MONTHYEARML23360A1562023-12-26026 December 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request to Revise the Ventilation Filter Testing Program in Technical Specifications ML23166A0622023-06-15015 June 2023 NRR E-mail Capture - Acceptance Review - Wolf Creek Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded post-tensioning System Components ML23090A1042023-03-31031 March 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML23090A0072023-03-31031 March 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request for Relief for Follow-Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Peened Surface ML23080A0652023-03-21021 March 2023 NRR E-mail Capture - Wolf Creek Generating Station Evacuation Time Estimate Analysis Review ML23026A0222023-01-25025 January 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements ML23009A4082023-01-0909 January 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request to Revise TS to Adopt Technical Specification Task Force (TSTF)-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22361A0052022-12-27027 December 2022 NRR E-mail Capture - Request for Additional Information Wolf Creek Request for Deviation from Fire Protection Program Requirements ML22321A2662022-11-16016 November 2022 January 2023 Emergency Preparedness Program Inspection - Request for Information ML22307A1372022-11-0202 November 2022 August 2022 Emergency Preparedness Exercise Inspection Unresolved Item - Request for Information ML22251A1312022-09-0808 September 2022 NRR E-mail Capture - Acceptance Review - Wolf Creek Request for Deviation from Fire Protection Program Requirements to Allow Use of Portable Lighting ML22215A2742022-08-0202 August 2022 Inservice Inspection Request for Information ML22208A1322022-07-27027 July 2022 NRR E-mail Capture - Wolf Creek Table of Contents LAR ML22166A3222022-06-14014 June 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22131A0522022-05-11011 May 2022 NRR E-mail Capture - Draft Supplemental Information Needed for Acceptance - Wolf Creek Inservice Inspection Relief Request for Reactor Pressure Vessel Head Penetration Nozzles with Peened Surface ML22055A1142022-02-23023 February 2022 NRR E-mail Capture - Request for Additional Information - Wolf Creek Request to Revise Diesel Generator Completion Time ML22045A4512022-02-14014 February 2022 NRR E-mail Capture - Request for Additional Information - Wolf Creek Steam Generator Inspection Report 24th Refueling ML22026A4392022-01-26026 January 2022 NRR E-mail Capture - Wolf Creek Acceptance Review Results - Removal of TS Table of Contents (L-2022-LLA-0008) ML22025A3612022-01-21021 January 2022 PI&R RFI Final ML21327A2602021-11-23023 November 2021 NRR E-mail Capture - Request for Additional Information - Wolf Creek Revision of Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21309A0332021-11-0505 November 2021 NRR E-mail Capture - Acceptance Review - Wolf Creek Revision of Technical Specification 3.8.1, AC Sources - Operating ML21307A4202021-11-0303 November 2021 NRR E-mail Capture - Acceptance Review - Wolf Creek Revision of Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21271A1952021-09-28028 September 2021 E-mail 9-28-21 RFI for Wc EP Inspection Nov 2021 ML21259A0652021-09-16016 September 2021 NRR E-mail Capture - Draft Supplemental Information Needed for Acceptance - Wolf Creek License Amendment and Exemption Requests Regarding GSI-191 (EPIDs L-2021-LLA-0152 and L-2021-LLE-0039) ML21221A1282021-08-0505 August 2021 NRR E-mail Capture - Urgent: Draft Request for Additional Information - Wolf Creek one-time Request for Exemption from the Biennial Emergency Preparedness Exercise ML21189A0252021-07-0101 July 2021 NRR E-mail Capture - Acceptance Review - Wolf Creek Request Revision to the Emergency Plan Related to on-shift Staffing ML21230A3922021-05-19019 May 2021 May 19, 2021 Dricks Response to Gurdziel Letter Dated May 13, 2021 - August 17, 2021 ML21102A3342021-04-12012 April 2021 Email 4-12-21 RFI for In-Office Rvw of Recent RERP and a Related EPIP Change ML21064A0342021-03-0404 March 2021 NRR E-mail Capture - Wolf Creek Generating Station Upcoming Steam Generator Tube Inservice Inspection ML20353A2712020-12-18018 December 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange ML20349A3092020-12-14014 December 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek License Amendment Request for Change to Owner Licensee Names ML20297A3022020-10-22022 October 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML20262A7512020-09-17017 September 2020 NRR E-mail Capture - Requests for Additional Information: Wolf Creek Amendment Request to Modify Technical Specification Surveillance Frequency Consistent with TSTF-425 ML20191A0222020-07-0606 July 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek Request in Support of Replacement Engineered Safety Features Transformers with Load Tap Changers ML20162A1642020-06-0909 June 2020 Email June 9, 2020 - RFI in Preparation for Wolf Creek EP Program Inspection ML20149K4272020-05-22022 May 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek License Amendment Request Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) ML20133J8972020-05-12012 May 2020 12 May 2020 E-mail - RFI for NRC In-Office Inspection of Recent Wcngs Eplan_Eal Changes ML20132A3442020-05-11011 May 2020 NRR E-mail Capture - Acceptance Review - Wolf Creek Generating Station License Amendment Request to Revise Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20009E4802020-01-0909 January 2020 Relief Request to Utilize Code Case N-666-1 for Wolf Creek Generating Station - Request for Additional Information ML19273A0232019-09-30030 September 2019 NRR E-mail Capture - Acceptance Review - License Amendment Request to Revise Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System, ML19268B7172019-09-25025 September 2019 NRR E-mail Capture - Acceptance Review - Inservice Inspection (ISI) Program Relief Request to Use Code Case N-666-1 ML19261A2272019-09-18018 September 2019 NRR E-mail Capture - Regulatory Audit Plan - Wolf Creek Generating Station License Amendment Request to Revise Technical Specification 3.3.5 ML19255H3032019-09-12012 September 2019 NRR E-mail Capture - Acceptance Review - Relief Request I4R-07 to Utilize Code Case N-513-4 ML19224A5242019-08-12012 August 2019 NRR E-mail Capture - Request for Additional Information - License Amendment Request to Revise Wolf Creek Generating Station Technical Specification 3.3.5 ML19274D2752019-07-31031 July 2019 Request for Information-IR 05000482 2019-004, Dated 7/31/2019 ML19203A2362019-07-19019 July 2019 LTR-19-0291 Tom Gurdziel, E-mail July 18, 2019, Confirmatory Order on Wolf Creek ML19112A1772019-04-22022 April 2019 NRR E-mail Capture - Acceptance Review - License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ML19091A0362019-03-29029 March 2019 NRR E-mail Capture - Acceptance Review - License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange ML19065A0982019-03-0606 March 2019 NRR E-mail Capture - Acceptance Review - Wolf Creek License Amendment Request for Revision to Technical Specifications to Adopt TSTF-529 ML19036A6832019-02-0505 February 2019 LTR-18-0498 - Email Response - Sheryl Sweet, Licensing Engineer, Wolf Creek Nuclear, E-mail Acronyms for NRC Personnel 2023-06-15
[Table view] |
Text
From: Lee, Samson Sent: Wednesday, May 11, 2022 7:33 AM To: Joshua Turner
Subject:
DRAFT supplemental information needed for acceptance - Wolf Creek inservice inspection relief request for reactor pressure vessel head penetration nozzles with peened surface (EPID: L-2022-LLR-0039)
- Josh, Below is DRAFT supplemental information needed for acceptance of the Wolf Creek inservice inspection relief request for reactor pressure vessel head penetration nozzles with peened surface. We have scheduled a clarification call for May 18, 2022. We plan to issue the final supplemental information needed for acceptance after the clarification call. As agreed, please provide a response by June 6, 2022.
- Thanks, Sam BACKGROUND By letter dated April 4, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22095A252), Wolf Creek Nuclear Operating Corporation (the licensee) submitted a proposed alternative to the requirements of Title 10 of the Code of Federal Regulations (10 CFR) paragraph 50.55a(g)(6)(ii)(D)(5), Peening, regarding the follow-up volumetric examination frequency and bare metal visual examination requirements. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the U.S. Nuclear Regulatory Commission (NRC) staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Pursuant to 10 CFR 50.55a(z)(1), the licensee shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety.
The NRC staff has reviewed your alternative and concluded that it did not provide technical information in sufficient detail to enable the NRC staff to complete its detailed review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements for the protection of public health and safety and the environment.
REGULATORY BASIS Pursuant to 10 CFR 50.55a(g)(6)(ii), Augmented ISI [inservice inspection] program, the NRC may require the licensee to follow an augmented ISI program for systems and components for which the NRC deems that added assurance of structural reliability is necessary.
Paragraph 50.55a(g)(6)(ii)(D) of 10 CFR, Augmented ISI requirements: Reactor Vessel Head Inspections, requires licensees of pressurized water reactors (PWRs) to augment their ISI of the reactor vessel head with the American Society of Mechanical Engineers (ASME) Code Case N-729-6, Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds,Section XI, Division 1, with conditions.
INFORMATION INSUFFICIENCIES During its acceptance review of the proposed alternative, the NRC staff noted that the licensees reason for the request was that the warranty from the vendor, which provided the peening service, specified that the follow-up inspection be conducted in the third refueling outage after the peening. However, the submittal did not include the technical basis for why the follow-up examination should be extended to the third refueling outage, and that the examination in accordance with the current NRC regulation would not be acceptable. Additionally, the basis for not performing a bare metal visual examination, during outages when volumetric/surface examinations are being performed, was limited to a hardship basis associated with radiological dose and expense.
SUPPLEMENTAL INFORMATION NEEDED To support the continuation of the acceptance review for this application, the NRC staff requests the licensee to supplement the submittal with the following information:
- 1. Technical basis to support extending the first follow-up volumetric/surface examination to three refueling outages after peening in accordance with the peening vendors warranty provision. At a minimum, the technical basis should address the change in stresses due to the application in peening, the potential effect on any missed flaws during the application cycle examinations, and potential unacceptable flaw growth that could occur during the proposed extended frequency of the examination.
- 2. Technical basis to remove the defense-in-depth bare metal visual examination requirement when performing a volumetric examination during the first follow-up examination, specifically, and then follow-up examinations for the duration of the proposed alternative. Consideration should be given to the effect of the change in stress profile by the surface application of peening on the J-groove weld, the potential to open up fabrication defects due to the application of peening, the non-destructive examinations applied, and the inability to volumetrically inspect the weld.
- 3. The licensee submitted the relief request under 10 CFR 50.55a(z)(1). However, Section 4, Reason for Request, of the attachment to the submittal discusses hardships. In order for the NRC staff to consider hardship as a basis, the licensee should also submit the relief request under 10 CFR 50.55a(z)(2) and provide additional estimates of radiological dose savings with the extended examination frequency.
Docket No. 50-482
Hearing Identifier: NRR_DRMA Email Number: 1629 Mail Envelope Properties (SA1PR09MB865328D7DA4BFFC4F3D8676E9AC89)
Subject:
DRAFT supplemental information needed for acceptance - Wolf Creek inservice inspection relief request for reactor pressure vessel head penetration nozzles with peened surface (EPID:
L-2022-LLR-0039)
Sent Date: 5/11/2022 7:33:10 AM Received Date: 5/11/2022 7:33:00 AM From: Lee, Samson Created By: Samson.Lee@nrc.gov Recipients:
"Joshua Turner" <Josh.Turner@evergy.com>
Tracking Status: None Post Office: SA1PR09MB8653.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 5141 5/11/2022 7:33:00 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: