P. O. BOX 128, FT. PIERCE FL 33450 CMW-PSL Ltr. Bk. #1942
\\\\tl/f Copies to:
CMW, JHB, D/55, NGR, RRJ Offsite: JJW, KNH, HNP, PLP, REU FLORioA POWER & LIGHT COMPANY May 9, 1983 To:
Mr. J. P. O'Reilly, Director, Region II Office of Inspection and Enforcement g
U. S. Nuclear Regulatory Commission 3
Atlanta, Georgia 30303 1,
c.o From:
Mr. C. M. Wethy, Plant Manager
. ~
a]E p
St. Lucie Plant NPF-16 m
g Florida Power & Light Company 93 Miami, Florida 7,
p'
SUBJECT:
MEMO FOR FACSIMILE TRANSMISSION TO CONFIRM PROMPT REPORTABLE OCCURRENCE 389-83-005 ISOLATED SAFETY INJECTION TANKS This memo confirms the telephone call at 9:47 P.M. on 5/7/83 with the NRC Duty Call Supervisor.
At about 9:15 P.M. on 5/7/83, it was noted that the SIT isolation valves were closed with the plant in Mode 4 above 276 psia which is not in compliance with TS 3.5.1.a.
The valves were immediately opened.
The condition had existed for 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. The apparent cause is personnel error in that a procedural step had been overlooked during plant heatup for post core load hot functional testing. The plant was at about 260 F and 400 psia. It should be noted that the plant has not been critical and thus has no decay heat and that these valves open automatically at 515 psia.
kN))
C. M. Methy Plant Manager St. Lucie Plant CMW/RRJ:esr
Af 8305170310 030509 PDR ADOCK 05000 8 S