RS-11-110, Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
(Redirected from RS-11-110)
Jump to navigation Jump to search
Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations
ML111801262
Person / Time
Site: Dresden, Peach Bottom, Oyster Creek, Byron, Braidwood, Limerick, Clinton, Quad Cities, LaSalle, Crane  Constellation icon.png
Issue date: 06/29/2011
From: Hansen J
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, NRC/FSME, Office of Nuclear Reactor Regulation
References
RS-11-110, RIS-11-004
Download: ML111801262 (14)


Text

Nuclear RS-11-110 June 29, 2011 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-2, (Renewed) DPR-19 and DPR-25 NRC Docket Nos. 50-10. 50-237. and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

June 29, 2011 U. S. Nuclear Regulatory Commission Page 2

Subject:

Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2011-04, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2011-04, "Preparation and Scheduling of Operator Licensing Examinations," dated May 26,2011 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2013 through 2016, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2013 and 2014. Attachments 1 through 11 provide responses to RIS 2011-04 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2013, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 7. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 7 for LGS. Attachment 9 for PBAPS references Attachment 7 where appropriate.

June 29, 2011 U. S. Nuclear Regulatory Commission Page 3 There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station -IL T - Completed NRC Form 536 for Limerick Generating Station - LSRO - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station 0 - Completed NRC Form 536 for Quad Cities Nuclear Power Station 1 - Completed NRC Form 536 for Three Mile Island Nuclear Station

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 31S0-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch IT-S FS3). U.S.

Nuclear Re~ulatory Commission, Washington, DC 20S55-000,or by internet EXAMINATION DATA e-mail to in ocollects@nrc-g0v, and to the Desk Officer, Office of Information and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget. Washington, DC 20S03.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Braidwood Station, Units 1 and 2 Facility operating License Nos. NPF-72 and ~PF-77 III

'liRe Docket :'IIos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2013 CY 2014 Cy 2015 CY 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 Cy 2014 CY 2015 CY 2016 NUMBER OF REACTOR OPERATORS 6

0 6

6 NUMBER OF SENIOR REACTOR 10 0

to 6

OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 3125/2013 N/A 1/5/2015 1013/2016 ALTERNATE DATE

-t/8/2013

'lilA 121812014 10/17/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

f) 16 0

0 0

0 0

CANDIDATES

'iRe FORM 536,'S*20081 "RI~TED ON RECYC,-ED PAPER

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOINPrivacy Services Branch F-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-000,or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 III NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 CY 2015 Cy 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF 0

0 0

NRC-PREPARED 0

EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY 2014 Cy 2015 CY 2016 NUMBER OF REACTOR 2

OPERATORS 9

0 7

NUMBER OF SENIOR REACTOR 9

6 0

7 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 1

1 0

1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 4/29/2013 9/15/2014 N/A 3/2112016 ALTERNATE DATE 5/13/2013 9/29/2014 N/A 4/412016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 0

0 0

0 0

14 0

CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRC FORM 536 u.s. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (1Q*2006)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection ;s used to plan budgets OPERA TOR LICENSING and resources for operator examinations. Send comments re~rdin~ burden estimate to the Records and FOIAlPrlvacy Services Branch ~ -5 F 3), U.S.

Nuclear Re?,ulatOry Commission, Washington, DC 20555*000

  • or by, intemet EXAMINATION DATA e*ma~ to in oco!lects@nrc~v. and 10 the Desk Officer. Office of In ormation and Regulato~ Affairs, NE B*10202, (3150*0131). Office of Management and Budget, Wash glOn, DC 20503.

If a means used 10 Impose an information collection does not display a currentiy valid OMS control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collectIon.

FACILITY NRC REGION Clinton Power Station Facility Operating License No. NPF-62 HI NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 Cy 2015 Cy 2016 ESTIMATED NUMBER OF LlCENSEE*PREPARED I

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY2014 CY2015 Cy2016 NUMBER OF REACTOR OPERATORS 6

()

6 0

NUMBER OF SENIOR REACTOR 4

OPERATORS

  • INSTANT 0

4 0

NUMBER OF SENIOR REACTOR 2

0 2

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 8-19-13 N/A 8-17-15 N/A ALTERNATE DATE 8-26-13 N/A 8-24-15 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

()

0 10 0

0 CANDIDATES NRC FORM 536 (10*2008)

PRINTED ON RECYCLED PAPER

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150*0131 EXPIRES: 10/31/2011 (10*2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection is used to plan budgets and resources for operator examinations. Send comments re~arding burden OPERA TOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch ~ *5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555*000,or by internet EXAMINATION DATA e*mail to infocollects@nrc'gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NE B*10202, (3150*0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 III NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 CY 2015 CY 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

0 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY 2014 Cy 2015 CY 2016 NUMBER OF REACTOR OPERATORS 2

0 6

4 NUMBER OF SENIOR REACTOR 2

0 5

7 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 1

1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 10/14/2013 N/A 03/02/2015 08/08/2016 ALTERNATE DATE 10/28/2013 N/A 03/23/2015 08/22/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

12 0

0 0

0 CANDIDATES NRC FORM 536 (10*2008)

PRINTED ON RECYCLED PAPER

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRC FORM 536 U.s. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPI RES: 10/3112011 (10-2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection is used to plan budgets and resources for operator examinations. Send comments retarding burden OPERATOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch ~ -5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-000,or bfc internet EXAMINATION DATA e-mail to infocollects@nrc'80v, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-ll and NPF-18 III NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 Cy 2015 Cy 2016 ESTIMATED NUMBER OF LlCENSEE*PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY 2014 CY 2015 CY 2016 NUMBER OF REACTOR 0

4 0

6 OPERATORS NUMBER OF SENIOR REACTOR 0

9 0

5 OPERATORS

  • INSTANT NUMBER OF SENIOR REACTOR 0

1 0

1 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERA TORS - LIMITED PROPOSED DATES PRIMARY DATE N/A 10/13/2014 N/A 10/10/2016 ALTERNATE DATE N/A 10/20/2014 N/A 10/17/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

13 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection is used to plan budgets and resources for operator examinations. Send comments re~arding burden OPERA TOR LICENSING estimate to the Records and FOINPrivacy Services Branch ~ -5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-000,or by intemet EXAMINATION DATA e-mail to infocollects@nrc'80v, and to the Desk Officer, Office of Information and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I

NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 Cy 2015 CY 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY 2014 CY 2015 Cy 2016 NUMBER OF REACTOR OPERATORS 0

8 0

8 NUMBER OF SENIOR REACTOR 0

6 0

6 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

2 0

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE N/A 10/6/2014 N/A 10/3/2016 ALTERNATE DATE N/A 10/13/2014 N/A 10/10/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

14 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERA TOR LICENSING estimate to the Records and FOIAJPrivacy Services Branch ~T-5 F53), U.S.

Nuclear Rer,ulatOry Commission, Washington, DC 20555-000,or b¥C intemet EXAMINATION DATA e-mail to in ocollects@nrc'80v, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I

NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 CY 2015 CY 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 0

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY 2014 CY 2015 CY 2016 NUMBER OF REACTOR OPERATORS 0

0 0

0 NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 6

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 7/15/2013 N/A N/A N/A ALTERNATE DATE 7/22/2013 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection is used to plan budgets and resources for operator examinations. Send comments reo/rding burden OPERA TOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch ~ -5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-000, or by internet EXAMINATION DATA e-mail to infocollects@nrc.sov, and to the Desk Officer, Office of Information and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collecllon.

FACILITY NRC REGION Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 I

NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 CY 2015 CY 2016 ESTIMATED NUMBER OF 1

0 1

LICENSEE-PREPARED 0

EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY 2014 Cy 2015 Cy 2016 NUMBER OF REACTOR OPERATORS 0

6 0

6 NUMBER OF SENIOR REACTOR 0

5 0

3 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0

2 0

3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE N/A 05/26/2014 N/A 05/23/2016 ALTERNATE DATE N/A 06/02/2014 N/A 05/30/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 Cy 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 13 0

0 0

0 0

0 0

CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection is used to plan budgets and resources for operator examinations. Send comments retarding burden OPERA TOR LICENSING estimate to the Records and FOINPrivacy Services Branch ~ -5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-000, or b{; intemet EXAMINATION DATA e-mail to infocollects@nrc.sov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-1 0202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR-56 I

NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 CY 2015 CY 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY 2014 Cy 2015 Cy 2016 NUMBER OF REACTOR 4

0 6

0 OPERATORS NUMBER OF SENIOR REACTOR 5

OPERATORS -INSTANT 0

6 0

NUMBER OF SENIOR REACTOR 3

0 2

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR

  • See LGS OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 3/25/2013 N/A 3/23/2015 N/A ALTERNATE DATE 4/112013 N/A 3/30/2015 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 12 0

0 0

0 0

CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 0 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch F-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-000,or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 III NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 Cy 2015 CY 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY 2014 Cy 2015 CY 2016 NUMBER OF REACTOR 0

OPERATORS 0

2 0

NUMBER OF SENIOR REACTOR 0

0 4

0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE N/A N/A 2/23/2015 N/A ALTERNATE DATE N/A N/A 3/9/2015 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 Cy 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 6

0 0

0 0

0 CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 1 Page 1 of 1 NRC FORM 536 U.s. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERA TOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch ~T-5 F53). U.S.

Nuclear Regulatory Commission. Washington. DC 20555-000

  • or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov. and to the Desk Officer. Office of Information and Regulatory Affairs. NE B-10202. (3150-0131). Office of Management and Budget. Washington. DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number. the NRC may not conduct or sponsor. and a person is not required to respond to. the information collechon.

FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 I

NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 Cy 2015 Cy 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 Cy2014 CY 2015 CY 2016 NUMBER OF REACTOR 0

4 0

4 OPERATORS NUMBER OF SENIOR REACTOR 0

OPERATORS -INSTANT 7

0 8

NUMBER OF SENIOR REACTOR 0

3 0

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE N/A 06/23/2014 N/A 06/1312016 AL TERNA TE DATE N/A 07114/2014 N/A 07/1112016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBEROF 0

0 17 0

0 0

15 0

CANDIDATES NRC FORM 536 (10*2008)