ML20024B972
From kanterella
Revision as of 13:12, 12 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML20024B972 | |
Person / Time | |
---|---|
Site: | Quad Cities |
Issue date: | 06/30/1983 |
From: | Gerner L, Kovack T COMMONWEALTH EDISON CO. |
To: | |
Shared Package | |
ML20024B969 | List: |
References | |
PROC-830630-01, NUDOCS 8307120068 | |
Download: ML20024B972 (6) | |
Similar Documents at Quad Cities | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217D7961999-10-12012 October 1999
[Table view]Proposed Tech Specs Pages,Removing Turbine EHC Low Oil Pressure Trip from RPS Trip Function Requirements in TS Sections 2.2 & 3/4.1.A ML20210R8281999-08-13013 August 1999 Revised Bases Page B.3/4.9-6 to TS Section 3/4.9,providing Clarity & Consistency with Sys Design Description in UFSAR Sections 8.3.2.1 & 8.3.2.2 ML20209J2321999-07-16016 July 1999 Proposed Tech Specs 3/4.7.D Replacing Limit for Any One Msli Valve of Less than or Equal 11.5 Sfch with Aggregate Value of Less than or Equal 46 Scfh for All MSIVs ML20196K1941999-06-30030 June 1999 Rev 2.0 to Chapter 11 of Quad Cities Offsite Dose Calculation Manual ML20209C2951999-06-29029 June 1999 Proposed Tech Specs Section 3/4.3.C, Reactivity Control - Control Rod Operability ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20205L2631999-04-0505 April 1999 Tech Spec Page B 3/4.5-2 to TS Section 3/4.5, ECCS, to Clarify Requirement Discussed in ML20205J9741999-03-30030 March 1999 Proposed Tech Specs,Deleting Various License Conditions That Have Been Completed,Making Editorial Changes & Providing Clarifying Info ML20205J9321999-03-30030 March 1999 Proposed Tech Specs 3/4.6.E Changing SRs 4.6.E.2 to Allow one-time Extension of 18 Month Requirement to Pressure Test or Replace One Half of MSSVs to Interval of 24 Months ML20205J9911999-03-30030 March 1999 Proposed Tech Specs Allowing Alternative Methodology for Quantifying RCS Leakage When Normal RCS Leakage Detection Sys Is Inoperable ML20199L6921999-01-21021 January 1999 Proposed Tech Specs Section 3/4.6.I,relocating from Chemistry TS Requirements to UFSAR ML20199L7741999-01-21021 January 1999 Proposed Tech Specs Bases for Sections 3/4.10.K & 3/4.10.L, Provides Description of Design & Operation of RHR SD Cooling Subsystem ML20196H4571998-11-30030 November 1998 Proposed Tech Specs 3/4.8.J, Safe Shutdown Makeup Pump, Reducing Current AOT from 67 Days to 14 Days ML20196F6451998-11-30030 November 1998 Proposed Tech Specs 3/4.1.A,3/4.10.B & 3/4.12.B,proposing Changes to Relocate Requirement to Remove RPS Shorting Links Which Enable non-coincident Scram for Neutron Instrumentation,To Licensee Controlled Document ML20196K5861998-11-0505 November 1998 Rev 3 to Qcap 0280-01, Process Control Program for Processing of Radioactive Wet Wastes at Quad Cities Nuclear Power Station ML20155D8091998-10-29029 October 1998 Proposed Tech Specs Bases Sections 3/4.2.D & 3/4.5.D, Providing Clarity & Consistency with Sys Design Description Contained in UFSAR Section 5.4.6.2 ML20195J9041998-09-24024 September 1998 Rev 0 to TR-VQ1500-02, Clean ECCS Suction Strainer Head Loss Test Rept ML20151S7991998-08-31031 August 1998 Proposed Tech Specs,Increasing Max Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve When Tested at 25 Psig, IAW SR 4.7.D.6 ML20236W8401998-07-31031 July 1998 Proposed Tech Specs Bases 3/4.7.C & 3/4.7.12.C,clarifying Testing Requirements for Primary Containment Excess Flow Check Valves ML20247D7761998-05-0505 May 1998 Proposed Tech Specs Page B 3/4.4-1,changing Administrative Error.Bases for Net Quantity of Gallons for Solution Is Changed from 3254 (Correct Quantity) to 3245 ML20246Q3481998-04-29029 April 1998 TS Page B 3/4.5-3,reflecting Change to TS Bases for Section 3/4.5.C ML20217G1481998-03-27027 March 1998 Proposed Tech Specs Bases Section 3/4.5.A,reflecting Design Info Contained in Rev 4 to Ufsar,Dtd Apr 1997 ML20216C6381997-08-29029 August 1997 Proposed Tech Specs,Incorporating New Siemens' Methodologies That Will Enhance Operational Flexibility & Reducing Likelihood of Future Plant Derates ML20196G0271997-05-0101 May 1997 Proposed Tech Specs 4.9.A.8.b Revising Load Value for Diesel Generator to Be Equal to or Greater than Largest Single Load & Revising Frequency & Voltage Requirements During Performance of Test ML20138G3321997-04-29029 April 1997 Proposed Tech Specs,Permitting Loading of ATRIUM-9B Fuel in Plant Unit Core for Operational Modes 3,4 & 5.Modes Will Support Refueling Activities Such as Fuel Load,Vessel re- Assembly & Single Rod Timing ML20138B3231997-04-21021 April 1997 Proposed Tech Specs,Requesting That NRC Grant Exigent Amend to TS 2.1.B & 6.9.A.6.b to Support Plant Unit 2 Cycle 15 Operation Scheduled to Begin 970519 ML20137G3981997-03-26026 March 1997 Proposed Tech Specs 3/4.7.P Re Standby Gas Treatment & TS 5.2.C Re Secondary Containment ML20135F7321997-03-0303 March 1997 Proposed Tech Spec Bases 3/4.9.E,clarifying Purpose of SR 4.9.E ML20135D9461997-02-24024 February 1997 Proposed Tech Specs,Clarifying Bases for TS Surveillance 4.8.D.5.c ML20138L4011997-02-17017 February 1997 Proposed Tech Specs Section 2.1.B Re Thermal Power,Section 3/4.11 Re Power Distribution Limits,Section 3/4.6 Re Primary Sys Boundary,Section 5.3 Re Reactor Core & Section 6.9 Re Reporting Requirements ML20138L3701997-02-17017 February 1997 Proposed Tech Specs 4.9.A.8.h Re Diesel Generator Endurance Test Surveillance Requirements ML20134D2191997-01-27027 January 1997 Proposed Tech Specs Deleting marked-up Sentence from TS Bases for Section 3/4.7.K ML20129K3321996-10-18018 October 1996 Cycle 15 Startup Test Results ML20129C2391996-10-16016 October 1996 Proposed Tech Specs for Dresden 2 & 3 & Quad Cities 1 & 2, marked-up to Show Transition Verbiage ML20129D3981996-09-20020 September 1996 Proposed Tech Specs 3/4.6.K,updating Pressure-Temp Curves to 22 Effective Full Power Yrs & TS Bases ML20216H8841996-06-30030 June 1996 Revs to ODCM for Quad Cities,Including Rev 1.8 to Chapters 10,11,12 & App F ML20116F3971996-06-30030 June 1996 Rev 1.8 to ODCM, Annex,Chapters 10,11,12 & App F ML20113C3571996-06-25025 June 1996 Proposed Tech Specs Re Upgrade Program ML20113A7861996-06-10010 June 1996 Proposed Tech Specs,App A,To Reflect Transition of Fuel Supplier from General Electric to Siemens Power Corp ML20117D7121996-05-0606 May 1996 Proposed Tech Specs,Implementing New LCO & SR Re Revs to TS for 10CFR50,App J,Lrt ML20107A1881996-04-0404 April 1996 Proposed Tech Specs 3.4/4.4 Re Standby Liquid Control Sys ML20101H1381996-03-25025 March 1996 Complete Version of TS Upgrade Program Pages That Reflect Current Configuration of Plant & Specifies SRs That Will Not Be Current Upon Implementation of Tsup Project ML20097D9231996-02-0808 February 1996 Proposed Tech Specs,Upgrading Existing TS 3/4.5, Eccs ML20100C0441996-01-24024 January 1996 Secondary Containment Leak Test Summary ML20093K7721995-10-12012 October 1995 Quad-Cities Nuclear Power Station Unit 2 Cycle 14 Startup Test Results Summary ML20098A3821995-09-20020 September 1995 Proposed Tech Specs,Revising TS Upgrade Program & Improving Plant Submittals ML20086D4741995-06-30030 June 1995 Proposed Tech Specs Re TS Upgrade Program for Dresden Units 2 & 3 & Quad Cities Units 1 & 2 ML20087H8651995-05-0202 May 1995 Proposed Tech Specs Re TS Upgrade Program Section 3/4.10 ML20082H7481995-04-10010 April 1995 Proposed Tech Specs,Revising SR for HPCI & RCIC Sys ML20080K8171995-02-23023 February 1995 Proposed Tech Specs,Changing Name of Iige to Reflect Results of Merger Between Iige,Mid American Energy Co,Midwest Power Sys Inc & Midwest Resources Inc 1999-08-13 Category:TEST/INSPECTION/OPERATING PROCEDURES MONTHYEARML20196K1941999-06-30030 June 1999
[Table view]Rev 2.0 to Chapter 11 of Quad Cities Offsite Dose Calculation Manual ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20196K5861998-11-0505 November 1998 Rev 3 to Qcap 0280-01, Process Control Program for Processing of Radioactive Wet Wastes at Quad Cities Nuclear Power Station ML20216H8841996-06-30030 June 1996 Revs to ODCM for Quad Cities,Including Rev 1.8 to Chapters 10,11,12 & App F ML20116F3971996-06-30030 June 1996 Rev 1.8 to ODCM, Annex,Chapters 10,11,12 & App F ML20064G1081994-02-14014 February 1994 Quad-Cities Nuclear Station 1994 Mgt Plan ML20063H8141994-02-11011 February 1994 Revised Procedures,Including Rev 16 to Qep 120-0, Technical Director Index 58 & Rev 3 to Qep 120-T10, Key Point History Listing ML20063F9231994-01-31031 January 1994 Rev 1.0 to Chapters 10,11,12 & App F to ODCM,Quad-Cities Station ML20062J3681993-10-28028 October 1993 Station,Third Ten-Yr Interval IST Plan ML20127D0691992-12-30030 December 1992 Corporate Emergency Response Organization Required Reading Package 92-11 ML20099B9741992-07-27027 July 1992 Temporary Procedure Secondary Containment Preventative Maint Program ML20102A5971992-07-0202 July 1992 Corrected Chapter 11 to, Environ Radiological Monitoring Table of Contents, Odcm,Revs 0.C & G ML20097G0781992-05-31031 May 1992 Rev 0.G to Odcm,Chapter 11,pages 11-i,11-6,11-9,11-10,11-12 & 11-15 ML20079H0121991-10-0202 October 1991 Tech Spec Upgrade Program ML20082H1951991-08-15015 August 1991 Tech Spec Upgrade Program,Proposed Amend Section 3.4/4.4, 'Standby Liquid Control Sys.' ML20085B5901991-07-29029 July 1991 Tech Spec Upgrade Program ML20082M2261991-04-30030 April 1991 Rev 10 to Quad-Cities Process Control Program for Processing of Radioactive Wet Waste ML20055E8101990-07-0101 July 1990 Rev 3 to Pump & Valve Inservice Testing Plan for Quad-Cities Nuclear Power Station Units 1 & 2 ML20029B1981990-04-30030 April 1990 Rev 9 to, Quad-Cities Process Control Program for Processing Radioactive Wet Waste. ML20245L7651989-08-0707 August 1989 Rev 0 to Offsite Dose Calculation Manual ML20059C7341989-02-28028 February 1989 Rev 8 to Quad-Cities Station Process Control Program for Processing of Radioactive Wet Waste ML20235N4731989-01-31031 January 1989 Guidelines for Neutron Radioassay Measurements at Quad-Cities Unit One Spent Fuel Storage Pool ML20235N8151988-12-31031 December 1988 Quad-Cities Station Process Control Program for Processing Radioactive Wet Waste ML20235A8921988-07-31031 July 1988 Rev 6 to, Process Control Program for Processing of Radioactive Wet Waste ML20237J8081987-08-31031 August 1987 Rev 0 to Emergency Plan Implementing Procedure EPIP 200-T4, Containment Radiation Time Dependent Correction Factors ML20212H5851987-02-11011 February 1987 Rev 5 to Process Control Program for Processing of Radioactive Wet Waste ML20210E2111986-12-31031 December 1986 General Abnormal Manual ML20203L3551986-04-30030 April 1986 Rev 0 to Comm Ed Training Program Description for Station Control Room Engineer/Shift Technical Advisor ML20205F5581985-12-31031 December 1985 Rev 11 to Offsite Dose Calculation Manual List of Tables for Quad-Cities Section 7.2 ML20112G4691984-10-31031 October 1984 Inservice Insp & Testing Program,Quad Cities Nuclear Power Station,Units 1 & 2 ML20108A6551984-10-30030 October 1984 Emergency Operating Procedures Generation Package ML20093M6781984-10-0505 October 1984 Suppl 2 to Detailed Control Room Design Review Program Plan ML20087P5611984-03-0202 March 1984 Public Version of Revised Emergency Plan Implementing Procedures QEP-310-O, Notification of Responsible Authorities & QEP-310-T3, Prioritized Notification Listing. W/Jm Felton 840323 Release Memo ML20087Q0641984-01-20020 January 1984 Public Version of Revised Emergency Plan Implementing Procedure Qep 340-7 Re Chemical Spill Cleanup & Qep 520-2 Re Training for Offsite Support Agencies.W/Jm Felton 840326 Release Memo ML20086J6011983-12-19019 December 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure Qep 200-2 Re Classification of Incident Involving Hazardous Matls & Qep 310-1 Re Initial Notification ML20083J4771983-11-15015 November 1983 Public Version of Revised Emergency Plan Implementing Procedures Qep 350-T1, Recommended Protective Actions for Gaseous Release & Qep 350-2, Emergency Drills ML20081B7011983-11-0303 November 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 110-0 Re Station Director & Qep 110-2 Re Acting Station Directory (Shift Engineer).W/Jm Felton Release Memo ML20081L8921983-10-13013 October 1983 Public Version of Revised Emergency Plan Implementing Procedures Qep 310-1, Initial Notification & Qep 340-4, Action to Be Taken in Event of Oil Spill to Mississippi River ML20090G7031983-10-0606 October 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 550-1 Re First Aid & Decontamination Facilities,Qep 550-2 Re Emergency Equipment Inventory & Qep 550-T1 Re Environ Sampling Supplies ML20078M7891983-09-30030 September 1983 Rev 10 to Offsite Dose Calculation Manual for LaSalle & Quad Cities ML20078E8701983-09-0808 September 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 550-0 Re Emergency Equipment & Supplies & Qep 550-T4 Re Emergency Operations Facility Supplies ML20078G0761983-09-0808 September 1983 Public Version of Revised Emergency Plan Implementing Procedures Qep 110-2 Re Acting Station Director (Shift Director) & Procedure Qep 310-1 Re Initial Notification ML20078M8091983-08-31031 August 1983 Rev 9 to Offsite Dose Calculation Manual for Braidwood, Consisting of Chapters 7.2 & 8.0 ML20024B9721983-06-30030 June 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 330-0 Re Assessment Actions & Qep 330-11 Re Estimation of I-131 Release by Field Team Measurements.Revised Index Encl ML20085N1321983-06-0707 June 1983 Public Version of Rev 14 to Emergency Plan Implementing Procedures Qep 310-0, Notification of Responsible Authorities & Rev 8 to Qep 310-T3, Prioritized Notification Listing ML20024E1751983-06-0303 June 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 330-0 Re Assessment Actions & Qep 330-11 Re Estimation of I-131 Release by Field Team Measurements ML20081F1401983-05-24024 May 1983 Public Version of Revised Emergency Plan Implementing Procedures Qep 200-T1 Re Emergency Action Levels & Qep 310-T3 Re Prioritized Notification Listing ML20024A1901983-05-0404 May 1983 Public Version of Rev 11 to Emergency Plan Implementing Procedure Qep 550-0, Emergency Equipment & Supplies & Rev 5 to Qep 550-T1, Environ Sampling Supplies. Receipt Form Encl ML20069L0021983-04-0404 April 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Qep 160-1 Re Administrative Director,Qep 530-0 Re Exercises & Drills & Qep 200-0 Re Emergency Conditions ML20077B9231983-03-31031 March 1983 Rev 3,to Process Control Program for Solidification of Radwaste 1999-06-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20024B972&oldid=2468274"