Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions Project stage: Request ML24263A0832024-09-19019 September 2024 NRR E-mail Capture - Acceptance Review Wolf Creek Revision to Technical Specification to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions Project stage: Acceptance Review 2024-08-14
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24296A0632024-10-22022 October 2024 NRR E-mail Capture - Acceptance Review Wolf Creek License Amendment and Exemption Requests for a risk-informed Resolution to GSI-191 ML24263A0832024-09-19019 September 2024 NRR E-mail Capture - Acceptance Review Wolf Creek Revision to Technical Specification to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24250A0252024-09-0606 September 2024 NRR E-mail Capture - Acceptance Review Wolf Creek Revision to Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology) ML23360A1562023-12-26026 December 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request to Revise the Ventilation Filter Testing Program in Technical Specifications ML23166A0622023-06-15015 June 2023 NRR E-mail Capture - Acceptance Review - Wolf Creek Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded post-tensioning System Components ML23090A1042023-03-31031 March 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML23090A0072023-03-31031 March 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request for Relief for Follow-Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Peened Surface ML23080A0652023-03-21021 March 2023 NRR E-mail Capture - Wolf Creek Generating Station Evacuation Time Estimate Analysis Review ML23026A0222023-01-25025 January 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements ML23009A4082023-01-0909 January 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request to Revise TS to Adopt Technical Specification Task Force (TSTF)-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22361A0052022-12-27027 December 2022 NRR E-mail Capture - Request for Additional Information Wolf Creek Request for Deviation from Fire Protection Program Requirements ML22321A2662022-11-16016 November 2022 January 2023 Emergency Preparedness Program Inspection - Request for Information ML22307A1372022-11-0202 November 2022 August 2022 Emergency Preparedness Exercise Inspection Unresolved Item - Request for Information ML22251A1312022-09-0808 September 2022 NRR E-mail Capture - Acceptance Review - Wolf Creek Request for Deviation from Fire Protection Program Requirements to Allow Use of Portable Lighting ML22215A2742022-08-0202 August 2022 Inservice Inspection Request for Information ML22208A1322022-07-27027 July 2022 NRR E-mail Capture - Wolf Creek Table of Contents LAR ML22166A3222022-06-14014 June 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22131A0522022-05-11011 May 2022 NRR E-mail Capture - Draft Supplemental Information Needed for Acceptance - Wolf Creek Inservice Inspection Relief Request for Reactor Pressure Vessel Head Penetration Nozzles with Peened Surface ML22055A1142022-02-23023 February 2022 NRR E-mail Capture - Request for Additional Information - Wolf Creek Request to Revise Diesel Generator Completion Time ML22045A4512022-02-14014 February 2022 NRR E-mail Capture - Request for Additional Information - Wolf Creek Steam Generator Inspection Report 24th Refueling ML22026A4392022-01-26026 January 2022 NRR E-mail Capture - Wolf Creek Acceptance Review Results - Removal of TS Table of Contents (L-2022-LLA-0008) ML22025A3612022-01-21021 January 2022 PI&R RFI Final ML21327A2602021-11-23023 November 2021 NRR E-mail Capture - Request for Additional Information - Wolf Creek Revision of Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21309A0332021-11-0505 November 2021 NRR E-mail Capture - Acceptance Review - Wolf Creek Revision of Technical Specification 3.8.1, AC Sources - Operating ML21307A4202021-11-0303 November 2021 NRR E-mail Capture - Acceptance Review - Wolf Creek Revision of Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21271A1952021-09-28028 September 2021 E-mail 9-28-21 RFI for Wc EP Inspection Nov 2021 ML21259A0652021-09-16016 September 2021 NRR E-mail Capture - Draft Supplemental Information Needed for Acceptance - Wolf Creek License Amendment and Exemption Requests Regarding GSI-191 (EPIDs L-2021-LLA-0152 and L-2021-LLE-0039) ML21221A1282021-08-0505 August 2021 NRR E-mail Capture - Urgent: Draft Request for Additional Information - Wolf Creek one-time Request for Exemption from the Biennial Emergency Preparedness Exercise ML21189A0252021-07-0101 July 2021 NRR E-mail Capture - Acceptance Review - Wolf Creek Request Revision to the Emergency Plan Related to on-shift Staffing ML21230A3922021-05-19019 May 2021 May 19, 2021 Dricks Response to Gurdziel Letter Dated May 13, 2021 - August 17, 2021 ML21102A3342021-04-12012 April 2021 Email 4-12-21 RFI for In-Office Rvw of Recent RERP and a Related EPIP Change ML21064A0342021-03-0404 March 2021 NRR E-mail Capture - Wolf Creek Generating Station Upcoming Steam Generator Tube Inservice Inspection ML20353A2712020-12-18018 December 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange ML20349A3092020-12-14014 December 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek License Amendment Request for Change to Owner Licensee Names ML20297A3022020-10-22022 October 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML20262A7512020-09-17017 September 2020 NRR E-mail Capture - Requests for Additional Information: Wolf Creek Amendment Request to Modify Technical Specification Surveillance Frequency Consistent with TSTF-425 ML20191A0222020-07-0606 July 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek Request in Support of Replacement Engineered Safety Features Transformers with Load Tap Changers ML20162A1642020-06-0909 June 2020 Email June 9, 2020 - RFI in Preparation for Wolf Creek EP Program Inspection ML20149K4272020-05-22022 May 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek License Amendment Request Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) ML20133J8972020-05-12012 May 2020 12 May 2020 E-mail - RFI for NRC In-Office Inspection of Recent Wcngs Eplan_Eal Changes ML20132A3442020-05-11011 May 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek Generating Station License Amendment Request to Revise Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20009E4802020-01-0909 January 2020 Relief Request to Utilize Code Case N-666-1 for Wolf Creek Generating Station - Request for Additional Information ML19273A0232019-09-30030 September 2019 NRR E-mail Capture - Acceptance Review - License Amendment Request to Revise Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System, ML19268B7172019-09-25025 September 2019 NRR E-mail Capture - Acceptance Review - Inservice Inspection (ISI) Program Relief Request to Use Code Case N-666-1 ML19261A2272019-09-18018 September 2019 NRR E-mail Capture - Regulatory Audit Plan - Wolf Creek Generating Station License Amendment Request to Revise Technical Specification 3.3.5 ML19255H3032019-09-12012 September 2019 NRR E-mail Capture - Acceptance Review - Relief Request I4R-07 to Utilize Code Case N-513-4 ML19224A5242019-08-12012 August 2019 NRR E-mail Capture - Request for Additional Information - License Amendment Request to Revise Wolf Creek Generating Station Technical Specification 3.3.5 ML19274D2752019-07-31031 July 2019 Request for Information-IR 05000482 2019-004, Dated 7/31/2019 ML19203A2362019-07-19019 July 2019 LTR-19-0291 Tom Gurdziel, E-mail July 18, 2019, Confirmatory Order on Wolf Creek ML19112A1772019-04-22022 April 2019 NRR E-mail Capture - Acceptance Review - License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation 2024-09-06
[Table view] |
Text
From: Samson Lee Sent: Thursday, September 19, 2024 9:23 AM To: Josh Turner Cc: Nathan Lee
Subject:
Acceptance Review: Wolf Creek revision to technical specification to adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions (EPID: L-2024-LLA-0109)
By letter dated August 14, 2024 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24227A556), Wolf Creek Nuclear Operating Corporation (the licensee) submitted a request for Wolf Creek Generating Station to revise technical specification (TS) to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions. The proposed amendment revises the TS definitions for engineered safety feature and reactor trip system response times. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed the licensees application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, the licensee will be advised by separate correspondence.
Based on the information provided in the licensees submittal, the NRC staff has estimated that this licensing request will take approximately 150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br /> to complete. The NRC staff expects to complete this review by March 19, 2025. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application, and they could change, due to several factors including complexity and uniqueness of the review, requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact me.
Samson Lee Wolf Creek Project Manager Plant Licensing Branch 4 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-3168
Docket No. 50-482
Hearing Identifier: NRR_DRMA Email Number: 2608
Mail Envelope Properties (SA1PR09MB8653E260A79225C6405214379A632)
Subject:
Acceptance Review Wolf Creek revision to technical specification to adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions (EPID L-2024-LLA-0109)
Sent Date: 9/19/2024 9:22:31 AM Received Date: 9/19/2024 9:22:00 AM From: Samson Lee
Created By: Samson.Lee@nrc.gov
Recipients:
"Nathan Lee" <Nathan.Lee@evergy.com>
Tracking Status: None "Josh Turner" <Josh.Turner@evergy.com>
Tracking Status: None
Post Office: SA1PR09MB8653.namprd09.prod.outlook.com
Files Size Date & Time MESSAGE 3123 9/19/2024 9:22:00 AM
Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: