ML19253B396

From kanterella
Revision as of 01:41, 2 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
RO-335-79-30:on 790918,during Insp & Evaluation of Pipe Restraints & Supports,Two Restraints on ECCS Piping Sys Were Found to Be in Nonconformance.Both Restraint Errors Corrected
ML19253B396
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/19/1979
From: Wethy C
FLORIDA POWER & LIGHT CO.
To:
References
NUDOCS 7910150493
Download: ML19253B396 (1)


Text

. _ . . . . ._ . _ . _ _ _ . . _ _ . . . _ _ . _ _ _ _ . . _ _ . . . . . . _ _ . . .

P.O. BOX #128, FT. PIERCE, FLA. 33450 CMW-PSL 's Ltr. Bk. 684 USNRO .

ANTf '-

ID' k@

Copies to: CMW, JHB, CAW, NCR, DAS g- {y 4g FLORioA POWER & UGHT COMPANY Offsite: ADS, JRB, COW, MAS, REU, KNH .L fPT g~'

"[ept@Ser 19, 1979 To: Mr. J. P. O'Reilly, Director, Region II Offica of Inspection and Enforcement U. S. Nuclear Regulatory Commission Atlanta, Georgia 30303 From: Mr. C. M. Wethy, Plant Manage r St. Lucie Plant - DPR 67 Florida Power & Light Company Miami, Florida

Subject:

MEMO FOR FACSIMILE TRANSMISSION TO CONFIRM PROMPT REPORIABLE OCCURRENCE 335-79-30 This memo confirms our telephone notification of the subject 14-day reportable occurrence made on September 18, 1979 to Mr. J. Dyer of your office. ,

During the inspection / evaluation of pipe restraints / supports in accordance with NRC I & E Bulletin 79-14, two restraints on ECCS piping systems were found to be in non-conformance. Restraint SI-676-429 on line 4"-SI-416 (vertical riser section) was found as a U-bolt type restraint which would prohibit movement in both the North-South and East-West directions. By design it should permit movement in the East-West direction.

A restraint on line 6"-SI-464 (horizontal section) which is designed to prohibit lateral and vertical movement was found missing. In its place was pipe hanger SIH-99 which is suspended from the ceiling above.

Both restraint errors have been corrected. The U-bolt at restraint SI-676-429 has been replaced with a unidirsctional restraint that parmits East-West movement New restraint SI-868-6099 has been fabricated and installed on line 6"-SI-464 to prohibit vertical and lateral movement.

aWdt'hy,IJ8 mr Plant Manager St. ucie Plant CMW:cwe t'

k 7 910150 F/8 omrTArDOPY 1,:2 007

. - . - . . . . - - . . - - . . , - . - ,