RS-09-109, Response to NRC Regulatory Issue Summary 2009-11, Preparation & Scheduling of Operator Licensing Exams
| ML092260134 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Peach Bottom, Oyster Creek, Byron, Braidwood, Limerick, Clinton, Quad Cities, LaSalle, Crane |
| Issue date: | 08/13/2009 |
| From: | Hansen J Exelon Nuclear |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RIS-09-011, RS-09-109 | |
| Download: ML092260134 (13) | |
Text
Exelon Nuclear www.exeloncorp.com 4300 Winfield Road Warrenville, IL 60555 RS-09-109 August 13, 2009 U. S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 Exelon.
Nuclear
August 13, 2009 U. S. Nuclear Regulatory Commission Page 2
Subject:
Response to NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations" Reference :
NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations," dated July 16, 2009 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2010 through 2013, and the number of candidates requiring Generic Fundamentals Examinations (GFEs) for calendar years 2010 and 2011. Attachments 1 through 10 provide responses to RIS 2009-11 for the Exelon Generation Company, LLC (EGC) plants identified above. The requested information for each facility is provided on a separate NRC Form 536.
In calendar year 2010, eight candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 6. The schedule for the indicated examination is as follows : the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS) ; the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate.
There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819.
L: Hansen ger - Licensing and Regulatory Affairs - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 (10-2008)
PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)
Estimated burden per
~
response to comply with this voluntary ry information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets OPERATOR LICENSING and resources for operator examinations. Send comments r burden estimate to the Records and FOIA/Pdvacy Services Branch-5 arding F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-000 or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 III NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2010 Cy 2011 Cy 2012 Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 0
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
O EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2010 Cy 2011 Cy 2012 Cy 2013 NUMBER OF REACTOR 0
7 0
5 OPERATORS NUMBER OF SENIOR REACTOR 0
12 0
12 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0
2 0
OPERATORS-UPGRADE 2
NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE N/A 06/20/2011 N/A 03/24/2013 ALTERNATE DATE N/A 07/11/2011 N/A 04/08/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2010 Cy 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 21 0
0 0
0 0
0 19 CANDIDATES Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 (10-2006)
PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2006)
Estimated burden per response to comply with this voluntary information collection request : 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments re arding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch
-5 F53), U.S Nuclear Regulatory Commission, Washington, DC 20555-000 or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection FACILITY NRC REGION Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 III NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2010 Cy 2011 Cy 2012 Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2010 Cy 2011 Cy 2012 Cy 2013 NUMBER OF REACTOR 8
0 0
6 OPERATORS NUMBER OF SENIOR REACTOR 8
6 6
6 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1
1 0
O OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 09/27/2010 09/26/2011 09/24/2012 09/23/2013 ALTERNATE DATE NBA 10/03/2011 10/01/2012 10/07/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2010 Cy 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
6 0
0 0
6 0
0 CANDIDATES Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 (e-2005)
PRINTED ON RECYCLED PAPER NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO. 3150-0131 EXPIRES : 08131/2008 (9-2005)
Estimated burden pe r response This to comply with this voluntary information collection request: t hour.
information collection is used to plan budgets OPERATOR LICENSING and resources for examinations. Send estimate operator burden topthe Records Servicescommentsre~a Branch rding (T-5 Fb9y3), U.S.
EXAMINATION DATA e-mall ec
~
to IIniocollenrc~
ctseand and
.gov FOIA/Privacy to the Desk Officer Office of Information and Regolatoy ArralaI NEOB-1 0202, (3150-0131), Office of Management and Budget, Washington, OC 20503.
If a means used to Impose an Information Collection does riot display a currently valid OMB Control number, the NRC may not conduct or corn.
a onsor, and a person is not required to respond to, the Information FACILITY NRC REGION Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 111 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2010 CY 201 1 CY 201 2 CY 201 3 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 0
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010 CY 201 1 CY 2012 CY2013 NUMBER OF REACTOR 6
6 0
6 OPERATORS NUMBER OF SENIOR REACTOR 0
4 0
4 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0
2 0
2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 10/25/2010 12/05/2011 N/A 08/19/2013 ALTERNATE DATE 11/0112010 12/11/2011 N/A 08/26/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED
~
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 9
0 0
0 0
0 CANDIDATES Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 (10-2008)
PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2011 (10-2008)
Estimated burden per response to comply with this voluntary information collection request : 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments re arding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch ~-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-000 or by Internet EXAMINATION DATA e-mail to infocollects@nrc.go v, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 111 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2010 Cy 2011 Cy 2012 Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2010 Cy 2011 Cy 2012 Cy 2013 NUMBER OF REACTOR 2
3 3
3 OPERATORS NUMBER OF SENIOR REACTOR 6
9 9
9 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1
1 1
OPERATORS-UPGRADE 1
NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 03/08/2010 03/07/2011 03/05/2012 03/04/2013 ALTERNATE DATE 04/05/2010 04/04/2011 04/02/2012 04/01/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2010 Cy 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
12 0
0 0
12 CANDIDATES Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 (10-2008)
PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO
. 3150-0131 EXPIRES: 10/31/2011 (10-2008)
Estimated burden per response to comply with this voluntary information collection request : 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments r arding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-000, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.
FACILITY NRC REGION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 III NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 Cy 2011 Cy 2012 Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
L 0
0 0
EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2010 Cy 2011 Cy 2012 Cy 2013 NUMBER OF REACTOR 3
0 6
0 OPERATORS NUMBER OF SENIOR REACTOR 11 0
8 0
OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0
0 2
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 O
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 09/14/2010 N/A 09/24/2012 N/A ALTERNATE DATE 09/21/2010 N/A 10/01/2012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2010 Cy 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
0 0
14 0
0 CANDIDATES Response to RIS 2009-11 Page 1 of 2 re+C FORl1 sae (ra2ooe)
PPoNTED ON RECYCLED PAPER KRC FORM SM U.S. NUCLEAR REGULATORY CO ON APPROVED BY OMs: NO. 3150,0131 EXPIRES: 10/3112011 ta2o0e)
Estlrnated burden response to comply wkh We voluntary Infomadon
-gesso, request 1p hsa. TMs Wornratbn oollecUorn k used b plan budgets OPERATOR LICENSING and resources is exrninsdons. Send oarsnenb burden ear.
opsmbr to t>> R.~
end FOIAmrwa`y ~"" erenrh, -3 F ~ U.S.
Nuclear commission, OC or htrnst "mom ~
i=
EXAMINATION DATA and +~ ft D
. O~ a
&rdpst
- vW. DC 20W33.
H a lmpaoss msms usod oopsctbn n fomrdon does not display a armeMy v*Nd OMB control nunber, t NRC may not conduct an sponsor. and a person is not required to respond to, the FACILRY NW REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 1
NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2010 Cy 2011 Cy 2012 Cy 2013 ESTIMATED NUMBER OF UCENSEE4 3REPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2010 Cy 2011 Cy 2012 Cy 2013 NUMBER OF REACTOR 6
0 11 0
OPERATORS NUMBER OF SENIOR REACTOR 7
0 5
0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 5
0 2
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 10/04/2010 N/A 10/01/2012 N/A ALTERNATE DATE 10/18!2010 N/A 09/2412012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2010 Cy 2011 PROPOSED NUMBER MARCH JUNE
~SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
0 0
16 0
0 CANDIDATES Response to RIS 2009-11 Page 2 of 2 NRC FORM 536 (10-2008)
PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets OPERATOR LICENSING and resources for operator examinations. Send comments rear estimate to the Records burden and FOIA/Privacy Services Branch ding
-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-000 or by Internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collecton.
FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 1
NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
O 0
0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 NUMBER OF REACTOR 0
0 0
OPERATORS 0
NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0
OPERATORS-UPGRADE O
0 0
NUMBER OF SENIOR REACTOR 8
0 0
OPERATORS - LIMITED 0
PROPOSED DATES PRIMARY DATE 06/14/2010 N/A N/A N/A ALTERNATE DATE 06/07/2010 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
0 0
0 0
0 CANDIDATES Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 (10
.2008)
PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)
Estimated burden per response to comply with this voluntary information collection request : 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets OPERATOR LICENSING and resources for examinations. Send comments re burden estimate operator to the Records and FOIA/Privacy Services Branch arding
-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-000 or by internet EXAMINATION DATA e-mail to infocollects@nrc.go v, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2010 Cy 2011 Cy 2012 Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2010 Cy 2011 Cy 2012 Cy 2013 NUMBER OF REACTOR 6
6 6
0 OPERATORS NUMBER OF SENIOR REACTOR 7
7 8
0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2
1 2
OPERATORS-UPGRADE 0
NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 05/17/2010 07/11/2011 05/28/2012 N/A ALTERNATE DATE 05/24/2010 07/18/2011 06/04/2012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2010 Cy 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 13 0
0 0
14 0
0 0
CANDIDATES Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 (10-2008)
PRINTED ON RECYCLED PAPER
- See Attachment 6 (Limerick Generating Station) for Limited SRO numbers and exam dates NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2011 (10-2008)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments r arding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch -5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-000 or by Internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Peach Bottom Atom Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 1
NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2010 Cy 2011 Cy 2012 Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 0
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 Cy 2011 Cy 2012 Cy 2013 NUMBER OF REACTOR 0
6 0
8 OPERATORS NUMBER OF SENIOR REACTOR 0
8 0
10 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0
3 0
2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 01/31/2011 N/A 02/11/2013 ALTERNATE DATE 03/21/2011 N/A 02/04/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 Cy 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
0 0
0 18 0
CANDIDATES Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 (10-2008)
PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/3112011 (10-2008)
Estimated burden per response to comply with this voluntary information collection request : 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments re arding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch ~-5 F53), U.&
Nuclear Regulatory Commission, Washington, DC 20555-000 or by Internet EXAMINATION DATA e-mail to in ocollects@nrc.go v, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information Collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 III NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2010 Cy 2011 Cy 2012 Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED O
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 Cy 2011 Cy 2012 Cy 2013 NUMBER OF REACTOR 0
6 4
3 OPERATORS NUMBER OF SENIOR REACTOR 0
11 10 10 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0
O 1
OPERATORS-UPGRADE 1
NUMBER OF SENIOR REACTOR 0
0 O
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE N/A 05/30/2011 03/12/2012 04/15/2013 ALTERNATE DATE N/A 06/13/2011 03/26/2012 04/29/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2010 Cy 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
14 0
0 0
0 CANDIDATES 0
Response to RIS 2009-11 Page 1 of 1 NRC FORM 538 (10"2008)
PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO
. 3150-0131 EXPIRES: 10/3112011 (10-2008)
Estimated burden per respono$ to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Thle Information collection is used to plan budgets OPERATOR LICENSING and resources for examinations estimate operabr Send to the Records comments and FOWPrIvacy Services regard' burden Branch mg (T-5 F53), U.s.
EXAMINATION DATA Nuclear Washington hDsk and ~Regulator7y fAffairs, Reguiato~sCortun.soonnd Of icer, Office of in rman NEOS-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to Impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or and a is Information
- sponsor, not collection.
person required to respond to, the FACILITY NM REGION Three Mile Island Nuclear Station, Unit 1 Facility Operating License no. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 Cy 2012 Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 O
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 Cy 2011 Cy 2012 Cy 2013 NUMBER OF REACTOR 1
10 0
OPERATORS 9
NUMBER OF SENIOR REACTOR 1
10 0
8 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0
1 OPERATORS-UPGRADE 0
1 NUMBER OF SENIOR REACTOR 0
0 0
OPERATORS - LIMITED 0
PROPOSED DATES PRIMARY DATE 01/21/2010 09/12/2011 N/A 09/09/2013 ALTERNATE DATE 01/28/2010 09/19/2011 N/A 09/16/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2010 Cy 2012 PROPOSED
.m~~
NUMBER MARCH JUNE ISEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 21 0
0 0
18 0
0 0
CANDIDATES