Application for Revisions to License DPR-77,deleting Inappropriate Items from License & Moving Completion Date of Items Originally Scheduled for Completion from 820101 to Aug 1982
ML19347C722
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 12/30/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML19347C723 List:
References
NUDOCS 8101050215
Download: ML19347C722 (3)


Text

_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - - _ _ - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ . _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _

TENNESSEE VALLEY AUTHORITY CH AT TANOOGA. TENNESSEE 37401 000 Chestnut Street Tower II December 30, 1980 Director of Nuclear Reactor Regulation Attention: Mr. A. Schweneer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Schwencer:

In the Matter of ) Docket No. 50-327 Tennessee Valley Authority )

Enclosed are 40 copies of proposed revisions to the Sequoyah Nuclear Plant Unit 1 Operating Licenso DPR-77. Changes 1 through 11 are proposed to delete complete or inappropriate items from the license. Changes 12 through 15 are proposed to move the completion date of items originally scheduled to be complete by January 1,1982, to the end of the first >

refueling outage, which is now scheduled to start as late as August 1982.

In scoordance with the mquirements of 10 CFR 170.22, we have determined the proposed revisions identified as changes 1 through 11 result from the initial increase in power to 100 percent of the initial design power and are not subject to fees. We have determined the revisions identified as changes 12 through 15 to be Class II since they are administrative in

.napum. The remittance of $1,200 is being wired to the Nuclear Regulatory g Commissioq3 Attention: Licensing Fee Management Branch.-

,= os k'

@ _~ 1 un Very truly yours, 2 3>

'CO C p[9 0 TE10 LESSEE VALLEY AUTHORITY y m. p-E m hTYlM L. M. Mills, Manager

'E O Nuclear Regulation and Safety Sworn to. sad'subscri ed before me-this3/of day of . 1980 1 h >aD_w e Notar Tubne {

My Co saion Expires 4!4,f EP_

Enclosure (40)

^ " " " " ' an 't""v e ma'*ver '

81010 5 o sI5

  • . e n Director of Nuclear Reactor Regulation December 30, 1980 cc (Enclosure):

ARMS, 640 CST 2-C A. W. Crevasse, 401 UBB-C H. N. Culver, 249A HBB-K H. J. Green, 1750 CST 2-C J. A. Raulston, W10C126 C-K Resident Inspector, Sequoyah-NRC H. S. Sanger, Jr. , E11B33 C-K F. A. Szczepanski, 417 UBB-C COORDINATED: NUC PR/Burzynski W

e h -

'%- e + aw- Ma w ve# ts,w 9 e , -p-_

Director of Nucicar Reactor Regulation December 30, 1980 cc (Enclosure):

ARfG, 640 CST 2-C A. W. Crevasse, 401 UBB-C H. N. Culver, 249A lEB-K H. J. Green, 1750 CST 2-C J. A. Raulston, W10C126 C-K Resident Inspector, Sequoyah-NRC H. S. Sanger, Jr., E11B33 C-K F. A. S:czepanski, 417 UBB-C d