ML19337A551
ML19337A551 | |
Person / Time | |
---|---|
Site: | Sequoyah |
Issue date: | 09/24/1980 |
From: | Mills L TENNESSEE VALLEY AUTHORITY |
To: | |
Shared Package | |
ML19337A552 | List: |
References | |
TVA-SNP-TS-7, NUDOCS 8009290262 | |
Download: ML19337A551 (1) | |
Similar Documents at Sequoyah | |
---|---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20217F9551999-10-14014 October 1999
[Table view]Application for Amends to Licenses DPR-77 & DPR-79,proposing Change to TS SRs & Bases to Incorporate ARC for Axial Primary Water Stress Corrosion Cracking at Dented Tube Support Plant Intersections ML20217E4211999-10-12012 October 1999 TS Change 99-15 to Licenses DPR-77 & DPR-79,providing Unisolation of Containment Penetrations Under Administrative Controls ML20211K1521999-08-30030 August 1999 TS Change 99-10 to Licenses DPR-77 & DPR-79,providing Clarification to Current TS Requirements for Containment Isolation Valves ML20211M7261999-08-30030 August 1999 TS Change 99-08,for Amends to Licenses DPR-77 & DPR-79 to Provide Alternative to Requirement of Actually Measuring Response times.Marked-up & Revised TS Pages,Encl ML20209B7661999-06-30030 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,updating Current TS Requirements for RCS Leakage Detection & RCS Operational Leakage Specifications to Be Consistent with NUREG-1431 ML20196G4441999-06-24024 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,to Revise TS to Be Consistent with Rev to ISTS Presently Submitted to NEI TSTF for Submittal as Rev to NUREG-1431 ML20196F2121999-06-24024 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,to Change TS Allowing Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20195E9661999-06-0707 June 1999 Application for Amend to License DPR-79,increasing Max Allowed Specific Activity of Primary Coolant from 0.35 Microcuries/Gram Dose Equivalent I-131 to 1.0 Microcuries/ Gram Dose Equivalent I-131 for Plant Cycle 10 (U2C10) Core ML20206E1551999-04-29029 April 1999 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 99-04, Auxiliary Feedwater Suction Pressure Low Surveillance Frequency Rev. Change Deletes Surveillance ML20206E1341999-04-29029 April 1999 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change Request 99-03, Main Control Room Emergency Ventilation Sys Verses Radiation Monitors. Change Adds LCOs 3.3.3.1 & 3.7.7 & NUREG-1431 Changes ML20204H3991999-03-19019 March 1999 TS Change 99-01 to Licenses DPR-77 & DPR-79,relocating TS Associated with Electrical Equipment Protective Devices to Technical Requirements Manual ML20207D5941999-02-26026 February 1999 Application for Amend to Licenses DPR-77 & DPR-79,relocating TS 3.7.6, Flood Protection Plan & Associated Bases from TS to Plant TRM ML20207D6251999-02-26026 February 1999 Application for Amends to Licenses DPR-77 & DPR-79,revising TS to Provide for Consistency When Exiting Action Statements Associated with EDG Sets ML20199K5841999-01-15015 January 1999 Application for Amends to Licenses DPR-77 & DPR-79,adding New Action Statement to TS 3.1.3.2 That Would Eliminate Need to Enter TS 3.0.3 Whenever Two or More Individual RPIs Per Bank May Be Inoperable,While Maintaining Protection ML20206S0061999-01-15015 January 1999 TS Change 98-09 for Licenses DPR-77 & DPR-79,relocating TS 3.3.3.3, Seismic Instrumentation & Associated Bases from TS to Plant Technical Requirements Manual ML20195H6041998-11-16016 November 1998 Application for Amends to Licenses DPR-77 & DPR-79,revising EDG SRs by Adding Note to Allow SR to Be Performed in Modes 1,2,3 or 4 If Associated Components Are Already OOS for Testing or Maint & Removing SR Verifying Lockout Features ML20154H7201998-10-0808 October 1998 Supplemental Application for Amends to Licenses DPR-77 & DPR-79,changing TS to Add CRMP to Administrative Controls Section & Bases of TS ML20238F1051998-08-27027 August 1998 Application for Amend to License DPR-79,revising TS to Provide for Insertion of Limited Number of Lead Test Assemblies,Beginning W/Unit 2 Operating Cycle 10 Core ML20238F2981998-08-27027 August 1998 Revised Applications for Amends to Licenses DPR-77 & DPR-79, Replacing 72 H AOT of TS 3.8.1.1,Action b,w/7 Day AOT Requirement for Inoperability of One EDG or One Train of Edg.Response to RAI Included in Encl ML20249C6321998-06-26026 June 1998 Application for Amends to Licenses DPR-77 & DPR-79,lowering Specific Activity of Primary Coolant from 1.0 Uci/G Dose Equivalent I-131 to 0.35 Uci/G Dose Equivalent I-131,as Provided in GL 95-05 ML20248E9841998-05-28028 May 1998 Suppl TS Change 95-19 to Licenses DPR-77 & DPR-79,replacing Direct Ref to Nuclear QA Plan in TS Section 6.3.1,facility Staff Qualification,W/Actual Requirements Stated in TVA-NQA-PLN89-A ML20217N3411998-04-30030 April 1998 Application for Amends to Licenses DPR-77 & DPR-79,modifying TS Surveillance Requirement 4.4.3.2.1.b to Change Mode Requirement to Allow PORV Stroke Testing in Modes 3,4 & 5 W/Steam Bubble in Pressurizer Rather than Only in Mode 4 ML20203J1511998-02-25025 February 1998 Application for Amends to Licenses DPR-77 & DPR-79 to Change TS for Units 1 & 2,revising EDG Surveillance Requirements ML20202J6601998-02-13013 February 1998 Application for Amends to Licenses DPR-77 & DPR-79, Incorporating MSIV Requirements to Be Consistent W/Std TS (NUREG-1431) ML20202J7101998-02-13013 February 1998 Application for Amends to Licenses DPR-77 & DPR-79,adding New LCO That Addresses Requirements for Main Feedwater Isolation,Regulating & Bypass Valves ML20202J7421998-02-13013 February 1998 TS Change 97-04 to Application for Amends to Licenses DPR-77 & DPR-79,relocating Snubber Requirements from Section 3.7.9 of TS to Plant Technical Requirements Manual ML20198T4211998-01-21021 January 1998 Suppl TS Change 95-19 to Licenses DPR-77 & DPR-79,revising Title for President,Tva Nuclear & Chief Nuclear Officer to Generic Title of Chief Nuclear Officer ML20199K4441997-11-21021 November 1997 Application for Amend to License DPR-55,adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required ML20211A3091997-09-17017 September 1997 TS Change 97-02 to Licenses DPR-77 & DPR-79,revising Pressure Differential Surveillance Requirements for Containment Spray Pumps ML20137C8271997-03-19019 March 1997 Revised TS Change 96-01 to Licenses DPR-77 & DPR-79,revising Appropriate Specifications,Surveillances & Bases to Allow for Conversion from Westinghouse Fuel to Framatome Cogema Fuel ML20136J0251997-03-13013 March 1997 Application for Amends to Licenses DPR-77 & DPR-79,revising Allowed Enrichment of Fuel in TS Section 5.6.1.2 for New Fuel Pit Storage Racks from 4.5 to 5.0 Weight % U-235 ML20129D2561996-10-18018 October 1996 Application for Amends to Licenses DPR-77 & DPR-79,removing Existing Footnotes That Limit Application of Apc for Plant SG Tubes to Cycle 8 Operation for Both Units ML20129G7111996-09-26026 September 1996 Application for Amends to Licenses DPR-77 & DPR-79,revising Fire Protection License Conditions & Relocation of Fire Protection Tech Spec ML20113G2421996-09-20020 September 1996 Application for Amends to Licenses DPR-77 & DPR-79, Clarifying Work Shift Durations for Overtime Limits ML20117J3341996-08-28028 August 1996 Application for Amends to Licenses DPR-77 & DPR-79, Revising Psv & MSSV Setpoint Tolerance from Plus or Minus 1% to Plus or Minus 3% ML20117D0921996-08-22022 August 1996 Application for Amends to Licenses DPR-77 & 79 Changing Tss of Sqb Units 1 & 2 by Deleting Table 4.8-1, DG Reliability & Revising Sectio 3.8.1 to Allow a Once Per 18 Month 7 Day AOT for EDGs ML20117D3271996-08-21021 August 1996 TS Change 96-06 to Licenses DPR-77 & DPR-79,removing Surveillance Requirement 4.8.1.1.1.b to Verify Ability to Transfer Unit Power Supply from Unit Generator Supported Circuit to Preferred Power Circuit ML20117D2931996-08-21021 August 1996 TS Change 96-03 to Licenses DPR-77 & DPR-79,revising TS 3.7.1.3, Condensate Storage Tank, to Include New Mode of Applicability to Read Mode 4 When SG Relied Upon for Heat Removal ML20112H0361996-06-0707 June 1996 Application for Amends to Licenses DPR-77 & DPR-79,revising Section 6, Administrative Controls, to Be More Closely Aligned W/Requirements of STSs ML20101N6981996-04-0404 April 1996 TS Change 96-01 to Licenses DPR-77 & DPR-79,allowing Use of Nuclear Fuel Provided by Framatome Cogema Fuels (Fcf). Proprietary & Nonproprietary Versions of Fcf TR Supporting TS Change 96-01 Encl.Proprietary Version of TR Withheld ML20096B3671996-01-0404 January 1996 Application for Amends to Licenses DPR-77 & DPR-79,revising TS Change 95-22,extending Radiation Monitoring Instrumentation Surveillance Period Per GL 93-05 ML20095F0271995-12-12012 December 1995 Application for Amend to License DPR-79,consisting of TS Change 95-23 Revising TS SRs & Bases to Incorporate Alternate S/G Tube Plugging Criteria at Tube Support Plate Intersections,Per GL 95-05 ML20095D5731995-12-0808 December 1995 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 95-20,extending Containment Spray & RHR Sys Nozzles Testing Period from 5 to 10 Yrs in Accordance W/Gl 93-05 ML20095D5431995-12-0808 December 1995 Application for Amend to Licenses DPR-77 & DPR-79,consisting of TS Change 93-09,revising Setpoints & Time Delays for AFW loss-of-power & 6.9 Kv Shutdown Board loss-of-voltage & degraded-voltage Instrumentation ML20095D5811995-12-0808 December 1995 Application for Amend to Licenses DPR-77 & DPR-79,revising TSs to Implement Recent Rule Change to 10CFR50,App J ML20092E0191995-09-11011 September 1995 Application for Amend to License DPR-79,consisting of TS Change Request 95-13,rev 1 Re Extension of Response Time Surveillance Requirements for Unit Two Cycle 7 ML20092E0351995-09-0808 September 1995 Application for Amends to Licenses DPR-77 & DPR-79,revising Section 3/4.7.8 to Clarify Intent of Vacuum Relief Flow During TS Required Testing of Auxiliary Bldg Gas Treatment Sys ML20092E2741995-09-0707 September 1995 Revised TS Change 95-15 for Amend to License DPR-77,revising TS Surveillance Requirements & Bases to Incorporate Alternate S/G Tube Plugging Criteria at Tube Support Plate Intersections,Per GL 95-05 ML20091K4241995-08-21021 August 1995 Proposed TS Change 95-21 to Licenses DPR-77 & DPR-79, Revising TS LCO 3.7.5.c to Allow for Increase in Ultimate Heat Sink Temp to 87 F Until 950930 ML20087D3751995-08-0707 August 1995 Application for Amends to Licenses DPR-77 & DPR-79,revising Time Constants for Overtemp Delta Temp & Overpower Delta Temp Equations 1999-08-30 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARML20217F9551999-10-14014 October 1999
[Table view]Application for Amends to Licenses DPR-77 & DPR-79,proposing Change to TS SRs & Bases to Incorporate ARC for Axial Primary Water Stress Corrosion Cracking at Dented Tube Support Plant Intersections ML20217E4211999-10-12012 October 1999 TS Change 99-15 to Licenses DPR-77 & DPR-79,providing Unisolation of Containment Penetrations Under Administrative Controls ML20212F4601999-09-23023 September 1999 Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively, Approving Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20211K1521999-08-30030 August 1999 TS Change 99-10 to Licenses DPR-77 & DPR-79,providing Clarification to Current TS Requirements for Containment Isolation Valves ML20211M7261999-08-30030 August 1999 TS Change 99-08,for Amends to Licenses DPR-77 & DPR-79 to Provide Alternative to Requirement of Actually Measuring Response times.Marked-up & Revised TS Pages,Encl ML20209B7661999-06-30030 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,updating Current TS Requirements for RCS Leakage Detection & RCS Operational Leakage Specifications to Be Consistent with NUREG-1431 ML20196G4441999-06-24024 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,to Revise TS to Be Consistent with Rev to ISTS Presently Submitted to NEI TSTF for Submittal as Rev to NUREG-1431 ML20196F2121999-06-24024 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,to Change TS Allowing Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20195E9661999-06-0707 June 1999 Application for Amend to License DPR-79,increasing Max Allowed Specific Activity of Primary Coolant from 0.35 Microcuries/Gram Dose Equivalent I-131 to 1.0 Microcuries/ Gram Dose Equivalent I-131 for Plant Cycle 10 (U2C10) Core ML20207A5781999-05-20020 May 1999 Errata to Amend 163 to OL DPR-79 on 931126.SR 4.1.1.1.1.d Was Inadvertently Omitted from Pp 3/4 1-1 of Unit 2 TS ML20206E1341999-04-29029 April 1999 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change Request 99-03, Main Control Room Emergency Ventilation Sys Verses Radiation Monitors. Change Adds LCOs 3.3.3.1 & 3.7.7 & NUREG-1431 Changes ML20206E1551999-04-29029 April 1999 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 99-04, Auxiliary Feedwater Suction Pressure Low Surveillance Frequency Rev. Change Deletes Surveillance ML20204H3991999-03-19019 March 1999 TS Change 99-01 to Licenses DPR-77 & DPR-79,relocating TS Associated with Electrical Equipment Protective Devices to Technical Requirements Manual ML20207D5941999-02-26026 February 1999 Application for Amend to Licenses DPR-77 & DPR-79,relocating TS 3.7.6, Flood Protection Plan & Associated Bases from TS to Plant TRM ML20207D6251999-02-26026 February 1999 Application for Amends to Licenses DPR-77 & DPR-79,revising TS to Provide for Consistency When Exiting Action Statements Associated with EDG Sets ML20206S0061999-01-15015 January 1999 TS Change 98-09 for Licenses DPR-77 & DPR-79,relocating TS 3.3.3.3, Seismic Instrumentation & Associated Bases from TS to Plant Technical Requirements Manual ML20199K5841999-01-15015 January 1999 Application for Amends to Licenses DPR-77 & DPR-79,adding New Action Statement to TS 3.1.3.2 That Would Eliminate Need to Enter TS 3.0.3 Whenever Two or More Individual RPIs Per Bank May Be Inoperable,While Maintaining Protection ML20195H6041998-11-16016 November 1998 Application for Amends to Licenses DPR-77 & DPR-79,revising EDG SRs by Adding Note to Allow SR to Be Performed in Modes 1,2,3 or 4 If Associated Components Are Already OOS for Testing or Maint & Removing SR Verifying Lockout Features ML20154H7201998-10-0808 October 1998 Supplemental Application for Amends to Licenses DPR-77 & DPR-79,changing TS to Add CRMP to Administrative Controls Section & Bases of TS ML20238F1051998-08-27027 August 1998 Application for Amend to License DPR-79,revising TS to Provide for Insertion of Limited Number of Lead Test Assemblies,Beginning W/Unit 2 Operating Cycle 10 Core ML20238F2981998-08-27027 August 1998 Revised Applications for Amends to Licenses DPR-77 & DPR-79, Replacing 72 H AOT of TS 3.8.1.1,Action b,w/7 Day AOT Requirement for Inoperability of One EDG or One Train of Edg.Response to RAI Included in Encl ML20249C6321998-06-26026 June 1998 Application for Amends to Licenses DPR-77 & DPR-79,lowering Specific Activity of Primary Coolant from 1.0 Uci/G Dose Equivalent I-131 to 0.35 Uci/G Dose Equivalent I-131,as Provided in GL 95-05 ML20248E9841998-05-28028 May 1998 Suppl TS Change 95-19 to Licenses DPR-77 & DPR-79,replacing Direct Ref to Nuclear QA Plan in TS Section 6.3.1,facility Staff Qualification,W/Actual Requirements Stated in TVA-NQA-PLN89-A ML20217N3411998-04-30030 April 1998 Application for Amends to Licenses DPR-77 & DPR-79,modifying TS Surveillance Requirement 4.4.3.2.1.b to Change Mode Requirement to Allow PORV Stroke Testing in Modes 3,4 & 5 W/Steam Bubble in Pressurizer Rather than Only in Mode 4 ML20203J1511998-02-25025 February 1998 Application for Amends to Licenses DPR-77 & DPR-79 to Change TS for Units 1 & 2,revising EDG Surveillance Requirements ML20202J6601998-02-13013 February 1998 Application for Amends to Licenses DPR-77 & DPR-79, Incorporating MSIV Requirements to Be Consistent W/Std TS (NUREG-1431) ML20202J7421998-02-13013 February 1998 TS Change 97-04 to Application for Amends to Licenses DPR-77 & DPR-79,relocating Snubber Requirements from Section 3.7.9 of TS to Plant Technical Requirements Manual ML20202J7101998-02-13013 February 1998 Application for Amends to Licenses DPR-77 & DPR-79,adding New LCO That Addresses Requirements for Main Feedwater Isolation,Regulating & Bypass Valves ML20198T4211998-01-21021 January 1998 Suppl TS Change 95-19 to Licenses DPR-77 & DPR-79,revising Title for President,Tva Nuclear & Chief Nuclear Officer to Generic Title of Chief Nuclear Officer ML20199K4441997-11-21021 November 1997 Application for Amend to License DPR-55,adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required ML20211A3091997-09-17017 September 1997 TS Change 97-02 to Licenses DPR-77 & DPR-79,revising Pressure Differential Surveillance Requirements for Containment Spray Pumps ML20137C8271997-03-19019 March 1997 Revised TS Change 96-01 to Licenses DPR-77 & DPR-79,revising Appropriate Specifications,Surveillances & Bases to Allow for Conversion from Westinghouse Fuel to Framatome Cogema Fuel ML20136J0251997-03-13013 March 1997 Application for Amends to Licenses DPR-77 & DPR-79,revising Allowed Enrichment of Fuel in TS Section 5.6.1.2 for New Fuel Pit Storage Racks from 4.5 to 5.0 Weight % U-235 IA-97-261, Amend 220 to License DPR-77,authorizing Operation at Reactor Core Power Levels Not in Excess of 3,411 Megawatts Thermal1997-03-0404 March 1997 Amend 220 to License DPR-77,authorizing Operation at Reactor Core Power Levels Not in Excess of 3,411 Megawatts Thermal ML20211K5631997-03-0404 March 1997 Amend 220 to License DPR-77,authorizing Operation at Reactor Core Power Levels Not in Excess of 3,411 Megawatts Thermal ML20129D2561996-10-18018 October 1996 Application for Amends to Licenses DPR-77 & DPR-79,removing Existing Footnotes That Limit Application of Apc for Plant SG Tubes to Cycle 8 Operation for Both Units ML20129G7111996-09-26026 September 1996 Application for Amends to Licenses DPR-77 & DPR-79,revising Fire Protection License Conditions & Relocation of Fire Protection Tech Spec ML20113G2421996-09-20020 September 1996 Application for Amends to Licenses DPR-77 & DPR-79, Clarifying Work Shift Durations for Overtime Limits ML20117J3341996-08-28028 August 1996 Application for Amends to Licenses DPR-77 & DPR-79, Revising Psv & MSSV Setpoint Tolerance from Plus or Minus 1% to Plus or Minus 3% ML20117D0921996-08-22022 August 1996 Application for Amends to Licenses DPR-77 & 79 Changing Tss of Sqb Units 1 & 2 by Deleting Table 4.8-1, DG Reliability & Revising Sectio 3.8.1 to Allow a Once Per 18 Month 7 Day AOT for EDGs ML20117D2931996-08-21021 August 1996 TS Change 96-03 to Licenses DPR-77 & DPR-79,revising TS 3.7.1.3, Condensate Storage Tank, to Include New Mode of Applicability to Read Mode 4 When SG Relied Upon for Heat Removal ML20117D3271996-08-21021 August 1996 TS Change 96-06 to Licenses DPR-77 & DPR-79,removing Surveillance Requirement 4.8.1.1.1.b to Verify Ability to Transfer Unit Power Supply from Unit Generator Supported Circuit to Preferred Power Circuit ML20112H0361996-06-0707 June 1996 Application for Amends to Licenses DPR-77 & DPR-79,revising Section 6, Administrative Controls, to Be More Closely Aligned W/Requirements of STSs ML20101N6981996-04-0404 April 1996 TS Change 96-01 to Licenses DPR-77 & DPR-79,allowing Use of Nuclear Fuel Provided by Framatome Cogema Fuels (Fcf). Proprietary & Nonproprietary Versions of Fcf TR Supporting TS Change 96-01 Encl.Proprietary Version of TR Withheld ML20096B3671996-01-0404 January 1996 Application for Amends to Licenses DPR-77 & DPR-79,revising TS Change 95-22,extending Radiation Monitoring Instrumentation Surveillance Period Per GL 93-05 ML20095F0271995-12-12012 December 1995 Application for Amend to License DPR-79,consisting of TS Change 95-23 Revising TS SRs & Bases to Incorporate Alternate S/G Tube Plugging Criteria at Tube Support Plate Intersections,Per GL 95-05 ML20095D5431995-12-0808 December 1995 Application for Amend to Licenses DPR-77 & DPR-79,consisting of TS Change 93-09,revising Setpoints & Time Delays for AFW loss-of-power & 6.9 Kv Shutdown Board loss-of-voltage & degraded-voltage Instrumentation ML20095D5731995-12-0808 December 1995 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 95-20,extending Containment Spray & RHR Sys Nozzles Testing Period from 5 to 10 Yrs in Accordance W/Gl 93-05 ML20095D5811995-12-0808 December 1995 Application for Amend to Licenses DPR-77 & DPR-79,revising TSs to Implement Recent Rule Change to 10CFR50,App J ML20092E0191995-09-11011 September 1995 Application for Amend to License DPR-79,consisting of TS Change Request 95-13,rev 1 Re Extension of Response Time Surveillance Requirements for Unit Two Cycle 7 1999-09-23 |
Text
. %
TENNESSEE VALLEY AUTHORITY CH AT TA NOOG A, TE N N ESSEc 37 401 400 Che-atnut Street Toucr Il September 2'i, 1980 TVA-30P-TS-7 Hr. li. R. Dent,on, Director Office of Nuolcar Reactor Pegulation U.S. riuolear Re6ulatory Comiccion Washington, DC 10%5
Dear 14r. Denton:
In the Matter cf ) Docket No. 50-327 Tennessee Volley Authority )
Ecfor ence: Lotter from L. !!. Mills to A. Schwencer dated Septenber 23, 1980 In accordance with the provisions of 10 CFR Part 50.59, we are enclosing 40 coplea of n rtquested aceridtrent to licenec DPR-77 to change the technical specifications of Sequoyah Kuole:ar Plant imit 1 (Enolcsure 1).
Aluc enclcsed are justificttiens to suppert the proposed chenges (Enclosure 2). The enclosed changes concist of codifications to technien1 epecifica-tien 3 4.6.2.f to pernit lesh tecting of valvec in l'CDE 3 and to ellow TVA 30 dayr to accurulate data at rated system pres ure to ectablish baco-line leaktde licits for the Residual !! cat Removal System nupply lina valven.
In accordanct uith the requirements of 10 CFR Part 170.22, we have deternint:d the proposed cnendment to be Class III. The claccification la based en the fcet that a single raroty $acue is invclved. The rerit-Lance of $4,000 in being uired to the huolesr Regulatory Cectiesien, attention: Licensing Fec l'.ana6en.cnt Branch.
Very truly yourn, TELhESSEE VALLEY AUT!:0RITY
,1
. N. Milla, Ibt.ager 1:ucienr Regulation and Safety Overn to cntt oubecrib bafore ec thip M day of_ , /
1960 c.
U [Gr<- l* ; Qtty3
.Octav Pulilic Ny Comission Expirenj V b i
- Er*OlOC UID An Equal Opporturuty Employer