METROPOl.ITAN EDISON CO M P A N Y soesioi.,y o, c.o.i codiic utii.ii., co,no,.iion TMI UNIT 1 NRC INSPECTION EXIT -

Location TMI NUCLEAR STATION subject INSPECTION REPORT 79-24 Date JANUARY 14, 1980 To ACTION PARTIES ATTENDEES:

G. P. Miller

- Unit 1 Met-Ed Met-Ed - Manager HP Unit 1 W. E. Potts D. R. Haverkamp - Unit 1 Resident Inspector (Acting)

Senior Radiation Specialist (Acting)

K. E. Plumlee

-~

7J{_T.; Collins 2

-Deputy. Director,;TMI Support-7 l.

This inspection covered Unit 1 operations and Health Physics through the period November 28, 1979 to January.4, 1980. The inspection in-cluded plant tours, inspections by shift NRC personnel, records and document searches.

2.

The Operations Area was found acceptable with no items of non-compiiance.

3.

Past Open Item 78-06-01 relative to work inside steam generators --

NRC concern is in relation to the fact that Met-Ed owes a response and action.

Met-Ed, by letter dated 12/11/79 - GQL 1510, committed a response on this item by 12/31/79 and this response has not been forwarded to date.

To resolve this item:

(a)

Met-Ed owes a response Action: Harding /Potts (b)

Until HP will look at the Unit 2 commitment in this area and will resolve the items with the NRC Action:

Potts 8212010390 800114 DR ADOCK 05000 INTER-0FFICE MEMORANDUM

- r[ '

c, ACTION PARTIES PAGE 2 TMI UNIT 1 NRC INSPECTION EXIT -

JANUARY 14, 1980 INSPECTION REPORT 79-24 4.

Health Physics reviewad:

(a)

Cleanliness (b)

Housekeeping (c)

Epicor I (d)

Waste Solidification (e)

Surveying and Frisking (f)

Respiratory Program (g)

Work Requests /RWP's (h)

Logs / Records These areas found acceptable at this time.

5.

This Inspection Report and the next one will be issued for Units 1 and 2.

The NRC intends to separate the Units' inspection reports in the future.

04# rMiller GPM/jl 4

cc: Attendees T. M. Hawkins - SU/T C. E. Hartman - PORC Chairman for review with PORC as applicable.

J. J. Colitz D. Dyckman L. W. Harding M. J. Ross D. M. Shovlin R. S. Harbin - 1.

Inform G. Troffer 2.

You have the follow-up action.