Forwards Agenda for Auxiliary Sys Branch 810609-10 Meeting
ML20004C230
Person / Time
Site: 05000470
Issue date: 05/29/1981
From: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Charemagne Grimes
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
LD-81-023, LD-81-23, NUDOCS 8106020367
Download: ML20004C230 (2)


Text

-

l l

t Tel. 2o3/688-1911 C-E Power Systems Cornbustion Engineenng. Inc. Tefer 99297 1000 Prosoect Hill Road Windsor. Connecticut o6095 POWER H SYSTEMS Docket No.: STN-50-470F May 29, 1981 LD-81-023 g 1.' : I.2 l

Mr. Christopher Grimes, Project Manager

- hl/.y \ -

Standardization & Special Projects Branch Office of Nuclear Reactor Regulation 3 \b 14 f .0g 60 'g U. S. Nuclear Regulatory Commission ll:

i l

\

Washington, D. C. 20555 [f' , #

i

~,

I

Dear Mr. Grimes:

. a. .

As requested, Combustion Engineering (C-El is preparing for a series of presen-tations to the Auxiliary Systems Branch in a meetino scheduled for June 9 and 10,  !

on the CESSAR-F docket. An agenda for the meeting is attached. Each presentation li will address the appropriate issues, as provided in the text of CESSAR-F. Many of the SAR sections within the review scope of the ASB are outside of the licensing scope of CESSAR-F. However, interfaces with CESSAR-F systems, which relate to these SAR sections, will be discussed. For example, interface requirements from i l

the Reactor Coolant System (Section 5.1.4) which apply to the Service Water l j

System (Section 9.2) will be addressed. l Time will be allotted at the end of each presentation to answer NRC questions and to discuss related issues. C-E plans to have available the proper personnel to l

l answer questions which may arise and to make any necessary commitments.

If you have any questions or require additional information, please contact me or Mr. G. A. Davis of my staff at (203)688-1911. Extension 3917.

Very truly yours, COMBUSTION ENGINEERING, INC.

)

. . Scherer Director Nuclear Licensing AES:dac i

h00l 3

Attachment

//

l il0802 0367

O Jc AGENDA FOR MEETING WITH AUXILIARY SYSTEMS BRANCH ON CESSAR-F s

June 9, 1981 (Begin at 9:00 a.m.)

~

MORNING SESSION

  • 3.4 Water Level (Flood) Design
  • 3.5 Missile Protection 3.6.1 Postulated Piping Failures In Fluid Systems Outside of Containment 4.6 Functional Design of Reactivity Control Systems AFTERNOON SESSION 5.2.5 Reactor Coolant Pressure Boundary aakage Detection Systems 5.4.11 Pressurizer Relief Tank '
  • 9.1.1 New Fuel Storage
  • 9.1.2 Spent Fue1 5torage Racks
  • 9.2 Water System l June 10, 1981 (Begin at 9:00 a.m.)

l

  • 9.3.1 Compressed Air Systems
  • 3.3.3 Equipment andFloor Drainage System 7
  • 9.4 Air Conditioning, Heating, Cooling, and Ventilation Systems
  • These SAR sections are primarily outside of CESSAR-F scope. H-"cVer, presentations will discuss interfaces with CESSAR-F systems, as related to these SAR sections.

, . . . - - . - -. -.. .-- .. .. .