MONTHYEARNG-99-1415, Monthly Operating Rept for Sept 1999 for Daec.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Daec.With NG-99-1226, Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With NG-99-1115, Monthly Operating Rept for July 1999 for Daec.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Daec.With NG-99-0963, Monthly Operating Rept for June 1999 for Daec.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Daec.With NG-99-0835, Monthly Operating Rept for May 1999 for Daec.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Daec.With NG-99-0682, Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With NG-99-0530, Monthly Operating Rept for Mar 1999 for Daec.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Daec.With NG-99-0330, Monthly Operating Rept for Feb 1999 for Daec.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Daec.With NG-99-0020, Monthly Operating Rept for Dec 1998 for Daec.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Daec.With NG-98-2010, Monthly Operating Rept for Nov 1998 for Daec.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Daec.With NG-98-1875, Monthly Operating Rept for Oct 1998 for Daec.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Daec.With NG-98-1717, Monthly Operating Rept for Sept 1998 for Daec.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Daec.With ML20153B4141998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DAEC NG-98-1389, Monthly Operating Rept for July 1998 for DAEC1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DAEC ML20236R3251998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DAEC ML20249B5171998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DAEC ML20247H9381998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for DAEC ML20216F6791998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for DAEC NG-98-0650, Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center NG-98-0398, Monthly Operating Rept for Feb 1998 for DAEC1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for DAEC NG-98-0252, Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center NG-98-0017, Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center NG-97-2118, Monthly Operating Rept for Nov 1997 for DAEC1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DAEC NG-97-1959, Monthly Operating Rept for Oct 1997 for DAEC1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for DAEC NG-97-1781, Monthly Operating Rept for Sept 1997 for Duane Arnold Energy Center1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Duane Arnold Energy Center ML20217C3491997-08-31031 August 1997 Revised MOR for Aug 1997 for DAEC ML20210V1851997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for DAEC NG-97-1452, Monthly Operating Rept for July 1997 for DAEC1997-07-31031 July 1997 Monthly Operating Rept for July 1997 for DAEC NG-97-1258, Monthly Operating Rept for June 1997 for DAEC Per GL 97-021997-06-30030 June 1997 Monthly Operating Rept for June 1997 for DAEC Per GL 97-02 NG-97-1033, Monthly Operating Rept for May 1997 for Duane Arnold Energy Center1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Duane Arnold Energy Center NG-97-0894, Monthly Operating Rept for Apr 1997 for Duane Arnold Energy Ctr1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Duane Arnold Energy Ctr NG-97-0674, Monthly Operating Rept for Mar 1997 for Duane Arnold Energy Ctr1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Duane Arnold Energy Ctr NG-97-0453, Monthly Operating Rept for Feb 1997 for Duane Arnold Energy Center1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Duane Arnold Energy Center NG-97-0308, Monthly Operating Rept for Jan 1997 for Duane Arnold Energy Center1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Duane Arnold Energy Center NG-97-0059, Monthly Operating Rept for Dec 1996 for Duane Arnold Energy Center1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Duane Arnold Energy Center NG-96-2647, Monthly Operating Rept for Nov 1996 for Duane Arnold Energy Center1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Duane Arnold Energy Center NG-96-2447, Monthly Operating Rept for Oct 1996 for Duane Arnold Energy Center1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Duane Arnold Energy Center NG-96-2166, Monthly Operating Rept for Sept 1996 for DAEC1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for DAEC NG-96-1913, Monthly Operating Rept for Aug 1996 for DAEC1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for DAEC NG-96-1713, Monthly Operating Rept for Jul 1996 for DAEC1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for DAEC NG-96-1481, Monthly Operating Rept for June 1996 for Duane Arnold Energy Ctr1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Duane Arnold Energy Ctr NG-96-1298, Monthly Operating Rept for May 1996 for Duane Arnold Energy Center1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Duane Arnold Energy Center NG-96-1055, Monthly Operating Rept for Apr 1996 for Duane Arnold Energy Center1996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Duane Arnold Energy Center NG-96-0825, Monthly Operating Rept for Mar 1996 for DAEC1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for DAEC NG-96-0624, Monthly Operating Rept for Feb 1996 for DAEC1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for DAEC NG-96-0320, Monthly Operating Rept for Jan 1996 for DAEC1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for DAEC ML20096C3101995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Duane Arnold Energy Ctr NG-95-3516, Monthly Operating Rept for Nov 1995 for Duane Arnold Energy Ctr1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Duane Arnold Energy Ctr NG-95-3235, Monthly Operating Rept for Oct 1995 for Duane Arnold Energy Ctr1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Duane Arnold Energy Ctr NG-95-3057, Monthly Operating Rept for Sept 1995 for Duane Arnold Energy Ctr1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Duane Arnold Energy Ctr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8991999-10-18018 October 1999 SER Approving Licensee Requests for Relief NDE-R001 (Part a & B),NDE-R027,NDE-028,NDE-R029,NDE-R030,NDE-R032 & NDE-R035. Relief Request NDE-036,denied & Relief Request NDE-R-034, Deemed Unnecessary NG-99-1415, Monthly Operating Rept for Sept 1999 for Daec.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Daec.With ML20212H2381999-09-22022 September 1999 Safety Evaluation Supporting Amend 228 to License DPR-49 NG-99-1226, Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With NG-99-1115, Monthly Operating Rept for July 1999 for Daec.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Daec.With NG-99-0963, Monthly Operating Rept for June 1999 for Daec.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Daec.With ML20195G9901999-06-0909 June 1999 Safety Evaluation Supporting Amend 227 to License DPR-49 NG-99-0835, Monthly Operating Rept for May 1999 for Daec.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Daec.With ML20206N7551999-05-13013 May 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safey-Related Power-Operated Gate Valves NG-99-0682, Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With NG-99-0530, Monthly Operating Rept for Mar 1999 for Daec.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Daec.With ML20207G0251999-03-0303 March 1999 SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety- Related MOVs at Duane Arnold & That Licensee Adequately Addressed Actions Requested in GL 96-05 NG-99-0330, Monthly Operating Rept for Feb 1999 for Daec.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Daec.With ML20202B4311999-01-26026 January 1999 Safety Evaluation Accepting Request for Approval to Use ASME Code Case N-508-1 in ISI Program for Duane Arnold Energy Ctr ML20202B3851999-01-26026 January 1999 Safety Evaluation Addressing Thermo-Lag Related Ampacity Derating Issues.Ampacity Derating Analysis Results Acceptable NG-99-0020, Monthly Operating Rept for Dec 1998 for Daec.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Daec.With ML20206N3211998-12-0707 December 1998 Final Part 21 Rept Re Piston Failure of MSIV Actuator at Daec.Rept Indicates That No Reportable Defect Exists,Per 10CFR21 NG-98-2010, Monthly Operating Rept for Nov 1998 for Daec.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Daec.With ML20196F9571998-11-24024 November 1998 Rev 20 to QA Program Description,Ufsar 17.2 for Daec NG-98-1875, Monthly Operating Rept for Oct 1998 for Daec.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Daec.With NG-98-1767, Cyclic Rept of Facility Changes,Tests & Experiments,Fire Plan & Commitment Changes,For Period from 970301-980930. with1998-09-30030 September 1998 Cyclic Rept of Facility Changes,Tests & Experiments,Fire Plan & Commitment Changes,For Period from 970301-980930. with NG-98-1717, Monthly Operating Rept for Sept 1998 for Daec.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Daec.With ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML20153B4141998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DAEC NG-98-1389, Monthly Operating Rept for July 1998 for DAEC1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DAEC ML20236X5321998-07-29029 July 1998 Safety Evaluation Re USI A-46 Program Implementation for Plant ML20236W0021998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief NDE-R020 Re Third 10-yr ISI Interval of Plant,Per 10CFR50.55a(a)(3(i) ML20236S2541998-07-14014 July 1998 Special Rept 98-01:on 980629,diesel-driven Fire Pump Was Inoperable for Greater than Seven Days.Caused by Sheared Off Tie Rods on Accessory Drive End of Engine.Evaluated Condition,Procured Parts & Replaced Tie Rods ML20236R3251998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DAEC ML20249B5171998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DAEC ML20247P5651998-05-18018 May 1998 Part 21 Rept Re Model SA-A101 MSIV A' Actuator Showing Evidence of Internal Leakage,In Both Directions Past Pneumatic Piston.Situation Being Reviewed to Determine If Failure Could Pose Substantial Safety Hazard ML20247K1881998-05-0808 May 1998 Rev 0 to Cycle 16 COLR, for May 1998 ML20247H9381998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for DAEC ML20217K7251998-04-16016 April 1998 Correction to SE of Relief Request MC-R001 Re Qualification Requirements for non-destructive Exam Personnel Performing Containment Insp ML20216J9171998-04-16016 April 1998 Safety Evaluation Accepting Relief Request MC-R001 for First 10-yr Interval of Containment Insp Program Per 10CFR50.55a (a)(3)(ii),per 971219 Request ML20217K0471998-04-0101 April 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request NDE-R004 for Plant Third 10-yr ISI Interval,Based on Finding That Compliance W/Code Would Result in Hardship W/O Compensating Increase in Level of Quality & Safety ML20217H8831998-04-0101 April 1998 Safety Evaluation Supporting Request for Relief for Third ISI Program ML20216F6791998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for DAEC NG-98-0650, Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center ML20217F8841998-03-23023 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Program Plan Requests for Relief for Plant NG-98-0398, Monthly Operating Rept for Feb 1998 for DAEC1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for DAEC ML20199L3481998-01-31031 January 1998 Rev 0 to Duane Arnold Energy Ctr Emergency Action Level (EAL) Technical Basis Document NG-98-0252, Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center ML20249B3391997-12-31031 December 1997 Central Iowa Power Coopertive 1997 Annual Rept ML20249B3351997-12-31031 December 1997 1997 Annual Rept for Corn Belt Power Cooperative ML20249B3331997-12-31031 December 1997 1997 Annual Rept for Alliant Corporation NG-98-0017, Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center NG-97-2118, Monthly Operating Rept for Nov 1997 for DAEC1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DAEC ML20199J6841997-11-21021 November 1997 SER Approving Relief Requests to Second 10-year Inservice Inspection Interval for Duane Arnold Energy Center NG-97-1959, Monthly Operating Rept for Oct 1997 for DAEC1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for DAEC 1999-09-30
[Table view] |
Text
- .
OPERATING DATA REPORT DOCKET NO. 050-0331 DATE November 15, 1979 COMPLETED BY .1 Van Ric 1 TELEPHONE 319-053-3b OPERATING STATUS Notes
- 1. Unit Name: Duane Arnold Enerov Center
- 2. Reporting Period: 0<+nhar 1070
- 3. Licensed Thermal Power (MWt): 1AER
- 4. Nameplate Rating (Gross MWe): 6AG (T"vhina on tinn)
- 5. Design Electrical Rating (Net MWe): 91A
- 6. Maximum Dependable Capacity (Gross MWe): W
- 7. Maximum Dependable Capacity (Net MWe): 515
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since List Report. Give Reasons:
- 9. Power Level To which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
"this Month Yr..to.Date Cumulative
- 11. Hours in Reporting Period 745 7.296 41.616
- 12. Number Of Hours Reactor Was Critical 719.2 5.547.5 29,160.3
- 13. Reactor Reserve Shutdown Hours 0 0 0
'14. Hours Generator On.Line 714.4 5.446.7 28,433.7
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 626.808 7.114.096 35.180.736
- 17. Gross Electrical Energy Genented (MWH) 206.765 _ _ .
9.406.628 11.744.057
- 18. Net Electrical Energy Generated (MWH) 190.967 2.258.512 10,974,812
- 19. Unit Service Factor 95.9% 74.75 68.3%
- 20. Unit Availability Factor 95.9% 74.7% 68.3%
- 21. Unit Capacity Factor (Using MDC Net) - 49.8% 60.1% 51 .2%
- 22. Unit Capacity Factor (Using DER Net) 47.6% 97 5% 49.0%
- 23. Unit Forced Outage Rate 4.1% ,
25.3% 21.6%
- 24. Shutdowns Scheduled Over Nest 6 Months (Type. Date,and Duration of Each):
Refuelino. Februarv 9.?980, 12 weeks .
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- Turbine Rating: 565.7 MWe Generator Rating: 663.5 (MVA) x .90 (Power Factor) = 597 MWe-7011200YO
i ,
AVERAGE DAILY UNIT POWER LEVEL
. DOCKET NO. 050-331 UNIT Duane Arnold Energ3 Center DATE November 15. 1979
_ COMPLETED BY J. Van Sickel TELEPHONE 319-851-5611 MONTH Octnbar.1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Neti I 192 17 _,_
305 2 210 is 314 3 220 g, 309 4 199 203 20 5 220 21 183 6 167 278 22 7 15'B 220 23 8 186 0 24 9 198 25 190 to W 26 407 11 193 27 389 12 207 491 23 13 210 3, 477 14 170 471 3o is 283 434 3,
16 270 INSTRUCTIONS ,
On this format, list the average daily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.
, (9/77) 1363 324
t r
DOCKET NO. 050-0331 UNITSIIUTDOWNS AND POWER REDUCTIONS UNIT NAnfE Duane Arnold Energy Cente' DATE Nnvomher 15. 1979 COMPLETED BY Van Rickn1 REPORT hf 0NTII October, 1979 -_1 TELEPilONE 319-851-5611 ,
~
. q _
%- G C No. Date
{
.! E gg
};;
}{3oc
} Licensee Event E%
g7 {*1 a.
L Cause & Corrective Action to mu 5 [u b
oE jgy Report # Prevent Recurrence d
- 14. 791006 S 0 F 4 N/A ZZ ZZZZZZ Power reduced due to lack of demand and to conserve fuel for winter peak loads
- 15. 791020 S 0 F 4 N/A ZZ ZZZZZZ Power reduced due to lack of demand and to conserve fuel for winter peak loads.
- 16. 791023 F 0 A 4 N/A ZZ ZZZZZZ Power reduced in preparation for plant shutdown.
- 17. 791024 F 28.8 A 1 N/A CH PIPEXX Plant shutdown to repair "B"
. feed pump seal water line.
- 18. 791031 F 1.8 A 3 N/A HA INSTRU Turbine trip and reactor scram i during turbine stop valve testing i due to EHC low pressure indication.
LN .
& I 2 3 4 u: F: Forced Reason: hiethod: Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) l-blanual for Preparation of Data u B klaintenance of Test 2-klanual Scram. Entry Sheets for Licensee N 0-Refueling 3 Automatic Scram. Event Repor ti.ER) File (NUREG- ;
ty, D Regulatory Resiriction 4 Other (Explain) 0161)
E-Operator Training & Ucense Examination F Administrative 5 G-Operational Er rur (I'.xplain) Exhibit 1 - Same Source (9/77) 11 Other (Explain) i 1
UCCKU L nU. U3U-OJJ8
',' s- Unit Duane Arnold Energy Cen Date .Jtoyember- 15. 1979 REFUELING INFORMATION Completed by J. Van Sickel Telephone 319!E51-5611 f,
- 1. Name iir facility.
A. Duane Arnold Energy Center
- 2. Selirilo t. i slate for next refueling shutdown.
A. February 9, 1980
- 3. Schettoteil it.ite for restart following refueling.
A. May 3, 1980
- 4. Will e fueling or resumption of operation thereafter require a technical specification change or other license amendment?
A. Yes, MCPR and MAPLHGR operating limits as derived from transient and
, accident analyses.
- 5. Scheduled date(s) for submitting proposed licensing action and ,
supporting information.
A. Unknown.
- 6. Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or per-formance analysin methods, significant changes in fuel design, new operating procedures. -
A. The. reload will consist of up to 92 8 x 8 2 water rod bundles. .
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
A. a) 368 b) 276
- 8. The pre.sent licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
A. 2050 .
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
A. 1998 O
1363 326 ee - _- eo. ...ee4 e 6- -^P"9
Docket No. U)U-U ni . - - -
U-' Unit Donne Arnald Enerov Croter Date Nnunman , 19. 197o
... t . ._
Completed by J. Vnn W fm1
. ,, Telephone 319-091-5611 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE 10-1 At the beginning of the report period the plant was ope ating at 209 MWe. Plant load was administratively limited in order to conserve fuel for winter peak loads. The plant was following load to the extent possible while staying within administrative limits. .
10-3 During surveillance testing "B" rod block monitor (RBM) was found to be inoperable and generating a continuous rod withdrawal block. "A" RBM was tested and found to be operable.
R0 79-028 10-15 The "A" feed pump was started. Plant load was increased due to increasing system demand.
10-20 Plant load was reduced due to lack of demand and to conserve fuel for 1 winter peak loads.
10-23 The "B" feedwater pump seal water return line was found leaking. The leak was in an unisolable location so preparations for a plant shutdown were begun.
10-24 The main generator was tripped at 0117 hours0.00135 days <br />0.0325 hours <br />1.934524e-4 weeks <br />4.45185e-5 months <br />. The reactor was subcritical at 0215 hours0.00249 days <br />0.0597 hours <br />3.554894e-4 weeks <br />8.18075e-5 months <br />. The RCIC turbine was operated from 0348 hours0.00403 days <br />0.0967 hours <br />5.753968e-4 weeks <br />1.32414e-4 months <br /> to 0520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> for vessel pressure control.
10-25 Repairs were completed and plant startup begun. The reactor was critical.
at 0219 hours0.00253 days <br />0.0608 hours <br />3.621032e-4 weeks <br />8.33295e-5 months <br />. The main generator was placed on the line at 0607 hours0.00703 days <br />0.169 hours <br />0.001 weeks <br />2.309635e-4 months <br /> and a power increase was begun. The plant was at 388 MWe at 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br />.
A fuel preconditioning ramp was begun at 2345 hours0.0271 days <br />0.651 hours <br />0.00388 weeks <br />8.922725e-4 months <br />.
10-26 At 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> "B" rod block monitor was found inoperable. An R0 investigation is in progress.
During the performance of a special test of standby diesel generator 1G-21, the fuel oil level in the diesel fuel storage tank dropped below the 35,000 gallon technical specification limit. An R0 investigation is in progress. .
10-28 The plant was operating at 508 MWe. ,
10-29 The RCIC system was declared inoperable due to a packing leak on CV-2409.
A seven day LCO was started.
10-30 CV-2409 was repaired and the RCIC system tested with satisfactory results.
The seven day LC0 was cancelled.
10-31 At 2214 hours0.0256 days <br />0.615 hours <br />0.00366 weeks <br />8.42427e-4 months <br /> a turbine trip and reactor scram occurred during turbine stop valve testing. The turbine supervisory instrument system first hit was EHC low pressure. An investigation was begun.
t363 327
. O
~~~50c'k'etNo. 050-0331
, Unit Duane Arnold Enerov renIer Date Novenhor 15.14fd MAJOR SAFETY RELATED MAINTENANCE heephon 319-851 561 '
COMPONENT DESCRIPTION DATE SYSTD4 10-3-79 Containment Atmospheric LR 4385 Replaced pen and tape assembly Control 10-4-79 Neutron Monitoring. Rod block Monitoring ",B" Reconnected pin connector 10-6-79 Containment Atmospheric AN-8181B Changed chemicals and calibrated
. Control 10-9-79\____ _ Containment Atmospheric AN-8181B Checked span and recalibrated Control k Rebuilt valve operator 10-9-79 RHR MOV-2009 10-19-79 ESW IS-89A, 1S-898 Cleaned strainers 10-23-79 River water supply IP-117B Adjusted impeller 10-23-79 RHR IS-90A, 1S-90B Cleaned strainers 10-25-79 ESW lS-89A, 1S-89B Cleaned strainers 10-26-79 Neutron Monitoring Rod Block Monitor "B" Installed new amplifier card 10-29-79 Fuel pool cooling and Wall penetration on HCD-23 Installed grout cleanup 10-30-79 ESW IS-89B Cleaned strainer M
GM
9