MONTHYEARML20211K0641999-09-0101 September 1999 Proposed Tech Specs,Changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2,correcting Dc Voltage & Degraded Voltage Settings in SR 3.3.6.2 & Correcting Typo in TS 5.6 ML20211G7681999-08-27027 August 1999 Proposed Tech Specs,Allowing Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities While Irradiated Fuel Assembly Movement Continues in SFP ML20196E2191998-11-30030 November 1998 Proposed Tech Specs,Allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 Repair Sleeves ML20195K3831998-11-20020 November 1998 Proposed Tech Specs Removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section XI, Subsections IWE & Iwl,Per 10CFR50.55a ML20195J7181998-11-19019 November 1998 Proposed Tech Specs 3.7.6, SWS, Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20155F7001998-10-30030 October 1998 Proposed Tech Specs Bases,Revs 1,2 & 3 Re List of Effective Pages for Plant ML20154N1961998-10-16016 October 1998 Proposed Tech Specs Pages,Revising TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20236S5621998-07-20020 July 1998 Proposed Tech Specs Providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20217D2691998-04-21021 April 1998 Proposed Tech Specs Re Change to Reactor Coolant Sys Flow Requirements to Allow Increased SG Tube Plugging ML20216H0831998-03-16016 March 1998 Rev 13 to Proposed TS Re Conversion to Improved TSs ML20199J5281998-01-28028 January 1998 Proposed Tech Specs,Converting to Improved TSs ML20198K9851998-01-12012 January 1998 Rev 11 to Proposed Tech Specs,Reflecting Conversion to Improved Sts,Per NUREG-1432 ML20198R7331997-11-0505 November 1997 Proposed Tech Specs Pages Re Rev 10 to Convert to Improved TS ML20217K6161997-10-23023 October 1997 Proposed Tech Specs Section 3.8 Re Change Request to Convert to Improved Std TSs ML20217K6671997-10-22022 October 1997 Proposed Tech Specs Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20198K3321997-10-20020 October 1997 Proposed Tech Specs Section 3.3 Re Change Request to Convert to Improved Std TSs ML20217G3571997-10-0606 October 1997 Proposed Tech Specs Section 3.6 to Reflect Conversion to Improved STS ML20217G3781997-10-0606 October 1997 Proposed Tech Specs Section 3.7 Re Change Request to Convert to Improved STS ML20211J2751997-10-0202 October 1997 Proposed Tech Specs,Reflecting New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20217C7361997-09-29029 September 1997 Proposed Tech Specs Page Omitted from 970609 License Amend Request Re Conversion to Improved TSs ML20210T8701997-09-10010 September 1997 Proposed Tech Specs Rev 5 to Section 3.4 of Original License Amend Application & Other Changes Identified by Personnel ML20210K9711997-08-14014 August 1997 Proposed Tech Specs,Reflecting Removal of TSTF-115,as Well as Other Changes Identified by Plant Personnel ML20149H5821997-07-21021 July 1997 Rev 2 to TS Sections 4.0 & 5.0,converting to Improved Std Tss,Per NUREG-1432 ML20148P7171997-06-27027 June 1997 Proposed Tech Specs Revising Wording to Support Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20135F0441997-03-0606 March 1997 Proposed Tech Specs,Superceding Previously Submitted Marked Up Pp for ABB-CE Sleeves.New Info to Be Incorporated in Updated Licensing rept,CEN-630-P,Rev 01, Repair of 3/4 OD SG Tubes Using Leak Tight Sleeves ML20134E3361997-02-0303 February 1997 Proposed Tech Specs Vol 17,Unit 2 Current Markup Improved Conversion License Amend Request ML20134E3221997-02-0303 February 1997 Proposed Tech Specs for Vol 16,Unit 1 Current Markup Improved Conversion License Amend Request ML20134D3041997-01-31031 January 1997 Proposed Tech Specs Re Requirements to Allow Increased SG Tube Plugging ML20135A5231996-11-26026 November 1996 Proposed Tech Specs Adopting Option B of 10CFR50,App J to Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20134N1831996-11-20020 November 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML20128H6031996-10-0303 October 1996 Proposed Tech Specs,Changing Provisions for Receiving, Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7991996-09-10010 September 1996 Proposed Tech Specs 3/4.3 Re instrumentation,3/4.5 Re ECCS & 3/4.6 Re Containment Sys ML20117L3441996-09-0404 September 1996 Proposed Tech Specs Clarifying License Amend Request Re Implementation of Changes to Radiological Effluent TSs as Proposed by GL 89-01 ML20116F8281996-08-0101 August 1996 Proposed Tech Specs Re Use of Blind Flanges in Place of Containment Purge Valves During Operation ML20116E3771996-07-26026 July 1996 Proposed Tech Specs Allowing Repair of Defective SG Tubes by Electrosleeving ML20117F6431996-05-15015 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls ML20101K6011996-03-28028 March 1996 Proposed TS Figure 3.1.1-1 Re Change to Moderator Temp Coefficient ML20096D4461996-01-16016 January 1996 Proposed Tech Specs,Adopting Option B of 10CFR50,App J to Require Type a Containment Lrt to Be Performed on performance-based Testing Schedule ML20095K2761995-12-21021 December 1995 Proposed Tech Specs,Requesting Temporary Exemption & TS Change to Allow Placement of Four Lead Test Fuel Assemblies in Unit 1 Reactor Core During Cycles 13,14 & 15 ML20095C7471995-12-0707 December 1995 Proposed Tech Spec to Add Analysis Technique to List of Approved Core Operating Limits Analytical Methods in TS for Plant ML20094S1531995-11-30030 November 1995 Proposed Tech Specs,Allowing Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20094D6171995-11-0101 November 1995 Proposed Tech Specs,Upgrading ESF Electrical Sys at Plant to Provide Addl Protection from Loss of Electrical Power ML20093M4291995-10-20020 October 1995 Proposed Tech Specs,Extending 18-month Surveillances to 960331 ML20098C0741995-10-0202 October 1995 Proposed TS 3.7.6.1,extending Action Statements a & B from 7 Days to 30 Days for Loss of Emergency Power ML20086N2551995-07-13013 July 1995 Proposed TS 5.2.1, Fuel Assemblies, Allowing Use of Cladding Matls Other than Zircaloy or ZIRLO W/Approved Temporary Exemption to 10CFR50.46,10CFR50.44 & 10CFR50,App K & Allowing Use of Lead Fuel Assemblies ML20085D5091995-06-0909 June 1995 Proposed Tech Specs,Implementing Changes to Radiological Effluent TS Per GL 89-01 ML20084R0171995-06-0606 June 1995 Proposed Tech Specs Reflecting Extension of Certain 18-month Frequency Surveillances to Refueling Interval ML20084P9741995-06-0202 June 1995 Proposed Tech Specs Re Pressurizer Safety Valves Lift Tolerance ML20087H9281995-04-28028 April 1995 Proposed Tech Specs Re Extension of Allowed Outage Time ML20081D0551995-03-15015 March 1995 Proposed Tech Specs Re Reformation of Current Administrative Controls Section of Plant TS & Relocation of Several Requirements to Other Documents & Programs 1999-09-01
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K0641999-09-0101 September 1999 Proposed Tech Specs,Changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2,correcting Dc Voltage & Degraded Voltage Settings in SR 3.3.6.2 & Correcting Typo in TS 5.6 ML20211G7681999-08-27027 August 1999 Proposed Tech Specs,Allowing Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities While Irradiated Fuel Assembly Movement Continues in SFP ML20207F0261999-06-0101 June 1999 Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2 ML20195B2751999-03-31031 March 1999 Rev 0 to Rept 98-FSW-021, Corrosion Test of SG Tubes with Alloy 800 Mechanical Sleeves ML20204H6011999-01-29029 January 1999 Age Related Degradation Insp (Ardi) Program Technical Requirements Document for Mechanical Systems ML20196E2191998-11-30030 November 1998 Proposed Tech Specs,Allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 Repair Sleeves ML20195K3831998-11-20020 November 1998 Proposed Tech Specs Removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section XI, Subsections IWE & Iwl,Per 10CFR50.55a ML20195J7181998-11-19019 November 1998 Proposed Tech Specs 3.7.6, SWS, Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20155F7001998-10-30030 October 1998 Proposed Tech Specs Bases,Revs 1,2 & 3 Re List of Effective Pages for Plant ML20154N1961998-10-16016 October 1998 Proposed Tech Specs Pages,Revising TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20198A2981998-09-15015 September 1998 Technical Procedure CP-217,rev 7,PCR 98-034, Specifications & Surveillance,Secondary Chemistry ML20198A3131998-09-15015 September 1998 Technical Procedure CP-224,rev 4,PCR 97-049, Monitoring Radioactivity in Systems Normally Uncontaminated ML20236S5621998-07-20020 July 1998 Proposed Tech Specs Providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20195B2861998-06-0505 June 1998 Rev 0 to Rept 98-TR-FSW-005, Test Rept on Alloy 800 Mechanical Sleeve-Addl Qualification Testing Using Low Yield Strength Tubing ML20217D2691998-04-21021 April 1998 Proposed Tech Specs Re Change to Reactor Coolant Sys Flow Requirements to Allow Increased SG Tube Plugging ML20216H0831998-03-16016 March 1998 Rev 13 to Proposed TS Re Conversion to Improved TSs ML20198A2911998-02-23023 February 1998 Technical Procedure CP-206,rev 4,PCR 98-034, Specifications & Surveillance Component Cooling/Service Waster System ML20199J5281998-01-28028 January 1998 Proposed Tech Specs,Converting to Improved TSs ML20198K9851998-01-12012 January 1998 Rev 11 to Proposed Tech Specs,Reflecting Conversion to Improved Sts,Per NUREG-1432 ML20198R7331997-11-0505 November 1997 Proposed Tech Specs Pages Re Rev 10 to Convert to Improved TS ML20217K6161997-10-23023 October 1997 Proposed Tech Specs Section 3.8 Re Change Request to Convert to Improved Std TSs ML20217K6671997-10-22022 October 1997 Proposed Tech Specs Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20198K3321997-10-20020 October 1997 Proposed Tech Specs Section 3.3 Re Change Request to Convert to Improved Std TSs ML20217G3571997-10-0606 October 1997 Proposed Tech Specs Section 3.6 to Reflect Conversion to Improved STS ML20217G3781997-10-0606 October 1997 Proposed Tech Specs Section 3.7 Re Change Request to Convert to Improved STS ML20211J2751997-10-0202 October 1997 Proposed Tech Specs,Reflecting New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20217C7361997-09-29029 September 1997 Proposed Tech Specs Page Omitted from 970609 License Amend Request Re Conversion to Improved TSs ML20211J2981997-09-18018 September 1997 Pump & Valve IST Program Third Ten-Yr Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20210T8701997-09-10010 September 1997 Proposed Tech Specs Rev 5 to Section 3.4 of Original License Amend Application & Other Changes Identified by Personnel ML20210K9711997-08-14014 August 1997 Proposed Tech Specs,Reflecting Removal of TSTF-115,as Well as Other Changes Identified by Plant Personnel ML20149H5821997-07-21021 July 1997 Rev 2 to TS Sections 4.0 & 5.0,converting to Improved Std Tss,Per NUREG-1432 ML20148P7171997-06-27027 June 1997 Proposed Tech Specs Revising Wording to Support Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20141G4471997-06-16016 June 1997 Ccnpp Unit 2 Cycle 12 Startup Testing Rept ML20141D9341997-05-0909 May 1997 Radiation Safety Procedure 1-104, Area Posting & Barricading & High Radiation Area Pre-Entry Checklist ML20135F0441997-03-0606 March 1997 Proposed Tech Specs,Superceding Previously Submitted Marked Up Pp for ABB-CE Sleeves.New Info to Be Incorporated in Updated Licensing rept,CEN-630-P,Rev 01, Repair of 3/4 OD SG Tubes Using Leak Tight Sleeves ML20134E3221997-02-0303 February 1997 Proposed Tech Specs for Vol 16,Unit 1 Current Markup Improved Conversion License Amend Request ML20134E3361997-02-0303 February 1997 Proposed Tech Specs Vol 17,Unit 2 Current Markup Improved Conversion License Amend Request ML20134D3041997-01-31031 January 1997 Proposed Tech Specs Re Requirements to Allow Increased SG Tube Plugging ML20210P3971996-12-0404 December 1996 Rev 2 to RP-2-101, Administrative Procedure Radwaste Mgt ML20135A5231996-11-26026 November 1996 Proposed Tech Specs Adopting Option B of 10CFR50,App J to Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20134N1831996-11-20020 November 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML20210P3871996-10-17017 October 1996 Rev 2,Change 0 to Offsite Dose Calculation Manual ML20128Q8041996-10-14014 October 1996 Cycle 13 Summary of Startup Testing ML20128H6031996-10-0303 October 1996 Proposed Tech Specs,Changing Provisions for Receiving, Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7991996-09-10010 September 1996 Proposed Tech Specs 3/4.3 Re instrumentation,3/4.5 Re ECCS & 3/4.6 Re Containment Sys ML20117L3441996-09-0404 September 1996 Proposed Tech Specs Clarifying License Amend Request Re Implementation of Changes to Radiological Effluent TSs as Proposed by GL 89-01 ML20116F8281996-08-0101 August 1996 Proposed Tech Specs Re Use of Blind Flanges in Place of Containment Purge Valves During Operation ML20116E3771996-07-26026 July 1996 Proposed Tech Specs Allowing Repair of Defective SG Tubes by Electrosleeving ML20117F6431996-05-15015 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls ML20101K6011996-03-28028 March 1996 Proposed TS Figure 3.1.1-1 Re Change to Moderator Temp Coefficient 1999-09-01
[Table view] |
Text
.._ __ .
Docket No. 50-Qi Attachment Millstone Nuclear Power Station, Unit No. 2 Proposed Revisions to Technical Specifications 8112140184 811202 December, 1981 PDR ADOCK 05000336 p PDR
- IF.E.1hs CEI?.ATIONS Sut'T33,N C00'.IhG AND COOLANT CIRCULATION LitGTING C0'.01T10N FOR OPERATION 3.9.E.1 At least one shutdown ecoling loop shall be in operation *.
AFFLICABILITY: MDDE 6 at,all reactor water levels.
ACTION:
k'ith less than one shutdown cooling loop in operation, suspend all operations ir.v:lving ar. increase in the reactor decay heat load or a re~ duction in boron cr.centratic1 of the Reactor Coolant Syster.. C. lose all containment penetra-tiens providing direct access from the containc.ent atmosphere to the outside atecsphere within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
3.9.8.2 Two ir. dependent' shutdown cooling loops shall be OPERABLE **
Applicability: Mode 6, whenever the following conditions are not
.. satisfied:
a.
reactor vessel water level at or above the vessel flange, and;
- b. the reactor v'essel pit seal installed, and; c.
the combined av.ailable volume of water in the refuel pool and refueling water storage tank exceeds 370,000 gallon,s , and;
- d. (1) the LPSI pump not in service is OPERABLE ** and can be '
~ aligned to take suction from the WST and deliver flow to the RCS, or (2) one HPSI pump is OPERABLE ** and can be aligned to take suction from the RWST and deliver flow to the RCS.
Action:
With less than the required shutdown cooling loops OPERABLE, initiate corrective action to return the loop (s) to OPERABLE status within one hour.
The provisions of Specification 3.03 are not applicable for 3.9.8.1 and 3.9.8.2.
Millstone - Unit 2 3/4 9-8
SURVEILLANCE RE001REtiENTS 4.9.8.1 At least one shutdown cooling loop shall be verified to be in opera-tien and circulating reactor coolant at a flow rate of greater than or equal >
to 3000 gpm at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4.9.8.2 Once per 7 days, the required shutdown cooling loops, if not in operation, shall be determined OPERABLE by verifying correct breaker alignments and indicated power availability for pump and shutdown cooling valves, or:
Verifying that the reactor vessel water level is at or above the vessel flange, the reactor vessel pit seal.is installed, and greater than 370,000 gallons or water is available as a heat sink, as indicated by either:
- a. refuel pool level greater than 23 feet, above the reacto,r -
vessel flange, or;
- b. the combined volume of the refuel pool and refueling water storage t2 ink exceeds 370,000 gallons and a flow path is available from the refueling water storage tank to the refuel pool.
- 4s. -
The shutdown cooling loop may be removed from operation for up to I hour per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period during the performance of CORE ALTERATIONS in the vicinity of the reactor pressure vessel hot legs.
MILLSTONE - UNIT 2 3/4 9-Ba
- -m
- e -+o+- wy &v a -WM #w= v ea +w-v m ..e--ww e e - -eru w --+, .9 es ,,---g g i -< - &
' I REFUELINGOf}iTIONS BASES 3/4.9.6 CRANE OPERA 5!LITY - CONTAINMENT BUILDING The OpEEAEILITY requirements of the cranes used for movement of fuel assemblies ensures that: 1) each crane has sufficient load capacity to lift a fuel ele .ert, and 2) the core internals and pressure vessel are protected from excessive lifting force in the event they are inadvertently engaged during lifing cperations. .
3/4.9.7 CRANE TRAVEL - SPENT FUEL STORAGE BUILDING The restriction on movement of loads in excess of the nomina'l weight of a fuel assembly and CEA over irradiated fuel assemblies ensures that no more than- the contents of one. fuel essembly will be ruptured in the event of a fuel handling accident. This assumption is consistent with the activity release assumed in the accident analyses.
3/4.9.8 SHUTD3'a'N COOLING AND COOLANT CIRCULATION .
The requirement that at least one shutdown cooling loop be in operation ensures that (1) sufficient cooling capacity is available to remove gecay heat and maintain the water in the reactor pressure vessel below 140 F as required during the REFUELING MODE, and (2) sufficient coolant circulation
,is maintained through the reactor core to minimize the effects of a boron dilution incident and prevent boron stratification. .
The requirement to have two shutdown cooling. loops OPERABLE, when the refuel pool is unavailable as a heat sink, ensures that a single failure of the operating shutdown cooling loop will not result in a complete loss of decay heat removal capability. With the reactor vessel water level at or above the vessel flange, and the reactor vessel pit seal installed, and a combined available volume of water in the refuel poor and refueling water. storage tank in excess of 370,000 gallons; a large heat sink is readily available for core cooling. Thus allowing adequate time to initiate emergency e procedures to provide core cooling in the event of a failure of the operating shutdown cooling loop.
3/4. 9. 9 and 3/4.9.10 CONTAINMENT RADI ATION MONITORING AND CONTAINMENT PURGE VALVE ISOLATION SYSTEM The OPERABILITY of these systems ensures that the containment purge valves will be automatically isolated upon detection of high radiation levels within the containment. -Ohe OPERABILITY of these systems is required to restrict the release of radioactive material from the containment atmosphere to the environment.
3_/4. 9.11 and 3/4. 9.12 WATER LEVEL-REACTOR VESSEL AND STORAGE POOL HATER LEVEL The restrictions on minimum water level ensure that sufficient water depth is available to remove 99% of the assumed 10% iodine gap activity released from the rupture of an irradiated fuel assembly. The minir:um water depth is consistent with the assumptions of the accident analysis.
MILLSTONE - UNIT 2 B 3/4 9-2