2014 Byron Station, Initial License Examination Miscellaneous Correspondence
ML14283A374
Person / Time
Site: Byron  Constellation icon.png
Issue date: 06/02/2014
From: Walton R
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML14140A569 List:
References
Download: ML14283A374 (54)


Text

2014 BYRON STATION INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 May 28, 2014 Mr. Michael J. Pacilio Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Pacilio:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Byron Station, Units 1 and 2.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Stanley Kerr, Training Director. Note that any examination waivers have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," during the weeks of June 9 and 16, 2014. The NRC staff will administer the operating tests during the weeks of June 2 and 9, 2014.

This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1 021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (630) 829-9707.

Please contact Mr. R. K. Walton, Chief Examiner, at (630) 829-9836, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents

M. Pacilio Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

1ronori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via LISTSER~

M. Pacilio Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via LISTSERy DISTRIBUTION:

Joseph Nick RidsNrrDorllpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Carmen Olteanu John McHale DOCUMENT NAME: +Ltr 05xx14 Exam Approval (RKW).docx 1Zl Publicly Available D Non-Publicly AvailableD Sensitive 1Z1 Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" =Copy without attach/encl"E" = Co with attach/enci"N" = No co

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 4, 2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

BYRON STATION

Dear Mr. Pacilio:

We have received your corporate letter RS-11-110 dated June 29, 2011, and Byron 2011-0136 letter dated September 28, 2011. In these letters, you requested initial operator licensing examinations be rescheduled at the Byron Station from September 2014 to June 2014 and from March 2016 to August 2015.

In response, we have canceled the initial licensing exams previously scheduled for September 2014 and March 2016. We have also scheduled initial licensing examinations for the weeks of June 2 and 9, 2014, and for the weeks of August 10 and 17, 2015, at the Byron Station. Onsite validation for these initial licensing examinations will take place about three weeks prior to the exam date.

We note that you were previously scheduled for an initial operator licensing exam the weeks of January 14 and 21, 2013. Per your request, we have changed this examination date to the weeks of April 29 and May 6, 2013, with an onsite validation date of April 1, 2013. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.

M. Pacilio In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RAI Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via ListServ'

M. Pacilio In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA!

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via ListServ' DISTRIBUTION:

Amy Snyder RidsNrrDoriLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirslrib Resource Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak ROPreports Resource DOCUMENT NAME: G:\DRSIII\DRS\WORK IN PROGRESS\LTR 110411 BYRON EXAM 2011.DOCX

  • D Publicly Available D Non-Publicly Available D Sensitive D Non-Sensitive To receive a copy of this document, indicate in the box: "C" =Copy without attachmenUenclosure "E" = CQ0' with attachmenUenclosure "N" =No copy OFFICE Rill I Rill IN I I NAME RKWalton:ls HPeterson DATE 10/31/11 11/04/11 OFFICIAL RECORD COPY

Exelon Generation Company, LLC www.exeloncorp.com Byron Station Nuclear 4450 North German Church Road Byron, IL 61010-9794 September 28, 2011 LTR: BYRON 2011-0136 File: 1.10.0101 Mr. Keith Walton Operations Branch - Region Ill U.S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket nos. STN 50-454 and STN 50-455

Subject:

Change to Byron Station Operator Licensing Examination 2014 and 2016 Dates Mr. Walton:

In a September 16, 2011 conversation with Mr. Gregg Smith, Senior Operations Training Instructor at Byron Station, a request to reschedule the current 2014 and 2016 Byron Station Initial Operator License Examination dates was confirmed.

Per response to RIS 2011-04 NRC Form 536 submitted in Exelon Generation Company letter RS-11-110 dated June 29, 2011, the current dates were provided. Proposed revised dates are shown below.

Current Date Proposed Date Weeks of Sept. 8 and 15, 2014 Weeks of June 2 and 9, 2014 (16 candidates) (16 candidates)

Weeks of Mar 21 and Apr 4, 2016 Weeks of Aug 17 and 24, 2015 (15 candidates) (12 candidates)

Please confirm these revisions by contacting Mr. Gregg Smith at 815-406-2386.

Sincerely, T' othy J. Tulon ite Vice President Byron Station T JT/GS/TH/cy

~'cf 'Vc;__ 'C..:Pc_

SEP 2 8 2011

Exelon Generation www.exeloncorp.com Exelon 4300 Winfield Road Nuclear warrenville.IL 6osss RS-11-110 June 29, 2011 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docl<et No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-2, (Renewed) DPR-19 and DPR-25 NRC Docket Nos. 50-10.50-237, and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50.:374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

June 29, 2011 U. S. Nuclear Regulatory Commission Page2

Subject:

Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2011-04, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2011-04, "Preparation and Scheduling of Operator Licensing Examinations," dated May 26, 2011 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2013 through 2016, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2013 and 2014. Attachments 1 through 11 provide responses to RIS 2011-04 for the EGC plants Identified above. The requested information for each facility Is provided on a separate NRC Form 536.

In calendar year 2013, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as Indicated on Attachment 7. The schedule for the indicated examination Is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling Information is provided on Attachment 7 for LGS. Attachment 9 for PBAPS references Attachment 7 where appropriate.

June 29, 2011 U. S. Nuclear Regulatory Commission Page3 There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - ILT - Completed NRC Form 536 for Limerick Generating Station - LSRO - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station 0 - Completed NRC Form 536 for Quad Cities Nuclear Power Station 1 - Completed NRC Form 536 for Three Mile Island Nuclear Station

Attachment 1 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRC FORM 53& U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 1013112011 (10.2001) Estimated burden per res~onse to comply with thla voluntary Information collection requell: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his lnformallon coiiiCIJon Is used lo plan budgets and reaourcn for operator examinations. Send comments ri'-idln~ burilen OPERATOR LICENSING eallmate to the Recorda and FOIAIPrlvacy Servlcaa Branch ' -5 F 3), U.S.

Nudear R~tory Commission, Washington, DC 20555-000 , or b7c lntamet

  • -mal to In IICIIQnrc-gov, and to the Ollie Officer, Offlct of In ormadon EXAMINATION DATA and Regula:r, Arran, NE B-10202, (3150-0131), Office of Mana~ament and Budgll. Wa ngton DC 20503. If a me1n1 used to Impose an nformatlon colleCtion doaa not diSplay a currendy valid OMB control numbar, lha NRC may not conduct or ~onaor, and a parson 11 not required to respond to, the JnformaUon cole n.

FACILITY NRC REGION Braidwood Station, Units I and l Facility operatln1 License Nos. NPF-7l and ~PF-77 Ill

't!RC Docket Nos. STN !0-4!6 and STN !0-4!7 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2013 CY 2014 CY 2015 CY 2016 LICENSEE-PREPARED I 0 I 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cv2o14 cv2o1s cv2o16 NUMBER OF REACTOR 6 0 6 Ci OPERATORS NUMBER OF SENIOR REACTOR 10 0 10 6 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS-UPGRADE 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 0

PROPOSED DATES PRIMARY DATE 3125/2013 N/A 1/5/2015 10/J/2016 ALTERNATE DATE 4/8/2013 ~/A 1218/2014 10/1712016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2013 CY 2014 ... _

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 I) 16 0 0 0 0 0 CANDIDATES NRC FORM 5311 l 1~*2C08l PAJ!IITEO ON AECYC<.ED PAPER

Attachment 2 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 31!50.0131 EXPIRES: 1013112011 (10.2008) Estimated burden .fer res~nse to comply with this voluntary Information collection request hour. Is lnformalloil collection 11 used to plan budgets and resources for operator examinations. Send comments rs~snllni burnen estimate to the Recorda end FOIA/Prlvacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclur R~ulatory Commission, Washington, DC 20!555-000 , or ~ lntemet a-mall to In ocollactsCnrc~, and to the Desk Officer, omce of In rmallon EXAMINATION DATA and Regula:Y, Alfalra NE B-10202, (3150.0131), Office of Man~ament and Budget, Wash ngton 0C 20503. If a maans used to Impose an nformatlon coU8C:IIon does not d1splay a currently valid OMB control number, the NRC may not conduct or s&onaor, and a person Ia not raqulred to respond to, the Information collec on.

FACILITY NRC REGION Byron Station, Units 1 and l Facility Operating License Nos. NPF-37 and NPF-66 Ill NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2013 CY 2014

- CY 2015

- CY 2016 LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cv2o14 cv2o15 CY 2016 NUMBER OF REACTOR 2 9 0 7 OPERATORS NUMBER OF SENIOR REACTOR 9 6 0 7 OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 1 0 1 OPERATORS-UPGRADE 1 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 0 PROPOSED DATES PRIMARY DATE 4/29/2013 9/15/2014 N/A 3/11/1016 ALTERNATE DATE 5/13/2013 9/2912014 N/A 4/4/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 0 0 0 0 0 14 0 CANDIDATES NRC FORM 53ll (10-2008) PRINTED ON RECYCLED PAPER

Attachment 3 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM531 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/3112011 (10-2001)

Eallmattd burden par r11~n** to comply with thla voluntary informallon COIIIctlon raqu11t: 1 ho..-. hla lnfllnnatloft collection II uaad to plan budglll and raaourcaa l'or operator llllmlnatlon.. Sand commanll re~lldln~ b..-den OPERATOR LICENSING aatlmata to the Recorda and FOIAIPrlvacy SeiVICII Brandl -5 F 3), U.S.

Nudur R=~ Commllalon, W11~. DC 20555-000 , ot ~llmat a-mal to IICIIOnfc.~, and 1D lhl Dllk Olllclr, Ofllce of I allan EXAMINATION DATA and Ragutato:t,Alf8lrl NE 8-10202t (3150-0131), Ofl1ca of M1t11= and B~ Wllh giDn 0C 20503. I I m11n1 used to Impose an ntonnallon coQiCIIOn doll riot dl.lplay 1 Qlrranlly valid OMB contJol number, the NRC may not condu~naor, and a paraon 11 not required to ra1pond to, the lnfonnaUon

  • I'IICII.ITY NRC REGION CUntoa Power Statloa FacUlty Operatlna Lk:ense No. NPF-61 Ill NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE cvl013 PROPOSED NUMBER ESTIMATED NUMBER OF CY 1014 CY 1015 CY 1016 LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY 1013 CYl014 CY2015 cvzo16 OPERATORS 6 0

' 0 NUMBER OF SENIOR REACTOR 4 0 4 0 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR l OPERATORS*UPGRADE 1 0 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS- UMITED 0 PROPOSED DATES PRIMARY DATE 8-HM3 N/A 8-17-15 N/A ALTERNATE DATE 8-1(~13 N/A 8-14-15 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 1013 CY 1014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 10 0 0 CANDIDATES NRC FORM 531 (10.2008) PRIHTED ON RECYCLED PAPER

Attachment 4 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150..0131 EXPIRES: 1013112011 (IIJ-2008) Estimated burden .fer ras~nae to comply wtth this voluntary Information collection raqueat: hour. Ia InformatiOn collection Ia used to plan budgets and resourcea for operator examinations. Send comments re~ardlnl bun:ten estimate to the Records and FOIA/Prlvacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~latory Comml11lon, Wash~. DC 20555-oOO , or ~ lntemet a-mall to In ocollacts@nrc-gov. and to tha Desk Ortlcar, Office of In ormation EXAMINATION DATA and Regulat:t.Alralrs NE B-10202, (3150..0131), Office of Mana~emant and Budget, Wash gtonl 0C 20503. If a means used to lm~sa an nformaOon colkiCtlon dOll not d splay a currandy valid OMB control number, the NRC may not conduct or *rconsor, and a person Is not required to respond to, the Information conact on.

FACILITY NRC REGION Dresden Nuclear Power Station, Units 1 and 3 Renewed FaciUty Operating License Nos. DPR-19 and DPR-25 Ill NRC Docket Nos. 50-137 and 50-149 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 1013

- CY 1014

- CY 2015 CY 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013

- cv1o14 cv1o15 cv1o16 NUMBER OF REACTOR 1 0 6 4 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 2 0 s 7 NUMBER OF SENIOR REACTOR 0 1 OPERATORS-UPGRADE 0 1 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 0 PROPOSED DATES PRIMARY DATE 10/14/2013 N/A 03/01/2015 08/08/1016 ALTERNATE DATE 10/18/2013 N/A 03/23/2015 08/22/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 12 0 0 0 0 CANDIDATES NRC FORM 538 (10*2008) PRINTED ON RECYCLED PAPER

Attachment 5 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 (10*2008) Estimated burden nr rea~nsa to comply with this voluntary Information collactlon raquaat: hour. Ia Information collecUon Ia used to plan budgets and reeourcaa for operator examinations. Send comments ~ardlnB burCien OPERATOR LICENSING estimate to the Recorda and FOIA/Prlvacy Servlcea Branch *!5 F 3), u.s.

Nuclear Riiulatory Commission, Washington, DC 20!5!5!5-000 , or ~ lntemet

  • mall to In ocollecta@nrc.mv, and to the Desk Officer, Office of In rmeUon EXAMINATION DATA and Regulato~ Affaire, NE 8-10202, (3150-0131), Office or Mana~ement and Budget, Wash ngton DC 20503. If a maana uSed to lmpoaa an nfonnatlon coQiii:tlon don not display a currently vand OMB control number, the NRC may not conduct or srconsor, and a person Is not required to respond to, the lnfonnetlon collect on.

FACILITY NRC REGION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 Ill NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013

- CY 2014

- CY 2015 CY 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATO~ LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cv2o14 cv2o1s CY 2016 NUMBER OF REACTOR 0 4 0 6 OPERATORS NUMBER OF SENIOR REACTOR 0 9 0 5 OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 1 0 1 OPERATORS-UPGRADE 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS

  • LIMITED 0

PROPOSED DATES PRIMARY DATE N/A 10/13/2014 N/A 10/10/2016 ALTERNATE DATE N/A 10/20/2014 N/A 10/1712016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED -- --

NUMBER JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH ESTIMATED NUMBER OF 0 13 0 0 0 0 0 0 CANDIDATES NRC FORM 538 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 6 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 (10.2008)

Esllmatad burden fer ras~nse lo comply with lhls volunlary lnrormallon coBacllon requeat hour. hla lnfonnatlon collection Ia uaad to plan budgata and resources for operator allllmlnaUona. Send comments ra~an:llnl buraen OPERATOR LICENSING l esllmata lo the Recorda and FOINPrlvacy Services Branch *5 F 3), U.S.

Nuclear R~latory Commission, Washington, DC 20555-000 , or bX,:.:met a-maU to In colleGII@nrc.gov. and to the Desk Offtcar, Offtca of In lion EXAMINATION DATA and Ragulato~ Affalra NE B*10202 (3150-0131), Olllca of Mana~amant and Bu!fgat, Wash ngton DC 20503. I; a means used to Impose an nformallon coUictlon don not d1splay a curranUy valid OMB control number, the NRC may not conduct o~nsor, and a person Ia not required lo respond to, the lnfonnatlon coli

  • FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 FaeiUty Operating License Nos. NPF-39 and NPF-85 I NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2013 CY 2014 CY 2015 CY 2016 LICENSEE.PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cv2o14 CY 2015 cv2o16 NUMBER OF REACTOR 0 8 0 8 OPERATORS NUMBER OF SENIOR REACTOR 0 6 0 6 OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 2 0 2 OPERATORS-UPGRADE 0 NUMBER OF SENIOR REACTOR 0 0 OPERATORS* LIMITED 0 0 PROPOSED DATES PRIMARY DATE N/A 10/6/2014 N/A 10/3/2016 ALTERNATE DATE N/A 10/13/2014 N/A 10/10/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY CY 2014 PROPOSED -2013- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 14 0 0 0 0 0 0 CANDIDATES NRC FORM 5311 (10.2008) PRINTED ON RECYCLED PAPER

Attachment 7 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/3112011 (10-2001)

Estimated burden fer res~nse to comply with this voluntary Information collection request: hour. lslnformadon collecdon Is used to plan budQ!IIs and resources for operator examlnadons. Send comments reF,idlnl buri1en OPERATOR LICENSING estimate to the Records and FOIA/Prlvacy Services Branch *5 F 3), U.S.

Nuclear R~latory Commlulon, Washington, DC 20555-000 , or ~lirtamet a-mall to In collects@nrc.gov. and to the Daek Officer, Office of In rmadon EXAMINATION DATA and Ragula:Y, Affaire, NE B-10202, (3150-0131), Office of Mana~mant and Budget, Wash ngton DC 20503. If a means used to lm~se an nformatton collaC:tlon does not display a currently valid OMB control number, the NRC may not conduct or *rconsor, and a parson Is not required to respond to, the lnformadon collect on.

FACILITY NRC REGION Limerick Generadng Station, Units 1 and 2 FacUity Operadng License Nos. NPF-39 and NPF-85 I NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2013 CY 2014 CY 2015 CY 2016 LICENSEE-PREPARED 1 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cv2o14 cv2o15 cy2016 NUMBER OF REACTOR 0 0 0 0 OPERATORS NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 0 OPERATORS-UPGRADE 0 0 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 6 PROPOSED DATES PRIMARY DATE 7/15/2013 N/A N/A N/A ALTERNATE DATE 7/22/2013 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ~EPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 0 CANDIDATES NRC FORM 538 (10*2008) PRINTED ON RECYCLED PAPER

Attachment 8 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM531 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150.0131 EXPIRES: 1013112011 (10.2008) Estimated burden fer res~nsa to comply wtth this voluntary Information collecUon request hour. Ia Information collection Is used to plan budgets and resources for operator examlnaUona. Send commenta ~i"dlnB buraen OPERATOR LICENSING estimate to the Recorda and FOIA/Prlva~ Services Branch *5 F 3), U.S.

Nuclear Retclatory Commlllllon, Waahlng n, DC 20555-000 , or ~ lntemet EXAMINATION DATA a-mall to In ollects@nrc-gov. and to the Desk Officer. omce of In rmatlon and Regulato:t,gAifalni, NE B-10202, (3150.0131), Ofllce of Man~amantand Budget, Wash ton DC 20503. If a maana used to Impose an nformallon collecUon doll not display a currently valid OMS control number. the NRC may not conduct or s~onsor, and a person Is not required to respond to, the Information coUect n.

FACILITY NRC REGION Oyster Creek Nuclear Generating Station Renewed FacUlty Operating License No. DPR-16 I NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2013 CY 2014 CY 2015 CY 2016 LICENSEE.PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cv2o14 cv2o15 cv2016 NUMBER OF REACTOR 0 6 0 6 OPERATORS NUMBER OF SENIOR REACTOR 0 5 0 3 OPERATORS *INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 3 NUMBER OF SENIOR REACTOR 0 0 OPERATORS* LIMITED 0 0 PROPOSED DATES PRIMARY DATE N/A 05/26/2014 N/A 05/23/2016 ALTERNATE DATE N/A 06/02/2014 N/A 05/30/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 13 0 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (10-2006) PRINTED ON RECYCLED PAPER

Attachment 9 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 10/31/2011 (10.2008) Estimated burden .fer res~nse to comply with this voluntary Information collection request hour. Is Information coDecUon Is used to plan budgets and resources for operator examinations. Send comments ~i"dln! burclan OPERATOR LICENSING l astlmata to the Recorda and FOIAIPrlvacy Sarvlcaa Branch -8 F 3), U.S.

Nuclear R~ulal!lfy Commission, Washington, DC 20655-000 , or ~ lntemet a-mall to In Ocollects@nrc"Sov, and to the Desk Offtcar, Office of In ormaUon EXAMINATION DATA and Ragulato~ Affairs, NE B-10202, (3150..0131), Ofllca of Man~amant and Bu~at. Wash ngton DC 20503. If a means used to Impose an nformetion colectlon does not display a cunntly valid OMB control number, the NRC may not conduct or s~onsor, and a person Ia not required to respond to, the Information colect n.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Unitsl and 3 FacUlty Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2013

- CY 2014

- CY 2015 CY 2016 LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cv2o14 cv2o15 CY 2016 NUMBER OF REACTOR 4 0* 6 OPERATORS 0

NUMBER OF SENIOR REACT.OR 5 0 6 0 OPERATORS *INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 3 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS

  • UMITED *See LGS * *
  • PROPOSED DATES PRIMARY DATE

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 0 0 CANDIDATES NRC FORM 538 (10*2008) PRINTED ON RECYCLED PAPER

Attachment 10 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/3112011 (10-2008) Estimated burden fer colladlon request hour.

ras~nse to comply with this voluntary Information Is lnformaUcin collection Is used to plan budgets and resources for operator axamlnaltona. Sand comments re~ai'dln§ bull!en estimate to the Records and FOIAIPrlvacy Service~ Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear Ra~latory Commlulon, Washington, DC 20655-000 , or ~lntemet a-mall to In collacts@nre.~v, and to the Desk Officer, Office of In rmatton EXAMINATION DATA and Ragulato~ Affalra~E B-10202, (3150-0131), omca of Mana~ament and Budget, Wash ngton 20503. tr a means used to Impose an nformallon collactlon does not display a currently valid OMB control number, the NRC may not conduct or s&onsor, and a parson Is not required to respond to, the lnformaUon collac on.

FACILITY NRC REGION Quad Cities Nuclear Power Statton, Units 1 and l Renewed Facility Operating License Nos. DPR-29 and DPR-30 Ill NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2013 PROPOSED NUMBER CY 2014 CY 2015 CY 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cvzo14 CY2015 cy2016 NUMBER OF REACTOR 0 0 2 0 OPERATORS NUMBER OF SENIOR REACTOR 0 0 4 0 OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 0 0 OPERATORS-UPGRADE 0 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 0 PROPOSED DATES PRIMARY DATE N/A N/A l/23/2015 N/A ALTERNATE DATE N/A N/A 3/9/2015 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 6 0 0 0 0 0 CANDIDATES NRC FORM 538 (10*2008) PRINTED ON RECYCLED PAPER

Attachment 11 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2011 (10.20081 Estimated burden fer ras~nae to comply with this voluntary Information collection request: hour. Ia lnfonnatiOn ccllecUon Is used to plan budgets end resoun:ea for operator exemlnaUon1. Send comments r'?trdlnLburdan OPERATOR LICENSING l estimate to the Recorda and FOIA/Prlvacy Services Branch *5 F ), U.S.

Nuclear R=tory Commission, Washington, DC 20555-000 , or b~lntamet a-mall to In llei:ts@nrc.gov, end to the Desk Ofllcar, Ofllca of In nnaUon EXAMINATION DATA end Reg~~lato~ Affairs, NE B-10202 (3150-0131), Ofllce of Mana~ement and Budget, Wash ngton DC 20503. I~ a mean* used to Impose an nfonnetlon collactlon does not d1splay a currenUy valid OMB control number, lhe NRC may not conduct or sc::nsor, and e parson Is not required to respond to, the lnfonneUon collect n.

FACILITY NRC REGION Three Mile Island Nuc:Jear Station, Unit J Renewed Facility Operating License No. DPR-50 I NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013

- CY 2014 CY 2015 CY 2016 ESTIMATED NUMBER OF LICENSEE.PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS cy201S PROPOSED NUMBER cv2ou cv2o14 cv20t6 NUMBER OF REACTOR 0 4 0 4 OPERATORS NUMBER OF SENIOR REACTOR 0 7 0 I

8 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 3 0 2 OPERATORS-UPGRADE 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS- LIMITED 0 PROPOSED DATES PRIMARY DATE N/A 06/23/2014 N/A 06/13/2016 AlTERNATE DATE N/A 07/1412014 N/A 07/11/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 17 0 0 0 15 0 CANDIDATES NRC FORM 538 (10.2008) PRINTED ON RECYCLED PAPER

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 1, 2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

BYRON STATION

Dear Mr. Pacilio:

We have received your corporate letter RS-10-130. In that letter, you requested an initial operator licensing examination be scheduled at the Byron Station for January 2014 and January 2015.

In response, we have scheduled an initial licensing examination for the weeks of January 27 and February 3, 2014, at the Byron Station. Additionally, we have scheduled an initial licensing examination for the week of February 9, 2015, at the Byron Station. On-site validation of these examinations is tentatively scheduled approximately three weeks prior to the examination date. We note that you were previously scheduled for an initial operator licensing exam the weeks of January 14 and 21, 2013. Per your request, the 2012 initial license exam has been moved to the week of January 23, 2012, with an onsite validation date of the week of January 2, 2012. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.

M. Pacilio In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/readinq-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA by D. McNeil for/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via ListServ

M. Pacilio In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA by D. McNeil for/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via ListServ DISTRIBUTION:

Daniel Merzke RidsNrrDorllpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariana Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\WORK IN PROGRESS\OL EXAM CONFIRMATION LETTERS\BYR 060111 DRS OL.DOCX D Publicly Available D Non-Publicly Available D Sensitive D Non-Sensitive To receive a copy of this document. indicate In the box: *c** ~Copy w*thout attachmenVenclosure "E"" ~ Coov with attachmenVenclosure ""N"" =No copy OFFICE Rill I Rill IN I 1 NAME RKWalton:co HPeterson DATE 05/17/2011 06/01/2011 OFFICIAL RECORD COPY

www.exei*Jncorp com Exelon Fxr.lon Generat1on 4300 Winfield Road Nuclear Warrenv11ie, IL 60555 RS-10-130 July 28, 2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. SIN 50-456 and SIN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. SIN 50-454 and SIN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating license Nos. DPR-2, (Renewed) DPR-19 and DPR-25 NRC Docket Nos. 50-10. 50-237. and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket Nos. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR-56 NRC Dgcket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

)

l)i'. < '(I / ' ll t '-f C AUG 2 - 2010

July 28, 2010 U.S. Nuclear Regulatory Commission Page 2

Subject:

Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations," dated June 28, 2010 The referenced Regulatory Issue Summary {RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2012 through 2015, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2012 and 2013. Attachments 1 through 10 provide responses to RIS 2010-08 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at {630) 657-2819. - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0- Completed NRC Form 536 for Three Mile Island Nuclear Station- Unit 1

Attachment 1 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2011 (1Q-:Z008) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection Is used to plan budgets and resources for operator examinations. Send comments rfardln~ burden estimate to the Records and FOINPrlvacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission, Washington, DC 20555-000 , or bYc Internet e-mail to in ocoilects@nrc.gov, and to tha Desk Officer, Office of In ormation EXAMINATION DATA and Regulato~ Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Wash ngton, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or seonsor. and a person is not required to respond to, the information collect on.

FACILITY NRC REGION Braidwood Stadon, Units I and 2 Facility Operating License Nos. NPF-72 and NPF-77 Ill NRC Docket Nos. STN 50-456 and STN 50-457 a A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 I I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 NUMBER OF REACTOR 0 OPERATORS 0 8 6 NUMBER OF SENIOR REACTOR 12 6 0 OPERATORS -INSTANT 0 NUMBER OF SENIOR REACTOR 0 OPERATORS-UPGRADE 0 0 0 NUMBER OF SENIOR REACTOR 0 OPERATORS- LIMITED 0 0 0 PROPOSED DATES PRIMARY DATE N/A 3/25/2013 12/08/2014 N/A ALTERNATE DATE N/A 4/8/2013 115/2015 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED --- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 12 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 2 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2011 (1()..2008)

Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments r~ardlng burden estimate to the Records and FOIA/Privacy Services Branch *5 F 3), U.S.

OPERATOR LICENSING Nuclear Re1,ulatory Commission, Washington, DC 20555-000

  • or b{c Internet e-mail to in ocollects@nrc.gov. and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Office or Management and Budget, Washtngton, DC 20503. If a means used to impose an informaUon collection does not display a currently valid OMB control number, the NRC may not conduct or sJ:onsor, and a person Is not required to respond to, the Information collec on.

FACILITY NRC REGION Byron Station, Units I and 2 Facility Operating License Nos. NPF-37 and NPF-66 Ill NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012 CY 2013 CY 2014 CY 2015 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 l EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS CY 2012 cv2o13 CY 2014 CY 2015 PROPOSED NUMBER NUMBER OF REACTOR 2 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 6 6 6 6

OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 0 0 1 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS- LIMITED PROPOSED DATES PRIMARY DATE 1/23/2012 1/21/2013 1127/2014 1119/2015 ALTERNATE DATE 1/16/2012 l/28/2013 l/20/2014 1/26/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ------*-* **--

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 6 0 CANDIDATES NRC FORM 536 (1CJ..2008) PRINTED ON RECYCLED PAPER

Attachment 3 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (1()-2008)

Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets and resources for operator examinations. Send comments r"!!rardin~ burden OPERATOR LICENSING estimate to the Records and FOINPrlvacy Services Branch \ -5 F 3), U.S.

Nuclear R~ulatory Commission. Washington. DC 20555-000 , or ~ Internet a-mall to in ocollects@nrc-gov, and to the Desk Officer, Otllc' ol In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Otllce of Management and Budget. Washmgton, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or seonsor' and a parson is not required to respond to, the information collect on.

FACILITY NRC REGION Clinton Power Station Facility Operating License No. NPF-62 Ill NRC Docket NO. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF cv2012

- CY 2013 CY 2014 CY 201S LICENSEE-PREPARED 0 I 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS cv2o12 cv2o13 CY 2014 CY 201S PROPOSED NUMBER NUMBER OF REACTOR 0 6 0 OPERATORS 6

NUMBER OF SENIOR REACTOR 4 0 4 0

OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 08/19/U N/A 08/17/15 ALTERNATE DATE N/A 08/26/13 N/A 08/24/15 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ~EPTEMBER DECEMBER ESTIMATED NUMBER OF 0 10 0 0 0 0 0 0 CANDIDATES NRC FORM 536 ( 10-2008) PRINTED ON RECYCLED PAPER

Attachment 4 E,celon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 llo!RC FORM$38 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES; 1013112011

,.,o-2001) Estlmatacl burden .f res~onsa to comply with this voluntary Information callac:11an request hOIIr. his lniOrmatfon collection is used to plan budgets and ntsauttel for operator axwnlnaUons. Sand carnrnenll re~dln~ burden OPERA TOR LICENSING aatlmata 10 tha Records and FOIAIPrlvacy Servicaa Branch \ -5 F 3), U.S.

Nuclear R~IAatory Commlsslon, Washington, DC 20555-000

  • or b~ Internal
  • meil to In ocallei:ts@nrc.~v, and to the Desk Officer, Office ol In ormeuon EXAMINATION DATA and Raaula:r, Affalri, NE 8*10202, (3150-0131), Office of 1\Aan~ant and Budget, Wash ngton, DC 20503. If a means used to impose an nformaUon callactlon dOes not dlaplay a currently valid OMB control number, the NRC may not conduct o~onsor, and a parson Is nat tequlred to respond to, the Information COil on.

F....CILITY NRC REGION Drt.Jden Nuclear Power Station, Units 2 and J Renewed Facility Opera ling License Nos. DPR~l9 and DPR~15 Ill NRC Dockel Nos. 50..237 and 50~249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014

- CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 I 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC.PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 1012 cv1ou cv1o14

- CY 1015 NUMBER OF REACTOR 5 4 0 4 OPERATORS NUMBER OF SENIOR REACTOR 7 0 7 7

OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 0 I 0 I OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 8/6/ll 10/14/13 N/A 312/15 AlTERNATE DATE 8/20/Jl 10/18/13 N/A 3/23/15 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2011 CY 2013 PROPOSED *******- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 tl 0 0 0 0 0 12 CANDIDATES NRC FORM 534 ( 10..2001) PRINTED ON RECYCLED PAPER

Attachment 5 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 1013112011 (10-2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his InformatiOn collection Is used to plan budgets and resources for operator examinations. Send comments reR!'rdln~ buri:len estimate to the Records and FOIA/Privacy Services Branch~ *5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission, Washington, DC 20555-000 , or bY. Internet e-mail to in ocollects@nrc.8'ilv, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulate~ Affairs, NE B-10202, (3150..0131 ), Office of Management and Budget, Wash ngton, DC 20503. If a means used to impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sr.,c;nsor. and a person is not required to respond to, the Information collect on.

FACILITY NRC REGION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-1 1 and NPF-18 NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012

- cv2o13 CY 2014 CY 2015 NUMBER OF REACTOR 8 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS* INSTANT s 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS *LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 9/24/2012 N/A 10/13/2014 N/A ALTERNATE DATE 10/1/2012 N/A 10/20/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ----- ---*--

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 12 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 6 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315(H)131 EX PI RES: 10/31/2011 (1Q-2008) Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection Is used to plan budgets and resources for operator examinations. Send comments r~ardlng burden estimate to the Records and FOIA/Prlvacy Services Branch *5 F 3 ). U.S.

OPERATOR LICENSING Nuclear Re~ulatory Commission, Washington, DC 20555*000

  • or b" 1ntemet e-mail to In ocollecls@nrc-gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulato~ Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Wash ngton, DC 20503. If a means used 10 impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the Information collection.

FACILITY NRC REGION Limerick Generating Station, Units I and 2 Facility Operating License Nos. NPF-39 and NPF-85 I NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012 CY 2013 CY 2014 CY 2015 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 l 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2012 cv2ou CY 2014 CY 2015 PROPOSED NUMBER NUMBER OF REACTOR 8 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 7 0 6 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 10/08/2012 N/A 10/06/2014 N/A ALTERNATE DATE 10/15/2012 N/A 10/1312014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED --- -----

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

  • Attachment 7 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 10131/2011 (10.2008)

Estimated burden per res~nsa to comply with lhls voluntary Information collactlon request: 1 l'lour. hill inlormaUon cotlechan 11 used to plan budgets and raaourcas lor operator examinaliona. Sand comments r~IVdiFl burden estlmall to lha Records and FOIA/Prlvecy Sarvlcat Bnsnch -5 F 3), U.S.

OPERATOR LICENSING NUClear R=tory ComrnlQion, WaShington, DC 20555.000

  • or ::Tc internet a-mlil to In lactaQnrc.8t, and to tht Dalk orncar. Office of I onnatlon EXAMINATION DATA and Regul= Atfalns, NE ~10202. (3150-0131). ornca of Mar18Q81"Nnt and Budg.C, W nglon, DC 20503. If a means used to *mposa an inlormatlon collactlon doas not display a currently valid OMS control number, the NRC may not conduct or sponsor, and a person ia not required to respond to, the lnlormatlan collectoon.

FACLITV NRC ReGION Oyster Creek Nudear Generating Station Renewed Facility Operating License No. DPR-16 I NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2012 CY 2013 CY 2014 CY 2015 LICENSEE-PREPARED I 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2011

- CY 1013

- CY 1014 CY 2015 NUMBER OF REACTOR 6 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 3 0 2 0 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 5 0 NUMBER OF SENIOR REACTOR 0 OPERATORS* LIMITED 0 0 0 PROPOSED DATES PRIMARY DATE 05/29/2012 N/A 06/02/2014 N/A AlTERNATE DATE 06/04/2012 N/A 06/09/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 13 0 0 0 CANDIDATES NRC FORM 535 (10.2008) PRINTED ON RECYClED PAPER

Attachment 8 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-Q131 EXPIRES: 10/31/2011 (1Q-2008) Estimated burden par ras~onsa to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection is used to plan budgets and resources for operator examinations. Send comments re;+ardin~ burden OPERATOR LICENSING l estimate to the Records and FOIA/Prlvacy Services Branch -5 F 3), U.S.

Nuclear R~ulatory Commission, Washington, DC 20555-000 , or bf: Internet e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office of In onmation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-Q131), Office of Management and Budget, Washmgton, DC 20503. If a means used to impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or s&,onsor. and a person is not required to respond to, the information collec n.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 I 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2012 CY 2013 CY 2014 CY 2015 PROPOSED NUMBER NUMBER OF REACTOR 6 OPERATORS 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 0 10 0 6 NUMBER OF SENIOR REACTOR 2 2 OPERATORS-UPGRADE 0 0 NUMBER OF SENIOR REACTOR '

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 12 0 CANDIDATES NRC FORM 5J6 (10.2008) PRINTED ON RECYCLED PAPER

Attachment 9 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08' Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 110-2008) Estimated burden per res~onse to comply with this Yoluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection Is used to plan budgets and resources for operator e*aminations. Send comments r"t\ardlng burden estimate to the Records and FOINPrivacy Services Branch\ *5 F 3), U.S.

OPERATOR LICENSING Nuclear R:;rc:,latory Commission, Washington, DC 20555-000 , or br. Internet e-mail to in ocollacts@nrc.gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulate~ Allalrs, NE B-10202. (3150-0131), Office of Management and Budget, Wash ngton. DC 20503. If a means used to impose an information collection does not display a currently Yalid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collectJon.

FACILITY NRC REGION Quad Cities Nuclear Power Station, Units I and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2012 CY 2013 CY 2014 CY 2015 LICENSEE-PREPARED I I 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012

- cv2o1J

- CY 2014 CY 2015 NUMBER OF REACTOR 4 5 0 OPERATORS 5

NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 9 s 0 s NUMBER OF SENIOR REACTOR I 0 OPERATORS-UPGRADE 0 0 NUMBER OF SENIOR REACTOR 0 0 OPERATORS- LIMITED 0 0 PROPOSED DATES PRIMARY DATE 3/26/2012 9/23/2013 N/A 2/9/2015 ALTERNATE DATE 4/23/2012 10/14/2013 N/A 2/23/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ----*-*-- *--

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 10 0 0 0 0 0 10 CANDIDATES NRC FORM 538 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 10 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-Q131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per res~onse to comply with this voluntary Information collectiOn request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his InformatiOn collection is used to plan budgets and resources for operator examinations. Send comments rwrding burden estimate to the Records and FOINPrlvacy Services Branch ~ -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission, Washington, DC 20555-000

  • or blc internet e-mail to in ocoliects@nrc.gov. and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-Q131). Office of Management and Budget, washington, DC 20503. If a means used to Impose an information collectiOn does not display a currently valid OMS control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection.

FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 I NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012 CY 2013 CY 2014 CY 2015 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 I I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2012 CY 2013 CY 2014 CY 2015 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 4 s 4 6 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT s 5 s 6 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS- LIMITED PROPOSED DATES PRIMARY DATE 02/6/2012 6/10/2013 6/16/2014 6/15/2015 ALTERNATE DATE 02/13/2012 6/17/2013 6/23/2014 6/22/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED -- ---*--

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 0 0 0 9 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 19, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION Ill EXELON STATIONS

Dear Mr. Pardee:

In a letter dated August 13, 2009 (RS-09-1 09), your staff responded to Regulatory Issue Summary (RIS) 2009-11, and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated March 19, 2009 (U-603882),

Cli~ton Power Station requested an examination be administered in October or November 2010 that was not included in your RIS response letter. That examination has been added to your examination schedule. In a separate letter dated November 18, 2009 (U-603924),

Clinton Power Station requested we not schedule the examination requested in December 2011 per your letter, but retain an August 2011 examination scheduled from your response to the 2008 RIS for examination scheduling. In a separate letter dated January 6, 2010 (Byron 201 0-0003), Byron Station requested we change the dates of their examinations proposed for 2011, 2012, and 2013 to other dates. We were unable to accommodate the April 2013 examination requested for Quad Cities Nuclear Power Station. It is currently listed as "To Be Determined" as we are currently negotiating a mutually acceptable examination date with Quad Cities training department personnel. This letter confirms scheduling of the requested examinations at the Region Ill Exelon power plants and incorporates the changes requested by Clinton Power Station and Byron Station. We have tentatively scheduled the requested examinations to occur as follows:

Station 2010 2011 2012 2013 2014 Braidwood N/R 06/20 N/R 03/25 N/R Byron 9127 N/R 01/16 01/14 01/27 Clinton 11/1 8/22 N/R 8/19 N/R Dresden 03/08 03/07 3/05 3/04 N/R LaSalle 09/13 N/R 09/24 N/R N/R Quad Cities N/R 5/30 3/26 TBD N/R N/R- None Requested TBD- To Be Determined On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station's training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

C. Pardee We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks.

Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule.

Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.

A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-37 4 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ

C. Pardee We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks.

Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule.

Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.

A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS}, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ DISTRIBUTION:

See next page DATE 01/25/10 02/17/10 02/19/10 OFFICIAL RECORD COPY

Letter to Mr. Charles G. Pardee from Mr. Hironori Peterson, dated February 19, 2010.

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION Ill EXELON STATIONS DISTRIBUTION:

RidsNrrDoriLpl3-2 Resource Susan Bagley RidsNrrPMBraidwood Resource RidsNrrPMByron Resource RidsNrrPMCiinton Resource RidsNrrPMDresden Resource RidsNrrPMLaSalle RidsNrrPMQuad Cities RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DR Sill Carole Aria no Linda Linn Patricia Buckley Tammy Tomczak

Exelon Nuclear www.exeloncorp.com Nuclear 4300 Winfield Road warrenville, IL 60555 RS-09-109 August 13, 2009 U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating license Nos. NPF-72 and NPF-77 NRC Docket Nos. SIN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. SIN 50-454 and SIN 50=455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Fadlity Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

~*.7 '

~-~.'ct"l-'~ N AUG 1 7 2009

August 13, 2009 U. S. Nuclear Regulatory Commission Page 2

Subject:

Response to NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations," dated July 16, 2009 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2010 through 2013, and the number of candidates requiring Generic Fundamentals Examinations (GFEs) for calendar years 2010 and 2011. Attachments 1 through 10 provide responses to RIS 2009-11 for the Exelon Generation Company, LLC (EGC) plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2010, eight candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 6. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate.

There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at {630) 657-2819.

ger - Licensing and Regulatory Affairs -Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station -Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

Attachment 1 Response to RIS 2009-11 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO, 3150.()131 EXPIRES: 10/31/2011 (10-2008) Estimated burden par res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collactlon is used to plan budgets and resources for operator examinations. Send comments r~ardlnH burden estimate to the Records and FOIA/Prtvacy Sarvlcas Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission, Washington. DC 20556-000

  • or ~ Internet a-mall to In ocollects@nrc.gov, and to the Desk Officer, Office of I ormaUon EXAMINATION DATA and Regula!~ Alfalrs. NE B-10202, (3150.()131), OffiCe of MaRa!tement and Budget, Wash ngton, DC 20503. If a means used to impose an mfom18tion collection does not display a currently valid OMB control number, lha NRC may not conduct or sra:nsor, and a parson Is not required to respond to, the Information collect on.

FACIUTY NRC REGION Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 Ill NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2010 CY 2011

-- CY 2012

- CY 2013

- '//

LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS cv2o11 PROPOSED NUMBER CY 2010

-- CY 2012

-- CY 2013 NUMBER OF REACTOR OPERATORS 0 7 0 s NUMBER OF SENIOR REACTOR 0 12 0 12 OPERATORS- INSTANT NUMBER OF SENIOR REACTOR 2 0 OPERATORS-UPGRADE 0 2 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS- LIMITED 0

PROPOSED DATES PRIMARY DATE N/A 06/20/2011 N/A 03/24/2013 ALTERNATE DATE N/A 07/1112011 N/A 04/08/2013 C. PROPOSED GENERIC FUNDAMENTALS EXANIINATION (GFE) SCHEDULE CY 2010 CY lOll PROPOSED --

NUMBER SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ESTIMATED NUMBER OF 21 0 0 0 0 0 0 19 CANDIDATES NRC FORM 536 (tQ-2008) PRII'ITI':O ON RI':CYCLED PAPER

Attachment 2 Response to RIS 2009-11 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315()..0131 EXPIRES: 10131/2011 (10-2008) Estimated burden per res~onse to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information conecllon Is used to plan budgets and resources for operator examinations. Send comments re~ardtng burden estimate to the Records and FOIAIPrlvecy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission, Washington, DC 20555-000 , or blt Internet e-mail to In ocollects@nrc.gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulato;r. Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Wash ngton, DC 20503. If a means used to Impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sr.onsor, and a person Is not required to respond to, tha Information collect on.

FACIUTY NRC REGION Byron Stadon, Units 1 and 1 Facility Operating License Nos. NPF-37 and NPF-66 Ill NRC Doeket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2010

- CY 2013 LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC* PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS cv2o12 PROPOSED NUMBER CY 2010 cv2ou

-- - CY 2013 NUMBER OF REACTOR 8 0 0 OPERATORS 6 NUMBER OF SENIOR REACTOR 8 6 6 6 OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 1 0 OPERATORS-UPGRADE I 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 0 PROPOSED DATES PRIMARY DATE 09/27/2010 09/26/2011 09ll412012 09/23/2013 ALTERNATE DATE N/A 10/03/2011 10/0112012 10/07/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED -----**- --*

NUMBER SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ESTIMATED NUMBER OF 0 6 0 0 0 6 0 0 CANDIDATES NRC FORM 538 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 3 Response to RIS 2009-11 Page 1 of 1 NRCFORMS31 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3151).0131 EXPIRES: 0813112008 (6-2005)

Eallmeted burden fr.r r.~nH lo comply wtth thla voluntary lnlormllllon IXIIIIIcllon reqvell: hour. lllnformalklil collec:tlon II uMII to pllln buclgel8 and rssouroee for operator eqmlnMJons. Send commente ~~buRien OPERATOR LICENSING EXAMINATION DATA 111lm1ta to lhl Recordl end FOIAIPriYecy SI!VIcet Branch -6 F ), U.S.

Nucl- R~ulelllry Cornmlaslon, Wuhlnglon, DC 201165-000 , or :z

.-m*l lo In ocaH.a.clnn:~, and lo the O.lllc Olllcer, Ofllc:e of I 0nn1111on liltemet lnd R~ Alfelrj, NE 10202, (3150-0131), 0111011 of Mlf1~ 811C1 Budget, WI gtOn.,;:; 20503. If

  • means uied to lmpoee 1n fllnMtlon collec:tlon does not d IIV
  • amenity valid OMB conllol number, thl NRC IIIIV not conduct o~onaor, end
  • per10n Ia not required to respond to, the lnformellon cal n.

FACIUlY NRC ReGION Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 Ill NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2010 CY2011 CY2012 CY2013 I LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESnMATED NUMBER OF NRc-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013 NUMBER OF REACTOR 6 6 0 OPERATORS 6 NUMBER OF SENIOR REACTOR 0 4 0 4 OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 2 OPERATORS-UPGRADE 0 0 2 NUMBER OF seNIOR REACTOR 0 0 0 0 OPERATORS* UMrTED PROPOSED DATES PRIMARY DATE 10/2512010 12/05/2011 N/A 08/1912013 AlTERNATE DATE 11/01/2010 12/11/2011 N/A 0812812013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINAnON (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED --*- ----

NUMBER SEPTEMBER DECEMBER MARCH SEPTEMBEFI DECEMBER MARCH JUNE JUNE ESTIMATED NUMBER OF 0 0 9 0 0 0 0 0 CANDIDATES NRC fORM 5:!11 (WOO!!) PRINTED ON RECYClED PAPER

Attachment 4 Response to RIS 2009-11 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: N0.. 3150-0131 EXPIRES: 10/31/2011 (10.2008)

Estimated burden per res~nae to comply with thla voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information colleellon Is used to plan budgets and resources for operator examinations. Send comments rar.rdlng buri:len estimate to the Records and FOIA/Prlvacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission, Washington. DC 20555-000 , or bYc Internet e-mail to In oc:ollects@nrc.gov, and to the Desk Officer, Office olin ormation EXAMINATION DATA and Regulate~ Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Wash ngton, DC 20503. If a means used to Impose an Information collection does not display a currently valid OMB control n\Jmber, lha NRC may not conduct or ~onsor, and a parson Is not required to respond to, the Information colla n.

FACILITY NRC REGION Dresden Nuclear Power Station, Units l and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 Ill NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2010 CY 2011 CY 2012 CY 2013 LICENSEE-PREPARED 1 I I I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011

- CY 2012

- CY 2013 NUMBER OF REACTOR 2 3 3 OPERATORS J NUMBER OF SENIOR REACTOR 6 9 9 9 OPERATORS- INSTANT NUMBER OF SENIOR REACTOR t 1 OPERATORS-UPGRADE I 1 NUMBER OF SENIOR REACTOR 0 0 OPERATORS- LIMITED 0 0 PROPOSED DATES PRIMARY DATE 03/08/2010 03/0712011 03/0S/2012 03/04/2013 ALTERNATE DATE 04/0512010 04/04/2011 04/02/2012 04/01/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 12 0 0 0 1l CANDIDATES NRC FORM 538 (10.2008) PRINTED ON RECYCLED PAPER

Attachment 5 Response to RIS 2009-11 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/3112011 (10.2008) Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection Is used to plan budgets and resources for operator examinations. Send comments re~rdln~ burden estimate to the Records and FOINPrlvacy Services Branch~ -5 F 3). U.S.

OPERATOR LICENSING Nuclear Ra?.utatory Commission. Washington, DC 20555*000 , or bt Internet e-maH to In ocollects@nrc.~v, and to the Desk Officer, Office of In rmation EXAMINATION DATA and Regulato~ Affairs, NE 8-10202, (3150-0131), Office of Management and Budget, Wash ngton, DC 20503. If a means used to Impose an Information collection does not display a currently valid OMB conlrol number, the NRC may not conduct or sconsor, and a person Is not required to respond to, the Information collect on.

FACILITY NRC REGION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 lll NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 CY lOll CY 2012 CY 2013 PROPOSED NUMBER

-- -- -- - ~

ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS cvzou PROPOSED NUMBER CY 2010 CY lOll

-- CY 2012 NUMBER OF REACTOR 3 0 6 OPERATORS 0

NUMBER OF SENIOR REACTOR 11 0 8 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 2 0 OPERATORS-UPGRADE 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS- LIMITED 0

PROPOSED DATES PRIMARY DATE 09/14/2010 N/A 09/24/2012 N/A AlTERNATE DATE 09/21/2010 N/A 10/01/2012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED --* ----

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES NRC FORM 538 (tD-2008) PRINTED ON RECYCLED PAPER

Attachment 6 Response to RIS 2009-11 Page 1 of 2 jNRC: _POIUI131 U.S. NUCU!AR IIIII!GULATORY C~IION Af'f'ROVIO flY OMB: NO. 3180-0131 E>CPINS: 1Mtl2011 1HOOI) caiiKtlan...... I:haur.~...,.to.......

Eeemelilcl burdell c:omply wllh tin vofun_WrJ lllfannllllon decllollll ..... 110-aplllllar ......iliiiDIIe. Send r~buiilln

~

oll::z..-...

....,... 110 llie Aeciordii...S F~ SeMcea er.nc11 :.& F ), U.S.

OPERATOR UCENSING EXAMINAnON DATA

...._ ~C'.onniiiiDII, w~ DC HIIIIIIIO ~..!:* end 110 1M 01111 Olllclr, Olllcl

.... ~~ 'f"'\131110-0131).

  • 01 otbol-:-....:: flml on

~ iilijji8, 201103.

  • _ , . uiediiO flnlae In I nat conduct lnbmllllan ex:.:-*

callii:dan dMIIial * ~VIlli OMB -*"1 .......,., . . I'R: ~

.nd

  • pttniOit Ia not requiNd ID ntlpond to, IIM1i PN:JUfY NRC ReGION U..erldr. Gelln'll.... Statio., Ualal aad 1 F~elllty Openfllla LlceiiH N01. NPF*l' ud NPF-85 I NRC Docbt N01. !10-352 ud 51-39 A. PROPOSED EXAMINATION PREPARATION SCHEDULE ey 1011 cvzou cvz*u PROPOSED NUMBER

- CY lilt ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 0 I ESTIMATED NUMBER OF NRC-PREPARED EXAMINATION8 *

  • 0
8. INinAL OPERATOR LICENSE EXAMINATIONS cvzon cvzou cvzeu PROPOSED NUMBER CY lOll NUMBER OF REACTOR 6 0 11 0 OPERATORS NUMBER OF SENIOR REACTOR 7 0 5 I OPERATORS *INSTANT NUMBER OF SENIOR AEACTOR 0 l OPERATORS* UPGRADE 5 I NUMBER OF SENIOR REACTOR OPERATORS* UMITED

NUMBER JUNE ~EPTEMBER DECEMBER MARCH JUNE !SEPTEMBER DECEMBER MARCH ESTIMATED NUMBER OF 0 0 0 0 0 16 0 0 CANDIDATES NRC FORU 131 (1Go21101)

Attachment 6 Response to RIS 2009-11 Page 2 of2 NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BYOMB: NO. 3150-0131 EXPIRES: 10131/2011 (lo-2008)

Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collactlon Is used to plan budget&

and resources for operator examinations. Send comments re~ardlnR burden estimate to the Records and FOIA/Prlvacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission, Washington, DC 20555-000 , or bz,lnternet a-mall to I ocollacts@nrc.gov, and to the Desk Officer, Office of In rmellon EXAMINATION DATA and Regulal~ Alfalrs, NE B-10202, (3150-0131), Office of Management and Budget, wash ngton DC 20503. II a means used to Impose an lnfonnallon collection does not display a currenUy valid OMS control number,lhe NRC may not conduct or s,ro:nsor. and a person Is not required to respond to, the lnlormauon cotlec on.

FACIUTY NRC REGION Limerick Generating Station, Units I and 2 Facility Operating License Nos, NPF-39 and NPF-85 I NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 CY 2011 CY 2012 CY 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010

- CY 2011 CY 2012 cy20t3 NUMBER OF REACTOR 0 0 0 OPERATORS 0

NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 0 0 OPERATORS-UPGRADE 0 0 NUMBER OF SENIOR REACTOR 0 0 OPERATORS- LIMITED 8 0 PROPOSED DATES PRIMARY DATE 06/14/2010 N/A N/A N/A ALTERNATE DATE 06/07/2010 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED --*- ----

NUMBER SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ESTIMATED NUMBER OF 0 0 0 0 0 0 0 0 CANDIDATES NRC FOAM 536 (10.2008) F'RINl'EO ON RECYCLED PAPER

Attachment 7 Response to RIS 2009-11 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 1013112011 (111-2008) Estimated burden par res~onse to comply with this voluntary lnlormallon collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection Is used to plan budgets and resources lor operator examinations. Send commenla r~ardlnB burden estimate to the Records and FOIA/Prlvacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission, Washington, DC 20555-000 , or ~ Internet e-mail to In ocollects@nrc.8ov, and to the Desk Officer, Office ol In ormation EXAMINATION DATA end Regulato:y, Affairs, NE B-10202, (3150.0131 ), Office of Management and Budget, Wash ngton, DC 20503. II a means used to Impose an Information collactlon does not display a currently valid OMB control number, the NRC may not conduct or s~nsor, and a person Is not required to respond to, the lnformallon collect .

FACILITY NRC REGION Oyster Creek Nuclear Generating Station Renewed FaeiUty Operating Llc:ense No. DPR-16 I NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 CY 2011 CY 2012 CY 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED I 1 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2010 CY 20ll cv2o12 CY 2013 PROPOSED NUMBER NUMBER OF REACTOR 6 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 7 7 8 0 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR t 2 0 OPERATORS-UPGRADE 2 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0

PROPOSED DATES PRIMARY DATE OS/17/2010 07/ll/2011 05/2812012 N/A ALTERNATE DATE 05/24/2010 07/18/2011 06/04/2012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED --- --

NUMBER SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ESTIMATED NUMBER OF 13 0 0 0 14 0 0 0 CANDIDATES NRC FORM 538 (10..2008) PRINTED ON RECYCLED PAPER

Attachment 8 Response to RIS 2009-11 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..()131 EXPIRES: 10/31/2011 (10.2008) Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection Is used to plan budgets and resources lor operator examinations. Send comments r~ardlng burden estimate to the Records and FOIA/Prlvacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear Re?culatory Commission, Washington, DC 20555-000 , or bbintemet a-mail to In ocollects@nrc.gov, and to the Desk Ofllcer, Office of In rmatlon EXAMINATION DATA and Regula!~ AffairS, NE B-10202, (3150.0131), Offlea of Management and Budget, Wash ngton DC 20503. If a means used to lmposa an lnformaUon collection does not display a currently valid OMB control number, the NRC may not conduct or ~onsor, and a person Is not required to respond to, the lnformaUon colle n.

FACiliTY NRC REGION Peach Bottom Atom Power Statton, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2010 CY 2011

- CY 2012

-- CY 2013 LICENSEE-PREPARED 0 1 0 l EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS cvzou PROPOSED NUMBER CY 2010

- CY 2011

-- CY 2012 NUMBER OF REACTOR 0 6 0 OPERATORS 8 NUMBER OF SENIOR REACTOR 0 8 0 10 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 3 OPERATORS-UPGRADE 0 0 2 NUMBER OF SENIOR REACTOR 0 0 OPERATORS- LIMITED

  • 0 PROPOSED DATES PRIMARY DATE
  • 01/31/2011 N/A 02/11/2013 ALTERNATE DATE

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 18 0 CANDIDATES NRC FORM 538 (10.2008) PRINTEO ON RECYCLED PAPER

  • See Attachment 6 (Limerick Generating Station) for Limited SRO numbers and exam dates

Attachment 9 Response to RIS 2009-11 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315().{)131 EXPIRES: 10/31/2011 (1().2008) Estimated burden per rea~onse to comply wtth this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection Is used to ptan budgets and resources lor oparator e~amlnatlons. Send comments re~rdln~ burilen estimate to the Records and FOINPrlvacy Services Branch *5 F 3), U.S.

OPERATOR LICENSING Nuclear Re~tory Commission, Washington, DC 20555-QOO , or ~Internet e-mail to In llects@nrc.gov. and to the Desk Officer, Olflca olin rmatlon EXAMINATION DATA and Regulatoili Affairs, NE B-10202, (3150.41131), Office of Management and Budgat, Wash ngton, DC 20503. If a means used to Impose en Information collection does not display a currently valid OMB control number, the NRC may not conduct or srconsor, and a parson i& not required to respond to, the Information collect on.

FACILITY NRC REGION Quad Cities Nuclear Power Station, Units I and 2 Renewed FaciUty Operating License Nos. DPR-29 and DPR-30 Ill NRC Docket Nos. 50-254 and S0-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010

. CY 2011 , CY 2012

- CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 t l 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 E;XAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 cvzo11 CY lOll cv2ot3 NUMBER OF REACTOR 0 6 4 OPERATORS 3

NUMBER OF SENIOR REACTOR 0 11 10 10 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 1 OPERATORS-UPGRADE 0 1 NUMBER OF SENIOR REACTOR 0 0 OPERATORS- LIMITED 0 0 PROPOSED DATES PRIMARY DATE N/A 05/30/2011 03/12/2012 04/15/2013 ALTERNATE DATE N/A 06/13/2011 03/26/2012 04/29/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 1010 CY 2011 PROPOSED *---- ---

NUftMBER ~EPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ESTIMATED NUMBER OF 0 0 0 14 0 0 0 0 CANDIDATES NRC FORM 538 (10.2008) PRINTED ON RECYCLED PAPER

Attachment 10 Response to RIS 2009-11 Page 1 of 1 NRC FORM 531 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 31110.0131 EXPIRES: 1013112011 (10.2001)

Eetlmatecl burden per r1~11 to comply wtth thll voluntary Information Clllllecllon 11tqUelt 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. lltnformllttan coiiCIJon Ia Ulllld!O plan budgetJI and teiDUICH for operelor IJICIIIIInlltlona. Send cammen11 ~~bwilen OPERATOR UCENSING ellll!llllto lha Recorda and FOtAIPrfvacy Semc:.t Branch -6 F , u.s.

Nuc:tear R~ulltory Conmlulon, Wahl~. DC 21J665.000 , or  ::t.mtmemet EXAMINATION DATA HMM to I cotl~nrcS: 1nd ID !hi Oetk Olllcer, Otlk:e of 1 Ilion end Reou=fran NE \0202, (3150-0131), Olllcl of M~t MC1 Budget, W on 0C 20503. II 1 !IIMnt ullllll to lmpote an folmlllon collKtloll doll not d!iPiiiy e cunanVy Ylllld OM8 conlrd nwnbar, IIMI NRC ~!

not conduct o~ntor, and

  • pereon Ia not required to reepond to the Information col .
  • FACILITY NRC REGION Three Mile lslaad Nuele*r Statloa. Unit I FHWty OperadDJ Lleeaae no. DPR-50 I NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 cv 2011 cvzot:z PROPOSED NUMBER

- - - CY lOll ESTIMATED NUMBER OF LICENSEE-PREPARED I 1 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC.PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS cvzo11 cv:zou PROPOSED NUMBER CV :ZOlO CY1013 NUMBER OF REACTOR 1 10 0 OPERATORS 9 NUMBER OF SENIOR REACTOR t 10 0 8 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR I 0 OPERATORS-UPGRADE 0 1 NUMBER OF SENIOR REACTOR 0 0 OPERATORS* LIMITED 0 0 PROPOSED DATES PRIMARY DATE Ol/1111010 09/12/1011 N/A 09/09/lOlJ AI.TERNATE DATE Ol/1811010 09/19110ll N/A 09/16/Z013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv 2010 CY 1011 PROPOSED --***-*~*- *-*---

NUMBER JUNE SEPTEMBER DECEMBER MARCH JUNE [sEPTEMBER DECEMBER MARCH ESTIMATED NUMBER OF ll 0 0 0 18' 0 0 0 CANDIDATES NRC FORM 15341 (ICI-2001) Pfl!HTI!D ON RECYClED PAPER