MONTHYEARML18066A6641999-09-30030 September 1999 Proposed Tech Specs Re Surveillance Implementation ML18066A6501999-09-17017 September 1999 Final Clean Copies of ITS & Bases Pages Incorporating Proposed Changes,Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to ITS LCOs 3.5.2,3.6.3,3.6.6, 3.7.5 & 3.7.7 & 3.7.8 ML18066A5911999-07-30030 July 1999 Proposed Tech Specs Sections 3.3,3.5 & 3.6,converting to Its,Per NUREG-1432 ML18066A5691999-07-19019 July 1999 Proposed Tech Specs Section 3.7, Plant Systems, Converting to ITS ML18066A5011999-06-11011 June 1999 Proposed Tech Specs Pages Re 980126 Submittal & Replacement Pages for Sections 3.3,3.4 & 3.9 ML18068A5851999-05-0303 May 1999 Proposed Tech Specs Section 3.5,converting to ITS ML18066A4551999-04-0707 April 1999 Proposed ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1 ML18066A4431999-03-30030 March 1999 Proposed Tech Specs Section 3.7,converting to ITS ML18066A4251999-03-22022 March 1999 Revised TS Pages for ITS Section 3.4 ML20207B2501999-03-0101 March 1999 Proposed Tech Specs Sections 2.0,3.1 & 3.2,converting to ITS ML18066A3281998-11-0909 November 1998 Proposed Tech Specs,Deleting CVCS Operability Requirements Currenty in LCOs 3.2 3.17.6 & Associated Testing Requirements Currently in SRs 4.2 & 4.17 ML20195E4451998-11-0909 November 1998 Proposed Tech Specs,Converting to Its,Consistent with NUREG-1432,Rev 1,in Response to 980824 RAI ML20154N2901998-10-12012 October 1998 Proposed Tech Specs Sections 1.0,3.0,4.0 & 5.0,converting to Improved Tech Specs ML20151Z8111998-09-14014 September 1998 Proposed Tech Specs Converting to Improved Tss, Consistent with NUREG-1432,Rev 1 ML18066A3021998-09-14014 September 1998 Proposed Tech Specs Markups of Previously Submitted Pages & Revised ITS Submittal Pages ML18066A2011998-06-17017 June 1998 Proposed Tech Specs,Reflecting Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18065B1801998-03-13013 March 1998 Proposed Tech Specs Allowing Installation of Plant Mod W/O Requiring Plant Shutdown ML18067A8161998-01-26026 January 1998 Proposed Tech Specs Converting to Improved Ts,Consistent W/ NUREG-1432,Rev 1.Includes Vols 1-20 ML18066A4901998-01-20020 January 1998 Proposed Tech Specs Re Partial Response to 990126 Request RAI for ITS Section 3.6, Containment. ML18067A7071997-10-0101 October 1997 Proposed Tech Specs,Stating That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note of Insp at End of Cycle 12 ML18067A6731997-09-0303 September 1997 Proposed Tech Specs,Updating TS to Reflect Capabilities of Installed CR Ventilation Equipment & to Emulate Std TS, CE Plants - NUREG 1432 Requirements for That Sys ML18067A6771997-09-0303 September 1997 Proposed Tech Specs,Deleting Snubber Operability Requiements in LCO 3.20 & Snubber Testing Requirements Currently in SR 4.16 ML18067A6001997-06-27027 June 1997 Proposed Tech Specs Revising Electrical Power Systems ML18067A4701997-03-28028 March 1997 Proposed Tech Specs Pp Supporting Completion of Administrative Control Changes Proposed in 951211 Safety Evaluation for Amend 174 ML20137H5901997-03-27027 March 1997 Proposed Tech Specs Change Request Re Change in Co Name ML18067A4531997-03-26026 March 1997 Proposed Tech Specs,Allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18065B0331996-10-25025 October 1996 Proposed Tech Specs Change Request,Revising Administrative Controls Sections of Plant TS ML18065B0171996-10-18018 October 1996 Proposed Tech Specs,Providing Info Necessary for Completion of Review & Approval Process Re Writting Commitment Be Made That Description of Palisades Operating Requirements Manual Will Be Added to FSAR ML18065A9551996-10-0202 October 1996 Proposed Tech Specs 4.6.1 Re Safety Injection sys,4.6.2 Re Containment Spray sys,4.6.3 Re Pumps & 4.6.4 Re Valves ML18065A9111996-09-0404 September 1996 Proposed Tech Specs 3.7, Electrical Power Systems. ML20117K9581996-09-0303 September 1996 Proposed Tech Specs,Revising Administrative Control & Resolution of NRC Comments ML18065A8631996-08-14014 August 1996 Proposed TS Table 4.3.2 Re Miscellaneous Surveillance Items ML18065A5861996-03-29029 March 1996 Proposed Tech Specs,Upgrading Plant TS & Bases to Emulate STS for Combustion Engineering Plants,NUREG-1432,Rev 1 ML18065A4911996-02-0606 February 1996 Proposed Tech Specs Re Removal of cross-train Testing Requirements from LCO Action Statements ML18065A4411996-01-18018 January 1996 Proposed Tech Specs Allowing Use of 10CFR50 App J Option B Containment Testing & Use of Warning Light to Identify Certain High Radiation Areas ML18065A4361996-01-18018 January 1996 Proposed Tech Specs Re Primary Coolant Pump Flywheel Insps ML18065A4111996-01-10010 January 1996 Proposed Tech Specs,Requesting Exemption from 10CFR50 App J & TS Change Request Concerning Local Leak Test Requirements for Emergency Escape Airlock in Plant Containment Bldg ML18065A3841996-01-0505 January 1996 Proposed Tech Specs,Revising SDC Requirements & Bases for TS Section 3.1.9.3 Prior to 1996 Refueling Outage ML18065A3771995-12-27027 December 1995 Proposed Tech Specs,Rewriting Electrical Power Sys Sections of TS & Bases to Closely Emulate STS ML18065A3481995-12-11011 December 1995 Proposed Tech Specs,Revising Administrative Controls Section to Emulate CE STS by Removing Review & Audit Requirements of Section 6.5 & Record Retention Requirements of Section 6.10 of TS Relocating in CPC Quality Program Description ML18065A3341995-12-0606 December 1995 Proposed Tech Specs,Relocating Crane Operation & Movement of Heavy Loads Requirements & Bases from TS to Other Plant Documents Prior to 1996 Refueling Outage ML18065A1761995-10-17017 October 1995 Proposed Tech Specs,Changing Pressurizer Cooldown Limit from 100 to 200 F/H,Adding Word Shall to TS 3.1.2c,adding Average Hourly to Column Headings in TS 3.1.2c & Removing Action 3.3.3C from Page 3-31 to 3-30 ML18065A1241995-09-21021 September 1995 Proposed Tech Specs Re Diesel Generator Testing ML18064A8411995-07-0505 July 1995 Proposed Tech Specs,Deleting Section 6.4, Training, & Revising Sections 6.5.1.2 on Plant Review Committee Composition & 6.5.3.1 & 6.5.3.2,clarifying & Modifying Function & Composition of Plant Safety & Licensing Staff ML18064A7611995-05-0101 May 1995 Proposed Tech Specs Re Requirements for Periodic DG Peak Load Tests ML18064A7331995-04-27027 April 1995 Revised Proposed Ts,Consisting of Changes to Basis in First Paragraph of Page 3-2 & Rev to List of Approved Methodology Repts ML18064A7361995-04-27027 April 1995 Proposed Tech Specs,Supporting Action Statements for Inoperable Safety Valves in Proposed Specs 3.1.7 of TS Change Request of 950103 ML18064A6631995-03-30030 March 1995 Proposed Tech Specs for One Time Surveillance Deferment ML18064A6691995-03-24024 March 1995 Proposed TS Re pressure-temp Limits ML18064A6221995-02-20020 February 1995 Proposed TS Figure 3-4, LTOP Setpoint Limit. 1999-09-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18066A6641999-09-30030 September 1999 Proposed Tech Specs Re Surveillance Implementation ML18066A6501999-09-17017 September 1999 Final Clean Copies of ITS & Bases Pages Incorporating Proposed Changes,Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to ITS LCOs 3.5.2,3.6.3,3.6.6, 3.7.5 & 3.7.7 & 3.7.8 ML18066A5911999-07-30030 July 1999 Proposed Tech Specs Sections 3.3,3.5 & 3.6,converting to Its,Per NUREG-1432 ML18066A5691999-07-19019 July 1999 Proposed Tech Specs Section 3.7, Plant Systems, Converting to ITS ML18066A5011999-06-11011 June 1999 Proposed Tech Specs Pages Re 980126 Submittal & Replacement Pages for Sections 3.3,3.4 & 3.9 ML18068A5851999-05-0303 May 1999 Proposed Tech Specs Section 3.5,converting to ITS ML18066A4551999-04-0707 April 1999 Proposed ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1 ML18066A4431999-03-30030 March 1999 Proposed Tech Specs Section 3.7,converting to ITS ML18066A4251999-03-22022 March 1999 Revised TS Pages for ITS Section 3.4 ML20207B2501999-03-0101 March 1999 Proposed Tech Specs Sections 2.0,3.1 & 3.2,converting to ITS ML18066A3281998-11-0909 November 1998 Proposed Tech Specs,Deleting CVCS Operability Requirements Currenty in LCOs 3.2 3.17.6 & Associated Testing Requirements Currently in SRs 4.2 & 4.17 ML20195E4451998-11-0909 November 1998 Proposed Tech Specs,Converting to Its,Consistent with NUREG-1432,Rev 1,in Response to 980824 RAI ML20154N2901998-10-12012 October 1998 Proposed Tech Specs Sections 1.0,3.0,4.0 & 5.0,converting to Improved Tech Specs ML18066A3021998-09-14014 September 1998 Proposed Tech Specs Markups of Previously Submitted Pages & Revised ITS Submittal Pages ML20151Z8111998-09-14014 September 1998 Proposed Tech Specs Converting to Improved Tss, Consistent with NUREG-1432,Rev 1 ML18066A2011998-06-17017 June 1998 Proposed Tech Specs,Reflecting Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18066A1841998-06-10010 June 1998 Simulator Four-Year Test Rept & Schedule for Performance Testing for Next Four-Year Period. ML18068A3451998-04-29029 April 1998 Rev 9 to EI-9, Offsite Radiological Monitoring. ML18068A3441998-04-28028 April 1998 Rev 3 to EI-6.6, Gamma E Determination. ML18065B2271998-04-21021 April 1998 Reactor Vessel Neutron Fluence Methodology. ML20217C3101998-03-24024 March 1998 Palisades,Review of Actual Fluence Determination ML18065B1801998-03-13013 March 1998 Proposed Tech Specs Allowing Installation of Plant Mod W/O Requiring Plant Shutdown ML18065B2021998-03-10010 March 1998 Rev 7 to Relocated TS Per GL 89-09. ML18067A8161998-01-26026 January 1998 Proposed Tech Specs Converting to Improved Ts,Consistent W/ NUREG-1432,Rev 1.Includes Vols 1-20 ML18066A4901998-01-20020 January 1998 Proposed Tech Specs Re Partial Response to 990126 Request RAI for ITS Section 3.6, Containment. ML20197G3851997-12-17017 December 1997 Rev 17 to Palisades Nuclear Plant Suitability,Training & Qualification Plan ML18065B2321997-10-24024 October 1997 Rev 5 to Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18067A7071997-10-0101 October 1997 Proposed Tech Specs,Stating That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note of Insp at End of Cycle 12 ML18067A6731997-09-0303 September 1997 Proposed Tech Specs,Updating TS to Reflect Capabilities of Installed CR Ventilation Equipment & to Emulate Std TS, CE Plants - NUREG 1432 Requirements for That Sys ML18067A6771997-09-0303 September 1997 Proposed Tech Specs,Deleting Snubber Operability Requiements in LCO 3.20 & Snubber Testing Requirements Currently in SR 4.16 ML18067A6001997-06-27027 June 1997 Proposed Tech Specs Revising Electrical Power Systems ML18067A4701997-03-28028 March 1997 Proposed Tech Specs Pp Supporting Completion of Administrative Control Changes Proposed in 951211 Safety Evaluation for Amend 174 ML20137H5901997-03-27027 March 1997 Proposed Tech Specs Change Request Re Change in Co Name ML18067A4531997-03-26026 March 1997 Proposed Tech Specs,Allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18067A5151997-02-11011 February 1997 Rev 5 to Health Physics Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18065B2011996-12-24024 December 1996 Rev 11 to Offsite Dose Calculation Manual. ML18065B0861996-11-27027 November 1996 Corrected Pages 14 & 15 to Rev 18 to EM-09-02, Inservice Testing Program Relief Request Valve Relief Request 20. ML20134P4071996-11-19019 November 1996 Suitability,Training & Qualification Plan, Rev 16 ML20137G3871996-10-29029 October 1996 Rev 6 to Relocated TS Per NRC GL 89-09 ML18065B0331996-10-25025 October 1996 Proposed Tech Specs Change Request,Revising Administrative Controls Sections of Plant TS ML18065B0171996-10-18018 October 1996 Proposed Tech Specs,Providing Info Necessary for Completion of Review & Approval Process Re Writting Commitment Be Made That Description of Palisades Operating Requirements Manual Will Be Added to FSAR ML18065A9551996-10-0202 October 1996 Proposed Tech Specs 4.6.1 Re Safety Injection sys,4.6.2 Re Containment Spray sys,4.6.3 Re Pumps & 4.6.4 Re Valves ML18065A9111996-09-0404 September 1996 Proposed Tech Specs 3.7, Electrical Power Systems. ML20117K9581996-09-0303 September 1996 Proposed Tech Specs,Revising Administrative Control & Resolution of NRC Comments ML18065A8631996-08-14014 August 1996 Proposed TS Table 4.3.2 Re Miscellaneous Surveillance Items ML18065A7661996-06-10010 June 1996 Expired Temporary Change O-96-044 to Rev 17 to SOP-17A, Clean Radwaste Sys. ML18065A7651996-06-10010 June 1996 Cancelled Tcn O-96-045 to Rev 17 to SOP-17B, Dirty Radwaste Sys. ML18065A5861996-03-29029 March 1996 Proposed Tech Specs,Upgrading Plant TS & Bases to Emulate STS for Combustion Engineering Plants,NUREG-1432,Rev 1 ML18065A8021996-02-21021 February 1996 Rev 2 to EM-09-13, ISI Pressure Testing Program. ML20137G3631996-02-16016 February 1996 Rev 10 to Offsite Dose Calculation Manual 1999-09-30
[Table view] |
Text
ATTACHMENT I Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION PAGE CHANGE October 4, 1990 I Page
5.2 CONTAINMENT DESIGN FEATURES (Cont'd) 5.2.2 Penetrations
- a. All penetrations through the steel-lined concrete structure for electrical conductors, pipe, ducts, air locks and doors are of the double-barrier design.
- b. The automatically actuated containment isolation valves are designed to close upon high radiation or high pressure in the containment structure. No single component failure in the actuation system will prevent the isolation valves from functioning as designed.
5.2.3 Containment Structure Cooling Systems
- a. The containment air cooling system includes four separate self-contained units which cool the containment air during normal operation and limit the pressure rise in the event of a design accident. Three units, each with a cooling water flow of 4875 gpm with an inlet temperature of 75°F, will remove 229 x 10 6 Btu/hr of heat.
- b. The containment spray system is capable of removing 233 x 10 6 Btu/hr (two pumps) from the containment atmosphere at 283°F by spraying the water from the 270,000-gallon SIRW tank.
Recirculation of spray water from the containment sump through heat exchangers into the. containment atmosphere is also provided.
Under this mode of operation, the heat removal capability is 167 x 10 6 Btu/hr based upon 4000 gpm of component cooling water flow with 114°F inlet temperature through the heat exchanger and 1420 gpm of spray water flow at 283°F inlet temperature.
5.3 NUCLEAR STEAM SUPPLY SYSTEM (NSSS) 5.3.1 Primary Coolant System Design Pressure and Temperature The primary coolant system is designed, and shall be maintained:
- a. In accordance with the Code requirements specified in Section 4.2 of the FSAR with allowance for normal degradation pursuant to the surveillance requirements,
- b. For a pressure of 2500 psia,
- c. For a temperature of 6-50°F' except the pressurizer which shali be 700°F, and
- d. With a volume of approximately 10,900 cubic feet.
5-2 Amendment No.
TSPR5-2
ATTACHMENT 2 Consumers Power Company Palisades Plant Docket 50-255 MARKED UP TECHNICAL SPECIFICATION PAGES October 4, 1990 1 Page
- 5.2 5.2.2 CONTAINMENT DESIGN.FEATURES (Contd) -
Penetrations
- a. *All penetrations through the steel-lined concrete structure for electrical conductors, pipe, ducts, air locks and doors are of the double-barrier design.
- b. The autamati~a.lly actuated containment isolation valves are designed to cJ.ose upon high radiation or high pressure in the containment structure.
- No single component fail.ure in the actuation system will prevent the isolation valves from functioning as designed.
Containment Structure Cooling Systems
- a. The containment air cooling system includes four separate self-contained units vhich cool the containment air during normal opera-tion and limit the pressure rise in the event of a design accident.
Three units, each with a cooling water flow of 4875 gpm with an 6
inlet temperature of 75°F, will remove 229 x 10 Btu/hr of heat.
- b. The contairnnent spr&Y' system is capable of removing 233 x io 6 Btu/hr (two pumps} from the containment atmosphere at 283°F by sp~ the
- water from the 270, 000-gallon SIRW tank. Recirculation of spr&Y"
- water. from the containm8nt sump through heat exchangers into. the
.containment atmosphere is al.so provided.
Under this mode of operation, the heat. removal capability is 6
167 x 10 Btu/hr based upon 4oOO gpm ot component cooling vater flow vi th U4 °F inJ.et temperature through the heat exchanger and 1420 gpm of spr&Y' water flow at 283°F inl.et temperature.
5.3 NUCLF.AR STF.AM SUPPLY SYSTEM (NSSS.}.
5.3.1 eo *. 'mie pl'1m""'¥. eeele.nt ey&tem eh'JJ be aeei.889d ead eeastl"l:letea ia aeeerdsnee wUh *ae ASMB Beiler- aad Pressure Veeeel Gede, See=
tioa III, Rq:;es toz eonstI tzeticm ot !uclesr YeHela, inelttcliftg a:il*
addenda th:roi:gb the winter ot ~965, and the ASA Oode. tor Preestare Fiptng B31. l:'.
'b. '&e pri:mary eeelaa11 s,.a1:1em e&all ee aesigaed ter a pl'eeeve at 25ee paia and a tempezseue ot 650°¥ except tor the preHom-her w&ieh sas 11 B:a¥e a aea:l:gn 'bemper&'btsre of 100°F.
- e. !he
- l'Clmne of the prima::ry eeelaa11 system s88:ll ee app!'elWllSitl eJ:y 10,900 elihie teet'*
ATTACHMENT 3 Consumers Power Company Pa 1i sades Pl ant Docket 50-255 DRAFT FINAL SAFETY ANALYSIS REPORT PAGE CHANGE October 4, 1990 2 Pages
- 1. 200 cycles of loss of turbine lo~d from 100% power
- 2. 200 cycles of total loss of reactor coolant flow when at 100% power
- 3. 2 cycles of loss of secondary system pressure 4.2.3 DESIGN SERVICE LIFE CONSIDERATIONS The major Primary Coolant System components are designed considering a 40-,year service life. In order to achieve this, the strict quality control assurance staridards as outlined in Subsections 4.5.4 and 4.5.S were followed.
Component design has also considered environmental protection, adherence to established operating procedures and irradiation 'effects on the material.
The reactor vessel is the only component of the Primary Coolant System which is exposed to a significant level of neutron irradiation. The irradiation surveillance program is outlined in Subsection 4.5.3. To com-pensate for any ins,rease in the NDTT shift caused by irradiation, the Plant
. operating procedures for the pressure-temperatu*re relationship during heatup and cooldown will be periodically r'evised to stay within the stress limits.
The design of the Primary Coolant System components allows for adequate inspection techniques to be applied over the lifetime o-f the Plant. All reactor internals are designed to be removable for inspection and to allow reactor vessel internal inspection. Insulation panels are ~emovable for external inspection of selected highly stressed areas.
4.2.4 CODES ADHERED TO AND COl1PONENT CLASSIFICATION The design, fabrication, construction, inspection, testing and clas~ifi cation of all reactor coolant system components are in accordance with the ASME Boiler and Pressure Vessel Code,Section III, 1965 edition, including all addenda through Winter.1965 (ASHE B&PV Code, Section'lII, 1965, W65a),
and the Code for Pressure Piping, ASA B31.1, 1955. ..,.....,..-: °"A
_J-NSE:l(1 IT The codes adhered tq and component classifications Tab~e 4-2.
4.2.S SAFETY CONSIDERATIONS OF DESIGN PARAMETERS Design Pressure After establishin-g the normal opera-ting pressure conditions of the Primary Coolant System, a minimum design pressure was determined which exceeds the normal operating pressure and anticipated operating transient pressure changes.*
Major considerations employed in the determination of this selected minimum design pressure include: :normal operating pressure, instrumentation and control response, reactor core thermal lag, coolant transport time, system fs0981-0492a-09-72 4.2-2 Rev 0
Insert "A" Replacement parts and components will satisfy the requirements of the original Plant construction code in a manner that is consistent with 10 CFR 50.55a, and the rules and requirements specified in ASME B&PV Code,Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components", Article IWA-7000.