MONTHYEARML23360A1562023-12-26026 December 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request to Revise the Ventilation Filter Testing Program in Technical Specifications ML23166A0622023-06-15015 June 2023 NRR E-mail Capture - Acceptance Review - Wolf Creek Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded post-tensioning System Components ML23090A1042023-03-31031 March 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML23090A0072023-03-31031 March 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request for Relief for Follow-Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Peened Surface ML23080A0652023-03-21021 March 2023 NRR E-mail Capture - Wolf Creek Generating Station Evacuation Time Estimate Analysis Review ML23026A0222023-01-25025 January 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements ML23009A4082023-01-0909 January 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request to Revise TS to Adopt Technical Specification Task Force (TSTF)-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22361A0052022-12-27027 December 2022 NRR E-mail Capture - Request for Additional Information Wolf Creek Request for Deviation from Fire Protection Program Requirements ML22321A2662022-11-16016 November 2022 January 2023 Emergency Preparedness Program Inspection - Request for Information ML22307A1372022-11-0202 November 2022 August 2022 Emergency Preparedness Exercise Inspection Unresolved Item - Request for Information ML22251A1312022-09-0808 September 2022 NRR E-mail Capture - Acceptance Review - Wolf Creek Request for Deviation from Fire Protection Program Requirements to Allow Use of Portable Lighting ML22215A2742022-08-0202 August 2022 Inservice Inspection Request for Information ML22208A1322022-07-27027 July 2022 NRR E-mail Capture - Wolf Creek Table of Contents LAR ML22166A3222022-06-14014 June 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22131A0522022-05-11011 May 2022 NRR E-mail Capture - Draft Supplemental Information Needed for Acceptance - Wolf Creek Inservice Inspection Relief Request for Reactor Pressure Vessel Head Penetration Nozzles with Peened Surface ML22055A1142022-02-23023 February 2022 NRR E-mail Capture - Request for Additional Information - Wolf Creek Request to Revise Diesel Generator Completion Time ML22045A4512022-02-14014 February 2022 NRR E-mail Capture - Request for Additional Information - Wolf Creek Steam Generator Inspection Report 24th Refueling ML22026A4392022-01-26026 January 2022 NRR E-mail Capture - Wolf Creek Acceptance Review Results - Removal of TS Table of Contents (L-2022-LLA-0008) ML22025A3612022-01-21021 January 2022 PI&R RFI Final ML21327A2602021-11-23023 November 2021 NRR E-mail Capture - Request for Additional Information - Wolf Creek Revision of Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21309A0332021-11-0505 November 2021 NRR E-mail Capture - Acceptance Review - Wolf Creek Revision of Technical Specification 3.8.1, AC Sources - Operating ML21307A4202021-11-0303 November 2021 NRR E-mail Capture - Acceptance Review - Wolf Creek Revision of Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21271A1952021-09-28028 September 2021 E-mail 9-28-21 RFI for Wc EP Inspection Nov 2021 ML21259A0652021-09-16016 September 2021 NRR E-mail Capture - Draft Supplemental Information Needed for Acceptance - Wolf Creek License Amendment and Exemption Requests Regarding GSI-191 (EPIDs L-2021-LLA-0152 and L-2021-LLE-0039) ML21221A1282021-08-0505 August 2021 NRR E-mail Capture - Urgent: Draft Request for Additional Information - Wolf Creek one-time Request for Exemption from the Biennial Emergency Preparedness Exercise ML21189A0252021-07-0101 July 2021 NRR E-mail Capture - Acceptance Review - Wolf Creek Request Revision to the Emergency Plan Related to on-shift Staffing ML21230A3922021-05-19019 May 2021 May 19, 2021 Dricks Response to Gurdziel Letter Dated May 13, 2021 - August 17, 2021 ML21102A3342021-04-12012 April 2021 Email 4-12-21 RFI for In-Office Rvw of Recent RERP and a Related EPIP Change ML21064A0342021-03-0404 March 2021 NRR E-mail Capture - Wolf Creek Generating Station Upcoming Steam Generator Tube Inservice Inspection ML20353A2712020-12-18018 December 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange ML20349A3092020-12-14014 December 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek License Amendment Request for Change to Owner Licensee Names ML20297A3022020-10-22022 October 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML20262A7512020-09-17017 September 2020 NRR E-mail Capture - Requests for Additional Information: Wolf Creek Amendment Request to Modify Technical Specification Surveillance Frequency Consistent with TSTF-425 ML20191A0222020-07-0606 July 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek Request in Support of Replacement Engineered Safety Features Transformers with Load Tap Changers ML20162A1642020-06-0909 June 2020 Email June 9, 2020 - RFI in Preparation for Wolf Creek EP Program Inspection ML20149K4272020-05-22022 May 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek License Amendment Request Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) ML20133J8972020-05-12012 May 2020 12 May 2020 E-mail - RFI for NRC In-Office Inspection of Recent Wcngs Eplan_Eal Changes ML20132A3442020-05-11011 May 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek Generating Station License Amendment Request to Revise Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20009E4802020-01-0909 January 2020 Relief Request to Utilize Code Case N-666-1 for Wolf Creek Generating Station - Request for Additional Information ML19273A0232019-09-30030 September 2019 NRR E-mail Capture - Acceptance Review - License Amendment Request to Revise Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System, ML19268B7172019-09-25025 September 2019 NRR E-mail Capture - Acceptance Review - Inservice Inspection (ISI) Program Relief Request to Use Code Case N-666-1 ML19261A2272019-09-18018 September 2019 NRR E-mail Capture - Regulatory Audit Plan - Wolf Creek Generating Station License Amendment Request to Revise Technical Specification 3.3.5 ML19255H3032019-09-12012 September 2019 NRR E-mail Capture - Acceptance Review - Relief Request I4R-07 to Utilize Code Case N-513-4 ML19224A5242019-08-12012 August 2019 NRR E-mail Capture - Request for Additional Information - License Amendment Request to Revise Wolf Creek Generating Station Technical Specification 3.3.5 ML19274D2752019-07-31031 July 2019 Request for Information-IR 05000482 2019-004, Dated 7/31/2019 ML19203A2362019-07-19019 July 2019 LTR-19-0291 Tom Gurdziel, E-mail July 18, 2019, Confirmatory Order on Wolf Creek ML19112A1772019-04-22022 April 2019 NRR E-mail Capture - Acceptance Review - License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ML19091A0362019-03-29029 March 2019 NRR E-mail Capture - Acceptance Review - License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange ML19065A0982019-03-0606 March 2019 NRR E-mail Capture - Acceptance Review - Wolf Creek License Amendment Request for Revision to Technical Specifications to Adopt TSTF-529 ML19036A6832019-02-0505 February 2019 LTR-18-0498 - Email Response - Sheryl Sweet, Licensing Engineer, Wolf Creek Nuclear, E-mail Acronyms for NRC Personnel 2023-06-15
[Table view] |
Text
From: Lee, Samson Sent: Thursday, March 4, 2021 3:23 PM To: Joshua Turner Cc: Bloom, Steven; Makar, Gregory; Taylor, Nick; Drake, James; O'Keefe, Neil; Henderson, Christopher; Vera, John
Subject:
Wolf Creek Generating Station Upcoming Steam Generator Tube Inservice Inspection Inservice inspections of steam generator (SG) tubes play a vital role in assuring SG tube integrity. A telephone conference call has been arranged with members of Wolf Creek Nuclear Operating Corporation (the licensee) staff to discuss the ongoing results of the SG tube inspections to be conducted during the upcoming Wolf Creek Generating Station refueling outage. This call will occur after the majority of the tubes have been inspected, but before the SG inspection activities have been completed.
The call supports the regional inspection and is non-public. The NRC staff will document a publicly available summary of the conference call, including any material that the licensee provides to the NRC staff in support of the call. Please contact Samson Lee, NRC Project Manager, at 301-415-3168 with any questions.
The following discussion points have been prepared to facilitate the conference call arranged with the licensee to discuss the results of the steam generator tube inspections to be conducted during the upcoming Spring 2021 refueling outage.
STEAM GENERATOR TUBE INSPECTION DISCUSSION POINTS
- 1. Discuss any trends in the amount of primary-to-secondary leakage observed during the recently completed cycle.
- 2. Discuss whether any secondary side pressure tests were performed during the outage and the associated results.
- 3. Discuss any exceptions taken to the industry guidelines.
- 4. For each steam generator, provide a description of the inspections performed including the areas examined and the probes used (e.g., dents/dings, sleeves, expansion-transition, U-bends with a rotating probe), the scope of the inspection (e.g., 100% of dents/dings greater than 5 volts and a 20% sample between 2 and 5 volts), and the expansion criteria.
- 5. For each area examined (e.g., tube supports, dent/dings, sleeves, etc.), provide a summary of the number of indications identified to-date for each degradation mode (e.g., number of circumferential primary water stress corrosion cracking indications at the expansion transition). For the most significant indications in each area, provide an estimate of the severity of the indication (e.g.,
provide the voltage, depth, and length of the indication). In particular, address whether tube integrity (structural and accident induced leakage integrity) was maintained during the previous operating cycle. In addition, discuss whether any location exhibited a degradation mode that had not previously been observed at this location at this unit (e.g., observed circumferential primary water stress corrosion cracking at the expansion transition for the first time at this unit).
- 6. Describe repair/plugging plans.
- 7. Describe in-situ pressure test and tube pull plans and results (as applicable and if available).
- 8. Discuss the following regarding loose parts:
- what inspections are performed to detect loose parts
- a description of any loose parts detected and their location within the SG (including the source or nature of the loose part, if known)
- if the loose parts were removed from the SG
- indications of tube damage associated with the loose parts
- 9. Discuss the scope and results of any secondary side inspection and maintenance activities (e.g., in-bundle visual inspections, feed-ring inspections, sludge lancing, assessing deposit loading, etc.).
- 10. Discuss any unexpected or unusual results.
- 11. Provide the schedule for steam generator-related activities during the remainder of the current outage.
Docket No. 50-482
Hearing Identifier: NRR_DRMA Email Number: 1058 Mail Envelope Properties (DM8PR09MB618383B05BA03C5F86E6B7499A979)
Subject:
Wolf Creek Generating Station Upcoming Steam Generator Tube Inservice Inspection Sent Date: 3/4/2021 3:22:44 PM Received Date: 3/4/2021 3:22:44 PM From: Lee, Samson Created By: Samson.Lee@nrc.gov Recipients:
"Bloom, Steven" <Steven.Bloom@nrc.gov>
Tracking Status: None "Makar, Gregory" <Gregory.Makar@nrc.gov>
Tracking Status: None "Taylor, Nick" <Nick.Taylor@nrc.gov>
Tracking Status: None "Drake, James" <James.Drake@nrc.gov>
Tracking Status: None "O'Keefe, Neil" <Neil.O'Keefe@nrc.gov>
Tracking Status: None "Henderson, Christopher" <Christopher.Henderson@nrc.gov>
Tracking Status: None "Vera, John" <John.Vera@nrc.gov>
Tracking Status: None "Joshua Turner" <Josh.Turner@evergy.com>
Tracking Status: None Post Office: DM8PR09MB6183.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3549 3/4/2021 3:22:44 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: