIA AN:! Revievvw , 1 1" Comments:

Ak'~L1,~ ~

C¢ A'3t~r~ 3.3w rn~T~

Sketch or Photo-

~OOR'L '00s 1-11 1---

E

,I

-7 i mr" r ~e J~AC~

£ I I doY~

/ I I

I C ~Jc~ ~ f1§4Z (s (S (3

Deteri mination of Percent Coverage for UT Examinations - Pipe

,- Site/Unit: Oconee / 2 Procedure: NDE-600 Outage No.: 02-23

-, *- Summary No.: 02,9.111.0031 Procedure Rev.: 17 Report No.: UT-08-132 Workscope: ISI Work Order No.: 01794228 Page: 4 of 4 45 de1 Scan 1  % Length X  % volume of length / 100 = " total for Scan I Scan 2  % Length X  % volume of length 1100 = " total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length / 100 = 50,000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length /100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000 %total for 45 deg Other deg - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan I 100.000  % Length X 0.000 .. %volume of length /100 = 0.000  % total for Scan 1 Scan 2 100.000  % Length X 50.000  % volume of length 1100 = 50.000  % total for Scan 2 Scan 3  % Length X  % volume of length /100 =  % total for Scan 3 Scan 4  % Length X  % volume of length 1100 =  % total for Scan 4 Percent comIleete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor: Date: ./LILL I7 IZ

Duke UT Pipe W ,d Examination MAE 15 OF 91 Site/Unit: Oconee / 2 Procedure: NDE-830 Outage No.: 02-23 Summary No.: 02.B9.11.0031 Procedure Rev.: 0 Report No.: UT-08-134 Work Order No.: 01 794228 Page: 1 of 2 Workscope: ISI Code: 1998 Cati/tem: B-J /B9.11 Location:

Drawing No,: ISI-OCN2-010

Description:

Casing to Safe End System ID: 50 Component ID: 2-PIB2-8 Size/Length: N/A Thickness/Diameter; 2.780/33.5 SS Limitations: None Start Time: 1210 Finish Time: 1242 Examination Surface: Inside 3 Outside E Surface Condition: GROUND Lo Location: 9.1.1.2 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07125 0

Temp. Tool Mfg.: Lutron Serial No.: MCNDE32795 Surface Temp.: 86 F Cal. Report No.: CAL08-131, CAL-08!A132 Angle Used 10 45 145T6 60 60L j 70L Scanning dB Indication(s): Yes D No [ Scan Coverage: Upstream o Downstream 1 CW o CCW0,/

Comments:

Scanned at 70.0 dB to maintain a 30% noise level. **Scanned at 75.0 dB to maintain a 30% noise level.

      • Best effort exam of upper 2/3 of weld to supplement coverage.

Results: Accept W Reject C Info 0 Percent Of Coverage Obtained > 90%: ... Reviewed Previous Data: Yes

AIIACHMENT A~

0 ke Supplem :al Report MAE 14, OiF 13 Reporll\o.: (. A8-134 Page: 2 of 2 Summary No.: 02.B9.11.0031 Examiner: Griebel, David M. ," , Level: IM-N Reviewer:

Examiner: Leeper. Winfred C. / Level: i1-N Site Review: NIA ,.. ... Dale:

Other: N/A Level: N/A ANI. Review: D at e'___

Comments:

==n: --z--n t,1 /

z* "

Sketch or Photo:

1 f

I t t I 1 1

I 1-1 f, Sz 313

UT Base Me Lamination AI1ACHMENT

_ke PA6E /7 UF g

~Enorgy Site/Unit: Oconee / 2 Procedure: NDE-640 Outage No.: N/A Summary No.: 02.B9.11.0058. Procedure Rev.: 4 Report No.: BOP-UT-08-026 Workscope: ISI 1 2EOC23 Work Order No.: 01794246 Page: 1 of 2 Code: 1998/2000 Addenda Cat./Item: N/A Location: N/A Drawing No.: ISI-OCN2-009

Description:

Casing to Safe End System ID: 50 Component ID: 2-P1B1-8 Size/Length: N/A Thickness/Diameter: 2.330/33.5 SS Limitations: None Start Time: 0935 Finish Time: 1015 Examination Surface: Inside

  • Outside f* Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07125 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32795 Surface Temp.: 86 -F Scanning dB: 35 Cal. Report No.: CAL-08-133 Position One Posidon Max Position, Two Ind Amplitude Loss  %* .-.. - - Remarks Sack Wall Full Screen Li WVI W2 MP LM W1 W2 M0 L2 WI W2 MP NRI Comments:

Results: Accept 0] Reject f Info ] Initial Section XI Exam Percent Of Coverage Obtained > 90%: Yes Reviewed Previous Data: NO.

Examiner Level IM-N Siqnature Date Revie,, r- Signature Date Muirhead, Barry A. 11/5/2008 ///

Examiner Level II.N r' Date Site Review' Signature Date Hollis, Jacob 11/5/2008 N/A Other Level N/k"< "Sig'nature Date ANliI Review '7Sgnature i,. Date

/ 115/2008 C/ /

Suppleme;.,al Report PA6E /1 Of 31 Report No.: BOP-UT-08-026 PbDu~de Page: 2 of 2 Summary No.: 02.B9.11.0058 Examiner: Muirhead, Barry A. Level: I1-N Reviewer: Date://./.

Examiner: Hollis. Jacob Level: IM-N Site Review: NIA Date:

Other: NIA Level: N/A ANII Review: Date: _______

Comments:

Sketch or Photo: Z:\UT'DDEAL\ProfileLine2.jpg CL 2.,'.16 ZY' 2 V 2J* 7 ' ,r , p.

I I .aK/?I"7,g 41, 2

/Zsr Z.I /zw/.~ /zj'- A4 ~ /2.jy Rc(

AT TA CHM~hIA PAHE O2F(

Duke UT Pipe Weld Examination Site/Unit: Oconee / 2 Procedure: NDE-600 Outage No.: 02-23 Summary No.: 02.B9.11.0058 Procedure Rev.: 17 Report No.: UT-08-131 Workscope: ISI Work Order No.: 01794246 Page: 1 of 4 Code: 1998 Cat./Item: B-J /B9.11 Location:

Drawing No.: ISI-OCN2-009

Description:

Casing to Safe End System ID: 50 Component ID: 2-PIS1-8 Size/Length: N/A Thickness/Diameter:. 2.780/33.50 SS Limitations: Yes - See Attached Limitation Report Start Time: .1030 Finish Time: 1100 Examination Surface: Inside D Outside ?JI Surface Condition: GROUND Lo Location: 9.1.1.2 Wo Location: Centerline of Weld Couplant: ULTRAGEL It Batch No.: 07125 Temp. Tool Mtg.: Lutron Serial No.: MCNDE32795 Surface Temp.: 86 °F Cal. Report No.: CAL-08..128, CAL-08-129, CAL-08-130 Angle Used 0 5T 6" " 0L Scanning dB 6 60 62 Indication(s): Yes 7 No Scan Coverage: Upstream Y) Downstream . CW l CCW jj Comments:

FC 08-03 Results: Accept C] Reject o Into 71 Initial Section XI Exam Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No Examiner Level I1-N Sig** re Date ýýReview '/t Signatu.e Leeper, Winfred C. 11/6/2008 /

Examiner Level I,.N Signato bDate.7Site Revieew Signature Date Griebel, David M,-- 111/62008. N/A Other N/A Level N/A DaIte 11/6/2008 REIVN -Signatur Sig ure Dat/

Date

ATIACHMENT A PA6E 2oO F 91 DUKE ENERGY COMPANY .

ISI LIMITATION REPORT Summary #: 02.B9.11.0058 Component ID 2-P1B1-8 remarks:

Z NO SCAN SURFACE BEAM DIRECTION DUe to RCP Configuration

[] LIMITED SCAN 0:1 L [ -2 K 2 []cw L- ccw FROM L N/A to L N/A: INCHES FROM WO ib.: to Beyond ANGLE: 13 0 13 45 El 60 other FROM 0 DEGto 360 DEG 1- NO SCAN SURFACE BEAM DIRECTION 13 LIMITED SCAN 1-- 132 [- 132 []cw L]ccw FROM L to L INCHES FROMWO to _ _

ANGLE: 30 1 45 E1 60 other FROM DEG to _ DEG I

-1] NO SCAN SURFACE BEAM DIRECTION ____

Lý LIMITED SCAN [M3i [1 2 El 311 2 r cw - Ccw I FROM L to L INCHES FROM WO to _

ANGLE: [ 0 [] 45 1 60 other FROM DEG to DEG F1 NO SCAN SURFACE BEAM DIRECTION 1- LIMITED SCAN 13' 13F2 Ell F2 13cw1ccw FFýOM L to L INCHES FROM WO to Sketch(s) attached AbNGLE: F1 0 13 45 13 60 other FROM DEG to __DEG. I E yes LNo Prepared By: Winfred Leeper Ii-06-2008 4 kuthor I, - *-

  • AIIACHNENI tl\

Eflil. " Aer Supplen tal Report PA6E? 0 F 08-131 IVEA.-ergy. FReport No.:

3 of 4 Summary No.: 02.89.11.0058 Examiner: Leeper, Winfred C Le~el: 11-N Reviewer:

Examiner: Griebel, David M. Level: I1-N Site Review; Date:.~Z Other: N/A Leve): NIA AN:I Reviewv Comments:

azov~j Lr~A o~ ~

k

%~j~ ~c()q,~ £ '2 i 7 ~ t.

t6:!ZEý 7-Z<.6,0. 1 I.

- ~  ! 'el -? 1 z~jr g&1Z~&

.I I

I, do L, 12- 'ý'7

/

(

0i Cc Q- c2

(*&

~>

D

90keDete r nination of Percent Coverage for UT Examinations - Pipe

' Site/Unit: Oconee / 2 Procedure: NDE-600 Outage No.: 02-23

- Summary No.: 02.B9.11.0058 Procedure Rev.: 17 Report No.: UT-08-131 Workscope: ISI Work Order No.: 01794246 Page: 4 of 4 45 den Scan I  % Length X  % volume of length / 100 =  % total for Scan 1 Scan 2  % Length X  % volume of length / 100 =  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length/ 100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length/100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg Otherdeo- 60 (to be used for supplemental scans)

The data lo be TwIed below is for coverage that was not obtained with the 45 deg scans.

Scan 1 100.000  % Length X 0.000  % volume of length / 100 = 0.000  % total for Scan 1 Scan 2 100.000  % Length X 50.000  % volume of length /100 = 50.000  % total for Scan 2 Scan 3  % Length X  % volume of length /100 =  % total for Scan 3 Scan 4  % Length X  % volume of length /100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam

/e~1-. Date,.

Site Field Supervisor: /1: 11 0 K

AttACHME~f A

,iD Ke UT Pipe W..J Examination MA6E23 OF 81 0%'Energy.

Site/Unit: Oconee / 2 Procedure: NDE-830 Outage No.: 02-23 Summary No,: 02.B9.11.0058 Procedure Rev.: 1 Report No,: UT-08-133 Workscope: ISI Work Order No.: 01794246 Page: I of 2 Code: 1998 Cat./Item: B-J /B9.11 Location:

Drawing No.: ISI-OCN2.009

Description:

Casing to Safe End System ID: 50 Component ID: 2-PIB1-8 Size/Length: N/A Thickness/Diameter: 2.780/33.5 SS Limitations: None Start Time: 1101 Finish Time: 1131 Examination Surface: Inside [ Outside [ Surface Condition: GROUND Lo Location: 9.1.1.2 Wo Location: Centerline of Weld Couplant: ULTRAGEL ti Batch No.: 07125 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32795 Surface Temp.: 86 OF Cal. Report No.: CAL-08-131, CAL-08-132 Angle Used 0 45[45T GL 660 0 70L Scanning dB -

Indication(s): Yes Fl No W Scan Coverage: Upstream W* Downstream Dv CW [ CcW Comments:

  • Scanned at 70.0 dB to maintain 30% noise level. **Scanned at 75.0 dB to maintain a 30% noise level.
      • Best Effort Exam of upper 2/3 of weld to supplement coverage - Non Section XI Exam - Info Only Results: Accept E., Reject D] Info [] Initial Exam Percent Of Coverage Obtained > 90%: Reviewed Previous Data: No mne LReviewer lDaze Signature Date Griebe,, David M. 11/6/20Q81 Examiner - Level. II.N Date Site Review Signature Date Leeper, Winfred C. .. 11/6/2008 N/A Other Level N/A " nature Date ANlFeview , Date NA11/6/20,

AJ1ACHM N' A PA6E2q OF g1 Duxe Suppleme,..al Report Report No.: UT-08-133 IýL 0Energy.

Page: 2 of 2 Summary No,: 02.B9.11.0058 Examiner: Griebel, David M. "'Z-d)ý Level: 14;N Reviewer: Dat:o: I./p.

1/ýI Examiner: Leeper, Winfred C.. */ Level: I-N Site Review: N/A ,,. Date:

4 "- "

Other: NIA Level: N/A ANII Review: 0 * ?./X* I"- ,

UlL.

Comments:

/--/- W/

Sketch or Photo:

I I

130,4zE WF!5I' 52.z I

i

AIIACHMENIA UT Base Met,, .amination PAWEý* Of 9(

--ke OVE',nergy-Plb6i-Site/Unit: Oconee / :2 Procedure: NDE-640 Outage No.: N/A Summary No.: 02.E39.11,0067 Procedure Rev.: 4 Report No.: BOP-UT-08-031 Workscope: ISI /2EOC23 Work Order No.: 01794421 Page: 1 of 2 Code: 1998/2000 Addenda Cat./Item: B-J/B9.11 Location: N/A Drawing No.: 2-53A-10

Description:

Valve 2LP-1 to Pipe System ID: 53A Component ID: 2-53A-10-3 Size/Length: N/A Thickness/Diameter: 1.125/.12.0 SS Limitations: None Start Time: 1350 Finish Time: 1400 Examination S urface: Inside D Outside 25 Surface Condition: AS FC)UND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07125.

Temp. Tool Mffg.: D.A.S Serial No.: MCNDE32825 Surface Temp.: 66.3 °F Scanning dB: 59.5 Cal. Report No CAL I50 Comments:

Results: Accept o Reject [] Info 0] Initial Section XI Exam

A1IACHMENT A PA 6E 4 OF F/

  • Duxe Supplemeh...al Report Report No.: BOP-UT-08-031 Page: 2 of 2 Summary No.: 02.89.11.0067 Level: Il-N Reviewer: Dae:/ /3i, 3'O Examiner: Johnson, Garland Level: i-N Site Review: N/A. -. . -,Ž Date:

Examiner: Tucker. DavidK Level: N/A ANII Review: ,jei , . Date, Other: N/A Comments:

Sketch or Photo: Z:\UT\IDDEAL\ProfileLine2,jpg 1.1,3 0J22

\IALL~ý PIPE-

A11ACRitENf ý3 S PA6EZ7 0F tl 1 Item No.: 03.B3.110.0008 Press *er Sampling Nozzle to Shell Weld No.: WP26-6 Inspector/Date: David Tucker 5/4/09*,j---

Nozzle Surface 2 LIZ 600 RL 600 RL Shell Surface 1 V or-8

AIIACHMENr 46 P46E2 OF p UT Vessel Examination Site/Unit: Oconee / -- 3 Procedure: NDE-3630 Outage No.: 03-24 3

Summary No.: 03.B3.150.0001 Procedure Rev.: 1 Report No.: UT-09-187 Workscope: ISI Work Order No.: 1813760 Page: 1 of 9 Code: 1998 Cat.!Item: B-D /B3.150 Location:

Drawing No.: 1-N32389-2

Description:

Nozzle to Channel Body System ID: 51A Component ID: 3-LDCA-IN-2V Size/Length: N/A Thickness/Diameter: 0.875/3.000(SS Limitations: See supplemental sheets Start Time: 10958 Finish Time: 1043 Examination Surface: Inside LI Outside fZ Surface Condition: AS GROUND _

Lo Location: CL of nozzle next to circ weld Wo Location: Centerline of Weld Couplant: ULTRAGEL ii Batch No.:, 07225 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32795. Surface Temp.: 72 *F Cal. Report No.: CAL-09-228 thru CAL-09-232 Angle Used 0 45 45T 1:Ar 6V.4%J 70L Scanning dB 53.6 54.0 69.8 73.7 54.6 Indication(s): Yes 0 No R] Scan Coverage: Upstream [] Downstream

Comments:

Scanning dB lowered from +14dB to maintain 2:1.siggnal to noiseratio FC 09-01 Results: Accept n Reject R Info L_

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level 1I-N Signature Date v Signature Ransom, Greg J. 4/30/2009/( 7s io Examiner Level Il-N Date Site v w S4i u ,

Tucker, David K. 4302009 Review Other Level NIA -Signature Date ANII Review J , jSsignaqtue ,, Date N/A$CO6C IQL

AITACHMENT PWA6E2? OF (

Report No.: UT-09-187 P ISupplemental Report Page: 2 of 9 Summary No.: 03.13.150.0001 Examiner: Ransom, Greg J.

Examiner: Tucker, David K.

,A. . Level:

Level:

I1-N 11-N Reviewer:

Site Review:

)$~aAIA I1~ Date:

Date:

Other: N/A Level: N/A ANII Review: Date: 5-1/3-e*

Comments:

Sketch or Photo: Z:\UT\OUTAGES\Oconee\3EOC24\O3.B3.150.0001.bmp

ATTACHMENTV Letdown Coplar Nozzle, to-Channel Body (Radius Vi ew.)PAE3 F6 Weld No.:* f,(A-1r( - Iterr! No. 0 ý3. P.Ao.I 00o0 A~~~~~ I 2/ .6hA< -C ~~

- * -' -C , /R7:..

z.

C-rx 1'k J-41'Ai 2l-,-

. lýk

/

0. -r h4~

V-1 Scale: 1" = 1"

~6~A~11K ~

  • Ofrq

Letaown CooiJr Nozzle to Channel Body (Radis View1)PA8 Ah

  • i 51 Veld No.:".-ir - e -id -- v Item ýNo.:C3 <1ooc1

((.~\Je~Af~dZ S~.4M'~)t~.U

,I~r) C AvIACL

-O7~

( 4 ~ ;t)

IIt ", -,_

I -AIE E

a

1 7-/.,

' (IC.

I- 14 eS.q I%

L 34~ - -- (1A~7~h~ LJ ,o I

Scale: 1" = 1" I,

AIIACHMENT E Letdown Cool Nozzle to Channel Body( Radius View*j *z6E 5 Weld No.: *-nrI-T

-* -- 7v Itemn No. o-3 13 -yflP, iK pooo

.2 A4F X--iZY'A&I (rWI.ýAvy

' A - 'irt

\hJ6 12 (tX,61tAr(C-

/-

xt 0

o0 1b**t / 65-.J ~*) ~ c7qje/

Scale: 1"= 1" OP47

AIIAC HMEN T 13' Letdown Cooler Nozzik, to Channel Body PA 6E 3ý3 F ý, /I Weld No.: hLrA -Ttt.- 7v/ Iteh-i No.: i *o

~k~tE r~ ~drI4L- AEC&. riF

\jJ*1 r) AIW~A P7;Cirs 30ý4Lx I-m' , 7k AL,,

Nozzle S2 85-11L.-

Z

'K Channel Body - S I C

_ _ I]

Scale: I"= 1" A A4~I( ~ '4'

AIIACHMENT B PAGE 3Lq Of 6 Letdown Cooler Nozzic co Channel Body We)ld No.:-- S-L FC-'-) I- 7 V Itein No.: ~.3iD0 p i7-,i Seý IYA t QJUr? AtL

-"7 I L " It- r. 1 CD&

V' ABC- 7-z I.. / I IL I.(,,;.I- Z- -- Lou.,. "- AC? 7, , ) *,-

L C-A 7041 Scale: I" = I" <0 7 A ýq

AIIACHMEN! 5 !

Letdown Cooler Nozzi, to Channel Body PASE ?,S OF 61 Weld No. " ",l -- d- A Item No.: .3.j*-- pp,

/A rý c -n .? ,*--e P7<,,s-Z, 7 h301, X 70,-ý 3o1 ýx.B*7.

Y C~ r~i 0 J*

y;;

I (...

~j5 ~

7 z

q 7 /-, /1, (1 5V41 ý/--

(

A 5-.

C- p l

Scale: I'= 1" 77ZT~ '~. oc~ 9

ATTACHMENT B ME 31, OF 61 Report No.: UT-09-187 I ISupplemerical Report Page: 9 of 9 Summary No.: 03.B3.150.0001 Examiner: Ransom, Greg Level: II-N .Date:

Reviewer: - 1 2ek*. g i=,

I Examiner: TuckerNDvdAK. Level: Il-N Site Review: / Date:

Other: N/A Level: N/A ANII Review:

e *~[4-~( Date: ____.___

Commnts:Site Field Supervisor: David K. Zimmerman 0510512009_

Sketch or Photo: Z:UIUAEýcne3O213B.5.0ie.P Letdownf Coo,[cr.NzI obne

  • 1t~mNo.. ~ 3.+/-$cO~O~f ~14 3 a~O t 9e 77, 718 ri 4ag T6_____'adir~ 21-Zus~V

UT Vessel Examination PAUE ýý7 OF 641 Site/Unit: Oconee I 3 Procedure: NDE-3630 Outage No.: 03-24 Summary No.: 03.B 3.150.0002 Procedure Rev.: Report No.: UT-09-188 Workscope: ISI Work Order No.: 1813760 Page: 1 of 9 Code: 1998 Cat./Item: B-D /B3.150 Location:

Drawing No.: 1-N32389-2

Description:

Nozzle to Channel Body System ID: SIA Component ID: 3-LDCA-OUT-5V Size/Length: NIA Thickness/Diameter: 0.87513.O00iss Limitations: See supplemental sheets Start Time: 1001 Finish Time: 1045 Examination Surface: Inside J Outside [] Surface Condition: AS GROUND Lo Location: CL of nozzle next to circ weld Wo Location: Centerline of Weld Couplant: ULTRAGELII -Batch No.: 07225 Temp. Tool Mfg.: Lutron Serial No.: MCNDE32795 Surface Temp.: 72 F Cal. Report No.: AL-09-228 thru CAL-09-232 Angle Used 0 45 45T ,W 6o.riL 7oL Scanning dB 53.6 54.0 69.8 73.7 54.6 Indication(s): Yes F1 No [] Scan Coverage: Upstream [ Downstream [ CW [] CCW R]

Comments:

Scanning dB lowered from +14dB to maintain 2:1 signal to noise ratio FC 09-01 Results: Accept 0 Reject n- Info E]

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level 1e-N ignatUre Date Reviewer.. rA Signature Date Ransom, Greg .3. 4/30/2009 Examiner Level Il-N .... Date Site Review Signature, Date Tucker, David K.~4/30/2009 Other Level JN/A- .Signature Date ANII Review S Date NA OIoB c.s L... Acu'c

ATTACHMENI PA6E3S *F 64B Supplemencal Report Report No.: UT-09-188 Page: 2 of 9 Summary No.: 03.B3.150.0002 Examiner: Ransom, Greg J.

Examiner: Tucker, David.K.

Level; Level:

11-N i1-N, Reviewer:

Site Review:

>~A n1o~ Date:

Date:

Other: NIA Level: NIA ANII Review: Date:_______

/j,,,-- ,,- ... .. ... * * - ,'l, ,

V Comments:

Sketch or Photo: Z:\UT\OUTAGES\Oconee\3EOC24\O3.83.150.0002.bmp

Lercdown Cool. Nozzle to Channel Body ( Radius View E'9p F (4 Weld No.: Item No. :

-ý - [ T)rA - r) t rr -  :ý v

_Wc)z-I - - NZA ~

S&A$*A ev,;7 ::WIZ

&Algý--tA I Af--66ý16-

-A A -,

I ,Z..7-A- . Z n. Al, C~% 1ý F C r)

~<n4~t -~ *1-Scale: 1V= I"

~jY~2 O((//Cw

AIIACHMENT 5 Lewiown Cool-.r Nozzle to Channel Body (Radius View A 0F Weld No. Item No. :

- I 173¢ A - ot I1"--..*:ý\/ 0,r". * , .. (3').

0' 7 )

A[5c It,,

  • { '*,,'All tL*-

"lr

-"7

-to

-  :ý 7 .- ,3 -

&go" A~I

  • ~(1,t 4 ,.ev* #-7!*,

o,1, ,, ,-2*, o ) "- ,o .

Scale: I" = 1" C)'//SoiAq A cýZ,p e, ýý- a,-

4 oF q

LeLdo n Coot-r .. ...ý ..Nozzle . ... to Cha.inel

. . ... .. : ,*-,: , . Body.._ (Radius

,.Ra4 , View GE q11 Weld No.: Item No. :

  • 'k- I MeA - ot, rr- <,,/ 03 -a'3 -1 f5 0,OND 2

34S6~K*ACA.Lfi:*UkCnr

- (C iw ~~,.frZ D 1 s tI17c--Cr VZL-

.. I n,.1,-,r xO,

)C O i C w

Li -( 7-0--i il~1Li~L8, Ak Q

Scale: i= I"

'I' o

A11ACH4ENT 1B Letdown Cooler Nozzlk to Channel Body PASE 42-/DF I' /

Weld No.: Item No. :

fT--5V (2 o,0?

~2L~ .~ .. ~ A A 17 /-- I 1= ý 7-A BCt-p J%7.S1-As.

.7 - 3 ~ Z- 77,- 1.

Ci " I-

- 1z 4~-r~~u

& .~

I I

Channel Body - SI C

I

-P e

- L Scale: 1" = I" A irý g, , 1/: ntllgn /,1ý7

<.._ 6

PASE qS3 OF (1.

Letdown Cooler Nozzkt to Channel Body Weld No.: Item No.

~,-~h(-pLr-* -0 3

-! .ý 1!50 .oo?.7 CDr. - .141;; -

C T)-

1 ~~4. 77. 77,

'p 1

-I-rz C I..~ t -

A Channel Body - S I Scale: 1"= I" r

7 1F I

AIIACHMENT PAGE'9q1 OF 5 Letdown Cooler Nozzk- to Channel Body Weld No.: Item No. :

3-( ThA-c~u1-~v - .Z R  :;,. 5C O-W 2 I-

  • 261.

0

/

C ll A.

'5' Scale: 1" = 1" gzj I

AML. A Supplemental Report Report No.:

Page:

PASE q!! OF 9

UT-09-188 of 9 6(

Summary No.: 03.B3.150.0002 Examiner: Ransom, Greg J././ ý Level: Il-N Reviewver: Date:

Examiner: Tucker, David K. - Level: fl-N Site Review: _ I Date:

Other: N/A Level: N/A ANII Review: Date: ________

V, ......

V Comments:

Site Field Supervisor: David K. Zimmerman 05105/2009 '/ z/,.//6"_?;)

Sketch or Photo: Z:\UT*OUTAGES\Oconee\3EOC24\O3.B3.150.0002new.JPG PAO

~M~PRO Axial, I -52.7%

Uiric 4

KAI Axia$

Mak44l CArS2

~ ~45$~*QQ S-~ 0'

-054,ý8~~$i

A11ACHt4MI UT Pipe Wtad Examination PASE *9(ý OF ~

Site/Unit: Oconee / 3 Procedure: NDE-830 Outage No.:: 03-24 Summary No.: 03.E19.11.0068 Procedure Rev.: 1 Report No.: UT-09-219 Workscope: ISI Work Order No.: 1813961 Page: 1 of I Code: 1998 Cat./Item: B-J lB9.11 Location:

Drawing No.: ISI-OCN3-011

Description:

Nozzle to Safe End System ID: 50 Component ID: 3-PDAI-1 Size/Length: N/A Thickness/Diameter: 2.330133.50/SS Limitations: Single Sided Exam Start Time: 1133 Finish Time: 1215 Examination Surface: Inside El Outside P Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEQIII Batch No.: 07225 Temp. Tool Mfg.: D.A.S Serial No.: MCNDE32795 Surface Temp.: 75 1F Cal. Report No.: CAL-09-271 and CAL-09-272 Angle Used f 0 45 45T J 60 601 70L Scanning dB 68.0 70.0 Indication(s): Yes El No S] Scan Coverage: Upstream [2 Downstream El CW 66 CCW G]

Comments:

Non Code Exam Results: Accept El Reject E] Info R]

Percent Of Coverage Obtained > 90%: No Reviewed Previous: Data: No /

    • /I ~~~~~~~~~..... . .... ..... ... '" .

... . !" . ..... i . .... '

Examiner Level I-N Slgn3at, e Date Site Review Signature Date Griebel, David M. , -" 518/2009 Other Level N/A (Signature Date ANII Review Stn.'Iture Date' NIA Cc'6

A11ACHMENT PA13E' OF UT Pipe Wwd Examination Site/Unit: Oconee / 3 Procedure: NDE-600 Outage No.: 03-24 Summary No.: 03.B9.11.0068 Procedure Rev.: 17 Report No.: UT-09-221 Workscope: 1SI Work Order No.: 1813961 Page: 1 of 5 Code: 1998 Cat .ltem: B-J 1B9.11 Location:

Drawing No.: ISI-OCN3-011

Description:

, Nozzle to Safe End System ID: 50 Component ID: 3-PDA1-1 Size/Length: N/A Thickness/Diameter: 2.330/33.50/SS Limitations: See Supplemental Report Start Time: _.h215 Finish Time: 1239 Examination Surface: Inside [] Outside [ Surface Condition: AS GROUND _

Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGE4 II Batch No.: 07225 Temp. Tool Mfg.: D.A.S Serial No.: MCNDE32795 Surface Temp.: 75 °F Cal. Report No.: CAL-09-278, CAL-09-279, and CAL-09-280 Angle Used 0145 45T 60 60L Scanning dB 62.0 67.0 71.0 Indication(s): Yes [l No R Scan Coverage: Upstream El Downstream [] CW [] CCW []

Comments:

FC 08-03 Results: Accept E] Reject RJ Info L_

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level II-N tuDate Reviewer Signature Date Leeper. Winfred C. 5/8/2009 .. ..

Examiner Level Il-N ature Date -Site Review Signature . .Daee Dean, Steven 5/8/2009 Other Level NIA Signature Date ANII Review . ..... Signure, Date NIA ~4OCC/L

PAGE 4 OF 6i DUKE POWER COMPANY ISI LIMITATION REPORT ComponentlWeld ID: 3-PDAI-1 Item No: 03.B9.11.0068 remarks:

[ NO SCAN SURFACE BEAM DIRECTION Due to RCP configuration and LI LIMITED SCAN Ej I  ; 2 0 1 E] 2 Z cw 0 ccw material type (cast stainless FROM L N/A to L N/A INCHES FROM WO N/A to N/A steel).

ANGLE: D 0 N 45 0 60 other N/A FROM N/A DEG to N/A DEG L] NO SCAN SURFACE BEAM DIRECTION Li LIMITED SCAN 0 1 [E 2 [E 1 [: 2 [-1 cw [:] ccw FROM L __.,, _-to L INCHES FROM WO to __,,

ANGLE: Di 0 Li 45 E) 60 other FROM DEG to DEG Li NO SCAN SURFACE BEAM DIRECTION DLIMITED SCAN Li1 Li2 i1 1 2 i cw [ccw FROM L to L INCHES FROM WO to ANGLE: EL 0 Li 45 [L 60 other FROM DEG to DEG Li NO SCAN SURFACE BEAM DIRECTION Li LIMITED SCAN i1 L-2 LI I Li 2 1i cw i-- ccw i "

FROM L to L INCHES FROM WO to 'Sketch(s) attached ANGLE: EL 0 Li 45 L 60 other FROM DEG to DEG 0 yes L No v.-

Determination of Percent Coverage for UT Examinations - Pipe Site/Unit: Oconee / 3 Procedure: NDE-600 Outage No.: 03-24 Summary No.: 03.B9.11.0068 Procedure Rev.: 17 Report No.: UT-09-221 Workscope: ISl Work Order No.: 1813961 Page: 3 of 5 45 deg Scan 1  % Length X  % volume of length!_L100 ...... .......... ..total-for-*Scan .1.

Scan 2  % Length X  % volume of length /100  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length /100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length /100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg Other deg - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 1 Scan 2 100.000  % Length X 0.000  % volume of length / 100 = O0000  % total for Scan 2 Scan 3  % Length X  % volume of length / 100 =  % total for Scan 3 Scan 4  % Length X  % volume of length /100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor David K. Zimmerman ,,, ' Date:

11ACHMENT

  • S ABE *0 Supplemb..tal Report Report No.: UT-09-221 Page:, 4 of 4 Summary No.: O3.B9.11.0068 Examiner: Leeper, Winfred C. /(}.4...L'/ .*'.Level: It-N Reviewer: Date: f r-2.

Examiner: Dean, Steven Level: Il-N Site Review: .... ___.. ..... . Date:

Other: NIA Level: N/A ANII Review: V/

je.m

-6

  • Comments: r--

A"A ct, .

IIJ ASe(r 33t; ~nc~,>

I I 7 'A 1 Jl

- ~.o6~L - I N 'I0 SI Af~~~c-E . '~

SýI- ý-ý - -I

(~1~ Dý

ATfIACHMEHT S PArF5 / 0 F1 Supplemw 1 ,tal Report 1440*6 MM Report No.:

Page:

UT-09-221 5 of 5 Summary No.: 03.B9.11.0068 Examiner: Leeper, Winfred C. Level: Il-N Reviewer: Date: 11_2..0 Examiner: Dean, Steven Level: It-N Site Review: Date:

Other: N/A Level: N/A, ANII Review: Date: 5-/2 ,*

Comments:

- /-/ 0W >

Sketch or Photo:

l 10-- 1 I

- - m V.3'c 0 A*erAX44i4 A-V 77

A11ACHMET

?,A6E.2. OF 6A UT Pipe Weid Examination Site/Unit: Oconee I 3 Procedure: NDE-830 Outage No.: 03-24 Summary No.: 03.B9.11.0074 Procedure Rev.: 1 Report No.: UT-09-220 Workscope: ISI Work Order No.: 1813975 Page: 1 of I Code: 1998 CatJItem: B-J /B9.11 Location:

Drawing No.: ISI-OCN3-014

Description:

Nozzle to Safe End System ID: 50 Component ID: 3-PDB2-1 Size/Length: N/A Thickness/Diameter: 2.330133.50/SS Limitations: Single Sided Exam Start Time: 0920 Finish Time: 0934 Examination Surface: Inside LI Outside [] Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch No.: 07225 i

Temp. Tool Mfg.: D.A.S Serial No.: MCNDE32795 SAnface Temp.: 75 'F Cal. Report No.: CAL-09-273 and CAL-09-274 Angle Used 0 45 45T 60 60L 70L Scanning dB 68.0 70.0 Indication(s): Yes El No j] Scan Coverage: Upstream [] Downstream CJ CW [] CCW R]

Comments:

Non Code Exam Results: Accept El Reject F) Info ____

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No Examiner Level Il-N Signature Date Reviewer Signature Date Ransom, Greg J. 51812009 5 " "

Examiner Level Il-N " ., Si, . Date Site Review Signature Date Griebel, David M. 518/2009 Other Level N/A Signa'ture Date ANII Review , Date N/A 33to 6 -C.fw -C

AIIACHM~ENI B PAISE 53ý Of: ýI UT Pipe Weld Examination Site/Unit: Oconee / 3 Procedure: NDE-600 Outage No.: 03-24 Summary No.: 03.B9.11.0074 Procedure Rev.: 17 Report No.: UT-09-222 Workscope: ISI Work Order No.: 1813975 Page: 1 of 5 Code: 1998 CatJltem: B-J 119.11 Location:

Drawing No.: ISI-OCN3-014.

Description:

Nozzle to Safe End System ID: 50 Component ID: 3-PDB2-1 Size/Length: N/A Thickness/Diameter: 2.330133.501SS Limitations: See Supplemental Report Start Time: 0853 Finish Time: 0917 Examination Surface: Inside j] Outside [] Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Centerline of Weld.. Couplant: ULTRAGEL! II Batch No.: 07225 Temp. Tool Mfg.: D.A.S Serial No.: MCNDE32795 Surface Temp.: 75 °F Cal. Report No.: CAL-09-275, CAL-09-276, and CAL-09-277 Angle Used 0 45 45T 60 60L j Scanning dB 62.0 67.0 71.0 Indication(s): Yes [] No R] Scan Coverage: Upstream El Downstream 2] CW FvI CCW R1 Comments:

FC 08-03 Results: Accept E: Reject 2) Info _-_

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yep Examiner Level II-N )i-M* natye Date Reviewer/j Signature .. Date Leeper, Winfred C. A f15-' ... .. .. 5 k .. .

Examiner Level II-N ,unL- S,, Date Site Re Signature Date Hollls, Jacob 55. .9/2009 Other Level N/A Signature Date ANII Review Date N/A .... A CPf OIL .. e~eiz 5.. zT2.

A11ACHMEWT B PA 6E 5q O DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 3-PDB2-1 Item No: 03.19.11.0074 remarks:

[ NO SCAN SURFACE BEAM DIRECTION Due to RCP configuration and F-] LIMITED SCAN r- 1 [ 2 0 1 rI 2 M cw ccw mrterial type (cast stainless FROM L to L INCHES FROM WO to steel).

ANGLE: El 0 ED 45 0 60 other N/A FROM N/A DEG to N/A DEG LI NO SCAN SURFACE BEAM DIRECTION

[7LIMITED SCAN l- I El 2 [1 1 [I 2 I- cw 0 ccw FROM L to L INCHES FROM WO to _

ANGLE: L] 0 [] 45 Li 60 other .. FROM DEG to __ .DEG Li NO SCAN SURFACE BEAM DIRECTION i LIMITED SCAN E] 1 [7 2 i- 1 [7 2 [] cw [i- ccw FROM L to L_________ INCHES FROM WO to _

ANGLE: E] 0 Li 45 EL 60 other FROM DEGto DEG I L NO SCAN SURFACE BEAM DIRECTION Li LIMITED SCAN Eli IE]2 D 1 l 2 Eicw Diccw FROM L t oL INCHES FROM WO to Sketch(s) attached I

'9

Deter] ruination of Percent Coverage for UT Examinations - Pipe k" Site/Unit: Oconee / 3 Procedure: NDE-600 Outage No.: 03-24

  • SummaryNo.: 03.B9.11.0074 Procedure Rev.: 17 Report No.: UT-09-222 Workscope: ISI Work Order No.: 1813975 Page: 3 of 5 Sc a n 1 .... . ... .. . . . %.Length-X. .  % voal m-e--oflen-gth-/-MGO _ ___ 6%totai-for Scan 1 Scan 2  % Length X  % volume of length / 100 =  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg Other deg - 60 (to be used for supplemental scans)

The data to be listed below Is for coverage that was not obtained with the 45 deg scans.

Scan 1 100.000  % Length X 50.000  % volume of length / 100 = 50.00.0  % total for Scan 1 Scan 2 100.000  % Length X 0.000  % volume of length /100 = 0.000  % total for Scan 2 Scan 3  % Length X  % volume of length /100 = . ....... __  % total for Scan 3 Scan 4  % Length X  % volume of length /100 = ......%total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor: David K. Zimmerman IC/ Date: r,____. ____

PA6E 5(* Of (e?(B A11ACHMENI Supplemtxital Report 101-a-, 6, Report.No.:

Page: 4 UT-09-222 of 5 Summary No.: 03.B9.11.0074 Examiner: Leeper, Winfred Level: Il-N Reviewer:- Date:.-. (2.a.

Examiner: HolUis, Jacob Level: It-N Site Review- Date:

Other: N/A Level: N/A ANII Review: Date: j,/2 -

Comments: Fe.., - -

  • ......,..A o,, 4PL'( 1r' tI4 A;

Sketch or Photo: * ~ ~ y . Chi z I I

'-)bg- ýy $-

11 'LJ&&.

I I Rý9ý& IT- u) Gi

- ~ I I

~L4~L~C~L L~tI 7.Q(,r~'~

I I

-~

.46~

1.

/ :1.

A2~Cazz

~A.

I $~L- ~g0 (~J~A( 7 e;~ LL~C.

s--t Q'

A11ACH*1 L~

Supplemtwltal Report FAS"E_ OF 6/O Report No.: UT-09-222 Page: 5 of 5 Summary No.: 03.B9.11.0074 Examiner: Leeper, Winfred C.

Examiner: Houlls, Jacob 4!-tZLevel:

Level: Il-N 11-N Reviewer:

Site Review:

z~g Oateo:

Date:

1-2

?-

Other: NIA Level: NIA ANII Review: Date:_______

6' Comments:

Sketch or Photo:

A~ I I

SI-IIX R'CPL I.

ATIACHHM1 PAHE5S3 Of UT Pipe Weid Examination Site/Unit: Oconee / 3 Procedure: PDI-UT-2 Outage No.: 03-24 Summary No.: 03.C5.21.0024 Procedure Rev.: C. Report No.: UT-09-181 Workscope: ISI Work Order No.: 01816627 Page: 1 of 4 Code: 1998 Cat./ltem: C-F-1/C5.21 Location:

Drawing No.: 3-51A-52

Description:

Valve 3HP-105 (Forged SS) to Pipe System ID: 51A Component ID: 3-51A-52-44 Size/Length: N/A Thickness/Diameter: 0.43813.000/SS Limitations: No circumferential scan on downstream side of weld due to taper Start Time: 1501 Finish Time: 1608 Examination Surface: Inside LI Outside [ Surface Condition: AS GROUND Lo Location: 9.1.1.1 Wo Location: Weld Centerline Couplant: ULTRAGELill Batch No.: 07225 Temp. Tool Mfg.: D.A.S Serial No.: MCNDE32827. Surface Temp.: 89 °F Cal. Report No.: CAL-09-222 and CAL-09-223 Angle Used 0. 45 *f45T 60 Scanning dB 50.2 50.2 60.7 Indication(s): Yes E] No 2] Scan Coverage: Upstream [] Downstream I] CW E) CCW El Comments:

FC 08-01, 08-04, 09-02 Results: Accept E] Reject I2] Info E_

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level Il-N 'g'.. Date Review-. Signature Date Ellis II,Kenneth R.

  • 2/212009 [, . , -og Examiner Level NIA Signature Date Site Review y Signature Date N/A __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Other Level N/A Signature Date ANII Review nature Date OSg N/A J... 0 C. 3C,/*OL

Deterimination of Percent Coverage for UT Examinations - Pipe ME Site/Unit: Oconee / 3 Procedure: PDI-UT-2 Outage No.: 03-24

_ -6ummary No.: 03.C5.21.0024 Procedure Rev.: C Report No.: UT-09-181

. _.. Workscope: ISt Work Order No.: 01816627 Page: 2 of 4 45 dee Scan 1  % LengthX . ... . olumeof-engthll.Q= --/ototal-for-SGan-1--

Scan 2  % Length X  % volume of length / 100 = %total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length / 100= 50.000 %total for Scan 3 Scan 4 100.000 o% Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg Other deg - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan 1 100.000  % Length X 100.000  % volume of length /100 = 100.000  % total for Scan 1 Scan 2 100.000  % Length X 100.000 %volumeoflength /100= 100.000  % total for Scan 2 Scan 3  % Length X  % volume of length 1100 =  % total for Scan 3 Scan 4  % Length X  % volume of length /100 =  % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 75.000  % Total for complete exam Site Field Supervisor. David K. Zimmerman Date: 4/2912009

AI1ACHMENT PAGE /,1OF OI Supplemental Report Report No.: UT-09-181 Page: 3 of 4 Summary No.: 03.CS.21.0024 Examiner. Ellis 11,Kenneth R. Level: I1-N Reviewer: Gary JMoss Level'II Date: 5/5/2009 Examiner: NIA Level: N/A Site Review: N/A Date:

Other: NIA Level: N/A ANII Review: Jacob C. Scholl Date: 5/5/2009 Comments:

Sketch or Photo: Z:\UTXOUTAGES\Oconee\3EOC24\O3.C5.21.0024T&Ct.JPG

-LI P~Ae ~n ce JI I

4~IA.

-A

i ~AIIACHMENI4T PAGE OF DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 3-51A-52-44 Item No: 03.C5.21.0024 r~marks:

I NO SCAN SURFACE BEAM DIRECTION Nb scan from centerline toward I LIMITED SCAN CD I El 2 E] I [] 2 CW CCW vlve duetoconfiguration FROM L N/A to L N/A INCHES FROM WO 0 to beyond . .. ____. ....... .....

ANGLE: [: 0 [ 45 [1 60 other FROM .o DEG to 360 DEG

["- NO SCAN SURFACE BEAM DIRECTION iLIMITED SCAN [] 1 [ 2 i]-I 11 2 E] cw El-7Ccw FROM L to L INCHES FROM WO to _ _

ANGLE: [E 0 LI 45 L] 60 other FROM DEG to DEG LI NO SCAN SURFACE BEAM DIRECTION i] LIMITED SCAN -- I El 2 I-1 [2 El cw ccw FROM L to L INCHES FROM WO to _

ANGLE: Li 0 [] 45 n] 60 other ___ FROM DEG to DEG i NO SCAN SURFACE BEAM DIRECTION E] LIMITED SCAN Ii Li2 E]i [1 2 - cw l ccw FROM L to L INCHES FROM WO to _ Sketch(s) attached ANGLE: Li 0 L] 45 L60 other FROM DEG to DEG yes Li No Prepared By: Kenneth Ellis Level: II Date: 02/02/2009 Sheet 4 of t Reviewed By: Date: AuthoriVn por:" Date:

AITAOMENT c UT Vessel E%ýamination PAGE I OF ý Site/Unit: Oconee I 3 Procedure: NDE-3630 Outage No.: N/A Summary, No.: N32389-3 WJ-32 Procedure Rev.: 0 Report No.: BOP-UT-06-112 Workscope: PSI Work Order No.: N/A Page: 1 of 5 Code: 1998 thru 2000 Addenda Cat.1item: NIA Location: N/A Drawing No.: OM 201.-3235.002

Description:

Inlet Channel Body to Chemical Connector System ID:

Component ID: N32389-3 WJ-32 Size/Length: NIA ThicknesstDiameter .875 18.620 Limitations: Yes - See Attached Limitation Report Start Time: 2122 Finish Time: 2218 Examination S3urface: Inside Outside Iv' Surface Condition: AS GROUND. _ , J ,

Lo Location: ............ ___Wo Location: Centerline of Weld Couplant: ULTRAGEL 11 Batch No:f~O 4 .- 3Z Temp. Tool Mfg.: FISHER Serial No.: MCNDE 27219 Surface Temp.: 68 °F Cal. Report'No.: CAL-06-297,,CAL.06 298:CAL.O6.299,CAL-06-3001 CAL*063O1 7

Angle Used I 0 4 4 45T 6T L f-.. ' 70t1I Scanning dB 52- 4S! 1 W 5. , ,53-Indication(s): Yes v' No. Scan Coverage: Upstream ivv Downstream kdI CW vii CCW

  • Comments:

FC 06-02

  • Lo = CL of nozzle adjacent to Circ. Weld Scanning Db's reduced from reference +14 to maintain 2:1 signal to noise ratio Results: Accept j,'l Reject I j Info I1 PSI Examination Percent Of Coverage Obtained > 90%: .c>- *>- Reviewed Previous Data: ._No

PAF I IACMNT2 DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: N32389-3 WJ-32 Item No: N/A remarks'

[ NO SCAN SURFACE BEAM DIRECTION Due to Nozzle El LIMITED SCAN Ni El 2 Z I N] 2 Z cw 2 ccw FROM L 0+3" to L o04" INCHES FROM WO CL+-.1 to Beyond ANGLE: E] 0 0 45 0 60 other 70 FROM DEG to DEG El NO SCAN SURFACE BEAM DIRECTION Taper on Chemical Connector

[ LIMITED SCAN 11 1 0 2 1 1 Z 2 0 cw Z ccw FROM L to L INCHES FROM WO +0.6 to +1.5 ____. _____.... .. .........

ANGLE: 0i 0 Z 45 0 60 other 7o FROM o DEG to 360 DEG LI NO SCAN SURFACE BEAM DIRECTION

[1 LIMITED SCAN El1 [E 2 0 1 E] 2 El cw El ccw FROM L to L INCHES FROM WO to ANGLE: El 0 El 45 El 60 other FROM DEG to DEG E. NO SCAN SURFACE BEAM DIRECTION, El LIMITED SCAN E 1i El 2 ] 1 El 2E[ cw El ccw FROM L to L INCHES FROM WO Sketch(s) attached 0,to ANGLE: El 0 El 45 El 6n. i*l FROM DEG to . DEG Z yes E] No Prepared By: Jay Eaton '05/1=4(006 1 Sheet 3 of 5 Reviewed By::

.1

Let Down Cooler - Chemical Connector to Channel Body

% Coverage Calculations

-~

Ž~32~3~S~r3 ~Y~-3l

.~

-~ C- Weld No.,:

0= 8.625" 0.875" Weld Length = 27.1" Total Inspection Area = 2.28 sq. in.

% Length Limited due to nozzle-= 6" 127.1" x 100 = 22.1%

A.ore-cate Coverage Calculation Axial Scans 22.1% of length x 96.5% of the volume of length / 100 = 21.3%

77.9% of length x 97.4% of the volume of length / 100 = 75.9%

Aggregate coverage Axial scans =.*'i'+ 75.9 = 97.2%

Circ. Scans 100% of length x 78.1% of the volume of lengt/ 100 = 7 8.1%

Total = (97.2 + 78.1) 12 = 87.7% Aggregate Coverage A-rLAL0$4D1rTD So?-Ufncx...lz'

)

Inspector Date: Page I of 5 4,1411,11 L~4I~

.- 4etdown Cooler Chemical C ,nnector to Channel BoAt -A-. I6 IIACH-MEtNTC fC*

Total Exam Area Weld No. : i~0~ZL3~ -3 Item No. : t)IA e JA cc, 14 Dv-Z-IV, Vt,)

Scale: 1" = 1" Y,,,,~s e-Iz3-0JOV- r-0 Z ofý-

Iea'.

_etdown Cooler Chemical i-innector to Channel B o.I, . OF q3 Area Examined - Circ. Scan Weld No. : i\)3Z3~A -3 Item No. :

I Area Not Examined = 0.5 sq. in.

LIZ] Area Examined= 2.28 - 0.5 / 2.28 x 100 = 78.1%

ckes4' 1 1~

c/0 Ca(I 450 450 Scale: 1" = 1 "

ý> -10ý '61z3fa!L

&-rMC-%A Me-Dýr -M (30?-OT-- o(o - i iz

'?A~me 3 ~n1::S

-etdown Cooler ChemicalC-.nnector to Channel Bod4Ayf-5 OF Area Examined - Axial Scans Weld No.: z-38g-3 u,)Y Item No. : - Itt, Area Not Examined = 0.05 + 0.01 = 0.06 sq. in.

L[II = Area Examined = 2.28 - 0.06 / 2.28 x 100 = 97.4%

Ck~J e - Tube Sheet - S2 Channel Body - SI The-

'(hg /,~

Scale: 1V-z 1" 44 q

'?

Al 1ACHMENT C

,,etdown Cooler Chemical C-nnector to Channel BodyAGE-7 OF qS Area Examined @ Nozzle - Axial Scans Weld No.: 3J q t- Item No. " 3,_1A

= Area Not Examined = 0.05 + 0.01 + 0.02 = 0.08 sq. in.

zzle zz* Area Examined 2.28 - 0.08 / 2.28 x 100 = 96.5%

I *

  • 0.05 sq. in.

0*01 sq. inl i 0.02 sq.

700 450 600 450 06 k)~e'o40 Channel Body - S I 4ýde-6'3-e&- S2 4

Iti I/1

ýk 6-j Av%('~ --0a

~ ~ X Jz Scale: " = 1"

?PAL-cr 'S Ofr'

Al ltAHMENTIC UT Vessel Examination PA6E--ý OF ý'3 Site/Unit: Oconee! 3 Procedure: NOE-3630 Outage No.: N/A Summary No.: N32389-3 WJ-33 Procedure Rev.: Report No.: -.BOP-UT-06-113 Workscope: PSI . Work Order No.: NIA Page: 1 of 2 Code: 1998 thru 2000 Addenda Cat./Item: NIA Location: N/A Drawing No.: OM 201.-3235.002

Description:

Inlet Tube Sheet Nozzle C to Channel Body System ID:

Component ID: N32389-3 WJ-33 Size/Length: N/A Thickness/Diameter .875/ 3.0 Limitations: Yes -See Attached Limitation Report. Start Time: 2122 Finish Time: 2218 Examination Surface: Inside , : Outside !v] Surface Condition: AS GROUND Lo Location: . WO Location: Centerline of Weld Couplant: ULTRAGEL II Batch o31 Z5 Temp. Tool Mfg.: FISHER Serial No.: MCNDE 27219 'Surface Temp.: 68 -F Cal. Report No.: CAL-06-297, CAL.O8.2S8;CAL-06-299,.CAL.O06:30i)CAL-.06301 Angle Used 0. j 45 45T 6oLI 6f' 7-tL-. I Scanning dB Y 2' 4N LWr U5o m CC Indication(s): Yes! No i.jScan Coverage: Upstream IYJ Downstream ik W Wv CCW IoI Comments:

FC 06-02

'Lo = CL of nozzle adjacent to Circ. Weld Scanning Db's reduced from reference +14 to maintain 2:1 signal to noise ratio Results: Accept !./! Reject I Info PSI Examinatio Percent Of Coverage Obtained > 90%: . Reviewed Previ ous Data: No Examiner Level ii ~aueDate Revie rSignature Date Eatlon, Jay A. . . /820 Examiner Level N/ASgntrDaeStRvewintu ae NaeSieR/A wY IDi NVA Other Level NIA Signature Date ANlII Re lvew @,l ~treto, ,.- Date

.(-J (,J1

iL-Let Down Cooler ' Nozzle to Channel Body

%0Coveraqe Calculations L-O.

Weld No.: Z38~-5 0S33 Axial Scans Along Axis of Pipe = 100% of the Length x 45.2% of the Volume = 45.2%

Along Radius of Pipe = 100% of the Length x 60.0% of the Volume = 60.0%

Average = 45.2% + 60.0% / 2 = 52.6%

Circ. Scans Along Axis of Pipe = 100% of the Length x 55.5% of the Volume 55.5%

Along Radius of Pipe = 100% of the Length x 81.7% of the Volume = 81.7%

Average = 55.5% + 81.7% / 2 = 68.6%

Total = (52.6 = 68.6 ) 1 2 = 60.6% Aggregate Coverage S-3) 0(1

.1 Inspector Date:

" 1Z A:' w Page I of¶..

ATIACHMENT C Letdown Cooler Nozzle to Channel Body PA6E7-0 0F 'T3 Weld No. ZfA-3 5 Item No. C: j Total Exam Area = 2.72 sq. in.

Scale: I" = 1"

--IZ-510o(.

ATfPcýr"6-W--M T'Ald, Z OF 7

ATIA*CHMENT C Letdown Cooler Nozzle to Channel Body PAGE 71 OF q Area Examined - Circ. Scans Weld No. : 0 5"Z.3 Sq -"5 L- --53 Item No. :

L--Z Area not Examined,= 0.81+ 0.40 = 1.21 sq. in.

LIII3 Area Examined = 2.72 - 1.21 / 2.72 x 100 = 55.5%

450 450 450 )&3 .t/

Scale: 1" = 1" 450 k~~Arnb~wj5ýCr-rD r --i-I3

-?Akf-. 3or 7

AIIAtHUMNiN C.

Letdown Cooler Nozz,1 e to Channel Body PAGE 7-~F9 Area Examined - Axial Scans Weld No. - t3:ý'Z-31bg -3 %-ý-:53 Item No. : A Area not Examined = 1.49 sq. in.

Li2 Area Examined = 2.72 - 1.49 / 2.72 x 100 = 45.2%

Scale: V = 1" 450

?i~'t~cEL. q o67

AIIACHMERT C

( Radius View.i F q-3 Nozzle to Channel Body L~tdown Cooler IIZY3-3 Item No. :

Weld No. : 03z,-ý611-3 Total Exam Area = 2.30 sq. in.

Scale: 1" 1" S-3 C,

  • etdown Cooler Nozzle to CL.annel Body ( Radius AACHMENI C AT Area Examined - Axial Scans Item No. :_ 4k -

Weld No.:* ____z___ -3 .

El Area not Examined = 0.92 sq. in.

LII Area Examined = 2.30 - 0.92 / 2.30 x 100 = 60.0%

700 600 4;50' sae.I" Af--,ýýkMCýJV -fD -BD? ')T--GL - 'r'

-7

etddown Cooler Nozzle to CGiannel Body (Radius vi~AME1C PAGE I~OF 9 Area Examined - Circ. Scans Weld No.: 7..J~ -3 -- Z-_33 Item No. : p2s I'k L--i Area not Examined = 0.42 sq. in.

450 Area Examined = 2.30 - 0.42 / 2.30 x 100 = 81.7!

Scale: I I

~~ 3o?-3/-oal,-

?A-)ý-~71a7

AT tA*CHMEN~T UT Vessel Exaimination PA6E ,

Site/Unit: Oconee 1 3 Procedure: NDE-3630 Outage No.: NIA Summary No.: N32389-3 WJ-35 Procedure Rev.: 0 Report No.: BOP-UT-06-114 Workscope: PSI Work Order No.: N/A Page: 1 of 5 Code: 1998 thru 2000 Addenda CalIltem: NIA Location: NIA Drawing No.: OM 201.-3235.002

Description:

Outlet Channel Body to Chemical Connector System ID:

Component ID: N32389-3 WJ-35 Size/Length: NJA Thickness/Diameter: .875 1 8.620 Limitations: Yes - See Attached Limitation Report Start Time: 2122 Finish Time: 2218 Examination Surface: Inside Outside !yi Surface Conelition: AS GROUIND Lo Location: ... ........ _ __ Wo Location: Centerline of Neld Couplant: ULTRAGEL**, Batch N -. ,I Temp. Tool Mfg.: FISHER Serial No.: MCNDE 272 19 Surface Temp.: 68 °F Cal. Report No.: CAL-06o297, CAL.06a298. CAL-06-299. C.AL-06-300, CAL-O6-301, Angle Used 0 45 45,T 6t-1 -G'1 I- TL(

Scanning dB 52- 45- 54-_

Indication(s): Yes iV, No Scan Coverage: Up stream IvI Downstream lv] CWIk1 CCW I#1 Comments:

FC 06-02 Lo = CL of nozzle adjacent to Cire. Weld Scanning Db's reduced from reference +14 to maintain 2:1 signal to noise ratio Results: Accept l1v Reject I I Info 1--l PSI Examination Percent Of Coverage Obtained > 90%: .,.O - fl"f Re'Viewed PrevioLis Data: No J1 Examiner Level III l3a=*!ure. Date Reviewer Signature Date Eaton, Jay A. 5/118/200(6 Examiner Level NIA StV ature Date site Review V Signature 1 Date NO NIA NIA Other Level NiA Signature ... . ANI 1l,(eview <1:' " nature . Date NIA. .... ............. .... .... . 6

AI IA.CJ{

ME 1Tl DUKE POWER COMPANY! P ISI LIMITATION REPORT Component/Weld ID: N32389-3 WJ-35 Item No: NIA remarks:

[ NO SCAN SURFACE BEAM DIRECTION Due toNozzle ii LIMITED SCAN Z 1 E] 2 Z I Z 2 Z cw Z ccw FROM L 0+3" to L 0o3- INCHES FROM WO CL+-.i 'to Beyond ANGLE: [] 0 45 [] 60 other 7o FROM DEG to DEG.

[] NO SCAN SURFACE BEAM DIRECTION Taper on Chemical Connector

[ LIMITED SCAN 01 0 2 Z I Z 2 Ncw Z ccw FROM L to L INCHES FROM WO +0.6 to +1.5 _

ANGLE: F] 0 (0 45 2) 60 other 70 FROM o DEG to 36o DEG El NO SCAN SURFACE BEAM DIRECTION

[] LIMITED SCAN 0 1 D []1 2LI 2Lcw I[-1 ccw FROM L to L INCHES FROM WO to ANGLE: 0I 0 El 45 [] 60 other FROM DEG -to PEG E] NO SCAN SURFACE BEAM DIRECTION EL LIMITED SCAN I1 2 LI Li 2 DI M w i cow Sketch(s) attached FROM L ..... to L INCHES FROM WO _to ANGLE: Li 0 EL 45 LI 69

  • ther FROM, DEGto Z yes 0 No DEG Priapared By: Jav Eaton .Dýate: 051,1 S12006

Let Down. Cooler -,Chemical Gonnector to Channel Body L.U

% Coveraqe Calculations Weld No.: 03nib3S -3 O= 8.625" lift = 0.875" Weld Length = 27.1" Total Inspection Area 2.28 sq. in.

% Length Limiteddue to nozzle:='.6" 127.1" x 100 = 221%

Agg regate Covera-ge Calculation Axial Scans 22.1% of length x 96.5% of the volume of length /100 = 21.3%

77.9% of length x 97.4% of the volume of length / 100 = 75.9%

Aggregate coverage Axial scans =*1<i75. ='97.2%

zi.3 Circ. Scans 100% of length x 78.1% of the volume of length.) 100 = 78.1%

Total = (97.2 + 78.1)1 2 = 87.7% Aggregate Coverage k4cA~-r¶D ~o?-~y~, -

Inspcto I Dte:L~fC 0 Pge~f '

Inspector I Date: Page ý of S ptlej TIguf"Nýý?

.. ,etdown Cooler Chemical ( )nnector to Channel BodY 6TEAMN1

  • Tt al/9 FAq3 Total Exam Area Weld No.: wb3Z?3q -3 "-3* Item No. : 1.. ý)JA 0qe, Scale: I " == I " S'a-II I~f V=' Ist-LA ATTP~f- 6-F-0r-0 -

?Ake Z,01ý

-*etdown Cooler Chemical C innector to Channel Bod§TAc$M, tc Area Examined - Circ. Scan GEO Weld No. : Item No. :

- Area Not Examined = 0.5 sq. in.

LIII] = Area Examined = 2.28 - 0.5 / 2.28 x 100 = 78.1%

k.

D 450 45' Scale: 1" = 1 AM-rWA" -Do?- 3rtn --

PA6Z 3 of-ý

.. etdown Cooler Chemical ()nnectorScans to Channel Bod§lEAL"MER*I C Area Examined - Axial Weld No.: -3 Item No.: r'IA Area Not Examined = 0.05 + 0.01 = 0.06 sq. in.

= Area Examined = 2.28 - 0.06 / 2.28 x 100 = 97.4%

CoL4 ek ICO Tube - S2 Channel Body - S I Scale: 1"= V

?Pck6; f Of--'5

,--Jetdown Cooler Chemical C-nnector to Channel Bod§ IAMENO (1 Area Examined @ Nozzle - Axial Scans Item No.: -[A Weld No.:

M = Area Not Examined = 0.05 + 0.01 + 0.02 = 0.08 sq. in.

LIZ = Area Examined = 2.28 - 0.08 / 2.28 x 100 = 96.5%

- . ,05 sq. in, 0...

0.01 sq. in. 0.602 sq.

45 0 600 459

\ 700 600 Channel Body - S I

-4ebe Ghee - S2 ATMM-k Jx-CG Scale: 1" = 1V

?AnC '5o0rz'

AIIACCHMENT C UT Vessel Examination PAGE aF 93 Site/Unit Oconee / 3 Procedure: NDE-3630. Outage No.: N/A Summary No.: N32389-3 WJ-36 Procedure Rev.: 0 Report No.: BOP-UT-06-115 Workscope: PSI Work Order No.: NIA Page: 1 of 2 Code: 1998 thru 2000 Addenda Cat./Item: NIA Location: N/A Drawing No.: OM 201.,3235.002

Description:

Outlet Tube Sheet.Nozzle D to Channel Body.

System ID:

Component ID: N32389-3 WJ-36 Size/Length: NIA Thickness/Diameter: .875 1 3.0 Limitations: Yes - See Attached Limitation, Report Start Time: 2122 Finish Time: 2218 Examination Surface: Inside ; Outside Iv) Surface Condition: AS GROUND Lo Location: __Wo Location: Centerline of Weld Couplant: ULTRAGEL II Batch 1Z.5 Temp. Tool Mfg.: FISHER Serial No.: MCNDE 27219 Surface Temp.: 68 "F Cal. Report No.: CAL-06-297, CAL06-298, CAL06-299, CAL-06-300, CAL-06-301 Angle Used 40545 64T 6OLI-r j 70L Scanning dB 52] 45" 54- 55" 53" Indication(s): Yes ! 1 No A! Scan Coverage: Upstream (A Downstream f,] CW fA CCW wi Comments:

FC 06-02

' Lo = CL of nozzle adjacent to Circ. Weld Scanning Db's reduced from reference +14 to maintain 2:1 signal to noise ratio Results: Accept IV, Reject Info I'-! PSI Examination Percent Of Coverage Obtained > 90%: _0 0 - (PO .(P 0/p Reviewed Previous Data: No

xaminer Level Ill nature Date] Reviewe A Signat

-"aton. Jav A. (-, A4111_l 5118/20061 A J 1*.-i //_j4 ?-..

Let Down Cooler - Nozzle to Channel Body Ul-  % Coverage Calculations Weld No. :

Axial Scans Along Axis of Pipe = 100% of the Length x 45.2% of the Volume = 45.2%

Along Radius of Pipe = 100% of the Length x 60.0% of the Volume = 60.0%

Average = 45.2% + 60.0% / 2 = 52.6%

Circ. Scans Along Axis of Pipe = 100% of the Length x 55.5% of the Volume = 55.5%

Along Radius of Pipe = 100% of the Length x 81.7% of the Volume = 81.7%

Average = 55.5% + 81.7% / 2 = 68.6%

Total = (52.6 = 68.6 ) 12 = 60.6% Aggregate Coverage XTTIPýWY,&ez< -rb -eý-z Inspector / Date: Page I of

AI iA'CHM EN KI PA 6 E,ýg OF Letdown Cooler Nozzle to Channel Body Weld No. : c3 '3?5q - 3 Item No.: ___

z f,

Total Exam Area = 2.72 sq. in.

Scale: P"= 1" jI -z5fa

'?AL(r, ZOF 7

AI XAME NT-GAE-G< OF Letdown Cooler Noz"-fe to Channel Body Area Examined - Circ. Scans Weld No.;: J,~g- Item No. :

Area not Examined = 0.81+ 0.40 = 1.21 sq. in.

El5 Area Examined = 2.72 - 1.21 / 2.72 x 100 = 55.5% A Scale: 1" = 1" 450 450

-?A kCE 3 oýý7

AI IA'CHMENT (2-Letdown Cooler NozZle to Channel Body PAgE 2 OF07 Area Examined - Axial Scans Weld No.

  • Y32' 9 -3 t:-3(, Item No.: ýSIA El Area not Examined =1.49 sq. in.

Area Examined =2.72 - 1.49 / 2.72 x 100 = 45.2% 8-4 450 Scale: 1V ="

Zd-r-6 11S

(Radius ViewlY*'? =

Letdo~n Cooler Nozzle to Channel Bod Item No. : -4A--

Weld No.

  • Total Exam Area = 2.30 sq. in.

Scale: !V = 1" Channel Body SI ~

~~fAC- ~ ~ ~ (.

S jt-rc&I~~f

Letdown Cooler Nozzle to C1 1annel Body ( Radius VieyHMENT Area Examined - Axial Scans PA5E fF Weld No. : ?3-SZ-55q -3 Item No. :

LIZ Area not Examined = 0.92 sq. in.

= Area Examined = 2.30 - 0.92 / 2.30 x 100 = 60.0%

700 60O 4 5c Scale: i" = '

AIIACtýMC-yr -f-D TPALS (A,ni-ý

AT IACHMENT Li.

UT Calibration aamination Oconee Procedure: PDI-UT-2 Outage No.: 03-25 Summary No.: 03.19.11.0056 Procedure Rev.: Report No.: UT-10-657 Workscope: Work Order No.: 01878531 Page: 1 of 6 Code: 1998/2000A Cat./ltem: B-J 1B9.11 Location: Rx Bldg.

Drawing No.: ISI-OCN3-008

Description:

Safe End to Nozzle System ID: so Component ID: 3-PIA2-8 Size/Length;" N/A Thickness/Diameter: 2.33133.5/SS Limitations: Yes - See attached sheet Start Time: 1051 Finish Time: 1115 Instrument Settings Search Unit Cat. Time Date Axial Orientated Search Unit Serial No.: 014BLC Serial No.: 0105LJ Checks ,Calration 1ound$.n.l Sweep h Manufacturer: KRAUTKRAMER Manufacturer KBA Iinitial Cal. 1019 11/412010 Reffdetor Amplhifdq % Division Model: USN-60 SW Size: 0.50 Shape: Round Inter Cal. 10 Kftoh so 5.4 4.238 Delay: 7.5947 Range: 8.00 Freq,: 2.25 MHz Style: Comp - G Inter. Cal. 1050 1114/2010 M'tt CalfVel: .1268 Pulser: High Exam Angle: 45 # of Elements: Single inter. Cal1 ... .

Damping: 500 Reject: 0% Mode: Shear Final Cal. ___2_ 111412010 Rep. Rate: Autohigh Freq.: 2.25 Measured Angle: 43 Couplant * ,,_,

Filter Fixed Mode: PE Wedge Style: MSWQC Cal. Batch: 09325 Circumferential Orientated Search Unit Voltage: 450 Other: Fullwave Type: ULTRAGEL II Calibration Signal I SWeep Ax. Gain (dB): 29.7 Circ. Gain (dB): 29.7 Search Unit Cable Mfg.: SONOT-hCH Rete;ctcr Ampiftude % Division Sound Pith 1 Screen Div. = .8 in. of Sound Path Type: RG - 174 Exam Batch: 09325 See Axial .........

Unearity Report No.: L-10-115 Length: 6' No. Conn.: 0..,

0 Type: ULTRAGEL II Calibration Block Scan Coverage Mfg.: SONOTECH Cal. Block No,: 40397 Upstream 2 Downstream[j Scan dB: 41.7 Reference Block ReferencetSimulator Block Thickness: 3.000 Da.: Flat CWR CCWF Scan dB: 41.7 Gain Signal P

___________________ - edlNo:S7 Refletctor Amplitude % Division SudPt Cal. Blk. Temp.: 62 Temp. Tool: MCNDE40132 Exam Surface: O.D Type: ROMPAS 12.5 2- Radius 80 2.5 1.898 Comp. Temp.: 74 Temp. Tool: MCNDE40132 Surface Condition: As Ground Recordable lndication(sl: Yes[] No (if Yes, Ref. Attached Ultrasonic Indication Report.) " i' z Results: Accept [Q Reject [] Into 5 Comments: NIA Percent Of Coverage Obtained > 90%: No Reviewed Previous Dat Yes Exarniner Level ll Sgraturc Date Reviewer " natu. e " "

Sull,~W.. Keith 1 10 oExa*r*ier Level It-N Signature Date Site RevieS nature Date Fos~s; Steven 111412010 Other Level NIA SgareDite ANtI teviow har Daye NIA

ATTACHMENTC6 UT Calibration. *amination PA6E_?L,0af ,

OO 3.Be1i. 35 Procedure: PDI-UT-2 Outage No.: 03-25 Sumrnmary No.: 03.819.11,00156 Procedure Rev.: E Report No.: UT-10-657 Workcope: Work Order No.: 018785311 Page: 2 of 6 Code. 19i,;2000A Cat~iem: 1-1 /89.11 Location: Rx Bldg.

Drawing No.: ISI-OCN3-008

Description:

Safe End to Nozzle System ID: 50' Component ID: 3-PIA2-8 SizeiLength: N/A Thickness/Diameter. 2.33133.61SS Limitations: Yes- See attached sheet Start Time: 1136 Finish Time: 1151 Instrument Settngs Search Unit Cal. TIme T Daw Axial Orientated Search Unit Serial No.: 014BLC Serial No.: SE0773 Checks Calibration S al Sweep S Manufacturer KRAUTKRAMER Manufacturer GE Initial Cal.1031 ________ Reflector Amplitude % Division Model: USN-60 SW Size: 0.50 Shape: Round InterCal totch 80 6.7 8.3 Delay: 9.5100 Range: 12.50 Freq.: 2.25 MHz Style: Comp - G Inter. Cal. l13S 11412010 M'I Calvel: .1232 Pulser: High Exam Angle: 70 # of Elements: Single I Inter. Cal.

Damping: 500 Reject: 0% Mode: Shear - Final Cat. 112___ i `412_401 Rep. Rate: Autohigh Freq.: 2.25 Measured Angle: 71 Couplant/

Filter, Fixed Mode: PE Wedge Style: MSWQC Cal. Batch. 09325 Circumferential Orientated Search Unit Voltage: 450 Other Fullwave Type: ULTRAGEL II Calibration Signal Sweep Search Unit Cable Mfg.: SONOTECH Reflector Amplitude % Divisicn IScund Path Ax. Gain (dB): 54.5 Circ. Gain (dB): tIA I Screen Div. = 1.25 in. of Sound Path Type: RG - 174 . Exam Batch: 09325 .. N/_A Linearity Report No.: L-l0-115 Length: 6- No. Conn.: 0 Type: ULTRAGEL II Calibration Block Scan Coverage Mfg.: SONOTECH Cal. Block No.: 40397 Upstream WJ DownstreamE[ Scan dB: 60.5 Reference Block Reference/Simulator Block Thickness: 3.000 Dia.: Flat CW[] CCW[J Scan dB: lNlA SeilN. 0484 Gain Signal Sweep SudPt Cal._ Temp.Toot MCDE401eria

_Temp.: - Suracn S2 No.: e d6 Reflector Amplitude % Division Calh k. Temp.: 062Temp. Tool:' MC E40132t ExamCSurface: C ".Dan  : Type: ROMPAS 1 I. Radiusi 8 1°.6 ,

Camnp. Temp.: 74 Temp. Tool: MCNOE40132 Surface Condition: As Ground 1.

Recordable Indication(s): Yes E No &J (if Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept 0 Reject r Info n Comments: NIA Percent Of Coverage Obtained > 90%: No Reviewed Previous Dat. Yes Examiner L~evel ll- eDaeRvwrX rSga n t . - le Bull, W. Keith 111412010 -

,Examirner Level It-N Signature Date Sit6 R*view Sý3nalure Fors, Steven 1114J2040 Other Level NIA S.iga-ture Date ANII Review 5n 'e ate NIA W'-4rK P~~.a 1 ni

UT Calibration. ,amination PAlIAH ET i Site/Unit Oconee J 3 Procedure: PDI-UT-2 Outafe No.: 03-25 Summary No.: O3.89.11.0058 Procedure Rev.: Report No.: UT-10-657 Workscope: ISI Work Order No.: 01878631 Page: 3 of 6 Code: 199812000A Catllemr: B-J 1B9.11 Location: Rx Bldg.

Drawing No.: ISI-OCN3-008

Description:

Safe End to Nozzle System ID: 50 Component ID: 3-PlA2-8 Size/Length: N/A Thickness/Diameter: 2.33/33.5/SS Limitations: Yes - See attached sheet Start Time: 1211 Finish Time: 1226 Instrument Settings Search Unit Cal. Time Da A SBaflh Unit Seral o.:O14LCSerial No.: 10-1204 Checks _____ Calibration Sifll sw SundPat Manufacturer: KRAUTKRAMER Manufacturer: RT Initial Cal. 1031 1114/2010 ReflecOr A division Model: USN-60 SW Size: 2(24x42)114L Shope: ReeL inter. Cal . . IDNoch so J 6.0 S.962 Delay: 111.2203 Range: 10.00 Freq: 2.0 MHz Style: WL2 Inter. Cal. 1210 1,111412010 M'tl Cal/Vel: .2121 Pulser: High Ex amAngle _ 60 Of Es: Dual Inter. Cal. "-"-

Damping: 500 Reject: 0% Mode: Long.inal Cal.. 1258 1117120101 Rep. Rate: Autohigh Freq.: 2.0 Measured Angle: 60 Couplant ..... _

Filter: Fixed Mode: Dual Wedge Style: Integral Cal. Batch: 09325 Circumferential Orientated Search Unit Voltage: 450 Other: Fullwave Type: ULTRAGEL II CalibrationI Signal Sweep Search Unit Cable Mfg.: SONOTECH Reflector Amplitude % Division koundlPath Ax. Gain (dB): 42.2 Circ. Gain (dB): NIA I Screen Div. = 1.0 in. of Sound Path Type: RG - 174 Exam Batch: 09325 N.A _ _ _ I Linearity Report No.: L-10-115 Length: 6' No. Conn.: Type: ULTRAGEL II Calibration Block Scan Coverage Mfg,: SONOTECH Cal. Block No.: __40397 Upstream R] Downstream_] Scan dB: Reference Block ReferencelSimulator Block Thickness: 3.000 Dia.: Flat CW [lj CCW Scan

[J dB: N IA Gain. Signal Sweep u ep o( CD412 Ea ufc:01 -ep:6 Serial No.: 04-8744 4111 Reflector Amplitude % Division Sound Patth Cal.___ B_________

Cal. 61k. Temp.: 6..1 Temp. Tool: MCNDE4O132 Exam Surface: 0.13 Type:

T ROMPAS R

f*1 19.1 t2,:' Radiu~s 2

,,80 ,2 21 1.99 ,

Camp, remp.: 74 Temp. Tool: MCNDE40132 Surface Condition: As Ground Recordable Indication(s): Yes E No [ (If Yes, Ref. Attached Ultrasonic Indication Repori.) _ _ _ _ _ _ _ _ _-

Results: Accept 0 Reject 91 Info [3 Comments: N/A Percent Of Coverage Obtained > 90%: No Reviewed Pievius Data: Yes Bull, W. Keith " 111412010" -,,

Examiner Foss, Steven Other

,NA Level LeVel l

N/A Y . Sinature Signatue

' Date 11141*210 Site Review Data ANtIIReview

>' ~7 j A Signa*ure I

11

/

I Date

AI1ACHMENT 'C-DUKE POWER COMPANY I_

ISI LIMITATION REPORT

.... . AIem No: 03911.06 remarks.:

,NO SCAN SURFACE BEAM DIRECTION S LIMITEDSCAN F

[1 2 0 i !

1 2 E) cw ccw FROM L 0.0 to L 105,25" INCHES FROM WO CL to Beyond ANGLE: 50 Ex 45 Z 60 other 70" FROM 0 DEG to 360 DEG F5 NO SCAN SURFACE BEAM DIRECTION E3 LIMITED SCAN n1 22 l2 cw E ccw FROM L to L INCHES FROM WO to ANGLE: 50 5] 45 5 60 other FROM DEG to DEG 5 NO SCAN SURFACE BEAM DIRECTION _

5 LIMITED SCAN n51 5 2 5]1 5] 2 []w Scow ___

FROM L to L INCHES FROM WO to I ANGLE: 5 0 5 45 5 60 other FROM DEG to DEG El NO SCAN SURFACE BEAM DIRECTION 5 LIMITED SCAN 5 1 5 2 E) 1 2 5 Cw 5 ccw UT-10-657 FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: .E 0] 45 5 60 other _ FROM DE-GtoQ DEC [] yes 5 No Prepared By: Steve Foss 5 Level: Date: 11104o10 4 5t_ "-"2-Reviewed By: ,,,/e . D,,e:

. ... 4 k. Date: -

AT IACHMENIT 2-PASE OF q-2 Supplemental Report Report No.: UT-10-657 Page: 5 of a Summary No.: O3.B9.11.0056 EXaminer Bull, W. Kelth Level: I1-14 Date Exaitner: Foss, Steven Level: N/-N Site Review: .

Level: NIA Date:

Other: NIA ANII Review:

Comments:

Sketch or Photo:

4 ý 5ARC e2M rA\ - 51 c4 F

Determination of Percent Coverage for LUT Examinations - Pipe

.JI.-- r. tunhl /

Procedure: r"uI"U I-Z UIutage No,: 03-26 Summary No.: 03.B9.11.0056 Rsport No.: UT-I 0467 Procedure Rev.: E Woilccope: 181 01878531 Page: 6 of 6 Work Order No.:

Scan1 _  % LenglthX %volumeoffengthl0OlOo . %_totalforSean Scan 2  % Length X %volume of length 1100 - %_totalfor$a 2 Scan3 100.000  % LengthX 50.000 %volumeoflength 1it'O10 M000  % total for fcan 3 San4. 100.000  % Length X 80.000

  • volume of length Ic00,, 60.000 %total forSca 4 Add totals and divide by # acanm z %totalfor45deg Other dm!.- 0 (to be used for supplemental scans)

The data to be Bated below is for coverage that was not obtained with the 45 dog scans.

Scan 1 100.000  % Length X 0.000  % volume of length 11001 0.000  % total for Scan 1 Scan 2 100.000  % Length X 50.000  % volume of length 100 a 60.000 %total for8can 2 San 3  % Length X  % volume oflenigth 1100 a.......% total for Scan 3 Scan 4  % Length X  % volume of length /100 a  % total for Scan 4 Add totala for each scan required and divide by # of scans to determine:

14k Total for complete exam

&e"~

Site Field Supervisow. Sil FildSup~er~ 6 ~.~

'~~Date;:LV

A TIACHME NI UT CallbraflonILý-aminaflon v~l PAI6 E...5Or9i Site/Unit: Oconee 1 3 Procedure: NDE-830 Outage No.: 03-25 Summary No.: 03.B9.11.0056 Procedure Rev.: I Report No.: UT-10-646 Workscope: IS' Work Order No.: 01878531 Page: 1 of 4 Code: 199812000A Cat./Item: B-J 1B9.11 Location: Rx Bldg.

Drawing No.; ISI-OCN3-608

Description:

Safe End to Nozzle System ID: 50 Component ID: 3-PIA2-8 SlzeJLength: NIA ThicknesslDiameter 2.33133.51SS Limitations: Yes - See attached sheets Start Time: 1003 Finish Time: 1033 Instrument Settings Search Unit Cal. Time I Date Axial Orientated Search Unit Serial No.: OOWHDK Serial No.: 03-789 Checks_ _ C"ribricn s s c Path Manufacturer. KRAUTKRAMER Manufacturer:

... RTD Initial Cal. 084 111412010 eell%!of C0or i Amplituide nw r %  % Civision wIepsio n Model: USN-60 Sie: 2(20x*4) Shape: Rect Inter. Cal. _ 314"T I'tt 80 4.8 328 Delay: 16,7506 Range: 7.0 i*.:0. MHz Style: TRLI Inter. Cal. 0959 111412010 M'tl CalVel: .2600 Pulser:. High Ex amn ie: 60L "'o fElements: Du al Inter. Cal. ;_ _ _ .. . .

Damping: 1K Reject: 0% mode: Final Cal. 132 111412010 Rep. Rate: Aulohigh Freq.: 1.0 Measured Angle: 60 Couplant :___... . __...__...

Filter: Fixed Mode: Dual Wedge Style: Integral Cal. Batch: 09325 Circumtferential Orientated Senrch Unit Voltage: Fixed Other: Fulhwave Type: ULTRAGEL II iibtion Si . Swep Ax. Gain (dB): 70.1 Circ. Gain (dB): 71.2 Search Un0t Cable Mtg.: . SOOTECH Reflecr Ampltde % Divsind' ath

.7 in. of Sound Path Type: RG - 174 Exam Batch: 09325 314 T Hole so 5.2 3.59 1 Screen Div- =

Linearity Report No.: L-10-109 Length: 6' No. Conn.: 0 Type: ULTRAGEL II Calibration Block Scan Coverage Mfg.: SONOTECH Cal. Block No.: . 50214 Upstream E] Downstream ] Scan dB: 72.S Reference Block IRfemencSimuatitr Block Thickness:

Cal. 81k. Temp.:

2.4"4 70 Temp. Tool:

Dia.: Flat' MCNDE40132 CW R Exam Surface.,

CCWJ Scan dB: 72.6 O.D. Serial No.:

Tye 04-8739 1 IGamdB 2iRe,"ector 30°2%

asPA signal adisB( Amplitiud I  % Sweep D 28 11 Slurd lh Comp. Temp.: 72 Temp. Tool: MCNDE40132 Surface Condition: As Ground ... I 2.00 Recordable Indication(s): Yes El No [] (if Yes, Ref. Attached Uitrasonic Indication Report.)

Results: Accept El Reject Ov Info E1 Comments: NIA Percent Of Coverage Obtained > 90%: N/A Revie Previous Data: _ _ _

xvnaelY se Reviewer -late Henrdrickson, Matthew 1142010 OtLer Level tI' " gna3* Date Site Review Sinal re Dat Griabel, David M. 1114/2DI0 Other Levet NIA sigrnaturd Dale ANII Review Sisnature Datl-

TAt HME ti T UT CafibrationIL--amination SitelUnit: Oconee / 3 Procedure- NOE-830 Outage No.: 03-25 Summary No.: 03.B9.11.0056 Procedure Rev.: I Repor" No.: UT-10-646 Workscope: Work Order No.: 01878531 Page: 2 of 4 Code: 199812000A Cat./item: B-J 159.11 Location: Rx Bldg.

Drawing No.: ISI-OCN3-408 Description, Safe End to Nozzle System ID: 50 Component ID: 3-PIA2-8 Size/Length: N/A Thickness/Diameter: 2.33133.5/SS Limitalions: Yes - See attached sheets Start Time: 1035 Finish Time: 1106 Instrument Settings Search Unit f Cal. Time Date Axial Orientated Search Unit Serial No-: 00WHDK Serial No.: 90-371 Checks _ __ "

Calibration Signal Sweep Sound Path Manufacturer. KRAUTKRAMER Manufacturer. RTD Initial Cal* 0461 11142010 Reflector Amplitude % Division Model: USN-60 Sizem Z(10x18) Shape. 9 Inter. Cal. _

114T Hole s0 3.8 1.89 Delay: 10.6653 Range: 5.00 Freq... 2.0"MHz Style: TRLA Inter. Cal. 1034 111412010.

M'tJ CaWe,: .2392 P,,lsec: High tkarnAngle: 70 *#fE*.s.o I'*ci IS4 Ie~n 14z Damping: 1K Reject: 0% ModFial o1534 Cal.

Rep. Rate: Autohigh Freq.: 2.0 Measured Angle: 70 Couplant Filter: Fixed Mode: Dual Wedge Style: Integral Cal. Batch: 09325 Circumferential Orientated Search Unit Voltage: Fixed Other:. Fullwave Type: ULTRAGEL II Calibration Signal Sweep Reflector Amplitude % Division Sound Path Ax. Gain (dB): 80.0 Circ. Gain (dB): NIA Search Unit Cable Mfg.: SONOTECH I Screen Div.= _.5 in. of Sound Path Type: RG - 174 E 09323 NIA t_

Linearity Report No.: L-10-109 Length: 6' No. Conn.: Type:

T ILTRAGEL II1 Calibration Block Scan Coverage mfg.: SONOTECH Cal. Block No.: 50214 Upstream D Downstream- Scan dB: 80.0 Ref Block Reference/Simulator Block Thickness: 2.464 Dia.: Flat CWRJ CCW&5 Scan dB: 500 Serial No.: 048739 Gain I Signal LSweep ý--O ....

Cal. Blk. Temp.: 70 Temp. Tool: MCNDE40132 Exam Surface: O.0. Type: ROMPAS dBI Reflector Amplitude % Division Sound Pat 36.5 ,12' Radiusl so 4.00 7.00 Camp. Temp.: 72 Temp. Tool: MCNDE40132 Surface Condition: As Ground Recordable Indicationfs): Yes No [ (if Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept C] Reject W Info [] Comments: Unab le to discern I14T Hole In circ. direction.

Percent Of Coverage Obtained > 90%: 1/ , .1NA R,, e~ed Previous Data: Yes

Ai7A~Th.T DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 3-P1A2-8 Item No: 03.19.11.0056 .. remarks:

[ NO SCAN SURFACE BEAM DIRECTION Procedure allows scanning from El LIMITED SCAN El 1 [ 2 Z I Dl 2 0l Cw F1 ccw cast sideonly.

FROM L N/A to L N/A INCHES FROM WO CL to Beyond _ _ _ ___,

ANGLE: El 0 El 45 Z 60 other 70 FROM 0 DEG to 360 DEG F] NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN El 1 1] 2 [1 I El 2 nl cw 5 Ccw FROM L to L INCHES FROM WO to ........ ..

ANGLE: nl 0 E] 45 El 60 other___ FROM _ DEG to _ DEC El NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN El I El 2 El 1 El 2 C) cw 5 cow

,FROM L to L INCHES FROM WO to ___

ANGLE: El 0 El 45 El 60 other FROM DEG to CDE El NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN 1 02 ElIE 2 5 ow [I Cow UT-1 0-646 FROM L to L. INCHES FROM WO :to Sketch(s) attached ANGLE: 5]0 0 45 0'60 / 0 DEG to __DEG I Z yes ElNo 4

Date:

Al ACHMENT,ý-

Supplemental Report Report No.: UT-1 0-646 Page: 4 of 4 Summary No.: 03.B9.11.0056 Examiner: Hendrickson, Matthew

  • vel: 11-N Reviewer: Date.

Examiner. Griebel, David M. Level: Site Review. Al/I; Date:

Other: NIA -Level: NIA ANI[ Review:

Comments: Best effort exam using 6O*RL & 70*RL per NOE 530 for upper 2[3 area of interest. V

'3'1/2 1ooýý

,::74w Sketch or Photo:

I, I

I I I I I -J Vi-

-524'4

UT CalibrationIL-ami nation AT I

- Site/Unit: Oconee 1 3 Procedure: P131-UT-2 Summary No.: 03.B9.11,0060 Procedure Rev.: E Report No.: UT-1 0-640 Workscope: IS' Work Order No.: 01878761 Page: I of 6 Code. 199812000A Catlitem: B-J 1B9.11 Location: Rx Bldg.

Drawing No.: ISI-OCN3-009

Description:

Safe End to Nozzle System ID: 50 Component ID: 3-P6-8 "Size/Length; .WA ThicknesslDiameter: 2.33133.5ISS Limitations: Yes - See attached sheet Start Time: 1210 Finish Time: 1250 Instrument Settings Search Unit cal. "Time Date " Axial Orientated Search Unit Serial No.: 0114738 Serial No.: 01F10K Checks Sweep Manufacturer KRAUTKRAMER. Manufacturer KBA Initial Cal. 1013 1114/2010 Reflector Amplitude % Division Model: USN-60 SW Size: .50 Shape: Round Irner Cal. 144 1114. 21.0 ID Notch 80 6.7 4,157 Delay: 5.7966 Range: 7.001 Freq.: 2.25 MHz Style: Comp -G Inter. Cal.

Mil CalNel: 0.1234 Pulser: Square Exam Angle: 45 # of Elements: Single Inter. Cal. 1248 1114/2010 Damping: 500 Reject: 0% Mode: Shear I Final Cal., 1312 11/412010  !

Rep. Rate: Autohlgh Freq.: 2.25 Measured Angle: 4;5 Couplant '__

Filter: Fixed MOde: PE Wedge Style: MSWQC Cal. Batch: 09325 Circumferential Orientated Search Unit Voltage: 450 Other Fullwave Type:, ULTRAGEL II Calibration Signal S.weep SudPt Ax. Gain (dB): NIA Circ. Gain (dB): 25.6 Search Unit Cable Mfg.: SONOTECH Reflector Amplitude % DisionS I Screen Div. = .70 in. of Sound Path Type: RG- 174 . Exam Batch: 093255.7 4.157 Linearity Report No.:

Calibration Block L-10-110 Length: 6- No. Conn.:

Scan Coverage

- Type:

Mfg.:

ULtRAGEL II SONOTECH t _. ..... .

Cal. Block No.: 40397 Upstream [J Downstream[] Scan dB: N/A Reference Block ReferencelSimulator Block Thickness: 3.000 Dia.:_______SralN.-484-B Flat CWPI CCWRJ Scan dB: 36.8 SerialGain Relco mltd Signal % :Division Sweep Son Sound Pth at MCNDE40132 Exam Surface: 0.0 Type: ROMPAS15 d 2 Refausl 60Am.iud 2,023 Cal. Blk. Temp.: TO Temp. Tool:

Comp. Temp.: 75 Temp. Tool: MCNDE40132 Surface Condition: As Ground Recordable Indication(s): Yes [J No [ (If Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept fl Reject [ Info [7] Comments: NIA Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

-examiner Level ni- Signature Date ReviewerS. njlur a Stauffer. Lester, E 111412010 N.

Peterson, Drew B.* . ..... .... *..11412010 Oeher-LevI . A... Signature Dote ANil Review NIA I",W ý f 0 9F

UT Calibration/L.4amination

  • Shte/Unit:

Oconee / 3 Procedure: PDIDUT-2 Outage No.: 03-25 Summary No.: 03.Bg.11.0060 Procedure Rev.: E Report No.: UT-10-640 Woftcopew ISl Work Order No.: 01878761 Page: 2 of 6 Code: 199812000A CatJitem: 1-J IB9.11 Location: Rx Bldg.

Drawing No.: ISi-OCN3-009

Description:

Safe End to Nozzle System ID: 60 Component ID: 3-P011-3 Size;Length: 'NIA Thickness/Diameter: 2.33133.5/SS Limitations: Yes - See attached sheet Start Time: 1210 Finish Time: 1250 Instrument Settings Search Unit Serial No.: 014738 Seria N o.: .. SE0355 Manufacturer. KRAUTKRAMER Manufs cturer: KBA Model: USN-60 SW Size: .S0 Shape: - Round Delay: 7.8484 Range: 12.00 Freq,: 2.25,MHz Style:: Comp-G M'tI Cal/Vel: 0.1235 Pulser Square Exam Angfe: .60 # of Elements: Single Damping: 500 Reject: 0% Mode: Shear IFinalCatl. 1 131 1114120101 Rep. Rate: Autohigh Freq.: 2.25 Measuroed Angle: 60 Couplant Filter: Fixed Mode: PE Wedge Style: MSWQC Cal. Batch: . 09325 Circumferential Orientated Search Unit Voltage: 450 Other: Fulhwave Type: . ULTRAGEL it ;slibr-ton Reflector 1Amplitude Signal we Division Sound Path Ax. Gain (dB): 42.3 Circ. Gain (dB): 42.3 Search Unit Cable Mfg.: SONOTECH 1 Screen Div. = 1.20 in. of Sound Path Type: RG.- 174. See Axial ____ ___ ___

Exam Batch: 09325 L-10-110 Length: 6. No. Conn.: 0 Linearity Report No.: Type: ULTRAGEL It Scan Coverage Mfg.: SONOTECH Calibration Block Cal. Block No.: 40397 Upstream El Downstream 2- Scan dB: 48.3 Reference Block Reference/Simulator Block Thickness: 3.000 Cia.: Flat CW ] CCWR Scan dB: 48.3 Serial No.: 044743 Gain Signal Sweep I Reflector Amplitude %I Division Sound Path dB Cal. Blk. Temp.: 70 Temp. Tool: MCNDE40132 Exam Surface: O.D Type: ROMPAS 15 12" Radius 97 I 1.7 I 2.019 Comp. Temp.: 75 Temp. Tool: MCNDE40132 Surface Condition: As Ground Recordable Indication(s): Yes [-- No MV (If Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept 0 Reject [] Info C] Comments: NIA Percent Of Coverage Obtained > 90%: No R..*wed Previous Data: Yes

UIT CalibrationIL-amination ATTACHMENT "

Oconee 1/ 3 Procedure: PoI-UT-2 A6E r Outage No.: 03-25

Summary No.: 03.B9.11.0060 Procedure Rev.: E Report No.: UT-10-640 Warkscope: Work Order No.: 01878161 Page: 3 of 6 Code: 1998/2000A Cat.*em: B-J 1B9.11 Location: Rx Bldg.

Drawing No.: iSI-OCN3-009

Description:

Safe End to Nozzle System ID: 50 Component ID: 3-PIBI-8 SizeiLength:. NIA Thickness/Diameter: 2.33133.SISS Limitations: Yes - See attached sheets Start Time: 1210 Finish Time: 1250 Instrument Settings Search Unit Cal. Time Date I Axial Orientated Search Unit Serial No.: 014738 Serial No.: 10-1203 Checks Calibration Signal Sweep Sound Path Manufacturer: KRAUTKRAMER Manufacturer. RTID Initial Cal. 1034 111412010 Reflector Amplitude % Division Model: USN-60 SW Size: 2(24x42)114L Shape: Rect. Inter. Cal. 1126 11142010 Not 80 6.7 5.737 Delay: 11.6894 "Range: 10.00 Freq.: 2.0 MHz Style: TRLA Inter., Cal. ,,__ ___________ ___

MTl Cal/Vel: 0.2188 Pulser: Square Exam Angle: 60 # of Elements: Dual Inter. Cal. 1253 111412010 Damping: 500 Reject: 0% Mode: Long. - Final Cal. 1310 Rep. Rate: Autohigh Freq.: 2.0 Measured Angle: 60 Couplant _

Fier. Fixed Mode: Dual Wedge Style: Integral Cal. Batch: 09325 Circumferential Orientated Search Unit Voltage: 450 Other: Fullwave Type: ULTRAGEL n Calibration Signal Sweep Sodila Ax. Gain (dB): 46.9 Circ. Gain (dB): N/A Search Unit Cable Mfg.: SONOTECH Reflector I Amplitude % Division P I Screen Div. =

Linearity Report No.:

1.0 in. of Calibration Block Sound Path L-10-110 Type:

Length: 6' RG - 174 No. Conn.:-

Scan Coverage Exam Batch:

Type:

Mfg.:

09325 ULTRAGEL 11 SONOTECH WA __

l_ _ I Cal. Block No.: 40397 Upstream [] Downstreamr Scan dB: 57.4 Reference Block ReferencelSimulator Block Thickness: 3.000 D1a.: Flat CWJ COWE Scan dB: NIA Gain din Signal Reflector Amplitude%

Sweep Division Sound Path Cal. Blk. Temp.: 70 Temp. Tool: MCNDE40132 Exam Surface: O.D Type: ROMPAS 40 2 Radiusj 88 1.971 Comp. Temp.: 75 Temp. Tool: MCNDE40132 Surface Condition: As Ground Recordable Indication(s): Yes No [] (if Yes, Ref. Attached Ultrasonic Indication Report,)

Results: Accept Q Reject [ Info [L Comments: NIA Percent Of Coverage Obtained > 90%: No RevFewed'0,vlous Daft' Yes Examlner evel ll-N S Date Rewer Stauffer, Lester, E. 1V412010 Examiner L-1e 1ll-N nurOe Site Review ,-haleDe "Peterson, Drew S. /4/201 Other Level NIA Sigwature Dale ANII RevtewvXe Acl l N/AA, Y

PAGE L-1 DF c DUKE POWER COMPANY LIMITED SCAN" IST LIMITATION REPORT ...... ..

CormponentfWeld'11: 34-9I34-8 Item No: 03.19.11.0060 remarks:

[ NO SCAN SURFACE BEAM DIRECTION No scan due tocast stainless

[1 LIMITEDSCAN 0 [ 2 LI1 MI 2

  • cv ccw, pumpcasing.

FROM L N/A to L NWA INCHES FROM WO CL to aBeyond _

ANGLE: C3 0 10 45 0, 60 other 60RL FROM 0 DEG to 360 ,DEG

[1 NO SCAN SURFACE BEAM DIRECTION I LIMITED SCAN [1 [] 2 1 E] 2. L] CM_________l_ _ _

FROM L to L INCHES FROM WO to _

.ANGLE: [.0 [] 45 L0 60 other FROM - DEG to DEG LI NO SCAN SURFACE BEAM DIRECTION

[E LIMITED SCAN [I I [E 2 El I Ll 2 E] cw El cow FROM L to LINCHES FROM WO to .... _

ANGLE: L] 0 L] 45 [060 other FROM DEG O to- _ DEG

[1NO SCAN SURFACE BEAM DIRECTION

[1 LIMITED SCAN [ 1 [] 2 [] 1 [1 2 [] eW LI CGw UT-10-640 FROM L to L INCHES FROM WO to iSketch(s) attached ANGLE: [1 0 0 45 E] 60 other FROM DEGto DE ye [ No Prepared By: Lester StaiJ<L> L -Level: ai:w... ti of fRevie~we-d By: ~ ., ~l:~ Ie Da

AI IACHMCNLf PAE[ fF ai Supplemental Report Report No.: UT-10-640 Page: 5 of -e,2 Summary No.: 03.B9,11.0060 Examiner: Stauffer, Lester, E. ow 111-N Reviewer: Me Date:

Examiner: Peterson; DrewA, Level: IlI-N Site Review: Date:

Other: N/A Level: H/A ANII Review: j -

4S Z,~4Z~

Comments:

Comments: Li :5

(ýZz Sketch or Photo:

40OPL

- ffAVAN rI_ 0 --- ) -

- fý cc(p-< ctJ~ i -M~t c -, 5 -rA 4iw . FIZoA,,? 9 2Ac -)A-Vr to AS7 C-A;-t -ýttt, Ev

Determination of Percent Coverage for Duk UT Examinations - Pipe x

Site/Unit: Oconee / 3 Procedure: PDI.UT-2 Outage No.: 03-25 Summary No.: 03.19.11.0060 Procedure Rev.: E Report No.: UT-10-640 Workscope: IS1 Work Order No.: 01878761 Page: 6 of 6 45 den Scan 1  % Length X  % volume of length 1100 =

  • total for Scan 1 Scan 2  % Length X  % volume of length /100 =  % total for Scan 2

'I:,

Scan 3 100.000  % Length X 50,000  % volume of length / 100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length /100 = 50.000 %total for Scan 4 Add totals and divide by# scans = 50.000  % total for 45 dog Other deg - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan I 0.000  % Length X 0.000  % volume of length / 100 = 0.000  % total for Scan 1 Scan 2 100,000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 2 Scan 3  % Length X  % volume of length / 100 =  % total for Scan 3 Scan 4  % Length X  % volume of length i 100 = %total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 37.500 %Total for complete exam Site Field Supervisor:

Sie ~ed uprvsr:Dae:i'F Date: J-X,

UT Calibration/L,-amin~ation ATTACHMENT, Oconee 1I. Procedure: NDE-830 PA&SE OF 0-3 Outage No.: 03-25 Summary No.: 03.B9.l1.0060 Procedure Rev.: Report No.: UT-10-647 Workscope: Ist Work Order No.: 01878761 Page: I of 4 Code: 1998d2000A Cat./item: B-.J 19.11 Location: Rx Bldg.

Drawing No.: ISI-OCN3-009

Description:

Safe End to Nozz le System ID: 50 Component ID: 3-PlB1-8 Size/Length: NA Thickness/Diameter: 2.33133.5/SS Limitations: Yes - See attached sheets Start Time: 1332 Finish Time: 1401 Instrument Settings Search Unit '.... .. -; .......

Serial No,: OOWHDK Serial No.: 03-789 Checks I  ;*t1zt ' i C alibration C t S ign al

  • o S,,u,r -,o p ath Manufacturer: KRAUTKRAMER Manufacturer: RTD IitialCal. - 111412010 Res-ctr '.Ap&i'uIe I DivOkn vs Model. .. USk-60 Size: 2(20x,34) Shape. Red. Inter. Cal. 34 T Hole X A0.8 3-28__

Delay: 16.7506 Range: 7.0 Freq.: 1.0 MHz Style: TR1 Inter. Cal. 1331 1,114,120106 M11 CaWel: .2600 Pulser: High Exam Angle: 6OL # of Elements: Dual Inter Calt_____2_

Damping: 1K Reject: 0% Mode: Long '1532 1142010 Rep. Rate: Autohigh Freq.: 1.0 Measured Angle: 60 Couplant __.... .

Filter. Fixed Mode: Dual Wedge Style: Integral Cal. Batch: 09325 Circumferential Orientated Search Unit Voltage: Fixed Other: Fuliwave Type: ULTRAGEL II Calibration signal Sw~erp 70.1 Circ. Gain (dB): 71.2 Search Unit Cable Mfg,: SONOTTECh R-f'l&oTr Ar*plitude % OD:h'on Sound Path Ax. Gain (dB):

I Screen Div. = .7 in. of Sound Path Type: RG- 174 Exam Batch: 09325 314THole J 80 5.2 3.59 Linearity Report No.: L-10-109 Length: 6- No. Conn.: 0 Type: ULTRAGEL II Calibration Block Scan Coverage Mfg.: .SONOTECH_

Cal. Block No.: 50214 Upstream[EI Downstream{* Scan dB: 72.6 Reference Slock ReferencelSimulator Block Thickness: 2.464 Dia.: Flat CWRJ CCWW Scan dB: 72.6 Gain SignN7.

a.le% p Sound Path Cal. B1k. Temp.: 70 Temp. Tool: MCNDE40132 Exam Surface: 0.0. Seil o: i Reflevar Amptlitude % Divia~on Type: ROMPAS 302 -' Radius so 2.s 2.00 Comp. Temp.: 72 Temp. Tool: MCNDE40132 Surface Condition: As Ground Recordable Indication(s): Yes E] No R] (If Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept f, Reject [] Info Comments: NIA Percent Of Coverage Obtained > 90%: NIA Reviewed Previous Data: Yes Examine'r Level fl is Date Reviewer nature tI Griebl, David M ./. ,,,,,- ..... . n' Examiner Level .Se Review Signalure Date" Hendrcs, Matthew Dl Other NIA Le-vel NIA j

ate ANIl Review 0oolr Sintr 0Jt D a!

UT CalibrationlL.am iination TACflMENT P0.-

Site/Unit: Oconee 1 3 Procedure: NDE-830 sE Ou7D ge No,: 03-25 Summary No.: 03.B9.11.0060 Procedure Rev.: I Report No.: UT-I 0-647 Workscope: Is' Work Order No.: 01878761 Page: 2 of 4 Code: 1998/2000A CatJltem: B-J IB9.11 Location: Rx Bldg.

Drawing No.: ISI-OCN3.09

Description:

Safe End to Nozzle System ID: 50 Component ID: 3-PIBI-8 Size/Length: N/A Thickness/Diameter. 2.33/33.5/SS Limitations: Yes - See attached sheets Start Time: 1403 Finish Time: 1435 instrument Seitings Search Unit T ...' AxIl Orientated Search Unit Serial No.: G0WHDK Serial No.: 90-371 Checks ________ Calibration signat* I OSwP Soud, Path Manufacturer: KRAUTKRAMER Manufacturer RTO Initial Cal. 0845 1114/2010' Refle"'or Amniti;de Y Division I Model: USN-60 Size; 2Cl,,x8,, s e:

. ec Inter..Cadl. obI Hole s0 3.8 1 1.89 Delay: 10.6653 Range: 5.00 Freq.. 2.0 MHz tyle: TRLA Inter.Cal. 1402$ 11141201a M'tl Calvel: .2392 Pulser: High Exam Aagle: 70 X of Elemenfts Dual 1Inter. Cal,,__4______ _________

Damping: 1K Reject: 0% Mode: Long - Fina Cal. 1534, 11142010 Rep. Rate: Autohigh Freq.: 2.0 Measured Angle: 70 _Couplant ..... ...... -_ .. .. ....

Filter: Fixed Mode: Dual Wedge Style: Integral Cal. Batch: 09325 Circumferential Orientated Search Unit Voltage: Fixed Other: Fullwave Type: ULTRAGEL II1 Calibration Signali Swe ep Search Unit Cable Mfg.: SONOTECH Reflector Amplitude m. Division u....d Pah Ax. Gain (UB): 50.0 Circ. Gain (dB): NIA 1 Screen Div. = .5 in, of Sound Path Type: RG - 174 Exam Batch: 09325 NIA ___ ',.......... .

Linearity Report No.: Length: 6' No. Conn.: 0 Type: ULTRAGEL I Leaiyeoto:L-10-109 - Tp: UTAE~

Calibration Block Scan Coverage Mfg.: SONOTECH.t Cal. Block No.: 50214 Upstream r-J OownstreamS Scan dB: 80.0 Reference Block Reference/Simulator Block Thickness: 2.464 Dia.: Flat CW- CCWRJ Scan dB: 50.0 Serial No.: 04-i1739 Gain si*icr, Sweep SoundPath OD. Type: ROMPAS 36.6 2' Radius 80 i 4.00 7.00 Cal. Blk. Temp.: 70 Temp. Tool: MCNDE40132 Exam Surface:

Comp. Temp.: 72 Temp. Tool: MCNDE40i32. Surface Condition: As Ground Recordable Indication(s): Yes M No [] (if Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept 0] Reject W] Info 0 Comments: Unable to discern 114T Hole in circ. direction.

Percent Of Coverage Obtained > 90%: NiA Reviewed Previous Data: Yes

,,,xaminer* - Leve ignatue Date evie....-.at S Date

ýGmrebel, David M. 1111412010 9

-a jI.-

Ex e Lev  ;.. Date S.. e Revie: Slnature Diate Other Level -si/gnature-D N/AI! C/

t A~

DUKE POWER COMPANY ISI1LIMTATION REPORT ... ...

Component/Weld ID: 3-PlBI-8 Item No:O 3.139.11.0060 remarksnto

[*NO SCAN SURFACE BEAM DIRECTION Procedure allows scannin g from SLIMITED SCAN 1 [I 2 0 1 02 S cw c cw castside only.

FROM L NIA to L N/A INCHES FROM WO CL to Beyond ANGLE: [1 0 E] 45 0 60 other 70 FROM 0 DEG to 360 DEG

[1 NO SCAN SURFACE BEAM DIRECTION

[1 LIMITED SCAN ] I [D 2 [] 1 [] 2 n cw Eccw FROM L to L INCHES FROM WO to ANGLE: E] 0 [] 45 5 60 -other FROM DEG to DEG

[1 NO SCAN SURFACE BEAM DIRECTION 0 LIMITED SCAN [1 [1 2 [11 n 2[ cw [] ccw FROM L to L INCHES FROM WO to ANGLE: [1 0 E 45 [1 60 other FROM DEG to DEG

[1 NO SCAN SURFACE BEAM DIRECTION

[1LIMITED SCAN ] 1 [1 2 [1 [ 2 [ cw[ cCw UT-10-647 FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: [1T0 5] 45 [] 60 other FROM to DEG 0 yes [1 No Pedvid Griebel /§ ,Level: Dte:. S104/i0 Sheet 3 of 4

  • ~o Le.. yAhorized Ihspector:.,

, .. . .. .. Date:

ReviwedBy:Date:-

AIIACHMENIC

-ýý r--\ (,-n- 7,_D Supplemental Report Report No.: UT-10-647 iz)Lr Page: 4 of 4 Summary No.: 03,99.l1.0060 Examiner: GrietbeI, David.M. tlevef: Il-N Reviewer: Date: _I-.9 Examiner: Henaricksont MattNer a eeel; I Site nReview: Date:

Other: NIA Levef: NIA ANII Review: 114 - Date:It._io -to Comments: Best effort exam using 60*Rt. & T 0'RL per NDE 830 for upper 213 area of Interest.

I I I. I I *),\ I

  • 1 /

~52

PASEK/j- 0 UT Calibration/ .amination

- Site/Unit: Oconee / 3 Procedure: POI-UT-2 Outage No.: 03-25 Summary No.: 03.89.11.0064 Procedure Rev.: E Report No.: UT-10-645 Wo'kscope: 'IS Wor3k O.'er No.: Page: 1 of 6 Code: 1998t2000A Cat/Item; B-J I18.11 Location: Rx Bldg.

Drawing No.: ISI-OCN3-010

Description:

Safe End to Nozzle System ID: so Component ID: 3-PIB2-8 Size/Length: N/A Thickness/Diameter: 2.33/33.5tSS Limitations: Yes - See attached sheet Start T me: 1127 Finish Time: 1200 Inument Settintgs Search UnitI Cal. ITime Date Axial Orientated Search Unit Serial No.: 014738 Serial No.: 01F10K Checks Sianl %Calibration Sv*sp Manufacturer: KRAUTKRAMER Manufacturer: KBA Initial Cal. _11013 11/412010 Reflector Ampitude % DVision Model: USN-60 SW Size: .50 Shape- Round Inter. Cal. '11144 111412010 lDNotch 80 5.7 J 4.157 Delay: 5.7966 Range:_ _ne,.C_.7.00- Freq.: 2.25 MHz

_ _, Style: Campo-0 Ioter.

_ Cal..

_ _ _ _ _ _ _ -I J ......

M']Cal/Vel: 0.1234 Pulsr Square Exam Angle: 45 # of Elements: Single Inter. Cal. 12*41 1`14M20101 Damping: o500 Rejed: 0% Mode: Shear FinaI Cal. 13121 11/4120101 3 Rep. Rate: Autohlgh Fmq.: 2.25 Measured Angle: 46 Couplant I 1 1 Filter- Fixed Mode: PE Wedge Style: MSWQC Cal. Batch: 09325 Circumferential Orientated Search Unit Voltage:....450 .Other Fullwave Type: ULTRAGEL II Calibration Signal Sweep SondPah Ax. Gain (dB): N/A Circ. Gain (dB): 25.6 Search Unit Cable Mf,: SONOTECH Reflector Amplitude % Division jSnd 1 Screen Div. = .70 in. of Sound Path Type: RG -174 Exam Batch: 09325 10 Notch 80 5.7 4.157 Linearity Report No.: L-10-110 Length: 6' No. Conn.: 0 Type: ULTRAGEL If Calibration Block Scan Coverage Mfg.: SONOTECH Cal. Block No.: 40397 Upstream ] DownstreamE] Scan dB: N/A Reference Block Referenceitimulator Slok, Thickness: 3.000 Dia.: Flat CW 0V CCW2 Scan dB: 36d. Serial No.: 04-8743 Sign Diivision S CaL Blk. Temp.:

Comp. Temp.:

70 75 Temp. Tool:

Temp. Tool: -MCNOE4tII32 MCNOE4Oi3Z Exam Surface:

Surface Condition: As0.03 Ground Type: RO1WPAS Is 2" Radius so. I2A8 Z023.

Recordable Indlcation(s): Yes 5 No R] (If Yes, Ref. Attached Ultrasonic Indication Report.) .

Results: Accept [] Reject .] Info 11 Comments: NIA Percent Of Coverage Obtained > 90%: No Reviewed Prev!ous Datw Yes Examiner Level III-N _ gnature Mate Reviewe S!inature Date Staffer', Lester, E. 1114f2010 1 , / C3 Examiner Level ll-N . . Date :Site Reviev nature D Peterson, Dre. 8 11-412010 Other Level WA ~Sign'ature Date A'NII Review y.Date N/A

Al iA*~(v~~~

~

UT Calibration/L .amination Site/Unit: Oconee 1 3 Procedure: PDW-T-2 Outage No.: 03-25 Summary No.: 03.B9.11.0064 Procedure Rev.: Report No.: UT-10-645 Workscope: ISt Work Order No.: 01878533 Page: 2 of 6 Code: 1998J2000A CatAlem: B-J 1B911 Location: Rx Bldg.

Drawing No.: ISI-OCN3-010

Description:

Safe End to Nozzle System ID: 50 Component ID: 3-PIB2-8 Size/Length: NIA Thickness/Diameler: 2.33133.51SS Limitations: Yes - See attached sheet Start Time: 1127 Finish Time: 1200 Serial No.:

Instrument Settings 014738 Ser! No.:

Search Unit SE0355 f

/ Checks al Time . Date Axial Orlentated Search Unit Ca1ibrtioon Signal Sweep Sound Path Manufacturer: KRAUTKRAMER Manufacturer: k-A Initial Cal., 1025 1114/2010. Reflrctor I Amplitude % Division Model: USN-6O SIN S*e: .50 Shape Round " lInter.-Cal'.. IDNotch * .. . ..

to Notch 80 1 4.3 5.414 7.8484 Range: 12.00 Freq.: 2.25 MHz Style:; Comp-G Inter. Cal. 1207 11,4/2010 Delay: I M'tl CalVel: 0.1235 Pulser: Square Exam Angle: s0 #of Elements: single !Inter. CaL ,,.

Damping: 500 Reject: 0% Mode: Shear Rep. Rate: Autohigh Freq,: 2,25 Measured Angle: 60 Couplant Filter Fixed Mode: PE Wedge Style: MSWQC Cal. Batch: 09325 Circumferential Orientated Search Unit Voltage: 450 Other: Fullwave Type: ULTRAGEL II Calibration Signal DvSweep Ax. Gain (dB): 42.3 Circ. Gain (dB): 42.3 Search Unit Cable Mfg.: SONOTECH Reflector j Amplitude % Division Sound Path 1 Screen Div. = 1.20 in. of Sound Path Type: RG - 174 Exam Batch: 09325 See Axial _

Linearty Report No.: L-10-1 10 Length: V' No. Conn.: 0 Type: ULTRAGEL i1 __, ___ __,, , _ __........_ t, .. . ___ I Calibration Block Scan Coverage Mfg.: SONOTECH Cal. Block No.: 40397 Upstream W Downstream[E Scan dB: 48.3 Reference Block IReference/SIreulator Block Thickness: 3.000 Dia.:________Serial Flat CWRJ CCWRJ Scan dB: 48.3 No.:....04-8743 dS Reflector Amrplitudo % Swep SoundPt Cal. Bik. Temp.: 70 Temp. Tool: MCNDE40132 Exam Surface: O.D Type: ROMPAS 15 2" Radius 97 1.7 2.019 Comp. Temp.: 75 Temp. Tool: MCNDE40132 Surface Condition: As Ground Recordable Indication(s): Yes El No [ (if Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept [ Reject [] Info Comments: N/A Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

PAi51,E.

UT CalibrationiL .amination SitelUnit: Oconee 3 Procedure: PDI-UT-2 Outage No.: 03-25 Summary No.: 03.139.111.0064 Procedure Rev.: E Report No.: UT-10-645 Workscope: is1 W-ik Orde. No., 01575533 Page: 3 of 6 Code: 99812000A Cal./Item: l*J iB9.11 Location: Rx Bldg.

Drawing No.: ISI-OCN3-010

Description:

Safe End to Nozzle System ID: so Component ID: 3-P122-8 Size/Length: MIA Thickness/Diameter: Z33133.5/SS Limitations: Yes - See attached sheets Start Time: 1127 Finish Time: 1200 Instrument Settings Search Unit Cal. Time Date Axial Orientated Search Unit I Serial No.: 014738 Serial t Jo.: 10-1203 Checks Manufacturer: KRAUTKRAMER Manufa cturer: Kilt Initial CaLt 1034 111412.010 Model: USN-60 SW Size: 2(24x42)114L Shape: Rect. Inter. Cal. 1126 010 ,

1114120' Delay: 11.6894 Range: 10.00 Freq.: 2.0 MHz Style: TRLA inter. Cal.,

M'tl Calvel: 0.2188 Pulser Square Exam A*ngle: Inter. Cal.,25 111412010 60 #of Elements: Dual Ite, ,

Damping: S00 Reject: 0% Mode: Long.- L .Final -

Cal., 13101.

1112010 Rep. Rate: Autohigh Freq.: 2.0 Measur ed Angle: 60 Couplant Filter: Fixed- Mode: Dual Wedge Style: Integ al Cal. Batch: 09325 Circumferential Orientated Search Unit Voltage: 450 Other:. Fulhwave Type: ULTRAGEL II Calibration I Signal tSweepI Division ound Pfth 46.9 Circ. Gain (dB): NIA Reflector Amplitude Ax. Gain (dB): Search Unit Cable Mfg.: SONOTECH 1 Screen Div. , 1.0 in. of Sound Path Type: RG -174 Exam Batch: 09325 Linearity Report No.: L-10-1t0 Length: 6' No. Conn.: 0 Type: ULTRAGEL 11 Scan Coverage Mfg.: SONOTECH Calibration Block Cal. Block No.: 40397 Upstream g Downstream[- Scan dB: 57.4 Referertce/Slmulator Block Reference Block Thickness: 3.000 Dia.: ..... lat_ _ CW[ CCW[] Scan dB: NZA Gain i I Signal I Sweep Sound Path Serial No.: 04-8743 dB [Reflector {Amplitude % I Division Cal. BIk. Temp.: 70 Temp. Tool: MCNDE40132 Exam Surface: 0.1 Type: ROMPAS 40 *2 RadiuS" 86 1.9 ' 1.971 Comp. Temp.: 75 Temp. Tool: MCNDE40132 Surface Condition: As Ground Recordable Indication(s): Yes [ No j] (If Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept E] Reject W Info 11 Comments: NIA Percent Of Coverage Obtained > 90%: . No Reviewed Previous Data: __ Yes

A4I K 6 f~ /

DUKE POWER COMPANY ISI LIMITATION REPORT ICompornentlWeld ID: 3-POB12-B8 Item No: 03.B9.11.0064 remarkis:

1 NO SCAN SURFACE BEAM DIRECTION No scan due to cast stainiess E1 LIMITED SCAN X 2 [1 ] 2 0 cw l ccw pum casin FROM L N/A to L N/A INCHES FROM WO CL to Beyond_

ANGLE: [] 0 0 45 [@ 60 other 60RL FROM 0 DEGto 360 DEG

[] NO SCAN SURFACE BEAM DIRECTION

[1 LIMITED SCAN []I [I 2 [l 1 [E 2 L cw 0 ccw FROM L _ to L INCHES FROM WO ___ to ..... .

ANGLE: [1 "0 [1 45 [E 60 other FROM DEG to DEG

[] NO SCAN SURFACE BEAM DIRECTION

[1 LIMITED SCAN [ 1 [1 2 [1 1 [ 2 [1 cw [l ccw FROM L ._ _to L INCHES FROM WO to ....... __ _

ANGLE: [1 0 [n 45 [ 60 other FROM DEG to, DEG,

[1NO

[1 SCAN LIMI TED SCAN [1 1 SURFACE

[ 2 [1 BEAM DIRECTION*

[1 2 [] cw[1 ccw UT-1Q0-645 I FROM L to L INCHES FROM WO to, Sketch(s) attached ANGLE: [ 0 [n 45 [160 ot her 0 I ppared By: Lester sfaV. J*~iv1 IReviewed B- t

PA I~fIA qHMNI('

Supplemental Report Report No.: UT-1 0-645 Page: 5 of Summary No.: 03.89.11.00$4 Examiner: .Stauflor, Leste r~f. , , Level: ill-N Reviewer: Date: Z0 Examiner: 'Pefrson, Drew Level: i11-N Site Review: A Date:

Other: MIA Level: NIA ANII Review: Date:

Comments:

r ~PI Pe Sketch or Photo:

66=RL 4O6 FAo~-)

Z5 C-

  • SDeter mination of Percent Coverage for UT Examinations - Pipe

, Site/Unit: Oconee / 3 Procedure: PDI-UT-2 Outage No.: 03-25

' Summary No.: 03.B9.11.0064 Procedure Rev.; Report No.: UT-10-645

  • '- Workscope: ISI Work Order No.: 01878533 Page: 6 of 6 45 deg Scan 1  % Length X %volume of length 1100 = %total for Scan 1 Scan 2 %Length X  % volume of length / 100 =  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length 1100 = 50.000 %total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg Other de - 60 (to be used for supplemental scans)

The data to be listed below is for coverage that was not obtained with the 45 deg scans.

Scan I 100.000  % Length X 60.000  % volume of length / 100 = 50.000  % total for Scan I Scan 2 0.000  % Length X 0.000  % volume of length 100= 0.000  % total for Scan 2 Scan 3  % Length X  % volume of length /100 =  % total for Scan 3 Scan 4  % Length X  % volume of length / 100 =  % total for Scan 4 Percent corn lete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor: Date:

II

PAG6 F 7 af UT Calibration/L .amination

- Site/Unit: Oconee ' 3 Procedure: NDE-830 Outage No,: 03-25 Summary No.: 03.B9.11.0064 Procedure Rev.: -I Report No.: UT-10-648 Workscope: ISI Work Order No,: 01878533 Page: 1 of 4 Code: 1998/2000A W-Mt B-J 189.11 Loclion-: Rx Bldg.

Drawing No.: ISI-OCN3-010

Description:

Safe End to Nozzle System ID: 50 Component ID: 3-PIB2-8 Size/Length: N/A Thickness/Diameter: 2.33133.5/SS Limitations: Yes - See attached sheets Start Time: 1214 Finish Time: 1247 Instrument Settings Search Unit cal. nTime Date Axial Orientated Search Unit Serial No.: 00WHDK Serial No.: 03-789 Checks _ _ ate A Mnfcue. .URAEMnuaur Calibration Signal Sweep Sound Path

}

Initial Cal. 0844 111412010. Reflector Amplitude % Division Model: USN.60 2Cal.33)1 Isnze: 4 T Hole 50 4.8 1 .3.28 Delay:

M't1CaVVel:

16.7'06

.2600 Range:

Pulser 7.0.

High Fe.-

Exam Angle:

1.0 Mz, SOL sI

ý#o.fElemens.- bD,-

" Intel. CalS.: 1213 inter. Cal inal Cal. 1532 115302.

I 11144;6i10":3,'T1o Damping: 1K Reject: 0% mod Long, -

Rep. Rate: Autohigh Freq.: 1.0 Measured Angle; " . Couplant ... ..

Filterý Fixed Mode: Dual Wedge Style: Integral Cal. Batch: 09325 Circumferential Orientated Search Unit Voltage: Fixed Other. Fullwave Type: ULTRAGEL It Cafibration Signal I .Sweep ISund Path Ax. Gain (dB): 70.1 Circ. Gain (dB): 71.2 Search Unit Cable Mfg.: SONOTECH Refiecor Amplitude *A Division ... a I Screen Div. = .7 in. of Sound Path Type: RG -.174 Exam Batch: 09325 314THole so . 3__9 Linearity Report No.: L-10-109 Length: 6. No. Conn.: - 0 -- Type: ULTRAGEL 11I_____

Calibration Block Scan Coverage Mfg.: SONOTECH 1 1 Cal. Block No.: S0214 Upstream [J Downstream[] Scan dB: 72.6 Reference Block ReferencelSlmulator Block Thickness: 2.464 Dia.: Flat CWR CCWR- Scan dB: 72.6 Serial No.: 0-9 Gain Signal Sweep Sound Path Tool: MCNDE40132 Exam Surface: O.D. dB I ReAlector Ar*pliude % Division Cal. Blk.Temp.: 70 .Temp.

Comp. Temp.: 72 Temp. Tool: MCNDE40132

____Type: Surface Condition: As Ground ROMPAS 30.2 12- Radius, e80 28 f 20 Recordable Indicatlon(s): Yes ] No [ (if Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept [] Reject [] info [*3 Comments: NIA Percent Of Coverage Obtained ' 90%: MIA Revewed Previous Data: Yes Examiner Level lý ftn4/DteRvlwi l Griebel. David M. 'Z , . *111--120 . '.90°'

Examiner o.,4 Level Dale Site evie0w Signature Data Hendrickson, Matthewf410 Other Level NIA - SntueDate ANII-ReviewSinur Date

A h PA[i UT CalibrationlL..amination

-Jk Site/Unit:

Oconee 1 3 Procedure: NDE-830 Outage No.: 03-25 Summary No.: 03.B9.11.0064 Procedure Rev.. Report No.: UT-10-648 Workscope: (St Work Order No.: 01878533 Page: 2 of 4 Code. 199812000A Catl.ltem: B.J IB9.11 Location: Rx Bldg.

Drawing No.: ISI-OCN3-010

Description:

Safe End to Nozzle System ID: 50 Component ID: 3-PIB2-8 Size/Length: NiA ThicknessJDiameter: 2.33133.5JSS Limitations: Yes - See attached sheets Start Time: 1250 Finish Time: 1322 Instrument Settings Search Unit Serial No.: OOWHDK Serial h1o.: 90-371 Manufacturer: KRAUTKRAMER Manufa clurer: RTO Model: USN-60. 2 01Oi, Shape: Red.

Delay- 10.6653 Range: 5X00 Freq.: 2.0 MHz Style: TRL.A M*tl Calwea: .2392 Pulser: High exam Angle: 70 t of.Elements: Ouat Damping: 1K Reject: 0%

1Aode: Long Rep. Rate: Autohigh Freq.: 2.0 Measun *d Angle: 70 Couplant Filter Flied Mdde: Dual Wedge Style: Integral. Cal. Batch: 09325 Circumfetential Orient"fed Search Unit Voltage: Fixed Other. Fuliwave Type: ULTRAGELII Calibration I Signal Sweep Ax.:Gain (d0): 80.0 Circ. Gain (dB): NIA Search Unit Cable Mfg.: SONOTECH Reflector Amplillude % { iviion 1Souid Path I

in. of Sound Path Type: RG -174 WA _ _ _ _ _ _ _

' Screen Div.= 5 I_

Exam Batch: 09325 "LineeityReport No.: L-10-09 Length: G' No. Conr.: 0 Type: ULTRAGEL II _ _ _ _ . _

Calibration Block Scan Coverage Mfg.: SONOTECH, Cal. Block No.: 50214 Upsiream 0 DownstreamW Scan d8: 80.0 Reference/Simulator Block Reference Block Thickness: 2.464 DVa.: Flat CW- CCW66 Scan dB: 80.0 Gain Signal Sweep I Serial No.: 04-8739

  • A Reflector Amplitude % Division Souhd Path Cal. Blk. Temp.: 70 Temp. Tool: MCNDE40132 Exam Surface: O.D. Type: ROMPAS 80 4.00 7.00 Comp. Temp.: 72 Temp. Tool: MCNDE40132 Surface Condition: As Ground Recordable Indicationis): Yes [I No 0 (If Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept [] Reject W] Info 11 Comments: Unable to discern 114T Hole In circ. direction.

Percent Of Coverage Obtained > 90%: NIA Reviewed Previous DWta: Yes.

Ex~iminer Level liae.Nvee ~Se~lr l

'Griebtil, Dwavd 41. 11114120101 rE_'ýminor 7Level ii4I latej D Silo Review Signature Dat Hendrickson, Matthew '.~'- a'AI eiw O0lher Level NI Signtr Dat Signatvewurate

Pl 6A M~F '2 DUKE POWER COMPANY _

ISI LIMITATION REPORT I ComponentlWeld ID: 3-PIB2-8 Item No: 03.B9.11.0064 remarks:

[ NO SCAN SURFACE BEAM DIRECTION Procedure allows scanning from C] LIMITED SCAN E 1 1 [12 cWE ccw cast side only.

FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: E] 0 L 45 0 60 other 70 FROM 0 DEG to 360 DEG L1 NO SCAN SURFACE BEAM DIRECTION LI LIMITED SCAN Li1 [12 L1 [I 2 cw [I ccw FROM L to L, INCHES FROM WO to ANGLE: E3 0 [D 45 [3 60 other FROM DEG to DEG Li NO SCAN SURFACE BEAM DIRECTION LiLIMITED SCAN L1 I n2 Li 1 E 2 fi cw [3 ccw FROM. L toL INCHES FROM WO to ANGLE: Q 0 [] 45 [] 60 other FROM DEG to OEG Li NO SCAN SURFACE BEAM DIRECTION LILIMITED SCAN Li1 Li2 Li1 [] 2L cwi ccw UT-10-648 FROM L _ _ to L INCHES FROM WO to Sketch(s) attached ANGLE: [] 0 [3 45 Li 60 .other FROM DEGto DEG yes Li No d1e Date: D11/Se.0 ReViewed By. pate: Date:

PAG6E G7 QF Supplemental Report Report No.: UT-10-648 Page: 4 of 4 Summary No.: 03.,9,11.0064 Examiner. Griebel, David. , .7.......... Reviewer. z Date:

Examiner: Hendrfbkson, Matthew -VeV e I.-N, Site Review: Date:_________

Other NIA. .L evel: NIA ANII Review: iJtA D~ate: I______a_1(-

Comments: Best effort exam using 60"RL & 70'RL per NDE 830 for upper 2/3 area of interest.

=i=-z /

i I

t 1 I.

I- - - .- -_j F'1/li7P 5-2--

PA&Ejo 6 0 l K.

UT Calibration/Examination

~: e~tinit: Oconee 13 Procedure: PDI-UT-2 autaqc:mlo.: 03-25 03.59.11.0070 Roport.Nlo.: UT-1 0-658 S~rn~ry f4o: Procedure Ryv.:

Work Order No.: 01879038 Pave. I of S Code: Oatlot:

419972IJOOA 9-1J I9.11 Location: RxBldg, Drawing No.: ISI-OCN3-Ol2

Description:

Nozzle to Safe End System ID: so Component iD: 3-PDA2-1 SIX4/Lengfth NIA ThicknessfDlameter: 2,33(33.5!SS UmIltaions: Yes - See attached sheet Start Time: 1116 Finish Time: 1131 intrumnent Settings Search Unit Cal. Timea oDat. Axial Ork'rWted S rch Unit Serial No.:

Manufacturer:

Model:

014BLC KRAUTKRAMER USN-60 SW

., Serial No.:

Manufacturer:.

Size: 0.50 010SLJ Shape:

KBA Round Checks Inter. Cal.

_, j 111412010 jIt

'ignal P,1i.ct3r Nolh rnplide %s' S;eoo 5,4 FInllalsCal S'un* P5Th 23S _

Delay: 7.5947 M1Range:

P alo:Inter.

e. 16 . Freq.: 2.25 M.z Style: Comp-oG Cal.l 1050, Inter. Cal. ' l il/412010

" . ." "-]i M~ l :.**2a* *.' * :

  • r: J *,. .*f O ExamAngl : 4-5 # of Ee m re nts*Sin l . * : l ZS : o1 ]

DampinT29! 0% "- ~a ~ Ser- I0final Cal 1,250;1 1-11412010 Dapn. 6 Reject: Mode-____ Shelf_ =% _________

Rep. Rate:, Autchlgh Preq.: 2.25 Measured Angle: A3 Couplant ______

Flilter: Fixed Mode: PE Wedge Style: MSWQC Cal. Batch: 09325 Circ-imferenltfif rint!azrd Soirch Un!t Voltage: 450 Other. Fullwave Type: ULTRAGEL II Calibratin Signal SGwoen a Patti Ax. Gain (dB): 29.7 Circ. Gain (dB): 29.7 Search Unit Cable Mfg.: SONOTECH ReDievtsr Attxne  % j Drskon iSri:rn1 lti 1 Screen DIV. .8 In- of Sound Path Type: RG.- 174 Exa Bath' 0032 See Axtel J Linearity Report No.: L-10-115 Length: 6' No. Conn.: 0 Type: ULTRAGEL II Calibration Block Cairto Bloc Scan Coverage Mfg.: SONOTECH " t _ _ _ I _i  !

Cal. Block No. 40397 Upstream [] Downstream Scan dB: 41.7 Reference Block RemncelSlmuitor s; tl.

Thickness

  • .0  : Flat CW Rj COW
  • Scan dB: 41.7 G:0a Signal t S -

____________~~~~ Serial No.: 04ýS4?4 d eakrApiueDvs~

Cal, a1. Temp. k2 Tamp. To):, MCNDE40132 Exam Surftice: _ _ _Type: ROMPAS j'2. R5"dius . 0 2.5 -

Comop. Temp. 74 Temp. ,Tool; 940NDF401i2 Surface Condition:. Asý Ground Recordable Indication($).* Ye's E No 9 (IfYos, Ref. Attached Ultrasonic In~dlcafionr Report.)

Results: Accept Reject S lnIi Comments: NIA Percent Of Coverage Obtained > 90%: No ReyfaWed Previous Data: Yes Examiner LcVel II.N ilr ~u~e Bul .Kih1114=190 Moss;Gary . .

Examiner Le. W 11 Dt4/2010 _

NIA.

XIAJ Z-i~2 I -

AA~~i~i (i P4FE /

UT Ca libration/Examination SlletlUnit: Oconcee Procedure: PDI-UT-2 Outage No.: 03-25 Summary No.: 03.89.11,0070 Procedure Rev.: E Report No.: UT-10i658

.Workscope: 151 Work Order No.: 01879038 Page: 2 of "

Code: 199812000A C Drtptem: ..... N 13 Sa9.

f d Location: Rx Bldg.

Descr'iption: Nozzle to Safe End Drawing No.: ISI-OGN3-012 System ID: a Component ID: 3-PDA2-1 Size/Length: MIA ThicknesslDiameter: 2.33133.51SS Limitations: Yes - See attached sheet Start Time: 1227 Finish Time: 1242 Instrument Settings Search Unit Seral No,: 0146LC Scial 40- 10-U204 Manufacluror .KRAUTKR-AMSR Manufr

,cturer.--

M*cde: USN-60 SW 2{24x42)1t4L. Shapo: Reoct Dely: .2203 Range. F .: 2.0 ML- Style: -TRL 2 M't Cavelý: .2121 Puls&i:, _ Exam_ ongle: to +of Elem +ntw: Dual, Damping: 5o0 ReJecGt 0% M Mode& Long; Reao Rate: Autohigh FreN.: 2.0 Me ned Angle: s0. Couptant Filter: Fixed Mode: Dual Wedge Style: IntograI Catl. Batch: '09325, Clrrm~renlatOricn~totd Seaorch Unat Vaitege: 450 Other: Fuiwave Type: ULTRAGEL It ~~i~fnF fSweep Ax, Gain (dBy 4j.2 Ctrc. Gain CdB) NUA Search Unit Cable Mtg.: SONOTECII

" Screen Div. = 1.0 in, o' Sound Pa!h Type: R. 4 Exam Batch: 09325 Unr--arty Report Noý: L.O.1*15 Len-th: V No. Conn.: 0 T ype: U LTRAGEL It Calibration Block Seen Coverage Mfg.: SONOTECH Cal. Block No., 40397 iUpstream Downslteam D] [] Scan dB: 60.5 Reference flock Re6ferancelSieuftator B lock Thickness 3.000 Die.: Flat CW El COW C] Scan dB: N/A Serial No.: 04.8744 I . dS Sig"nl *l Swepp IifelrAnipDliftrde tXtsin!I n d ar Cal. 81k. Temp.

Comp. Temp.

62 74 Temp. Tool:

Temp. Tool:

MCNDE40132 MCNDE46132 Exam Surface:

Surface Condition:

0.D As Ground Type: ROMPAS r19.1 j" 2 Radiuel 7S 1AI t Recordable Indication(s): Yes (3 No W (If Yes, Ref. Attached Ultrasonic Indication Report.)

-Results: Accept E) Re]ecl 2 Info 0 Comments: NIA Percent Of Coverage Obtained> 90%: NO Reviewed Previous Data: Yes

T PATF*~a I*73 UT Calibration/Examination SitelUnit: Oconee Outage No.: 03.25 Procedure: PDI-UT-2 Summary No.: 03.89.11.0070 Procedure Rev.: Report No.: UT-10-658 Workscope: Work Order No.. 01879038 Page: 3 of 6 Code: 1998I20DDA CtrJlte.r.: .*. 159.11

. Localion: Rx Bldg.

Drawing No.: ISS-OCN3-012 "escriptlgn: NqzrJc to Safe End System ID: so, Component ID; 3-__DA2-_ Size/Length: NIA Thickness/DIameter: 2.33133.5/SS Limitations: Yes - See attached sheet Start Time: Ii52 FinishFime; 1208 Instrument Settings Search Unit Cal. Tie _Date Axial Orientated Search Unlt Callbreton signal Sweep I1Sound Path Manufacturer: KRAUTKAMER Manufadcurer GE Initial Cal ?031 11/142010 Refi4dbr Ampltiude % iVis'19n Mode,: US--8 SW Size: 0.50 Shape: Rotmnd cal. ...

Cainter. _

ID Notch so 80.7 8-375j Delay- 9.S100 Rarre: 12450 F~OQ.~ 225 MH; Slyle: -C -G; Inter. Ca.I 1135 111412010 M'UCiiVvel:

D1arping:,

.1232 500 Puilse.

Refect

-44 0% ,?-Mode:

Sxi nl: 7 1 feotx

,Shear In inter. Cal.

FniCl 14 1M

______________, t _____ _____

Rep. Rate: Autohlgh Freq.: 2.25 Measured Angie: 71 Couplant Filtle Fixed Model: _ PE Wedge Style: MSWQC Cal. Batch: 09325 ClrcumferentfatOrlentatod'Seartýh Unit Voltage: 450 Other- Futziwv Type: ULTRAGEL II COilbraton Signal sweep "

AxyGafn (dO): 54.5 Cbr. Gain (fB): NWA Search Unit Cable Mfg.: SONOTECH Rectr Amplitude % DMslon ~Sound P!tl I Screen Div. = 125 In. Dfr Sound Path Type: RG - 174 Exam Batch: 09325 Unearity Report No.: L.10-115 Length: 61 No. Conn.: 0 Type: ULTRAGEL II Calimtiton Block Scan Coverage Mfg,: .. SONOTECH Cal. BlocM No. 40397 Upstam

..... 5

  • . - Oownstitrm*a .. dS:

Scan . 60.5

.Refueronco PlOCk ReflerenceljSimlator Block Th)cknnss 2.00, DPa.: Fiat CW 0 CCW 5] S4candB NIA Seralo.: 0"4744 Gain Stgnal I Swveep dI. R..l...IA slItude %I Division.So.n Cal. BIk. Temp. 62 Temp. Toot: MCNDE40132 Exam Sur.ce: O'D Type: ROMPAS 10.0 2- Radius go I.8 L-T Comp. Temp. 74 Temp. Took MCNDE40132 Surface Condilion: A-- Ground Recordable IndlCation(s): Yes 5 No [] (!f Yes. Ref Attached Uitrasonic IndIcation Report.) .

Results: Accept 0 Reject g Into 5 Comments: NIA

ATI A-CHME**( "

A4 6E  :

DUKE POWER COM[PANY ISI LIMITATION REPORT-, ....

Component/Weld ID: 3-PDA2-1 Item No: 03.B9.11.0070 remarks:

[ NO SCAN SURFACE BEAM DIRECTION U LIMITED SCAN U] 1 0 2 []1 n] 2 [] cw E] ccw FROM L N/A to L N/A INCHES FROM WO CL to -Beyond_

ANGLE: E] 0 [] 45 Z 60 other 700 FROM 0 DEG to 360 DEG U NO SCAN SURFACE BEAM DIRECTION-U LIMITED SCAN Ul 1 U 2 U 1 U 2 U cw U] ccw FROM L to L__ INCHES FROM WO _ to ANGLE: [20 [0 45 [260 other FROM DEGto DEG U NO SCAN SURFACE BEAM DIRECTION U LIMITED SCAN Ui1 2U, n cw ccw[

FROM L toL INCHES FROM WO to ANGLE: Ul 0 [2 45 U 60 other FROM DEG to DEG UN'0 SCAN SURFACE BEAM DIRECTION MITED SCAN UJIUEj2 U] 1 Ul 2 Ul Cw U] cow UT-1O-58 FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: U] 0 [2 45 [] 60 other FROM DEG to _ -P.G I yes

Supplemental Report Report No.; UT-i0-656 k

Page: 5 Of 6 Summary No.: 03.B9.11.0070 Examiner: Bell, W.KeIM Level: I-N Reviewar: Date: 1119/2010 Examiner: N/ Level: NIA Site Revlew. WfA Date:.

Other: WA Level: N/A ANNI Re~iow:-U-5A.- ý., Date:

Comments:

Sketch or Photo:

30 t

Determination of Percent Coverage for UT Examinations - Pipe Site/Unit: Oc.onee / 3 Procedure: PDI-UT-2 Outage No.: 03.25 Summary No.: 03.B9.11.0070 Procedure Rev.: E Report No.: UT-10-858 Workscope: 13) Work Order No.: 01879038 Page: 6 of 6 45 dov e Scan 1  % Length X  % volume of length 1100 = 6/%total for Scan 1 Scan 2  % Length X  % volume of length I 100 =  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000 %volume of length 1100 = 50.000  % total for Scan 4 Add totals and divide by # scans = 50.000  % total for-45 deg

) Other deg- 70 (to be used for supplemental scans)

The data to be listed below Is for coverage that was not obtained with the 45 deg scans.

Scan 1 i00.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 1 Scan 2 D.000  % Length X 0.000  % volume of length 1100 = 0.000  % total for Scan 2_,

Scan 3  % Length X  % volume of length /100 =  % total for Scan 3 Scan 4  % Length X %volume of length / 100 =  % total for Scan 4 Percentcomolete coverage Add totals for each scan required and divide by # of scans to determine; 37.500  % Total for complete exam Site Field Supervisor: A Y, K Date: ,/t

.)

UT Calibration/".amination A tACFMaNI SitelUnh: Oconee t 3 Procedure: NOE-830 Outage No.: 03-25 Summary No.: 03.89.11, 0070 Procedure Rev.: Report No.: UT-10-649 Workscope: Work Order No.: 01879038 Page: 1 of 4 Code: 1998/200DA Cat. tem. B-J 1B9.11 Location: Rx Bldg.

Drawing No.: iSIOCN3-012

Description:

Nozzle to Safe End System ID: 50 Component ID: 3-PDA2-1 Size/Length: NIA ThicknesslDiameter: 2.33,33.5/SS Limitations: Yes - See attached sheets Start Time: 11i9 Finish Time: 1140 Instrument Settings Search Unit I Cal. Tmo Axa*l Orientzed Search Unit.

Serial No.: OOWHDK Serial No.: 03-789 Checks I Caltbrat.ýn Manufacturer: KRAUTKRAMER Manufactdrer: RTD Initial Cal. 0844 1 Rer'ectocr Arrpitu-de Si~~Soun Divýep Iku~dP Path~ccr

4. .4 . 4. 4.

Model: USN-60 Site: 2C20x34) Shape Ret Inter. Cal. 314 T Hole s0 I 4.S 3.28 I df)flfl¶A at 4. .4 .4.

Delay: 16.7506 Range; 7.0 Freq.-: 1.0 M~ sw TIRL1 Inter. Cal. 1108 1 I Mtl Cal/el: .2600 Pulser: High 1ExamAngle: SOL #ol Eleaments: Dual Inter. Cal.

Damping: 1K Reject: 0% Mode: Long - Final Cal. 1532J Rep. Rate: Autohigh Freq.: 1.0 Measured Angle: Couplant Circumferentinl Oricntated Search Fitter: Fixed Mode: Dual Wedge Style: Integral Cal. Batch: 09: Unit Voltage: Fixed Other. Fullwave Type: ULTRAGI Calibratlion I$igral

  • ,motilude %

jSvieepn S cvis d Pa,h Ax. Gain (d8): 70.1 Circ. Gain (d0): 71.2 Search Unit Cable Mfg.: SONOTE Rel1-ctor 1 Screen Div. = .7 in. of Sound Path Type: RG - 174 Exam Batch: 09 ,314 T Hole 80 5.2 j 3.59 Length: 6. No. Conn.: 0 Type: ULTRAGE Linearity Report No.: L-10-109 Scan Coverage Mfg.: SONOTE Calibration Block Cal, Block No,: 50214 Upstream v Downstream 0 Scan dB: 72.6 Reference Blo R..e.enceRsirnulaStr Block Thickness: 2,464 Dia.: Fiat CW[-j CCWRJ Scan dB: 72.6 Serial No.: 04-8739 Gain R Signal. 1 8 e.S ep d -

dO Reaictor Amnplitude % Disiclon~

Cal, Bk. Temp.: 70 Temp. Tool;. MCNDE40132 Exam Surface: O.D. Type: ROMPAS 30.2 21 Radius go, 2.8 7-00o Comp. Temp.: 72 Temp. Tool: MCNDE40132 Surface Condition: As Ground Recordable Indication(s): Yes U No (If

( Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept 0 Reject RJ Info M Comments: N/A

AIIACWHMEV/J UT Cali brationlL....am ination Site/Unit: Oconee / 3 NDE-830 Outage No.: .03-25 Summery No.: 03.89.11.0070 I1 Report No.: UT-10-649 Workscope: Ist Work Order Noý: 01879038 Page: 2 of 4 Code: 199812000A Cat/item: B-J 119.11 Location: Rx Bldg.

Drawing No.: ISI-OCN3-012

Description:

Nozzle to Safe End System ID: so Component ID: 3-PDA2-1 Size/Length: NIA Thickness/Diameter: 2.33133.5ISS Limitations: Yes -See attached sheets Start Time: 1142 Finish Time: 1214 Instrument Settings Search Unit Cal. Time Date Axil Orientad Search Uni Serial No.: OOWHDK Serial No.,:

Manu e 90-371 1Initial Checks Cal

.m 0846 ot, 11420`0 Calibration AaOet Signal S

Sweep Un.t Sound Path M,

od el, Manufacturer:

USN.

KRAUTKRAMER 60 Sit: 2(1O Manufacturer xs* Shape: Re'" l"nter.Ca" RTD

1. 0o ,1/4. H' ole Reflector so Amplitude %

3.8 Division 1.89, Delay: 10.6653 Range: :5.00 Freq.: 2.0 MHz Style: Inter. Cal. 2114 111412010 M1t Cal/Vel: .2392 Pulter: High exam An~gle-, 0 #.ofElemalai Dual l Inter. Cal., ' _

Damping: 1K Reject: 0% Mode: Long -

Rep. Rate: Autohigh Freq.: 2.0 Measured Angle: 70 Couplant .. .. ._ . _

Filter: Fixed Mode: Dual Wedge Style: Integral Cal. Batch: 09325 Circumferential Orientated Search Unit Voltage: Fixed Other: Fulfwave Type: ULTRAGEL If Calibrati ,or, Signal Sweep .

Ax. Gain (dB): 80.0 Circ. Gain (dB): N/A Search Unit Cable Mfg.: SONOTECH Reflector Amplitude % Division Kfl d .

1 Screen Niv. = .5 in. of Sound Path Type: RG - 1174 Exam Batch: 09325 N/A Linearity Report No.: L-1 0-109 Length: 6" No. Conn.: 0 Type: ULTRAGEL 111 Calibration Block Scan Coverage Mfg.: SONOTECH Cal. Block No.: 50214 Upstream [ Downstreamfl Scan dB: 80.0 Rf Block ReferencelSimulator Block Thickness: 2.464 bia.: Flat CW RJ CCW[d Scan dB: 80.0 Gain I Signal Sweep Sound Path MCNOE40132 Exam Surface: O.D. Type: . ROMPAS 36.6 12" Radeflc 80 4.00 7.00 Cal. Blk. Temp.: 70 Temp. Toolt Camp. Temp.: 72 Temp. Toot. MCNDE40132 Surface Condition: As Ground

.Recordable Indication(s): Yes LI No [] (If Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept EI Reject W Info ED Comments: Unable to discern 1t4T Hole in circ. direction.

Percent Of Coverage Obtained > 90%: !itA Reviewed Previous Data: Yes

['xaminer' Level It-N Siitir Da~ Reviewer S1 ,,ur ,Oste aI Date _-,LGreeel Sit'iRevic'w Signsture Dat' Other Level NIA Signature Date A1,4i .Review Signature Date NIA k) LA- /.

A, AH ME DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 3-PDA2-1 Item No: 03.B9.11.0070 remarks:

[]NO SCAN SURFACE BEAM DIRECTION Procedure allows scanning from

[1 LIMITED SCAN M 1 02 1 0 2 Z CW 0 CCW cast sideonly.

FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: [10 [0 45 0 60 other 70 FROM 0 DEG to 360 DEG L] NO SCAN SURFACE BEAM DIRECTION LI LIMITED SCAN [] 1 0I 2 [i 1 E] 2 n cw ccw FROM L ._ to L INCHES FROM WO to _

ANGLE: J[1 0 11 45 [ 60 other FROM DEG to DEG S NO SCAN SURFACE BEAM DIRECTION LjLIMITED SCAN L1 [j2 [11 [ 2 [j cw[] cow FROM L . to L INCHES FROM WO to SANGLE: F1 0 [-1 45 [1 60 other FROM DEG to DEGG

[1 NO SCAN SURFACE BEAM DIRECTION

[1 LIMITED-SCAN [1 [12 [ 1 [n 2 [1 cw [ ccw UT-iO-64e I Sketch(s) attached FROM L ANGLE: [1O[

to L 45 [1 60 91 INCHES FROM WO DEG to to DEG 0 yes [1 No I Dat~e: D' I

AI1ACHMEN I112 Supplemental Report Report No..

IJT-10-649 Page: 4 of 4 Summary No.: 03.B.I.0070 Examiner: Hendrickson, Matthew "'Level: 11-N Reviewer: Date:

Examiner: GriNbel, Davi K z c Levet: 11-N Site Review: Date: __________

Other: NIA Level: NIA ANII Review: ______

______ ______ Date: _ _ _

Comments: Best effort exam using 60°RL & 70°RL per NDE 830 for upper 213 area of interest.

C-I.

I I

I.

AI TAlHMEMNI<

PAOEjJD OFir UT Ca ilibration/Examination

  • ftko. *SlIe/lUnil: Oconee 1 3 Procedure: P0I-UT-2 Outage No.: 03-25 Summary No.: 03B1. 911.0072 Procedure Roy.: Report No.: UT-10-641 Workscope: fSf Work Order No.: 01679354 Page: I of 6 Code: 199812000A CatAJiem: B-J 169.11 Location: Rx Btdg.

Drawing No.: ISI-OCN3-013

Description:

Nozzle to Safe End System ID: R0 Component 1O: 3-PDBI'/l Size/Lenglh: NIA Thickness/lDameter: 2.33133.51SS Limitations: Yes - See attached sheet Start Time: tB15 Finish Time: 1022 Instrument Settings Search Unit I Cal. Time 1 Date /'ýXtal Orientated st"alch Unit Seriai No.: 014738 Serial No.: OF1110K Checks I I____..._

C, Siqni)~ Sý - Sounld P'nia Manufacturer: KRAUTKRAMER Manufacturer KEA inittaI CA. 0950 1116/2010 Model: USN-60 SW Size: .50 Shape: Round Cal. 1 ID Netch1 .so 5.7 4,157 Delay: 5'7966 Range: 7.0 F"eq.: Free

  • 2.-"*-*,*"-

2.25Mtz *,la-Style: -c,-Z**

COMP-..* -!Inter. Cl Cal. , o41014.

anter.

1ro0 2010, MIt CatNel: 0.1234 Pulser: Square Exam Angle: 46 # of Elements: Single . .

Damping: 5SO Reject: 0% Mode- - Final Cal. i 1102 1116/20 10 I I Rep. Rate: Autohigh Freq.: 2.26 Measured Angle: 45 Couplant Filter: Fixed Mode: PE Wedge Style: MSWQC Cal. Batch: 09326 Circumferential Orientzoed Search unit Voltage: 450 Other: Fuliwave Type: ULTRAGEL II Ax. Gain (d4): NIA Cira. Gain (dB): 26.8 Search Unit Cable Mfg.: SONOTECH 1 Screen Div. = .70 in. of Sound Path Type: RG. 174 Exam Batch: 09326 Linearity Report No.: L-10-110 Length: 8a No. Conn.: 0 Type: ULTRAGEL It Calibration Block Scan Coverage Mfg.: SONOTECH Cal. Block No.: 40397 UpstreamE] Downstreem[] Scan dB: NIA Dla,: Ftt CW j CCW -J ScandB: 36.8 Thickness: 3.000 Serial No.: 04.8743 Cal, Blk. Temp.: 70 Temp. Tooi: MICNDE40132 Exam Surface: O.D Type: ROMPAS Comp. Tamp,: 86 Temp. Tool: MCNDE40132 Surface Condition: As Ground Recordable Indication(s): Yes EJ No Wj (If Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept E] Reject 0 Info F1 Comments: N/A Percent Of Coverage Obtained ;ý90%: No Reviewed Previous Data; Yes

AI IACHMENT c,,

PA6F"ýj) .r z*7 Ocbosb UT Calibration/Examination L**J " Sile/u~nhi:

Procedure: Outage No.: 03-25 PDI-UT-2 Summary No.: 03,80.11.0072 Procedure Rev.: E Report No_: UT-10-641 Page: 2 of 6 Workscope: Work Order No.:

01879364 Page: 2 of S Code: 19082!000A DCaoJltem: B-J tB9.t1 1-clloItoi: Rx Bldg.

Drawing No.: ISI-OCN3-013

Description:

Nozzle to Safe End System It: 50 Component ID: 3-PDBI.1 Size/Length: N1A ThlcknessiDamteinle: 2.33133.5/SS Limitatlons: Yes - See attached sheet Start Time: 1026 finish time: 1046 SerialSraNo:

No.: instrument Settngs 014738 Serial No.:

Search Unit SE0365 Cal.

Checks Tm:

m__ _

Dt at I Manufacturer: KRAIJTIRAMER Manufacturer: KGA initial Cal. 0960 1118120101 Model: USN.o SW Size: .X0 Shape* Round Inter. Cel.

Delay: 7.8484 Range: 12.00 Freq.: 2.2 MHz Style: CoM Inter Ca 1024 JIIJG/2010:

M'tl CalVel: 0.1235 Pulser; Square Exam Angle: 60 # of Elements: Single InIter. Cal.

Damping: 500 Reject: 0% Mode: 'Shear - Final Cal. 110111161201o Rep. Rate: Autohigh Freq.: 2.25 Measured Angle: so Couplant Filter, Fixed Mode: PE Wedge Style: MSWQC Cal. Batch: 00326 Circurnf6renthil OrL-ntptled Sezrob Unit Voltage: 450 Other. Fuliwave Type: ULTRAGEL It OrottdSawich Sigtrt~rnafl n Ax. Gain (dB): 42.3 Circ. Gain (d8): - 42.3 Search Unit Cable Mfg.: SONOTECH ptfle~ct JAmplilueo Division lsdtsfld P;'th I Screen Div. = 1.20 in. of Sound Path Type; RG - 174 Exam Batch: 09325 Linearty Report No.: L10-1'1 Length: 61 No, Conn.: 0 Type: ULTRAGEL II Calibration Block Scan Coverage Mfg.: SONOTECH Cal. Slock No.: 40397 Upstreamfj Downstreamni Scan dS: 49.3 Reference Block Thickness: 3.000 Die.: Flat CW0 CCWO Scan dB: 48.3 - Serial No,: 04-67413 Gain S S%nt Cal. Olk. Temp.: 70 Temp. Tool: MCNDE40132 Exam Surface: 0.0 Type: ROMPAS dO~~ ~ ~~' Di 'mtteP-'tb nSu

'eiel Comp. Temp.: 8_ Temp. Tool: MCNDE40132 Surface Condition: As Ground -15 12" Radlus 97 2.019 Recordable Indication(s): Yea E] NoD/ (if Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept E] Reject &a Info 0 Comments: NIA Percent Of Coverage Obtained > 90%: No Reviewed Previous Date: Yes.

UT Calibration/Examination tr1ACHE c/W SitelUnil: OMonee m 3 Procedure: POW-UT-2 Outage No.: 03-25 Summary No.: 03.B9. 11.0072 Procedure, Rev.: Report No.: UT-10.641 Workecope: 1!II Work Order No'- 01879364 Page: 3 of 6 C d... 1998/2000A

. ClAten: B-J 1B9.11 Location: Rx Wd g.

Drawing No.: ISI-0CN3-013 Decriptlon: "Nozzle to Safe End System ID: ell)

Component iD: 3-PDBI.1 SizaJdength: NfA Thlckness/Olameter: 2.33133.51SS Limitations: Yes See attached sheets :StdTime: 1007 Finish Time: 1013 Instrument Settings Search Unit COal Time Axial OiantatedSearrh "Un; ".

Serial No.! 014735 Serial No.: 10.1203 Checks Gi1rlo inl 1Sre ordPt M odel:

Manufacturer-.

U ,SN-0SWSize:

KRAUTKRAMER

.I 4* -

Manufacturer:

RV ~

Ii, In er :ctal -.093__

nltial.Ca.1 2 Re1e1t, Ampi2010e % Orv:s Delay: 11.6894 Range: 10.00 Freq.: 2.0 MHz Style: TRLA Inter. Cal. 1008 111612010 M'tl CafIVel: 0.2188 Pulsar. Square Exam Angle: so # of Elements: Dual Inter. Cal.___

Damping: 500 Reject: 0% Mode: Long.- FnlCa.10 11620 Rep. Rate: Autohlgh Freq.: 2.0 Measured Angle: 60 CovUptant "

FIfler. Fixed Mode: 6Dira Wedge Style: Integral cal: Batch:

, . 09325 C ,rum oeont o ntted Scnrch ,,t Voltage: 460 Other: Fullwave Type: uLTRAoEL II Cwllbrtion Signal swan, f .

Ax. Gain (dB): 46.9 Circ. Gain (dB): NIA Search Unit Cable Mfg.: SONOTECH Reflecor Ampitude % j Divis~aco n ,*.* ..

I Screen Div. 1.0 in. of Sound Path Type: RG -.174. Exam Batch: . 09325 N.fA ..... __ ..... ........ "

Linearity Report No.: L-10-110 Length: 6' No. Corn.: 0 Type: ULTRAGEL If

  • Calibration Block Scan Coverage Mfg.: SoNOTECK- 1.

Cal. Block No.: 40397 UpstreamC] Downstreamr Scan dB: 57.4 Reference Block ReferonBe/Sim rlack Thickness: 3.000 Dla.: Flat CWO CCWQD Scan dB: NIA~ Serial No.: 04-8743 Gai Ampitud % Divi weior.

e Cal. B1k. Temp.: 7n Tamp. Tool: MCNDE40132 Exam Surface: 0.3 Type: ROMPASI4lO I!"

As Ground u1 .9 7 1 "

Comp. Temp.: 86 Temp. Tool: ,MCNDE4013Z Surface Condition:

Recordable Indcallon*s)= Yes 0 No 2 (If Yes, Ref. Attached Ultrasonic Indication Report.)

Resulis: Accept D Reject 0 Info 0 Comments: NIA Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: yes xa riner Level 11.1N *S i*,rruro D z ata R& viom'4 r ,7 Si ,nalur* /aItt Exa m in er L evo l iu n .... . . . .... .. S...

,Bull,W. Ketl 111,. 10 ..

Other l.,cvt ,, . Signature. Datej ,ANII Revlaw . luro W/A ~ > 7 U (

AT I A-C HME N PAE62E Q:ý0 DUKE POWER COMPANY ISI LIMITATION RE,PORT

ýf ComponentlWeld ID: 3-PDBb1-* Item No: O3.B9.11.0072 I reýmatks:

NO SCAN SURFACE BEAM DIRECTION No scan due to cast stainless El LIMITED SCAN I [il 2 El1 R] 2 0 ew ccw pump casing.

FROM L N/A to L N/A INCHES FROM WO N/A r-to N/A cy-,

ANGLE: Dl 0 Z 45 0 60 other 60RL FROM 0 DEG to 360 DEG 0] NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN [Ei [] 2 [ii []2 ] cw2 ccw ___R FROM L to L_ INCHES FROM WO to ANGLE: 0l 0 El 45 E] 60 other FROM DEG'to DEG F] NO SCAN SURFACE BEAM DIRECTION LILIMITED SCAN E 1 [] 2 El I [] 2 El cw D] cow FROM L _ to L INCHES FROM WO to _

ANGLE: [] 0 [] 45 [] 60 other FROM DEG to _ DEG C] NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN [] 1 El 2 El I El 2 El rw El ccw UT-1-041 FROM L to L_ __._INCHES FROM WO to _ Sketch(s) attached ANGLE: 0] 0 F] 45 [360 other FROM DEG to DEG es E) No Pre....d By e-s . a Level: Date . ... o _

Reviewed By Ots ed Iný Date!/

/ I vt

ATTACHMENT C PAGE W~ OF 17 Supplemental Report Report No.: UT-10-641 Page: 5 of 4 (o.

Summar No.: 03.89.11.00T2 Exmaniinr Stauffer, masur, Le~vel: 1W-4 Reviewer; Date:

Eixaminer BUL, W.Keith Level: li-N Site Review. Date:

Othir., NIA Level, NIA ANII Review: -Pats Comments: L4$ ivAL4tr I

Sketch or Photo:

I 8 I

it CAsV SS I

.42~ -

I, I I I I I

I -S.-.

4 A. JZL,

Determination of Percent Coverage for UT Examinations -Pipe Site/Unit: Oconee 1 3 Procedure: PDI-UT-2 0 utage No.: 03-25 Summary No.: 03.B9.11.0072 Procedure Rev.: __Report No.,: UT-10-41 Workacope; 181 Work Order No.: 01879364 Page: 6 of 6 Scan I  % Length X  % volume of length / 100  % total for Smn 1 Scan 2  % Length X %volume of length /100 a %lotal for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length/ 1 00, 50,000  % total for Scan 3 J Scan 4 100,000  % Length X 50.000  % volume of length 1100 = 60,000  % total for Scan 4 Add totals and divide by # scans = 50.000  % total for 45 deg 9Oh don 60 (to be used for supplemental scans)

The date to be listed below Is for coverage that was not obtained with the 45 deg scans.

Scan 1 100,000  % Length X 0.000  % volume of length /100 = 0.000  % total for Scan I Scan 2 L40.000  % Length X 50.000  % volume of length/ 100 0.000  % total for Scan 2 Scan 3  % Length X  % volume of length / 100 =  % total for Scan 3 Scan 4 _ %Length

%_ X _ _ _  % volume of length 1100 ,, %total for Scan 4 Pecent comntete coveraae Add totals for each scan required and divide by # of scans to determine;

% Tota for complete exam Site Field Superlsor. Date:

~*

UT Calibration/l_ amination t- Site/Unit: Oconee / 3 Procedure: NDE-830 Outage No.: 03-25 Summary No.: 03.B9.11.0072 Procedure Rev.: I Report No.: UT-10-650 Workscope: SIM Work Order No.: 01679354 Page: 1 of 4 Codel. 199812000A CatJltem: B-J /09.11 Location: Rx Bldg.

Drawing No.: ISl-OCN3-013

Description:

Nozzle to Safe End System ID: ad Component ID: 3-PDBI-1 Size/Length: N/A Thickness/Diameter: 2.33/33.5]SS Limitations: Yes - See attached sheets Start Time: 1033 Finish Time: 1104 Instrument Settings Search Unit f Cal. 'rime Date I lentated Search Unit AXIal Or Serial No.: OOWHDK Serial No.: 03-789 Chee*'s 8 1SS01t Mnfcue:"RUTR ERManufacturer. RTI Reflector Amplitude% DIVslohn Model: USN-60 Slze: 2(20x34) Shape: Re. Inter.,CaL_ 314 T Note 80 4.8 3.28 Delay: 16.7506 Range: 7.0 Freq.: 1.0 SMty" T- -I Inter. Cal. 1032 1W16120210 M' CalNel: .2600 Pulser High Exami Angle: 6L ,O t -Elenefnt: 1) Inter. Ca,,

Damping: 1K Reject: 0% Mode: Lonig ii........

3 11612010 _

Rep. Rate: Autohigh Freq.: .. 1.0 Measured Angle: 66 Couplant _

Filter: Fixed Mode: Dual Wedge Style: Integral Cal. Batch: 09325 Clrcumferential.Orlentated Search Unit Voltage: Fixed Other. Fullwave Type: ULTRAGEL II Calibr~tton SJ'3a1 Sweep Ax. Gain (dB): 70.1 Circ. Gain (dB): 71.2 Search Unit Cable Mfg.: SONOTECH RelepW -AmnpitUide % DiviSlo ound Path.

I Screen Div. = .7 in. of Sound Path Type: RG - 174 Eam Batch: 09325 314 T Hole 80 5.2 . 3-59 Linearity Report No.: L-10-109 -ength: 6' No. Conn.: 0 Type: ULTRAGEL II Calibration Block Scan Coverage Mfg.: SONOTECH Cal. Block No.: 50214 Upstream [ Downstreamf] Scan dB: 72.6 Reference Block RcrerencefSimulator Stock Thickness: 2.464 Dia.: Flat CW* CCWfR] Scan dB: 72.6 Serial No.: 04-8739 Gain SA t Syeepsconi Pa*h Temp. Tool: MCNDE40132 Exam Surface: O.D. Type: ROMPAS k ..%0 .. "2.8 "

Am, l"Radru-I 2.00 Cal. Blk. Temp.: 70 Camp. Temp.: 85 Temp. Tool: MCNDE4D132 Surface Ccndition: As Ground Recordable Indication(s): Yes No [ (If Yes, Ref. Attached Ultrasonic Indication Report.) .

Results: Accept [] Reject

  • Info Comments: N/A Percent Of Coverage Obtained P 90%: ..N/A Reviewed Previous Data: Yes.

SExaminer Level 'I"tuI Date Revvier nature Hendrickson, Matthew 200 1612/

Examnlrer Le I ll-N/) - 04"DtoSite Review Dl

ýGrtebcf, Cavid .M. ~ / ~ ~~tr 1621 Other Level N/A / SDanttre Date .ANi Review Signature, Date WfA\

ATTACHMENT UT Calibration/Lkamination PAE 7 £aF T7,-

ocoie~e 1 Procedure: NDE-830 Outage No.: 03-25 Sumnmary No.: 03.9.911.0072 ProcedureRev.: 1 Fepcrf No.: UT-10-650 Woil(scope: Is; 'Workt Order No.: 01879354 Page: 2 of 4 Code: 1998/2000A CatIten): B-3 1B9.11 Location; Rx Bldg.

Drawing No.: ISl-OCN3-013

Description:

Nozzle to Safe End System ID: 50 Component ID: 3-PDBI-1 Size/Length. MIA Thickness/Diameter: 2.33/33.51SS Limitations: Yes - see attached sheets Start Time: 1107 Finish Time: 1137 Instrument Settings Search Unit I

Seral No.: OOWHDK Serial No.: 90-371 Manufacturer: KRAUTKRAMER Manufacturer: RFTD Model: USN-60 Siz& 2110x18) Shape:. ReCe.

Delay: 10.6653 Range:. 5.00 Freq.: 2.0 MWz Style: TRILA M'tl CalNel: .2392 Pulser: High Exam Angle: -

-70 of Elements: Dual Damping: 1K Reject: 0% Mode: Long Rep. Rate: Autohigh Freq.: . 2.0 Measured Angle: 70 Couplant Filter: Fixed Mode: Dual Wedge Style: Integral Cal. Batch: 09325 Circtmfer--ntial Orientated Search Unit Voltage: Fixed Other. Fullwave Type: ULTRAGEL i1 Calibration Signal Sweep S Paih Ax. Gain (dB): 80.0 Circ. Gain (dB): NIA Search Unit Cable Mfg.: SONOTECH Reflector Amplitude % 0i4ision

  • N/A _______________

1 Screen Div. = .5 in. of Sound Path Type: RG - 174 Exam Batch: 09325 Linearity Report No.: L-10-109 Length; 6" No. Conn.: 0 Type:. ULTRAGEL II Calibration Block Scan Coverage Mfg.: SONOTECH Cal. Block No.: 50214 Upstream El Downstream[a Scan dB: 80.0 Reference Block Referencet*S ulator 8Wock Thickness: 2,464. Da_: Flat CW R CCWRJ Scan dB: 80.0 Serial No.: 04-8739 Gin 7Signal BReftector.~ Anplt ude %Dvso Cal. Bk. Temp.: 70 Temp. Tool: MCNDE40132 Exam Surface: O,_ , Type: ROMPAS 36.0 2" Radius 30 4.00 7.00 Comp. Temp.: 85 Temp. Tool: MCNDE40132 Surface Condition: As Ground Recordable Indication(s): Yes F1 Noa] (if Yes, Ref. Attached Ultrasonic Indication Report,)

Results: Accept [] Reject W Info [] Comments: Un;able to discern 1/4T Hole in circ. direction.

Percent Of Coverage Obtained > 90%: N/A Re e4 Previous Data: Yes Ekariner Level t- Oa te, Reviewer Signetuit " ODat Hendrickson, Matthew I..I ii1(82, 0

_Xarnifner -Level 1I-4 -- i3re ' Cate SiteReview . Signritum Date Griobel, David M.  ;;,x.111612010 Other Level NIA, tigna!ure Date ANII Review Sig .ritur, Oate

DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 3-PDBI-1 Item No: 03.B9.11.0072 :remarks:

NO SCAN SURFACE - BEAM DIRECTION Procedure allows scanning from Li LIMITED SCAN [-)I N 2 0 1 E3 2 L1 cw Li ccw cast sideonly.

FROM L N/A to L N/A INCHES FROM WO CL to Beyond ANGLE: L] 0 L] 45 Z 60 other 70 FROM 0 DEG to 360 DEG L NO SCAN SURFACE BEAM DIRECTION i LIMITED SCAN Li 1 Li 2 Li1 nL 2 Li cw Li ccw FROM L to L INCHES FROM WO to .....

ANGLE: L] 0 C] 45 [] 60 other FROM DEG'to DEG Li NO SCAN SURFACE BEAM DIRECTION ED LIMITED SCAN Li I 2 1 n 2 Licw [ccw I FROM L to L INCHES FROM WO to ANGLE: L] 0 L] 45 Li 60 other FROM, ..DEGto __ DEG Li NO SCAN SURFACE BEAM DIRECTION

[L LIMITED SCAN i 1 EL 2 L] i 1 ] 2L cw n ccw UT-10-650 FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: Li 0 [L 45 Li 60 other FROM DEGto DEG [ yes Li No Prepared By: David Griebef,.- *,- Level: t Date: 11/06/10 Sheet 3' of 4 Reviewed By: Date: /7f ~ At~ie nspector Dalte:

Supplemental Report PAGE -7t j6?

Report No.: UT..10-650 Page: 4 of 4 Summary No.: 03..B9.11.10012 -

Examiner: Hendrickson, Matthew Reviewer: Date: &

Examiner: Grieb&6DavlidM. A .- Level; 11-N Site Review: Date: _____

Other: NJIA Level: N(A ANII Review: h-J(A Date: 11. jbi.

Comments: Best effort exam using 60*RL &.70'RL per NOE 830 for upper 213 area of Interest I______

-,Z2U1)7R. -2 *i

-i52-

UT Calibration/L._ amination

- Site/Unit: Oconee 1 3 Procedure: PDI-UT-2 Summary No.: 03.C5.21.0034 Procedure Rev.: c: Repori No.., UT-10-50 Workscope: Work Order No.: 01889593 page: 1 I Code: 1998/71;z ýy ,.. atJitV'ei: C-F-11Ct.21 Location: Aux Bldg.

Drawing No.: 3HP-365

Description:

Valve 3HP-27 to Elbow.

System ID: 51A Component ID: 3HP-386.40 Size/Length: N/A Thickness/Diameter: 0.67414.0JSS Limitations: Yes - See attached sheets Start Time: 1008 Finish Time: 1010 Instrument Seftings Search Unit Cal. Time Date Axial Orientated Search Unit Serial No.: 00X14L Serial No.: SB0253 Checks ___- --- Coibration Sipnaýl Swcr*p Sound Path Manufacturer:. KRAUTKRAMER" Manufacturer- KA Initial.Cal 0910 1011412010 Rlector Arnpittide % 0ivision Model:

Delay:

M'U Cal/Vel:

5.4594

.1234.

USN-60 Range:

Pulser:

20 High Size: *.

Freq.:

0.25f" 2.25 MHz Exam Angle: 35 Shape:

Style:

Round Comp - G

  1. of Elements: SIngle Inter. Cal.

Inter. Cal.

Inter. Cal.

_ _ 1 l1os 1011412010 NA 1 j____ ____

Damping: 1K Reject: 0% Mode: Shear F Ca 13 6 1W1 ;;201 Rep. Rate: Autchigh Freq.: 2.25 Measured Angle: 1

_3_ _ Couplant Filter: Fixed Mode: PE Wedge Style: MSWQC Cal. Batch: 09325 Circumferential Orientated Search Unit Voltage: Fixed Other. Fullwave Type: ULTRAGEL II ,Calibtatiorr Signl Swe Ax. Gain (dB): N/A Circ. Gain (dB): 38,2 Search Unit Cable Mfg.: SONOTECH Reflector Amrritude%. DiVi~in iat 1Svunds 1 Screen Div. = 0.2- in. of Sound Path Type: RG - 174 Exam Batch 09325 0.75" 1D Nbtch 8o 4.6 Linearity Report No.: L-104107 Length: 6. No. Conn.: 0 Type: ULTRAGEL It CalibratinnBlock Scan Coverage Mfg.: SONOTECH Cal. Block No. PDI-UT-2A-O Upstream [] Downstream E] Scan dB: NIA Reference/Simulator Block Reference Block Thickness .375 - 1.25" Dia.: Flat CW Sa CCW W Scan dB: 44.2 Serial No.: 04-8744 dB l.Reflector .Amplitudfe % Sound Path Cal. Bik. Temp. 76 Temp. Tool: MCNDE40132 Exam Surface: o.0. Type: ROMPAS Comp. Temp. 82 Temp. Tool: MCNDE40132 Surface Condition: As Ground so 1 4.6 .a-Recordable Indication(s):

Results: Accept C]

Yes El Reject 0]

No [ (If Yes, Ref. Attached Ultrasonic Indication Report.)

info 0] Comments:

10

! .0 1'Ra~du Impingment angle 54.9*

Percent Of Coverage Obtained - 90%: No Reviewed Previous Data: Yes

UT Calibrationk-amination WIACHAEUl C-PAGE S2 ZT(

Olon" /. 3 Procedure: PDI-UT-2 Outage No.: 072 Summary No.: 03.C5.21.00324 Procedure Rev.: Reporl.No.; UT-1OSO9 Workascope: Work Order No.: o188r903 Page. 2 of a Code:+ "199 It j '* iO...* ,.(O. Cat/hem: C-F.IIC5.21 Locaton: .Ax Bldg.

Drawing No.: 3HP40-5t!

Description:

Valve 3HP-27 to Elbow" System ID: 51A Component ID: 3HP-3640 Size/Length: WiA Thickness/Diameter. 0.67414.01SS Limitations: *eS - See attached she*ts Stat Time: 1013 Finish Time: 1015 Instrument Semnge Searh Unit Cal Tlm . at Axial Orientated Search Unit Seral No.:.

____o..__ ox,,,____i__..____o_0,____a, S SO*rX4 No.:

,ial . . DD72

+s .. . .

-C-helcksrtion

... ______°°

..... + ° + I +oweep ignal e ...° +

Manufa cture :K G 8 0.2 - Sae Ron Initi.al

  • ot -09a i14 0 Sound Pa-h Manfacurr moe.UN6 KAUKRAERManufacturer ie i$ SaeKBA ord Itr. cal. I oJV~l*~

Italat06104200 ID,~

Refleptor .....to Aptue% 4 Division I ........

beg*. 4.5282, ange: 2.0' Ft=: 2.2 SCamp_- " ntr 1012 101102010.

M'W Camelh .1245 Pulser High Exam Angle: 45 ... of Elements: Single  !°*L -- - _iP..... _"_ T Damping: 1K Reject: 0% Mode: SHEAR J.11U1 1011412010 I Rep. Rate: Autohigh Freq.: Z.25 Measured Angie: 45 Couplant ._*_ _ _ _

Fllter Fixed Mode: PE Wedge Style: MSWQC Cal. Batch: 0325 Circumferential Orientated Search Unit Voltage: Fixed Other Fullwava Type: ULTRAGEL U Calibratn Signal Sweep o Ax. Gain (d8): 37A Cim. Gain (dB): NIA Search Unit Cable Mfg.:, . SONOTECH Reflector Amplitude % Division Ufd Path I Screen Div. = 0-2, in. of Sound Path Type: RG - 174 Exam Batch 09325 NIA Lin"ar*y Report No.: L-10-107 Length. 6! No. Conn.- 0 Type: ULTRAGEL 11 Calibration Block Scan Coverage Mfg.: SONOTECH Cal. Block No. PDI-UT-2A-O Upstream [] Downstream R] Scan dB: 43.2 Re Block Refonce/Simulator Block Thickness .375-1.25 Dia.: Flat CW C] CCW fJ Scan dB: NIA Ga I Signal Swe Sound Path

______________ - Serial No.: 0487 .!Rpetrjinrue~DvsinSudPt Cat. B1k. Temp. 78 Temp. Tool: MCHDE40132 Exam Surface: O.D. Type: ROMPAS 31.5 RAmusl o 8 Division MCNDE40i32 Surface Condition: As Ground 314- ....

Comp. Temp. 82 Temp. Tool:

Recordable Indo.ation(s): Yes n No W (if Yes, Ref. Attached Ultrisonic Indicalion Repodt.)

Results: Accept j] Reject 21 Info M Comments: NIA Percent Of Coverage Obtained >90%: No Reviewed Previous Data: Yes Examiner Level i-gnature Date Reviewr na1urI GriabelI, Da4id[ M. Il-NA 1 Cochran, tonfnle 0. 10K412010 Other Level' 1N4A Sagnat Date ANII Review re Date NIA

UT Calibration/-arnmination PAGE OF Site/Unit: Oconee 1 Procedure: PDI-UT-2 Outtge.No.: 03-25 Summary No.: 03.C5.21 .0034 Procedure Rev.: Repor No.: UT-10-599 Workscope: Work Order No.: 01389593 Pace: 3 Of t; Code:,: t: caUitem; C-F-I1iC5.21 Location: Aux Bldg.

Drawing No.: 3HP-365

Description:

Valve 3HP-27 to Elbow System ID: 51A Component ID: 3HP-365-40 Size/Length: NIA Thickness/Diameter: 0.67414.OISS Limitations: Yes - See attached ahoets Start rime: 1020 Finish Time: 1026 Instrument Settings Search Unit Cal ime Date Axial Orientated Search Unit Serial No.: 0OX14L Serial No.: OODNL3 Checks , , ,,, Calibt ion S.Signalo SS,unpp ,

Manufacturer. KRAUTKRAMER Manufacturer. KBA Initial Cal 0912 10/11412010 Rcecicr Amnplitude %

Model: USN-60 Size: 0.25 Shape: Round Inter.,Cal. -_________ IsNotc 10 80 &4____ ) 1.35 Delay: 5.5072 Range: 2.r Freq.: 2.25 Style: Comp-G ,nter. 1019 1011412010 Cal.

M'd CalVel: .1249 Pulser. High Exam Angle: 60 # of Elements: Single Cal. ____.... IInter. ....... .................. ____

Damping: 1K Reject: 0% Moade: SHEAR - Final Cal 1140 011412010 1 Rep. Rate: Autohigh Freq.: 2.25 Measured Angle, 60 Couplant _____,

Filter: Fixed Mode: PE. Wedge Style: MSWQC Cal. Batch: . .09325 Circumferential Orientated Search Unit.

Voltage: Fixed Other: Fullwave Type: ULTRAGEL II f Cil iornt S~gnel Sweep Ax. Gain (dB): 55.4 Circ. Gain (dB): N/A Search Unit Cable Mfg.: SONOTECH NIeAector Amtlide % , ial pound ttt I Screen Div. .25 in. of Sound Path Type: RG - 174 Exam Batch 09325 NIA _

Lineanty Report No.: L-10-107 Length: 6- No. Conn.: - Type: ULTRAGEL II Calibration Block Scan Coverage Mfg.: SONOTECH I Cal. Block No. PDI-UT-2A-O Upstream C3 Downstream 2 Scan dB: 55.4 Reference Block RaferenceSinulator Block Thickness .375-1.25 Dia.: Flat CW C3 CCWfJ Scan dB: NIA Gain Signal % e P', Sound Path

___________ - Serial No.: 04-8744 dS Reflector Amplitude 'A Divsion Cal. Blk. Temp. 76 Temp. Tool: MCNDE40132 Exam Surface: 0.0 Type: ROMPAS 35.s JI- R jusI 80so 4.0 1 IX-Comp. Temp. 87 Temp. Tool: MCNDE.40132 Surface Condition: As Ground Recordable Indication(s): Yes No jGj (If Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept E Reject 0 Info Comments: N/A Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes ....

Examniner Level Il~li Dote Reviewer aleJ

'Djgntr Griebel. David M. 10114F7010 Examiner Level IM4 ,~ signatiedw Date site' Review Signrture Ot

-ora.Lonnie D. ~ . LL. ~10/1412010 Other Level NIA DateatuwItlRview Dl NIA

UT Calibration/L amination AT TACHMENT PA E T OF

- ' SiteiUnit: Oconee I 3 Procedure: PDI-UT02 Outage No.: O3-25 Summary No.: 03.C5.21.0034 Procedure Rev.: Report No.: UT-10-509 Workscope: IS' Work Order No.: 01889593 Page: 4 of 8 Code: 1900t r'w4 J&ý174-1& Cat./lte Dm n C-Fa-ICS.21 Location. Aux Bldg.

Drawing No.: 3HP-365

Description:

Valvo 3HP-27 to Elbow System ID: 51,A Component ID: 3HP-365-40 Size/Length: NtA Thickness/Diameter: 0.67414.0iSS Limitations: Yes - See attached shoets Start Time: 1216 Finish Time: 1225 Instrument Settings Search Unit Cal-. Time Date Serial No.: 0DX14L Serial No.: 10-1213. Checks Manufacturer:. KRAUTKRAMER Manufacturer: RTD iitial Ca0l 840 .0..201 Sound Path Model: USN-60 Saie: 2(BX14) Shape: Roet.. inter. Cal. _

1.2 Delay

8.2028 Range: 2.5 Freq.: 2.0 Mkz. Style: TRL 2 inter. Cat. ..1215 122010 Mil Ca/Vel: .2319 Pulser High Exam Angle 60 0 of Elemrents: Dual Inter. Cal.

Damping: 1K Reject: 0% Mode: Longg. Final Cal 1410 1012012010 Rap. Rate: Autohlgh Freq.: 2.0 Measured Angle: 60 Couplant Filter. Fixed Mode: Dual Wedge Style: Integral Cal. Balch: . 09325 Circumferential Orientated Search Unit Voltage:

Ax. Gain (dB):

Fixed 53.4 Other: Fullwave Cirm. Gain (dB): NIA Search Unit Cable Type:

Mfg.:

ULTRAGEL HI SONOTECH fCalibmiation Reflector fSignal 1Swoep Amplitude % Division gZ Sn Ph I Screen Div. = .25 in. of Sound Path Type: RG - 174 Exam Batch 09325 Linearity Report No.: L-10-107 Length: 6. No. Conn.: 0 Type: ULTRAGEL II Calibration Block Scan Coverage Mfg.: SONOTECH Cal. Block No. 8279-0412 Upstream F1 Downstream R] Scan dB: 53.4 Reference Block ReferencelSimulator Block Thickness 0.674 Dia.: 4.5 CW [] CCW n Scan dB: NIA Serial No.: 8279-0407 Gain S igns! SweeP Sound Path dS, Relector lAinflvdO %1 DivisiO.

Cal. BIk. Temp. 75 Temp. Tool: MCNDE40130 Exam Surface: O.D Type: DSC f

3.8 2-0 I so 8.0 2.00.

Comp. Temp. 87 Temp. Tool: MCNOE4oi3O Surface Condition: As Ground Recordable Indication(s): Yes E] No [] (If Yes. Ref. Attached Ultrasonic Indication Report.)

Results: Accept [] Reject [,] Info C] Comments: Trai nsducer specs FS-25mmlOD 5' Ax.

Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

=Eamniner Level lI.N Signature Date Revieweir a t D Cochran, Lonnie O, " ...... ,....

Exmnr Level 11-.N /)' l~ure Date, Site Review Dineer

.r.ibel, David M. 1012012010 Other Level NIA / Stgniture DaeANVi Reviewv~ Date:

N ,A o o""

V (......~7 4F C

PAl 6 ~ (1 DUKE POWER COMPANY I

ISI LIMITATION REPORT Component/Weld ID: 3HP-365-40 Item No: 03.C5.21.0034 remarks:

NO SCAN SURFACE BEAM DIRECTION Due to valve to elbow 33 LIMITED SCAN [] 1 [ 2 11 [] 2 33 cw 33 ccw configuration:

FROM L ._I to L INCHES FROM WO CL to Beyond ANGLE: 33 0 0 45 Z 60 other FROM 0 DEG to 360 DEG Z NO SCAN SURFACE BEAM DIRECTION Due to valve to elbow 33 LIMITED SCAN 33 1 E 2 33 1 33 2 [0 cw Z ccw configuration.

FROM L . to L INCHES FROM WO CL to Beyond _

ANGLE: 33 0 3] 45 3] 60 other 35° FROM 0 DEG to 360 DEG 33 NO SCAN SURFACE BEAM DIRECTION _

33LIMITED SCAN 3 1 3] 2 3 1 [] 2 cw 3 ccw 1 FROM L to L INCHES FROM WO to ....... i ANGLE: 30 3 45 3360 other FROM, DEG to DEG 33 NO SCAN SURFA\CE BEAM DIRECTION 33 LIMITED SCAN I

  • 3 71 2 331 [3 2 0 cw 03 cvw UT-1 0-509 FROM L t_o L INCHES FROM WO to Sketch(s) attached t5 [] 6.0 other ANGLE: 33 0 33 4 FROM DEG to DEC

Supplemential Report RepotlN. UT-10-509 4ý Page: 6 of 8 Summary No.: 03.C5.21.0034 Examiner: GNrebelDavidM. Level: 1l-N Reviewer:

Examiner: Cochran. Lonnie D. 4 Level: I1-N Site Review: Date:

Oth'er: N/A Level: NIA ANII Review, Date:

Comments: Profile and thickness Ki/,vL ,7 Sketch or Photo:

,-/I I I1 I (

I

AITACHME I f Supplemental Report Report No.: UT4i0-509 Page: 7 of 8 Summary No.: 03.C5.21.0034 Examiner: Griebef. Oavid M. < Levd. 11-N Reviewer, Date Examiner: Cochran, Lonnie 0. -__Z=*,... Levei: il-N Site Review. ~Date Other: NIA Level: NIA ANII Review: Date:

44 ~ TL~I Comments: Scan limitation due to valve 3HP-027

-== Z--hv,

.I LW?? I/V iV41L /*,

Sketch or Photo:

4

P.-

uJý -Du~r Determination of Percent Coverage for UT Examinations - Pipe t~LM

-C Sitef Unit: 0cones, 3 Procedure: PDI-UT-2 Outage No.: 03-25 Summary No.: 03.CS.21.0034 Procedure Rev.: E0 Report No.: UT.10-509 Workscope: ISI 01889593 Page: 8 of 8 Work Order No.:

Scan I  % Length X  % volume of length / 100 =  % total for Scan I Scan 2 %Length X  % volume of length / 00 =  % total for Scan 2 Scan 3 100.000  % Length X 50.000  % volume of length I 100 = 50.000  % total for Scan 3 Scan 4 100.000  % Length X 50.000  % volume of length / 100 = 50.000  % total for Scan 4 Add totals and divide by# scans a  % total for 45 deg Other don - 60 (to be used for supplemental scans)

The data to be listed below Is for coverage that was not obtained with the 45 dog scans.

Scan 1 100.000  % Length X 50.000 " volume of length / 100 = 50.000  % total for Scan 1 Scan 2 100.000  % Length X 0.000  % volume of length (100 = 0.000  % total (or Scan 2 Scan 3  % Length X  % volume of length I 100 = " total for Scan 3 Scan 4  % Length X  % volume of length /100 =  % total for Scan 4 Percent comalete coveraae Add totals for each scan required and divide by # of scans to determine;

_  % Total for complete exam Site Field Superv sor 2

. d / V14 Pate: __ _ _ _

UT Calibration amination A1 A HME41

~e y Site/Unit:

Oconee / 3 Procedure: PDI-UT-2 PA 5E ý7g Of 3 Outage No.: 03-25 Summiary No.: 03.CS.21.0086 p rocedure Rev.: .B Report No-: UT-1O-513 Worksope: ork Order No.: 01889598 pagto I of 6 Code: 1998/ZOOOA CatItem: C-F-liCS.21 Location: Aux Bldg Drawing No.: 3HP.8 Description; Reducer to Pipe System ID: SIA Component ID: 3HP-498-14 S4 Size/Length: N/A ThicknessfDiameter: 0.43612.01SS Limitations: Yes - See attached sheets Start Time: 0916 Finish Time: 0933 Instrument Settngs Search Unit Cal. Tim A t rinsedSach Sat Unit Seriat No-: 0OXI4L Serial Nat.: 80 Checks ____ airto we '~ 't Manufacturer: KRAUTKRAMER Manufactur er: IKAInitial Cal. 0634 ý10/21/2010 f r 'A'i - Iclsoun R.

Delay: 4.5262 Range: 1.V' " Frea. 2,2*.2*51z . Style- Cornp-G Inter. Cal. 0915 10/212.2010 Model:.1K. .SN-60 Sir..: .25 Shape: R * . .. '. 01 o M'l CalNel: .1245 Pulser: High Exam Ane: 4 #4of Elements: Single Inter. Cal. " . .. .... .

Damping: 1_K Reject: 0% Mode: Shear t Fina*_Cal; 10 _ .. -

Rep. Rate: Autobigh Freq.: 21S25 Measured Angle: ASCouplant__________

Filter Fixed Mode: PE Wedge Style: CCal. Batch: 09325 .r Un i Voltage: Fixed Other: Fullwave Type: ULTRAGEL II Calibration Signal Swep Ax. Gain (dB): 32.3 Circ. Gain (dB): NIA Search Unit Cable Mfg.: SONOTECH FRel*ector j deowx. i;viior Arnpitude%  !

Lineatily Report No.: L-10-107 Length: 6' No. Conn.: 0- Type: ULTRAGEL If Calibration Block Scan Coverage Mfg.: SONOTECH .

Cal. Block No.:, PDI-UT-2A-O Upstream C DownstreamF41 Scan dB: 38.3 Reference Block Refeorc,:emutStor Blockr Thickness: .375-1.25" Dia.: Flat CW[1 CCW* Scan dB:l N/A e4in Seo, e I Swee,

__________________ _ - ~~Serial Na,: 04-8737 RetcoAmioIOiin Cal. Bik.Temp.: 71 Temp, Tool: MCNOE4O Exam Surface: O.0. Type: ROMPAS 27.0 V 80 s.i 7 to0 Comp. Temp.: 87 Temp. Tool: MCNDE40132 Surface Condition: As Ground ________-_._ _____ .... -

Recordable Indication(s): Yes N No VL (If Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept F] Reject f Info J Comments: N/A Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes I ~

Examiner ) ~~vo1 lure Date ee r(Sitaie Qr~e aid 1.-1012112C1 /~ [

Examiner Level ti-N Cochran, Lonnie D, ._.. :0t!21:

OtherL Sl .A. *S Date

__ A _ _ _ _ _ __ _ _ _ _ _ __ _ _ _

UT Calibration aamination At 1ACHMENT C-V t , ..... Site/Unit Oconee t1 3 Procedure: POI-UT-2 Outage No.ý s?

Summary No.: 03.CS.21.0066 Procedure Rev.: E Report No-: UT-1"-13 Workscope: IS1 Work Order No.: o1a11s69 Page: 2 of Code: 1998B1000A Catitem: C#-lC5.21 Loc ation: Aux Bldg Drawing No.: .3HP-498 Descriptlon: Reducer t. Pipe System ID: 51A Component ID: 3HP-428-14 $S1ze/Length: N/A ThidcessIDIameter. 0.43512.0ISS Umhlallona: Y See attached

!ta che.t. Start Time: 0936 Finish Time: 0942 Instrumerd Setting* sernch Unit CA. 1ime Date AxI Orientated Search Unit Serial No.,: OX14L. Seria. Cec..to.: :.....

I-. Camii-o Signal S Sound Path anuaerK- - jtk 16M110 Reflior AmpIde O Division

,,,Manufacturer:

Manuatuer. FixedKA~t MoeinWig tliMSQ . ... a.ti Craentate h 92 ... !cmaeal SuohUnitd~

Mdel n n U.st,2 Paterh size.

yoech 0.25' . Shape: .- Round Cal. _ch

_____ __1.

Delay.

1 CalWelo 5.Bl7106

.1246 Range'.

PuIser. 2.00 High Freq.-

Exam Angle: o o ofCoElements: pS1,igle iter. Cal. 1 093N ofr. Cal, ,103TC/21H2 Dam.Ging(e: 1K? Reee:arod:

Cr.Gan(B / hEARn~ 80nCouprantk Mg:-al SOOE____r___~itie% Dvs*n un a Rap. Rate: Autohigh Fec 2.o Measured Angie:

Cal. Batch: 09325 Circumfearenttal Orientated Search Unit h

Filter. Fixed Mode* PE Wedge Style: MS 1WQC Voltage: Fixed Other FuitWave Type: .ULTRAGEL II Calibration signal, Sweep Ax. Gain (dB): 55.7 Ch,2Gain (dBFt NIA Search Unit Cable M1i10. SONOTECH Renector Amplitude % Olvslon tSnd Path C Saremen Div. 1 -2 in. of Sound Path Type-, *1! : RG Exa: Batch,,132. NIX..,____

Unearity Report No.: L-10-107 Length: 6 No. Conn.: REi .___T:

Calibration Block Scan Coverage Mfg: SoNtOTECH Cal. Block No. ... Upstream Downstream Sean dB: 81.7 Thickness .3" P1J! Di.: Flat CW 0.CCW C. Scan dB: NIA S No.: 04473 Gain dB Signal Sweep 'Sound Path Refllctor Ampltude % Divison Ti Tem.T___________xaSrfae:OX Ca______________

Caloo:

5k.Tep.71 CND4O3O em. ~ m ~ _____________Type: ROMPAS -. I' Radius .80 .5.0 1.00 Comp. Temp. 87 Temp. Tool: MCNOE40132 Surface Condition: As Ground Recordable Indication(s): Yes F1 No (11Yes. Ref. Attached Ultrasonic Indication Report.)

Results: Accept C) Reject R) info [] Comments:. NIA Percent Of Coeq g Obtained 90%: No Reviewed Praylous Dare:, Yeis E aiet Leve4l lN Data ýRelvewer oS~at*Dt drll, Daivid M.:. 111121/201160IAic Exiainerar cave] f sign Turte Date Siitedw, Re~r wat Cochrain, Lonnihi 0.DL-.-.- 1012112010

'Othee LevlN/ASinaur Date AýNII'Review ale N/A V. - f 4

UT Cal ibration/L.-amni nation AlI 1AEHM NT Site/Unit: Oconee / 3 Procedure: PDI-UT-2 Outage No.: 03-25 Summary No.: 03.C5.21.0066 Procedure Rev.: Report No.: UT-10-513 Workscope: 'Ii Work Order No.: 01889598 Page: 3 Of Code: 199812000A Catilltem: C-F-11C5.21 Location: Aux Bldg Drawing No.: 3HP-498

Description:

Reducer to Pipe System ID: 51A Component 0D: 3HP-498-14 Size/Length: N/A Thickness/Diameter: 0.43612.01SS Limitations: None Start Time: 1632 Finish Time: 1640 Instrument Settings Search Unit Cal. Axial Orientated S.arch Unit Serial No.: 0OX14L Serial No.: 014XD9 Checks I Calibration Signal Sweep Sound Path Manufacturer: KRAUTKRAMER Manufacturer KBA Inital Cal. 1417 10-2812010, Reflector Amplitude % 1 Division Model: USN-60 Size: 0.23 Shape: Round lt~ a. ____

_____ "Notch 80 7.8 1 1.97 Delay: 7.0688 Range: 2.5 Freq.: 2.25 MHz Style: Comp-G inter. Cal. 1630 10.2812010 M'tl Cal/el: .1263 Pulser: High Exam Angle: 70 # of Elements: Single Inter. Cal.

  • i. '

Damping: 1K Reject: 0% Mods: Shear . - Final-Cal. 1806 10W128212010 Rep. Rate: Autohigh Freq.: 2.25 Measured Angle: 70 Couplant___

Filter: Fixed Mode: PE Wedge Style: MSWQC Cal. Batch: 09325 Circumferential Orientated Search Unit Voltage: Fixed Other: Fullwavo Type: ULTRAGEL III Calibration Signal Sweep Search Unit Cable Mfg.: SONOTECH Reflector Amplitude % Division 1Sound Path Ax. Gain (dB): 66.8 Circ. Gain (dB): NIA RG - 174 Batch: 09325 A NIAExam _ _ _ _.... .

1-- Screen Div. = .25 in. of Sound Path Type: .

Linearity Report No.: L-10-107 Length: 6. No. Conn.: 1 Type: ULTRAGEL II -_ _

Scan Coverage Mfg.: SONOTECH .*

Calibration Block Cal. Block No.: P0I-UT-2A-O Upstream v Downstream[] Scan dB: 66.8 Reference Block Reference/Simulator Block Thickness: .375-1.25 Dia.: Flat CWW CCWE Scan dB: N/A Serial No.: 0"744 Gain Signal Sweep Sound Path

- Seial o.:. 04744 d8 Reflector .Arnolituide %IDivision SonI Pt Cal. Bik. Temp.: 71 Temp. Tool: MCNOE40130 Exam Surface: 0.0 Type: ROMPAS 49.0 i" Radlulý 80 4.1 1.00 Comp. Temp.: 85 Temp. Tool: MCNDE40130 Surface Condition: As Ground Recordable Indication(s): Yes -1 No _3 (If Yes. Ref. Attached Ultrasonic Indication Report.) .

Results: Accept 0J Reject V: llo Comments: Supplemental 70' used for single sided access Percent Of Coverage Obtained > 90%: No Reviewe"*d Previous ODate Yes Exaeriiiier Level ll.N .. ,igaueDale Revievveri aiijr&

Cochran, Lonnie 0. A 10f=82010 Other Level NIA Signature Datej ANtI ReviowqI NIA .: 4. K E

UT Cafibrafionhk--amination AI IACHMENITC PAGE6eT DFr~

- SitelUnit: Oconee / 3 Procedure: PDI-UT-2 Outage No.: 03-25 Summrary No.: 03.CS.2.1.0066 Procedure Rev,: E Report No.: LUT-10-513 Workscope: Isl Work Order No.: 01889598 Page: 4 of 6 Code: 199812000A, Cat./ltem: C-F-41C5.21 Location: Aux Bldg Drawing No.: 3HP-49B

Description:

Reducer to Pipe System ID: 51A.

Component ID: 3HP-49.-14 Siz"SLeng.h: MIA Thickness/Diameter: 0.436J2.OSS Limitations: Yes - See attached sheet Start Time: 0904 Finish Time: 0914 Serial No.:

Instrument Settngs 0OX14L No:

"earch Unit 00D72, 0ertai Cal.

Checks I f Time I

uate ..

D Axial Orientated Search Unit Cairtn Signal Swee Sound Path Manufacturer: KRAUTKRAMER Manufacturer: KSA Initial Cal. 0630 10/2112010 Ref'e2tcr Amplitude % Division Inter. Cal. . i Model: US*N-0 Size: 0.25 Shape: Round .7S Notch 0o 4X6 .961 Delay: 3.4019 Range: 2.00 Freq.:- 2.25 MRZ Style: Camp - G Inter. Cal. 0903 10/2112010 M'11CaUVet: .1220 Pulser: High Exam Angle: 30 # of Elements: Single In te r. C a l. - 1 Damping: 1K Rejec:: 0% Mode: SHEAR Final Cal. 1035 1012112010 Rep. Rate: Autohigh Freq,: 2.25 Measured Angle: 30 Couplant Filter: Fixed Mode: PE Wedge Style: MSWQC Cal. Batch: 09325 Circumferential ietedSrhUt Voltage: Fixed Other Fullwave Type: ULTRAGEL It Calibration Signal SvwleaP Ax. Gain (dB): NIA Circ. Gain (dB): 39.4 Search Unit Cable Reflecto'RreAmpnel% s D 1,,'oSound Path Mfg.: SONOTECH I Screen Div. = .2 in. of Sound Path Type: RG - 174 Exam Batch: 09325 Linearity Report No.: L-10-107 Length: 6- No. Conn.: 0 Type: ULTRAGEL II Calibration Block Scan Coverage Mfg.: SONOTECH.

Cal. Block No.: PDI-UT-2A-O Upstream [ DownstreamE] Scan dB: NIA Roeeefum* Ulatdr Bl'ockI Reference Block Thickness: .375" -1.25& Dia.: Fiat CWR CCWgJ Scan dB: 35.4 Serial No,: 04-8737 wain Sigial ;sweep Ohis Sound Path

...dB Reflector IAmplitude'%

Cal. BIk. Temp,: 71 Temp. Toot: . MCNOE4OI30 Exam Surface: O.D. Type: ROMPAS Comp. Temp.: 87 Temp. Toot: MCNDE40132 Surface Condition: As Ground I 30.0 1" Radius so 5.0 1.00 Recordable Indication(s): Yes 0 No [ (If Yes, Ref. Attached Ultrasonic Indication Report.)

Results: Accept (D Reject Info 0 i] Comments: Impingement angle 62' Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes

AIIACHMENi (

DUKE POWER COMPANY ISI LIMITATION REPORT Component/Weld ID: 3HP-498-14 Item No: 03.C5.21.0066 remarks:

[] NO SCAN SURFACE BEAM DIRECTION Limited scan due to reducer

[ LIMITED SCAN Li 1 [ 2 N I ni 2 [:1 cw El ccw configuration.

FROM L N/A to L N/A INCHES FROM WO .7" to Beyond ANGLE: 0 0 0 45 0 60 other FROM 0 DEGto 360 DEG 0 NO SCAN SURFACE BEAM DIRECTION LILIMITED SCAN Li1 02 i1 [ 2L cw [] ccw FROM L 'to L INCHES FROM WO to ANGLE: 0] 0 045 060 -other FROM DEG to DEG Li NO SCAN SURFACE BEAM DIRECTION O LIMITED SCAN 01 0i

[112 1 2 2] cw [ccw FROM L to L INCHES FROM WO to _

ANGLE: Li 0 Li 45 Ei 60 other FROM DEG tb DEG Li NO SCAN SURFACE BEAM DIRECTION Li LIMITED SCAN 0 I Li 2 Li1 [L 2 Li Cw Li ccw UT-10-513 FROM L to L INCHES FROM WO to Sketch(s) attached ANGLE: 0] 0 [] 45 0] 60 other FROM __ DEGto, _ DEGAyes L No PrePea .By' *,d Griebel David ,Level:

it Date: 10/2,110 s 1 5_ _

Reviewed By: Date: Date:

/" C , I

AxialS(

tern No. 03.C521.0(66 ILICIvr' Weld Nu43iHP-498-14 Pipe-Si

'Coverage of Vol urne Claimed 30.45% for Scan 2 Gr Scan Coverage Reducer-S2 Pipe-SI Coverage of Volume Claimed =100% for Scan 3&4 Scale: I"= "

Inspector I Date: )( Page (' ,f_*