ML19253B396
| ML19253B396 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 09/19/1979 |
| From: | Wethy C FLORIDA POWER & LIGHT CO. |
| To: | |
| References | |
| NUDOCS 7910150493 | |
| Download: ML19253B396 (1) | |
Text
.
P.O. BOX #128, FT. PIERCE, FLA. 33450 CMW-PSL
's Ltr. Bk. 684 USNRO k@
ANTf ID' Copies to: CMW, JHB, CAW, NCR, DAS g-
{y FLORioA POWER & UGHT COMPANY 4g Offsite: ADS, JRB, COW, MAS, REU, KNH
.L fPT g
"[ept@Ser 19, 1979
~'
To:
Mr. J. P. O'Reilly, Director, Region II Offica of Inspection and Enforcement U. S. Nuclear Regulatory Commission Atlanta, Georgia 30303 From:
Mr. C. M. Wethy, Plant Manage r St. Lucie Plant - DPR 67 Florida Power & Light Company Miami, Florida
Subject:
MEMO FOR FACSIMILE TRANSMISSION TO CONFIRM PROMPT REPORIABLE OCCURRENCE 335-79-30 This memo confirms our telephone notification of the subject 14-day reportable occurrence made on September 18, 1979 to Mr. J. Dyer of your office.
During the inspection / evaluation of pipe restraints / supports in accordance with NRC I & E Bulletin 79-14, two restraints on ECCS piping systems were found to be in non-conformance. Restraint SI-676-429 on line 4"-SI-416 (vertical riser section) was found as a U-bolt type restraint which would prohibit movement in both the North-South and East-West directions. By design it should permit movement in the East-West direction.
A restraint on line 6"-SI-464 (horizontal section) which is designed to prohibit lateral and vertical movement was found missing.
In its place was pipe hanger SIH-99 which is suspended from the ceiling above.
Both restraint errors have been corrected. The U-bolt at restraint SI-676-429 has been replaced with a unidirsctional restraint that parmits East-West movement New restraint SI-868-6099 has been fabricated and installed on line 6"-SI-464 to prohibit vertical and lateral movement.
a IJ8 mr Wdt'hy, Plant Manager St.
ucie Plant CMW:cwe t'k 7 910150 F/8 omrTArDOPY 1,:2 007
. -. -.... - -.. - -.., -. -,