Issue date | Title | Topic | |
---|---|---|---|
ML20087H722 | 12 March 1984 | Comments on Need to Resolve Mgt Integrity Issue Prior to NRC Restart Decision | |
ML20023B937 | 4 April 1983 | Forwards Eh Gischel Affidavit & Memo Re Allegations on safety-related Mods & Tests.Investigation Underway | |
ML20076J872 | 16 September 1982 | Memo Re Leak Feasibility | |
ML20085B107 | 17 June 1982 | Discusses Symptoms of Transients | |
ML20085B106 | 17 June 1982 | Discusses Symptons of Transients | |
ML20085B089 | 17 June 1982 | Submits,For Discussion, X Large Break W/Auxiliary Feedwater & Z Small Break Auxiliary Feedwater W/O Reactor Coolant Pumps | |
ML20085B109 | 11 May 1982 | Submits Marginal Comments | |
ML20077K914 | 25 February 1982 | Suggests Possible Misreading by Operator | |
ML20085A913 | 23 February 1982 | Submits Names of B Karrach & Bm Dunn | |
ML20085A656 | 22 January 1982 | Lists Activities,Including Site Program Repts,Weekly Status Repts,Radcas,Emergency Operations,Owners Group Meetings, Operating Experience Seminar,Plant Data Output,Summary Test Rept,Restart Test Rept & Training Contacts | |
ML20024C571 | 1 July 1981 | Provides Sequence of Events | Boric Acid |
ML20066F293 | 7 April 1980 | Summarizes 800407 Formal Exit Meeting for IE Insp Rept 50-289/80-06 on 800301-31 | |
ML20090G320 | 1 February 1980 | Forwards Summaries of Recent Correspondence Re TMI-1 PORV & Excerpts from TMI-1 Restart rept,NUREG-0578 & NUREG-0560 | |
ML20069M853 | 14 January 1980 | Discusses IE Insp Rept 50-289/79-24 on 791128-800104 | |
ML20024C556 | 14 December 1979 | Emphasizes Need for PRA Capability.Related Info Encl | Probabilistic Risk Assessment |
ML20085A680 | 27 November 1979 | Requests Evaluation & Action on Submitted Issues Critical to long-term Function of Engineering Dept.Issues Re Mgt of Resources,Product Responsibility & inter-dept Coordination Recommended | |
ML20085A979 | 10 September 1979 | Forwards Surveillance Instructions Sent to Customers Re Previous PORV Failures | |
ML20085A843 | 4 September 1979 | Requests Concept & Details of Safety Review Group Formation Be Reviewed W/Macmillan.Safety Review Group Should Meet Prior to 790915 to Develop Plan for near-term Actions for Submittal by 791001.Plan Should Include Manpower Assessment | |
ML20024C606 | 4 September 1979 | Summarizes Analysis Code Requirements & Verification Project,Action Item 5 on CRAFT2 Simulations of Small Break Transients | |
ML20085A470 | 3 September 1979 | Compares B&W & TVA Positions Following 781204 Telcon on Small Break LOCA Analysis.B&W Failed to Evaluate Michelson Rept in Sufficient Detail to Respond to TVA 781204 Telcon Questions | |
ML20085A410 | 3 August 1979 | Summarizes 781204 Telcon W/B&W Re Small LOCA | |
ML20024B292 | 31 July 1979 | Responds to Embrey Request for 790801 Draft &/Or Status of Presentation for B&W Sys Responsiveness & Suppls 790726 Ltr | Power change |
ML20085A970 | 30 July 1979 | Discusses Emergency Operation Guideline Preparation & Maint.Comments on Encl LER Review Proposal Requested by 740807 | |
ML20090G387 | 18 July 1979 | Reviews Procedures 2202-1.1 Through 2202-2.5 | |
ML20085A648 | 16 July 1979 | Requests Results of & Any Actions Taken Re Davis-Besse-1 Depressurization Incident in Sept 1977 | |
ML20125B466 | 13 July 1979 | Discusses 790905 Condensate Polisher Valve Malfunction. While Attempting to Place Polisher 8 in Svc & Remove Polisher 6,water Was Found in Air Supply to Polisher 8 Recorder.Event Duplicated 790328 Trip | |
ML20085A684 | 8 June 1979 | Recommends That B&W Site Residents Should Be Requested to Submit Immediately Notification of PORV Operation Situations.Prompt Feedback to Jd Carlson Requested | |
ML20136B529 | 7 June 1979 | Discusses Criteria for Processing I-131 Waste Using EPICOR-II Sys.Suggests Using Decanting/Sluicing Pump & Flow Path from Given Resin Bed to Truck Loading Dock.Requests Comments by 790615 | |
ML20136B534 | 7 June 1979 | Describes Status of EPICOR-II Facility Operability Program. Facility Presently Capable of Processing Radioactive Water. Schedule of Activities Necessary to Complete Operability Program Encl | |
ML20085A847 | 5 June 1979 | Forwards 790604 Memo Re B&W NSSS Responsiveness.Meeting W/N Embrey Recommended to Map Strategy for Demonstrating Manageability of Transient Control | |
ML20024C511 | 31 May 1979 | Advises That Preliminary Rept of Safety Concern PSC 16-79 Will Be Provided Upon Completion | |
ML20125D899 | 18 May 1979 | Summarizes Encl Testing Results for Scott canister-type Respirators,Per 790518 Telcon W/A Hack of Lasl.Environ Evaluation Encl | |
ML20085B097 | 2 May 1979 | Forwards Draft Writeups on Small Break Scenarios to Be Used in Small Break Cooldown Procedure.Comments,In Procedure Form Requested | |
ML20085A478 | 2 May 1979 | Forwards Draft Repts on Small Break Scenarios to Be Used in Small Break Cooldown Procedure.Comments Requested. Descriptions of RCS Leaks W/Auxiliary Feedwater & W/O Feedwater & Small Breaks in Pressurizer Encl | |
ML20024B756 | 1 May 1979 | Forwards Results Summary of 1978-79 Requal Written Exam,For info.Post-oral Packages Forwarded to Individuals Having Two or More Categories Less than 80% | |
ML20136C688 | 15 April 1979 | Responds to Ke Suhrke 790414 Memo,Instruction 461,re Relief Valve Performance.Forwards Tables Providing Electromatic Relief Valve Open/Close Times,State of Fluid Passing Through Valve,Flow Rate & Integrated Flow | |
ML20024B481 | 14 April 1979 | Discusses C Michelson,Of Tva,Critique of Small Breaks for B&W RCS in May 1978 | |
ML20136C663 | 13 April 1979 | Forwards Drawing 141563E-13 of Reactor Coolant Piping Assembly Elevation | |
ML20136C712 | 13 April 1979 | Forwards Drawing 141563E-13,reactor Coolant Piping Assembly Elevation.Re Kosiba 790409 Response to Levinson Forwarding Reactor Vessel Drawings for Core Bypass Calculations Encl | |
ML20085B104 | 10 April 1979 | Discusses LOCA-type Accidents | |
ML20126J717 | 9 April 1979 | Summarizes Trip to TMI-2 Following 790328 Incident | |
ML20136C722 | 8 April 1979 | Discusses Method for Steam Generator B Integrity Checking. WR Stagg 790406 Memo to G Urquhart Re Clarification of Question 1 on once-through Steam Generator B Leak Encl | |
ML20136C671 | 30 March 1979 | Discusses Contingency Recommendations for Actions If All Reactor Coolant Pumps Are Lost.Suggests Sys Be Taken Solid W/High Pressure Injection Pumps & Vented Through Pressurizer Via Electromatic Relief Valve Circulation | |
ML20085A419 | 3 January 1979 | Submits Monthly Progress Rept for Dec 1978 | |
ML20024C583 | 2 January 1979 | Forwards ECCS Analysis Unit Activities Rept,Dec 1978. | |
ML20125D880 | 22 December 1978 | Discusses Pressurizer Level Problems Following Reactor Trip on Old Forest Road Simulator.Transient Pressurizer Inventory Strongly Dependent on AFW Feedrate.Runs Showed That Pressurizer Not Far from Empty After Normal Reactor Trip | |
ML20024C577 | 11 December 1978 | Recommends Small Break Analyses W/Reactor Coolant Pumps Powered | |
ML20024B454 | 16 November 1978 | Requests Withdrawal of 780404 Potential Safety Concern Re Secondary Side Auxiliary Feedwater Control Level.Problem W/ 6-ft Control Not Inadvertent,But Part of Planned Effort | |
ML20024C816 | 15 November 1978 | Informs That Toledo Edison Needs to Reduce Auxiliary Feedwater Setpoints for Natural Circulation.Suggestion to Resolve Impasse Provided.Further Analytical Effort Required to Confirm 10 Ft Level Setpoint Adequate | |
ML20024B455 | 3 November 1978 | Dismisses Validity of Potential Safety Concern (PSC) Filed Against 205 Plants Re Secondary Side Auxiliary Feedwater Control Level.Potential Obstructions Nonexistent |