Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNG-99-1415, Monthly Operating Rept for Sept 1999 for Daec.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Daec.With NG-99-1226, Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With NG-99-1115, Monthly Operating Rept for July 1999 for Daec.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Daec.With NG-99-0963, Monthly Operating Rept for June 1999 for Daec.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Daec.With NG-99-0835, Monthly Operating Rept for May 1999 for Daec.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Daec.With NG-99-0682, Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With NG-99-0530, Monthly Operating Rept for Mar 1999 for Daec.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Daec.With NG-99-0330, Monthly Operating Rept for Feb 1999 for Daec.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Daec.With NG-99-0020, Monthly Operating Rept for Dec 1998 for Daec.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Daec.With NG-98-2010, Monthly Operating Rept for Nov 1998 for Daec.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Daec.With NG-98-1875, Monthly Operating Rept for Oct 1998 for Daec.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Daec.With NG-98-1717, Monthly Operating Rept for Sept 1998 for Daec.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Daec.With ML20153B4141998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DAEC NG-98-1389, Monthly Operating Rept for July 1998 for DAEC1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DAEC ML20236R3251998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DAEC ML20249B5171998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DAEC ML20247H9381998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for DAEC ML20216F6791998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for DAEC NG-98-0650, Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center NG-98-0398, Monthly Operating Rept for Feb 1998 for DAEC1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for DAEC NG-98-0252, Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center NG-98-0017, Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center NG-97-2118, Monthly Operating Rept for Nov 1997 for DAEC1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DAEC NG-97-1959, Monthly Operating Rept for Oct 1997 for DAEC1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for DAEC NG-97-1781, Monthly Operating Rept for Sept 1997 for Duane Arnold Energy Center1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Duane Arnold Energy Center ML20217C3491997-08-31031 August 1997 Revised MOR for Aug 1997 for DAEC ML20210V1851997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for DAEC NG-97-1452, Monthly Operating Rept for July 1997 for DAEC1997-07-31031 July 1997 Monthly Operating Rept for July 1997 for DAEC NG-97-1258, Monthly Operating Rept for June 1997 for DAEC Per GL 97-021997-06-30030 June 1997 Monthly Operating Rept for June 1997 for DAEC Per GL 97-02 NG-97-1033, Monthly Operating Rept for May 1997 for Duane Arnold Energy Center1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Duane Arnold Energy Center NG-97-0894, Monthly Operating Rept for Apr 1997 for Duane Arnold Energy Ctr1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Duane Arnold Energy Ctr NG-97-0674, Monthly Operating Rept for Mar 1997 for Duane Arnold Energy Ctr1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Duane Arnold Energy Ctr NG-97-0453, Monthly Operating Rept for Feb 1997 for Duane Arnold Energy Center1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Duane Arnold Energy Center NG-97-0308, Monthly Operating Rept for Jan 1997 for Duane Arnold Energy Center1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Duane Arnold Energy Center NG-97-0059, Monthly Operating Rept for Dec 1996 for Duane Arnold Energy Center1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Duane Arnold Energy Center NG-96-2647, Monthly Operating Rept for Nov 1996 for Duane Arnold Energy Center1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Duane Arnold Energy Center NG-96-2447, Monthly Operating Rept for Oct 1996 for Duane Arnold Energy Center1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Duane Arnold Energy Center NG-96-2166, Monthly Operating Rept for Sept 1996 for DAEC1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for DAEC NG-96-1913, Monthly Operating Rept for Aug 1996 for DAEC1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for DAEC NG-96-1713, Monthly Operating Rept for Jul 1996 for DAEC1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for DAEC NG-96-1481, Monthly Operating Rept for June 1996 for Duane Arnold Energy Ctr1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Duane Arnold Energy Ctr NG-96-1298, Monthly Operating Rept for May 1996 for Duane Arnold Energy Center1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Duane Arnold Energy Center NG-96-1055, Monthly Operating Rept for Apr 1996 for Duane Arnold Energy Center1996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Duane Arnold Energy Center NG-96-0825, Monthly Operating Rept for Mar 1996 for DAEC1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for DAEC NG-96-0624, Monthly Operating Rept for Feb 1996 for DAEC1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for DAEC NG-96-0320, Monthly Operating Rept for Jan 1996 for DAEC1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for DAEC ML20096C3101995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Duane Arnold Energy Ctr NG-95-3516, Monthly Operating Rept for Nov 1995 for Duane Arnold Energy Ctr1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Duane Arnold Energy Ctr NG-95-3235, Monthly Operating Rept for Oct 1995 for Duane Arnold Energy Ctr1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Duane Arnold Energy Ctr NG-95-3057, Monthly Operating Rept for Sept 1995 for Duane Arnold Energy Ctr1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Duane Arnold Energy Ctr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8991999-10-18018 October 1999 SER Approving Licensee Requests for Relief NDE-R001 (Part a & B),NDE-R027,NDE-028,NDE-R029,NDE-R030,NDE-R032 & NDE-R035. Relief Request NDE-036,denied & Relief Request NDE-R-034, Deemed Unnecessary NG-99-1415, Monthly Operating Rept for Sept 1999 for Daec.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Daec.With ML20212H2381999-09-22022 September 1999 Safety Evaluation Supporting Amend 228 to License DPR-49 NG-99-1226, Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With NG-99-1115, Monthly Operating Rept for July 1999 for Daec.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Daec.With NG-99-0963, Monthly Operating Rept for June 1999 for Daec.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Daec.With ML20195G9901999-06-0909 June 1999 Safety Evaluation Supporting Amend 227 to License DPR-49 NG-99-0835, Monthly Operating Rept for May 1999 for Daec.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Daec.With ML20206N7551999-05-13013 May 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safey-Related Power-Operated Gate Valves NG-99-0682, Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With NG-99-0530, Monthly Operating Rept for Mar 1999 for Daec.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Daec.With ML20207G0251999-03-0303 March 1999 SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety- Related MOVs at Duane Arnold & That Licensee Adequately Addressed Actions Requested in GL 96-05 NG-99-0330, Monthly Operating Rept for Feb 1999 for Daec.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Daec.With ML20202B4311999-01-26026 January 1999 Safety Evaluation Accepting Request for Approval to Use ASME Code Case N-508-1 in ISI Program for Duane Arnold Energy Ctr ML20202B3851999-01-26026 January 1999 Safety Evaluation Addressing Thermo-Lag Related Ampacity Derating Issues.Ampacity Derating Analysis Results Acceptable NG-99-0020, Monthly Operating Rept for Dec 1998 for Daec.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Daec.With ML20206N3211998-12-0707 December 1998 Final Part 21 Rept Re Piston Failure of MSIV Actuator at Daec.Rept Indicates That No Reportable Defect Exists,Per 10CFR21 NG-98-2010, Monthly Operating Rept for Nov 1998 for Daec.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Daec.With ML20196F9571998-11-24024 November 1998 Rev 20 to QA Program Description,Ufsar 17.2 for Daec NG-98-1875, Monthly Operating Rept for Oct 1998 for Daec.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Daec.With NG-98-1717, Monthly Operating Rept for Sept 1998 for Daec.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Daec.With NG-98-1767, Cyclic Rept of Facility Changes,Tests & Experiments,Fire Plan & Commitment Changes,For Period from 970301-980930. with1998-09-30030 September 1998 Cyclic Rept of Facility Changes,Tests & Experiments,Fire Plan & Commitment Changes,For Period from 970301-980930. with ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML20153B4141998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DAEC NG-98-1389, Monthly Operating Rept for July 1998 for DAEC1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DAEC ML20236X5321998-07-29029 July 1998 Safety Evaluation Re USI A-46 Program Implementation for Plant ML20236W0021998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief NDE-R020 Re Third 10-yr ISI Interval of Plant,Per 10CFR50.55a(a)(3(i) ML20236S2541998-07-14014 July 1998 Special Rept 98-01:on 980629,diesel-driven Fire Pump Was Inoperable for Greater than Seven Days.Caused by Sheared Off Tie Rods on Accessory Drive End of Engine.Evaluated Condition,Procured Parts & Replaced Tie Rods ML20236R3251998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DAEC ML20249B5171998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DAEC ML20247P5651998-05-18018 May 1998 Part 21 Rept Re Model SA-A101 MSIV A' Actuator Showing Evidence of Internal Leakage,In Both Directions Past Pneumatic Piston.Situation Being Reviewed to Determine If Failure Could Pose Substantial Safety Hazard ML20247K1881998-05-0808 May 1998 Rev 0 to Cycle 16 COLR, for May 1998 ML20247H9381998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for DAEC ML20216J9171998-04-16016 April 1998 Safety Evaluation Accepting Relief Request MC-R001 for First 10-yr Interval of Containment Insp Program Per 10CFR50.55a (a)(3)(ii),per 971219 Request ML20217K7251998-04-16016 April 1998 Correction to SE of Relief Request MC-R001 Re Qualification Requirements for non-destructive Exam Personnel Performing Containment Insp ML20217K0471998-04-0101 April 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request NDE-R004 for Plant Third 10-yr ISI Interval,Based on Finding That Compliance W/Code Would Result in Hardship W/O Compensating Increase in Level of Quality & Safety ML20217H8831998-04-0101 April 1998 Safety Evaluation Supporting Request for Relief for Third ISI Program NG-98-0650, Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center ML20216F6791998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for DAEC ML20217F8841998-03-23023 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Program Plan Requests for Relief for Plant NG-98-0398, Monthly Operating Rept for Feb 1998 for DAEC1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for DAEC NG-98-0252, Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center ML20199L3481998-01-31031 January 1998 Rev 0 to Duane Arnold Energy Ctr Emergency Action Level (EAL) Technical Basis Document ML20249B3331997-12-31031 December 1997 1997 Annual Rept for Alliant Corporation ML20249B3391997-12-31031 December 1997 Central Iowa Power Coopertive 1997 Annual Rept ML20249B3351997-12-31031 December 1997 1997 Annual Rept for Corn Belt Power Cooperative NG-98-0017, Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center NG-97-2118, Monthly Operating Rept for Nov 1997 for DAEC1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DAEC ML20199J6841997-11-21021 November 1997 SER Approving Relief Requests to Second 10-year Inservice Inspection Interval for Duane Arnold Energy Center NG-97-1959, Monthly Operating Rept for Oct 1997 for DAEC1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for DAEC 1999-09-30
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _
e u '
ALLI ANT
~
UTIL! TIES ins utisiae. inc.
^ "'"
IES Utilities T8 374",DA Palo IA 52324-9785 August 14,1998 Ofhce 319.851.7611 Fax: 319.851.7986 www.alliant-energy.com
~ NG 98-1389 Mr. James L. Caldwell Regional Administrator (acting)
Regim : '
U.e Nucle z Regulatory Commission 801.%Tenville Road Lisle, IL 60532-4351
Subject:
Duane Arnold Energy Center Docket No: 50-331 Operating License: DPR-49 July 1998 Monthly Operating Report File: A-118d
Dear Mr. Caldwell:
l Please find enclosed the Duane Arnold Energy Center Monthly Operating Report for July 1998.
The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02:
Revised Contents Of The Monthly Operating Report, and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.
- Very truly yours,
/4 ..
s/ --
)'
Gary VanMiddlesworth Plant Manager-Nuclear g GDV/RBW - h Enclosures l
1 I 9808190048 DR 9807317 ADOCK 05000331 )
PDR t
L--_____-__----__._.--__--_____-.__-___.--_.-__-___ - - _ - _ _ _ - _ _ _ _ _ . - _ _ . _ _ _ _ _ _ _ ._- _-.._.- . _ _ _ _ __-_..--._-.._.-___L
s Mr. James L. Caldwell
NG 98-1389 August 14,1998 Page 2 of 2 -
cc:
- U.S
- Nuclear Regulat6ry Commissioner Ms. Lisa Stump Attn: Document Control Desk lowa State Utilities Board Mail Station 0-Pl-17 Lucas State Oflice Building Washington, DC 20555-0001 (Orig.) Des Moines,IA 50319
' Ms. Barbara Lewis Dr. William A. Jacobs, Jr.
McGraw-Hill, Inc. GDS Associates,Inc.
1200 G Street NW, Suite 1100 1850 Parkway Place, Suite 720 Washington, DC 20005 Marietta, GA 30068-8237 Mr. Dennis Murdock Mr. Dale Arends CentralIowa Power Cooperative Corn Belt Power Cooperative Box 2517 130013th Street North Cedar Rapids,IA 52406 Humboldt,IA 50548 Document Control Desk Mr. Al Gutterman INPO Records Center Morgan, Lewis, Bockius 1
.700 Galleria Parkway 1800 M St.N W Atlanta, GA 30339-5957 Washington, DC 20036-5859 Mr. Rich Laufer DOCU Project Manager 1 White Flint North NRC Resident Inspector Mail Stop 13E21 11555 Rockville Pike CTS Project Rockville, MD 20857 l
I
s i 't ~
OPERATING DATA REPORT j DOCKET NO: 50-0331 DATE: 08/14/98 Unit: Duane Arnold Energy Center f COMPLETED BY: Richard Woodward TELEPHONE: (319) 851-7318 i
OPERATING STATUS l Average Daily Power Level I
, Unit Name: Duane Arnold Enerav Center 500 L Reporting Period: Juiv 1998 400 t
- 3. LicensedThermalPower(MW ):th 16.58 T 300
- 4. Nameplate Rating (Grosse MW DER): 565.7 (Turbine) is 2 200
- 5. Design Electrical Rating (Net MW, DER): j.38 100 5
6.
Maximum Dependable Capacity (Gross e MW MDC): j50 0
Maximum Dependable Capacity (Nete MW MDC): $2p 1 6 11 16 21 26 31 7.
Day 8.
If Changes Occur in Capacity Ratings (Items Number 3 through 7) since the last report, Give Reasons: Not Annlicable 9.
Power Level to Which Restricted, if Any (Net Mw ):e M%
10.
Reasons for Restrictions,if Any: MS 1998' Cumulative July-98 5,087.0 205,967.0 744.0
- 11. Ilours in Reporting Period 744.0 4,007.8 158,774.3
- 12. Number of Hours Reactor Was Critical 0.0 0.0 192.8
- 13. Reactor Reserve Shutdown Hours 3,922.2 155,071.3 744.0
- 14. Hours Generator On-Line 0.0 0.0 0.0
- 15. Unit Reserve Shutdown llours 6,311,606.4 221,017,648.6 1,221,004.8
- 16. , Gross ' Thermal Energy Generated (MWH) 2,113,399.0 74,106,085.6 403,261.0
- 17. ' Gross Electrical Energy Generated (MWH) 380,416.9 1,993,405.3 69,564,493.5
- 18. Net Electrical Energy Generated (MWH) 100.0 % 77.1 % 75.3 %
- 19. Unit Service Factor 77.1% 75.3 %
100.0 %
- 20. Unit Availability Factor 98.3 % 75.4 % 71.0%
- 21. Unit Capacity Factor (Using MDC Net) 95.0 % 72.8% 68.1 %
- 22. Unit Capacity Factor (Using DERNet) 0.0%. 0.0% i 9.6%
- 23. . Unit Forced Outage Rate 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): N/.A.
EM If Shutdown at End of Report Period, Estimated Date of Startup:
25.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-0331 -
DATE: 08/14/98 Unit: Duane Arnold Enercy Center
.,, .s COMPLETED E/: Richard Woodward TELEPHONE: (319) F51-7318 MONTH July 1998 Day Average Daily Power Level (MWe-Net) 1 520.4 2 521.8 3 515.3 4 518.7
! 5 521.0 6 512.1 7 511.4
! 8 516.0 9 514.1 10 515.0 11 518.8 l 12 517.9 13 517.8 14 516.2 15 515.3 16 517.2 17 517.8 l.'
18 378.4 19 505.9 20 508.9 21 512.4
! 22 513.7 23 514.9 24 500.5 25 520.5 26 519.7 27 514.1 ,
28 514.6 29 520.4 b 30 520.0 .
31 519.9 1
l
? ' REFUELING INFORMATION l DOCKET NO: $0-0331
\ DATE: 08/14/98 f Unit: Duane Arnold Enerev Center l COMPLETED BY: Richard Woodward l
TELEP1IONE: {319) 851-7318 1.
Name of facility, puane Arnold Enercy Center 2.
Scheduled date for next refueling shutdown. October 8.1999 3.
Scheduled date for restart following refueling. November 13.1999 ification change 4.
Will refueling or resumption of operation thereafter require a technical or otherlicense amendment? N_g i information.hi!/A 5.
Scheduled date(s) for submitting proposed licensing action and suppor different fuel design 6.
Important licensing considerations i associated with refueling, e.g., new or supplier, unreviewed design or performance analys s me design, new operating procedures. N_/A Projec5 Iate oflast 7.
s ...ent and projected fuel assemblics inventory:Numberof f refueling that can W .'.;.,Uarged F~ Fuel (after allowing margin for Assemblies maintenance of continuous full-core discharge capability)
N/A ~
~I 368 N/A [
l 1648 ._
Installed in_ reactor core 2001 StorageEPool Previously discharged from core to Spent Fuel l_ 2411 2006 Installed Capacity of Spent Fuel Storage Pool 2829 l 2010 Licensed Capacity of Spent Fuel Storage Pool (with reracking) 3152 a Licensed Capacity of Spent Fuel Storage Pool and Cask Pool (with '
reracking)
- ~ _ _ _ _ _ _ _ _ _
DOCKET NO: 50-0331 DATE: 08/14/98 Unit: Duane Arnold Enercy Center COMPLETED BY: Richard Woodward TELEPIIONE: (319) 851-7318 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: July 1998 No. Date Type Duration Reason Method of Licensee Cause (1) (Hours) (2) St utting Event Down Reactor Report #
(3) 4 7/17/98 S 36.0 B 5 Control Rod Sequence (6.3 Full- Exchange 7/19/98 Power-flours ,
Equivalent) 1 - F: Forced 2 Reason 3 - Method:
S: Scheduled A-Equipment Failure (Explain) 1 Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training & License Examination 5-Reduced Load F Administrative 9-Other (Explain) i G-Operational Error (Explain)
H-Other (Explain)
\ . .
.~
DOCKET NO.: 50-0331 DATE: 98/14/98 Unit: Duane Arnold Energy Center i '
COMP' ETED BY: Richard Woodward TELEPHONE: (3191 851-7318 Monthly Operational Overview for July 1998 During the month of July, the DAEC operated at its 1658 MW. licensed limit except for the following departures from full power:
Allocation of Production and Losses Electric Capacity Factor Full Power Output MWe % of 565.7 MWe Equivalent (Design Rating) Hours (FPilea)
Plant Process Computer maintenance,07/12 08:56 15:57 0.2 0.0% 0.2 Control Rod Sequence Exchange,07/17 23:12 - 07/1911:10 4.8 0.9% 6.3 Reduced recirculation flow to pull control rods to increase load line (Rod Pull), 0.1 0.0% 0.1 07/20 00:00 01:15 Maintenance on Stop Valve 2,07/23 22:00 07/24 07:00 0.7 0.1% l.0 Average Margin to 1658 MWthLimit 0.2 0.0% 0.2 Subtotal: Capacity Losses 5.9 1.0 % 7.8
'B' Moisture Separator Reheater Pert'ormance Loss 1.2 0.2% 1.6 Feedwater flow measurement nozzle fouling 3.0 0.5% 3.9 Other Losses, as yet unidentified 3.5 0.6% 4.6 Subtotal: Efficiency Losses 7.7 1.3 % 10.0 l Weather Losses l 10.1 l 1.9 % l 13.3 l l Total Losses l E 2 l E 4 l 3E l Net Electric Output 511.3 90.4 % 672.5 Plant Electric Loads (while on-line) 30.7 5.4% 40.4 Total Electric Generation 542.0 95.8 % R 7
l Design Electric Rating Total %, Total # of clock-hours l 565.7 l 100 0 % l 744.0 l (There were no Licensee Event Reports during the month.)
Licensing Action Summary:
Plant Availability: 100 % Unplanned Auto Scrams (while/ critical) this month: 0 Number of reportable events: 0 Unplanned Auto Scrams (while/ critical) last 12 months: 0 j Main Steam Safety and Relief Valve Challenges: 0 j 1
l 1
i
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ . . . - . . --.-