Discusses Lack of Prompt Notification to TMI Re Substantial Safety Hazard.Proper Customer Notification Will Be Provided by Licensing
ML20024C471
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 02/10/1978
From: Taylor J
BABCOCK & WILCOX CO.
To: Macmillan J
BABCOCK & WILCOX CO.
References
TASK-03, TASK-06, TASK-07, TASK-3, TASK-6, TASK-7, TASK-GB GPU-0254, GPU-254, NUDOCS 8307120660
Download: ML20024C471 (3)


Text

.' ,.

C, l

N, o

S' 8307120660 780210 gDRADOCK 05000289 HOL

. , I

. l l

THE BASCDCK & WILCOX COMPANY

  • g 9WER GENERATION GROUP To i J. H. MACMILLAN - VIG-PRESIDENT, NPGD Free J. H. TAYLOR - MANAGER, LICENSING (2317) - -

ses us.s hej.

CONEt.@..A1=W E EloBi'- 14.2 TMI-1 SUBSTANTIAL SAFETY HAIARD GUU!T'~'~"~ W' bat' FE3RUARY 1973 g n .- ~ - - _.

Y5u req' vested an explanatica as to why the safety concern dealing with the CT5G water level operating procedures, which was dis-covered on the TECO plant, was not passed on to *NI-I more promp tly. It should have been, and t.Yire is not a good reason why it was not.

It had not died at any point, but it did move more slowly than it should have. We are taking steps to assure quicker action in the fu:ure on safety, concerns affecting operating plants.

D For your information, a brief chronology of events en this con.

cern is presented below.

" 6/3/77 Preliminary Safety Concern flied -

Preliminary revised operating procedures L

had already been sent to TECO .

6/8/77 Evaluation of c6ncern initiated 6/15/77 ect Managenent Engineering recommending letter customer to Projfication not. of need to change procedures **

6/3/77 to . Stress gnalysis and' reactivity effect

  • 1/:7/78 evaluations performed to finali:e required

. tech spec and pr:cedure changes 2/1/73 blI-1 was advised that their cperating procedures mus: e changed N

.. In retrospect. I believe ene of the reascas 7MI was .ot notified earlier was due to the appicpriate Nuclear Service =anager not being involved in the early nee:ings en this subfect sr.:1 not

% being on distributica for :he 6/13/77 Engineering :epartment nemo.

I: see=s that everyen,e else was infor=ed but him. Licer. sing dces

~ " .. .

. . . (e P 0 . __ .__

Deft Exh. Forin MV menmes, Chanes Doyle Reparting Shapiro Inc.

GCSR g[3ff e)/

.nm 8 e

i.

32510Lk w-. r i s" .894 0 :=. -

^ -_-

..o e, , O

._. . _. s. .

J. H. MacMillan Page 2 . February.10, 1973 [

% f.

L g have responsibility for naking sure that PSC-related actions are  :'

proceeding at an appropriate pace.. and the actions nentioned above should nininize the possibility of a repeat of the TMI-I  :

situation. More specifically, I.icensing will take the lead in co-ordinating and assuring proper custoner tification in the {

~ -

future.

TMI was the only operating plant affected in this way. *

[

i.

.I JHT:dsf

. MM 1 cc: J. C. Deddens E. R. Kana

/ [

- E J. T. Janis G. M. Olds ,

W. A. Cobb

  • u

L A

c L

-- .  ;

r

. . t l

I t

I t

__;

-1 325i,O a5 d: j. F 15 [.9 2 0 6: .

1 1

______ _ _ _ _ _ _ _ . _ . _ _ _ . , . _ . . _ _ _ _ _ ._ , . , , _ . . , . . . . . _ _ . . _ . ___