ML17123A160

From kanterella
Revision as of 22:36, 8 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRR E-mail Capture - Acceptance Review - Relief Request IR4-05, Wolf Creek Generating Station (CAC No. 9639)
ML17123A160
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/03/2017
From: Balwant Singal
Plant Licensing Branch IV
To: Muilenburg W
Wolf Creek
References
MF8818
Download: ML17123A160 (3)


Text

NRR-PMDAPEm Resource From: Singal, Balwant Sent: Wednesday, May 03, 2017 10:02 AM To: Muilenburg William T (wimuile@WCNOC.com)

Subject:

Acceptance Review - Relief Request IR4-05, Wolf Creek Generating Station (CAC No. 9639)

By letter dated April 13, 2017 (Agencywide Access and management System (ADAMS) Accession No. ML17111A865), Wolf Creek Nuclear Operating Corporation (the licensee) submitted relief request I4R-05 for relief from American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, pressure test requirements at the system pressure for the reactor vessel flange leak-off lines at Wolf Creek Generating Station.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 120 hours5 days <br />0.714 weeks <br />0.164 months <br /> to complete. The NRC staff expects to complete this review by December 15, 2017. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Balwant K. Singal Senior Project Manager (Diablo Canyon and Wolf Creek)

Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 1

Fax: (301) 415-1222 2

Hearing Identifier: NRR_PMDA Email Number: 3485 Mail Envelope Properties (Balwant.Singal@nrc.gov20170503100100)

Subject:

Acceptance Review - Relief Request IR4-05, Wolf Creek Generating Station (CAC No. 9639)

Sent Date: 5/3/2017 10:01:39 AM Received Date: 5/3/2017 10:01:00 AM From: Singal, Balwant Created By: Balwant.Singal@nrc.gov Recipients:

"Muilenburg William T (wimuile@WCNOC.com)" <wimuile@WCNOC.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3012 5/3/2017 10:01:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: