MONTHYEARNG-99-1415, Monthly Operating Rept for Sept 1999 for Daec.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Daec.With NG-99-1226, Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With NG-99-1115, Monthly Operating Rept for July 1999 for Daec.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Daec.With NG-99-0963, Monthly Operating Rept for June 1999 for Daec.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Daec.With NG-99-0835, Monthly Operating Rept for May 1999 for Daec.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Daec.With NG-99-0682, Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With NG-99-0530, Monthly Operating Rept for Mar 1999 for Daec.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Daec.With NG-99-0330, Monthly Operating Rept for Feb 1999 for Daec.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Daec.With NG-99-0020, Monthly Operating Rept for Dec 1998 for Daec.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Daec.With NG-98-2010, Monthly Operating Rept for Nov 1998 for Daec.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Daec.With NG-98-1875, Monthly Operating Rept for Oct 1998 for Daec.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Daec.With NG-98-1717, Monthly Operating Rept for Sept 1998 for Daec.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Daec.With ML20153B4141998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DAEC NG-98-1389, Monthly Operating Rept for July 1998 for DAEC1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DAEC ML20236R3251998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DAEC ML20249B5171998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DAEC ML20247H9381998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for DAEC ML20216F6791998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for DAEC NG-98-0650, Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center NG-98-0398, Monthly Operating Rept for Feb 1998 for DAEC1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for DAEC NG-98-0252, Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center NG-98-0017, Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center NG-97-2118, Monthly Operating Rept for Nov 1997 for DAEC1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DAEC NG-97-1959, Monthly Operating Rept for Oct 1997 for DAEC1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for DAEC NG-97-1781, Monthly Operating Rept for Sept 1997 for Duane Arnold Energy Center1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Duane Arnold Energy Center ML20217C3491997-08-31031 August 1997 Revised MOR for Aug 1997 for DAEC ML20210V1851997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for DAEC NG-97-1452, Monthly Operating Rept for July 1997 for DAEC1997-07-31031 July 1997 Monthly Operating Rept for July 1997 for DAEC NG-97-1258, Monthly Operating Rept for June 1997 for DAEC Per GL 97-021997-06-30030 June 1997 Monthly Operating Rept for June 1997 for DAEC Per GL 97-02 NG-97-1033, Monthly Operating Rept for May 1997 for Duane Arnold Energy Center1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Duane Arnold Energy Center NG-97-0894, Monthly Operating Rept for Apr 1997 for Duane Arnold Energy Ctr1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Duane Arnold Energy Ctr NG-97-0674, Monthly Operating Rept for Mar 1997 for Duane Arnold Energy Ctr1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Duane Arnold Energy Ctr NG-97-0453, Monthly Operating Rept for Feb 1997 for Duane Arnold Energy Center1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Duane Arnold Energy Center NG-97-0308, Monthly Operating Rept for Jan 1997 for Duane Arnold Energy Center1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Duane Arnold Energy Center NG-97-0059, Monthly Operating Rept for Dec 1996 for Duane Arnold Energy Center1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Duane Arnold Energy Center NG-96-2647, Monthly Operating Rept for Nov 1996 for Duane Arnold Energy Center1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Duane Arnold Energy Center NG-96-2447, Monthly Operating Rept for Oct 1996 for Duane Arnold Energy Center1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Duane Arnold Energy Center NG-96-2166, Monthly Operating Rept for Sept 1996 for DAEC1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for DAEC NG-96-1913, Monthly Operating Rept for Aug 1996 for DAEC1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for DAEC NG-96-1713, Monthly Operating Rept for Jul 1996 for DAEC1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for DAEC NG-96-1481, Monthly Operating Rept for June 1996 for Duane Arnold Energy Ctr1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Duane Arnold Energy Ctr NG-96-1298, Monthly Operating Rept for May 1996 for Duane Arnold Energy Center1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Duane Arnold Energy Center NG-96-1055, Monthly Operating Rept for Apr 1996 for Duane Arnold Energy Center1996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Duane Arnold Energy Center NG-96-0825, Monthly Operating Rept for Mar 1996 for DAEC1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for DAEC NG-96-0624, Monthly Operating Rept for Feb 1996 for DAEC1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for DAEC NG-96-0320, Monthly Operating Rept for Jan 1996 for DAEC1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for DAEC ML20096C3101995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Duane Arnold Energy Ctr NG-95-3516, Monthly Operating Rept for Nov 1995 for Duane Arnold Energy Ctr1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Duane Arnold Energy Ctr NG-95-3235, Monthly Operating Rept for Oct 1995 for Duane Arnold Energy Ctr1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Duane Arnold Energy Ctr NG-95-3057, Monthly Operating Rept for Sept 1995 for Duane Arnold Energy Ctr1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Duane Arnold Energy Ctr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8991999-10-18018 October 1999 SER Approving Licensee Requests for Relief NDE-R001 (Part a & B),NDE-R027,NDE-028,NDE-R029,NDE-R030,NDE-R032 & NDE-R035. Relief Request NDE-036,denied & Relief Request NDE-R-034, Deemed Unnecessary NG-99-1415, Monthly Operating Rept for Sept 1999 for Daec.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Daec.With ML20212H2381999-09-22022 September 1999 Safety Evaluation Supporting Amend 228 to License DPR-49 NG-99-1226, Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With NG-99-1115, Monthly Operating Rept for July 1999 for Daec.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Daec.With NG-99-0963, Monthly Operating Rept for June 1999 for Daec.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Daec.With ML20195G9901999-06-0909 June 1999 Safety Evaluation Supporting Amend 227 to License DPR-49 NG-99-0835, Monthly Operating Rept for May 1999 for Daec.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Daec.With ML20206N7551999-05-13013 May 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safey-Related Power-Operated Gate Valves NG-99-0682, Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With NG-99-0530, Monthly Operating Rept for Mar 1999 for Daec.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Daec.With ML20207G0251999-03-0303 March 1999 SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety- Related MOVs at Duane Arnold & That Licensee Adequately Addressed Actions Requested in GL 96-05 NG-99-0330, Monthly Operating Rept for Feb 1999 for Daec.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Daec.With ML20202B4311999-01-26026 January 1999 Safety Evaluation Accepting Request for Approval to Use ASME Code Case N-508-1 in ISI Program for Duane Arnold Energy Ctr ML20202B3851999-01-26026 January 1999 Safety Evaluation Addressing Thermo-Lag Related Ampacity Derating Issues.Ampacity Derating Analysis Results Acceptable NG-99-0020, Monthly Operating Rept for Dec 1998 for Daec.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Daec.With ML20206N3211998-12-0707 December 1998 Final Part 21 Rept Re Piston Failure of MSIV Actuator at Daec.Rept Indicates That No Reportable Defect Exists,Per 10CFR21 NG-98-2010, Monthly Operating Rept for Nov 1998 for Daec.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Daec.With ML20196F9571998-11-24024 November 1998 Rev 20 to QA Program Description,Ufsar 17.2 for Daec NG-98-1875, Monthly Operating Rept for Oct 1998 for Daec.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Daec.With NG-98-1717, Monthly Operating Rept for Sept 1998 for Daec.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Daec.With NG-98-1767, Cyclic Rept of Facility Changes,Tests & Experiments,Fire Plan & Commitment Changes,For Period from 970301-980930. with1998-09-30030 September 1998 Cyclic Rept of Facility Changes,Tests & Experiments,Fire Plan & Commitment Changes,For Period from 970301-980930. with ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML20153B4141998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DAEC NG-98-1389, Monthly Operating Rept for July 1998 for DAEC1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DAEC ML20236X5321998-07-29029 July 1998 Safety Evaluation Re USI A-46 Program Implementation for Plant ML20236W0021998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief NDE-R020 Re Third 10-yr ISI Interval of Plant,Per 10CFR50.55a(a)(3(i) ML20236S2541998-07-14014 July 1998 Special Rept 98-01:on 980629,diesel-driven Fire Pump Was Inoperable for Greater than Seven Days.Caused by Sheared Off Tie Rods on Accessory Drive End of Engine.Evaluated Condition,Procured Parts & Replaced Tie Rods ML20236R3251998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DAEC ML20249B5171998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DAEC ML20247P5651998-05-18018 May 1998 Part 21 Rept Re Model SA-A101 MSIV A' Actuator Showing Evidence of Internal Leakage,In Both Directions Past Pneumatic Piston.Situation Being Reviewed to Determine If Failure Could Pose Substantial Safety Hazard ML20247K1881998-05-0808 May 1998 Rev 0 to Cycle 16 COLR, for May 1998 ML20247H9381998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for DAEC ML20216J9171998-04-16016 April 1998 Safety Evaluation Accepting Relief Request MC-R001 for First 10-yr Interval of Containment Insp Program Per 10CFR50.55a (a)(3)(ii),per 971219 Request ML20217K7251998-04-16016 April 1998 Correction to SE of Relief Request MC-R001 Re Qualification Requirements for non-destructive Exam Personnel Performing Containment Insp ML20217K0471998-04-0101 April 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request NDE-R004 for Plant Third 10-yr ISI Interval,Based on Finding That Compliance W/Code Would Result in Hardship W/O Compensating Increase in Level of Quality & Safety ML20217H8831998-04-0101 April 1998 Safety Evaluation Supporting Request for Relief for Third ISI Program NG-98-0650, Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center ML20216F6791998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for DAEC ML20217F8841998-03-23023 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Program Plan Requests for Relief for Plant NG-98-0398, Monthly Operating Rept for Feb 1998 for DAEC1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for DAEC NG-98-0252, Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center ML20199L3481998-01-31031 January 1998 Rev 0 to Duane Arnold Energy Ctr Emergency Action Level (EAL) Technical Basis Document ML20249B3331997-12-31031 December 1997 1997 Annual Rept for Alliant Corporation ML20249B3391997-12-31031 December 1997 Central Iowa Power Coopertive 1997 Annual Rept ML20249B3351997-12-31031 December 1997 1997 Annual Rept for Corn Belt Power Cooperative NG-98-0017, Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center NG-97-2118, Monthly Operating Rept for Nov 1997 for DAEC1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DAEC ML20199J6841997-11-21021 November 1997 SER Approving Relief Requests to Second 10-year Inservice Inspection Interval for Duane Arnold Energy Center NG-97-1959, Monthly Operating Rept for Oct 1997 for DAEC1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for DAEC 1999-09-30
[Table view] |
Text
4
- are Amoic Ere'qi Carter
.:77 CAEC Roaa
- D1.A 523:4
'eMonone 319 8517611 fax 319 8517611 UTILITIES September 13,1996 NG-96-1913 Mr. A. Bill Beach Regional Administrator Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351
Subject:
Duane Arnold Energy Center Docket No: 50-331 Operating License: DPR-49 August 1996 Monthly Operating Report File: A-118d l
Dear Mr. Beach:
Please find enclosed the Duane Arnold Energy Center Monthly Operating Report for August 1996. The report has been prepared in accordance with the guidelines of NUREG-0020 and distribution has been made in accordance with DAEC Technical Specifications, Section 6.11.1.c.
Very truly yours, I
as / $ ec l
Gary Van Middlesworth j Plant Manager-Nuclear l
GDV/RBW Enclosures j i
s i .
gyg #lw a 4':
280031 i
I An IEs Inclustnes Company
1
?. .
i f
Mr. A. Bill Beach NG-96-1713 September 13,1996 Page 2 of 2 ,
cc: .
l U.S. Nuclear Regulatory Commission Mr. Dennis Murdock Attn: Document Control Desk CentralIowa Power Cooperative Mail Station PI-37 Box 2517 l Washington, DC 20555-0001 (Orig.) Cedar Rapids,IA 52406 Mr. Glenn Kelly Dr. William A. Jacobs, Jr.
Project Manager GDS Associates,Inc.
1 Whiteflint North Suite 720 Mail Stop 13E21 1850 Parkway Place 11555 Rockville Pike Marietta, GA 30068-?237 Rockville, MD 20852 i
Document Control Desk Mr. Dale Arends INPO Records Center Corn Belt Power Cooperative
- l 700 Galleria Parkway 130013th Street North Atlanta, GA 30339-5957 Humboldt,IA 50548 l
l Ms. Lisa Stump - DOCU l Iowa State Utilities Board Lucas State Office Building NRC Resident Inspector ;
Des Moines,IA 50319 l Mr. Fred Yost Mr. Al Gutterman '
Director, Research Services Morgan, Lewis, Bockius l Utility Data Institute 1800 M St. NW 1700 K St. NW, Suite 400 Washington, DC 20036-5859 Washington, DC 20006 l
I
l.' -
l OPERATING DATA REPORT DOCKET NO: 50-0331
, . DATE: 09/13/06 Unit: Duane Arnold Enerev Center COMPLETED BY: Richard Woodward TELEPHONE: (310) 851-7318 OPERATING STATUS I .
- Average Daily Power Level
- 1. Unit Name
- Duane Arnold Enerev Center l 500
- 2. Reporting Period: August.l.226 E 400 l Z j 3. Licensed Thermal Power (Mwth): 1618 ; 300 j l B 200 ;
- 4. Nameplate Rating (Gross MWe DER): 565.7 (Turbine) 2 100 l
l 0
- 5. Design Electrical Rating (Net MWe DER): 518 l 1 6 11 16 21 26 31 l l 6. Maximum Dependable Capacity (Gross MW e MDC): 510 l Day
- 7. Maximum Dependable Capacity (Net MW e MDC): 520 l
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) since the last report, Give Reasons: N.o1 !
l I Aonticable l
- 9. Power Level to Which Restricted, If Any (Net Mwe ): Mal Aeolicable
- 10. Reasons for Restrictions,If Any: Not Aonlicable August-96 1996 Cummulative i 1. Hours in Reporting Period 744.0 5,855.0 189,191.0
- 12. Num'oer of Hours Reactor Was Critical 744.0 5,855.0 144,380.8
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 192.8
- 14. Hours Generator On-Line 744.0 5,855.0 140,968.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,224,978 1 9,255,041.7 198,516,256.1 l
l 17. Gross Electrical Energy Generated (MWH) 407,625.0 3,119,471.0 66,531,441.6
- 18. Net Electrical Energy Generated (MWH) 384,572.1 2,942,311.7 62,419,326.3
- 19. Unit Service Factor 100.0 % 100.0 % 74.5%
- 20. Unit Availability Factor 100.0 % 100.0 % 74.5 %
- 21. Unit Capacity Factor (Using MDC Net) 99.4 % 96.6 % 69.6 %
- 22. Unit Capacity Factor (Using DER Net) 96.1 % 93.4 % 66.6 %
- 23. Unit Forced Outage Rate 0.0% 0.0% 10.4 5
! 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): Refueline. 10/11/96.30 I
dCS
- 25. If Shutdown at End of Feport Period, Estimated Date of Startup: N/A
.- AVERAGE DAILY UNIT POWER LEVEL
. DOCKET NO: 50-0331 DATE: 09/13/96 Unit: Duane Arnold Energy Center COMPLETED BY: Richard Woodward TELEPHONE: (319) 851-7318 l
MONTH August 1996 Day Average Daily PowerIrvel (MWe-Net) 1 525.0 ,
2 521.9 I' 3 520.5 4 517.2 5 514.8 6 510.9 7 516.5 8 522.1 l 9 510.4 l 10 433.6 11 513.1
! 12 519.6 l I3 518.2 14 518.4 )
! 15 523.0 !
i 16 523.8 i l 17 521.7 18 519.9 i 19 518.8 20 518.5 21 514.3 22 516.7 23 523.3 24 523.8 25 522.6 26 522.3 27 522.4 28 520.7 29 523.7
, 30 523.7 31 522.5 I
l
, REFUELING INFORMATION DOCKET NO: 50-0331 DATE: 09/13/96
, . Unit: Duane Arnold Enerev Center COMPLETED BY: Richard Woodward TELEPHONE: (319) 851-7318
- 1. Name of facility.
Duane Arnold Energy Center
- 2. Scheduled date for next refueling shutdown.
Refuel Outage XIV to begin October 11,1996.
- 3. Scheduled date for r, start following refueling.
l November 11,1996 l
- 4. Will refueling or resumption of operation thereafter require a technical specification change or otherlicense amendment?
Yes RTS 269, T.S. 3.7," Plant Containment Systems" RTS 288, T.S. 2.1,3.2, " Reactor Water Clean-up Systems Vessel Level Isolation Set-Point Change" RTS 290, T.S. 3.6, " Reactor Water Conductivity Limit Change in Table 3.6.B.2-1"
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
RTS 269, submitted December 22,1995 RTS 288, submitted January 18,1996, Approved Amendment No. 217 received August 8,1996 RTS 290, submitted July 5,1996 j 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
l No
- 7. Current and projected fuel assemblies inventory:
Number of Fuel Projected date oflast l Assemblies refueling that can be discharged
! (after allowing margin for l maintenance of continuous full-core discharge capability)
Installed in t eactor core (following refueling) i 368 n/a Previously discharged from core to Spent Fuel Storage Pool i 1408 n/a i Discharged from core to Spent Fuel Storage Pool 1528 n/a (following Fall 1996 refueling)
- installed capacity of Spent Fuel Storage Pool 2411 2001
- Licensed Capacity of Spent Fuel Storage Pool (with reracking) ' 2829 2006 Licensed Capacity of Spent Fuel Storage Pool and Cask Pool 3152 2010 (with reracking) l
I DOCKET NO: 50-0331 ..
DATE- 09/13/96 ,
Unit: Duane Amold Enerev Center COMPLETED BY: Richard Woodward l TELEPilONE: 0 19) 851-7318 UNIT S11UTDOWNS AND POWER REDUCTIONS REPORTMONTII: August 1996 No. Date Type Duration Reason Method of Licensee Event System Code Comp. Code Cause (1) (flours) (2) Shutting Report # (4) (5)
Down Reactor (3) 10 August S 0 B 5 n/a n/a n/a Turbine Control Valve testing 10 - 12 (5.4 full- Control Rod Exercises power- Scram Solenoid Valve testing hours equivalent) -
1 - F: Forced 2 - Reason 3 - Method: 4 - Exhibit G-Instructions for S: Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry i B-Maintenance or Test 2-Manual Scram Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File (NUREG-D-Regulatory Restriction 4-Continued 0161)
E-Operator Training & License Examination 5-Reduced Load F-Administrative 9-Other(Explain) 5 - Exhibit 1 (Same Source)
G-Operational Error (Explain)
II-Other (Explain)
_ _ . _ _ . . . . _ . _ _ . . _ _ _ _ _ _ _ . _ _ . . _ . __ .___.__..__....____._.____..m.___._..__.__.m.._ _ _ _ _ . _ . . _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ . . _ . . _ _ _ _ . _ . _ . _ . . _ _ _ _ _ . _ _ . _ . .
l I DOCKET NO.: 50-0331 I
. DATE: 09/13/96 Unit: Duane Arnold Enerev Center COMPLETED BY: Richard Woodward TELEPHONE: (319) 851-7318 l Monthly Operational Overview for August 1996:
l i The DAEC operated at full thermal power throughout the month except:
I
( on August IG-ir, to perform scheduled Scram Time Testing, Turbine Control Valve Testing, and Control Rod Drive manipulations: 5.4 full-power-hours (equivalent) lost.
l on August 9,17,25,28 and 31, to reduce recirculation flow to withdraw a control rod.
1
! Total forgone production was the equivalent of 23.4 full-power hours of operation, including other small losses.
1 At the end of the month the Duane Arnold Energy Center had operated 453 consecutive days, its best-ever continuous operating run.
Allocation of Production & Losses: Electncal Capacity Factor Full Powei Output % of 565.7 MWe Equivalent MWe (Design Gross Houn l Rating) i i
Actual Metered Net Electric Output 516.9 91.4 % 679.8 Actual Metered Plant Electric Loads 31.0 5.5% 40.8 Load Following 0.0 0.0% 0.0 l Off-Line 0.0 0.0% 0.0 Weather losses, ie., condenser pressure >2.75 in lig / Circ Water Temp > 74.5 "F 7.8 1.4% 10J Planned Capacity Losses: August 9,10-12,17,25,28 & 31 -
4.9 0.9% 6.5
! Unplanned Capacity Losses: none 0.0 -0.1 % 0.0 Normal Capacity Losses (Avg MWth < 1658) 0.6 0.1% 0.8 Metering Losses (Avg indic MWe - Avg MWile) 1.6 0.3% 2.1 Efficiency Losses (Weather-Norm-Full-Power-MWe < 565.7) 2.1 {Lin ,1,2 Design Grns: Electric Output 565 7 100 0% 7440 There were no Licensee Event Reports.
Licensine Action Summary:
Plant Availability: 100.0 % Unplanned Auto Scrams (while/ critical) this month: 0
- Number of reportable events
- 0 Unplanned Auto Scrams (while/ critical)last 12 months: 0 l