ML19339C440
ML19339C440 | |
Person / Time | |
---|---|
Site: | Black Fox |
Issue date: | 02/23/1979 |
From: | Hunt B AFFILIATION NOT ASSIGNED |
To: | NRC OFFICE OF ADMINISTRATION (ADM) |
References | |
FOIA-79-51 NUDOCS 8011180378 | |
Download: ML19339C440 (1) | |
Similar Documents at Black Fox | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20094K9541992-03-13013 March 1992
[Table view]Forwards Supplemental Info Addressing Reasons for Delays Which Have Occurred in Schedule for Const of fossil-fueled Electric Generating Facility at Inola Station Site ML20092M4001992-02-20020 February 1992 Submits Addresses for DM Saunders & Jg Aronson,Per Request in Connection w/920226 Meeting.Addresses for R Butkin & M Graham W/Ok State Government Also Listed ML20092K4941992-02-14014 February 1992 Confirms 920205 Telcon Requesting Meeting Between NRC & Util on 920226 for Util to Present Matl Re Status of Inola Station Site to Demonstrate That Owner Have Satisfied Conditions Contained in 830307 Order ML20209H1221987-02-0202 February 1987 Final Response to FOIA Request.App I Documents Encl & Available in Pdr.App J Documents Withheld (Ref FOIA Exemption 5) ML20207L1381986-11-10010 November 1986 FOIA Request for Info Between Connelly & Officials at NRC Technical Training Ctr in Chattanooga,Tn Re Requirements for Training of NRC Inspectors & for Info Re IE Investigation Into NRC Inspector Training Requirements ML20199E4721986-02-0606 February 1986 Responds to FOIA Request for SECY-85-367A & SECY-85-371. Forwards Portions of Documents Listed in App.Info Also Available in Pdr.App Documents Partially Withheld (Ref FOIA Exemption 5) CY-85-367, FOIA Request for SECY-85-367A & SECY-85-3711985-12-13013 December 1985 FOIA Request for SECY-85-367A & SECY-85-371 ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20132C1621985-09-18018 September 1985 Responds to 850612 & 14 Requests for Waiver of 10CFR170 Fees for Withdrawal of CP Application & for Informal Hearings.Requests Denied.Util Not Denied Opportunity in 1981 to Withdraw Application ML20134E3211985-08-14014 August 1985 Advises of Corporate Approval of Change in Planned Dates for Commercial Operation for coal-fired Inola Station,To Be Built on Site of Canceled Black Fox Station.Units 1 & 2 Scheduled for Completion in Dec 1996 & 1998,respectively ML20127A9961985-06-14014 June 1985 Forwards Application for Waiver of Withdrawal Fees Under 10CFR170.12(b) & Brief in Support of Application,Per 850129 Meeting ML20132B4151985-06-12012 June 1985 Forwards Application for Waiver of Withdrawal Fees Under 10CFR170.12(b).NRC Delays in Issuance of CPs Deprived Util of Opportunity to Effect Withdrawal Before 1981 Operative Date of Regulation Charging Withdrawal Fees ML20097C3231984-08-0909 August 1984 Responds to Questions Re Beam Stops ML20091R5721984-06-0808 June 1984 Requests Precise Delineation of Applicable Regulations & Accounting of Prof Staff Hours Expended Re Review Costs Charged for Withdrawal of CP Application.Waiver of Any Interest Penalty Requested ML20088A1641984-04-10010 April 1984 Reiterates 840322 Request for Return of Reed Rept Under 10CFR2.790(b)(5).Reconsideration of Positions Taken in Oct 1980 Split Vote Re Release of GE Repts Requested. Certificate of Svc Encl ML20087K0001984-03-22022 March 1984 Requests Reconsideration of 801009 Split Vote to Release Reed Rept & Sub-Task Force Repts.Return of Repts Requested. Separate Views of Commissioner Hendrie & Certificate of Svc Encl ML20080F8011984-02-0303 February 1984 Requests Deletion of Gw Muench & Rl Range from Address Label ML20136E5971983-10-28028 October 1983 Advises of 831110 Site Visit to Observe Implementation of 820830 Soil Stabilization & Erosion Control Plan ML20069D8691982-09-20020 September 1982 Forwards Black Fox Station Soil Stabilization & Erosion Control Program, Per ASLB 820618 Memorandum & Order.Plan Addresses Concerns Raised in NRC 820602 Submittal ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects ML20054J0181982-06-22022 June 1982 Ack Receipt of Re Withdrawal of CP Application. NRC Responded in Timely Manner to Util Given TMI Accident & Need to Ensure Implementation of Lessons Learned from Accident ML20053D1821982-05-28028 May 1982 Forwards JB West 820527 Affidavit on NRC Concerns Expressed During 820517 Site Visit Re Potential Offsite Environ Impact of Erosion & Siltation in Areas of Inclined Reactor Pressure Vessel Haul Road from Barge Slip Facilities ML20041A5611982-02-16016 February 1982 Announces Cancellation of Black Fox Station,Confirming 820216 Verbal Notification.Site Will Be Preserved for Const of Future Power Generation Projects ML20040A9621982-01-18018 January 1982 Forwards Ok Corporation Commission 820115 Decision in Cause 27068 Re Util Application for Rate Increase ML20039E8561982-01-0606 January 1982 Forwards DF Guyot Affidavit & Interim Containment Loads Rept,Mark III Containment, Revisions 3 & 4.Matls Pertinent to Contentions 3 & 16 Litigated in Dec 1978 & Feb 1979 ML20039B7051981-12-11011 December 1981 Forwards Response to NRC 811203 Ltr Requesting Updated Info on Generic Issues A-10,A-31,A-36,A-42,A-43,A-44,A-45,A-46, A-47 & A-48 for SER Suppl.Svc List Encl ML20039C6051981-12-0909 December 1981 Suppls Response to 810912 & 0603 Ltrs Re Nonconformance Noted in QA Program Insp Rept 99900526/80-01.Revised Drawing List for Black Fox Facility Will Not Be Completed Until Apr 1982 ML20005C1001981-11-0505 November 1981 Forwards Amend 18 to Psar.Amend Contains Matl Responsive to Two Hydrogen Control Requirements of near-term Cp/Mfg License Regulations Which Were Adopted by NRC on 810827. Related Correspondence ML20140B2771981-09-0909 September 1981 Forwards Amend 16 to Psar.Review Copies Forwarded w/810901 Ltr ML20010H4021981-09-0808 September 1981 Forwards Ok Corp Commission,Black Fox Station Economic Viability Study. Related Correspondence ML20140B2851981-09-0101 September 1981 Forwards Amend 16 to Psar.Remaining Copies Forthcoming.Amend Begins New Vol of Psar,Designated as Addendum I ML20010D1641981-08-18018 August 1981 Requests Svc List Be Revised Per Encl ML20009D9311981-07-0808 July 1981 Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). ML20005A2541981-05-25025 May 1981 Responds to NRC 810423 Ltr Re Nonconformance Noted in QA Program Insp Rept 99900039/81-01.Corrective Actions:Quality Procedures Established to Ensure Control of Insp Activities in Accordance W/Ansi Requirements ML20005A2301981-05-18018 May 1981 Responds to NRC 810416 Ltr Requesting Info Re Status of Black Fox Unit 2 Reactor Vessel.No Activities Performed Since Last Visit ML20003E2571981-03-0202 March 1981 Forwards Ok Association of Electric Cooperatives 810122 Ltr Re Streamlining of Nuclear Plant Licensing & Development of Nuclear Power.Doe 810302 Response Encl ML20126E6991981-02-10010 February 1981 Opposes Facility ML20002D3261980-12-10010 December 1980 FOIA Request for Extracts of 27 safety-related Issues Identified by GE in Reed Rept ML20151B1111980-11-14014 November 1980 Suppls 800116 Response to FOIA Request for GE Reed Rept, & Excerpt Re 27 safety-related Issues.Forwards Commission Memo Re Release of Rept.Rept Cannot Be Released Pending Resolution of Claims.W/O Encl ML19345C2711980-10-29029 October 1980 Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants ML19343A9241980-10-21021 October 1980 Petition Urging Support for Wide Use of Solar & Wind Power, & Phasing Out of Nuclear Power Plants,Especially Black Fox, as Soon as Possible ML19340B8331980-10-21021 October 1980 Petitions Govt Representatives to Promote Use of Solar & wind-powered Energy & Phase Out Operation of Nuclear Plants as Quickly as Possible ML19347B5701980-10-10010 October 1980 Demands,On Behalf of Ge,That NRC Return GE Reed Rept Immediately Due to NRC Denial of Request That Rept Be Withheld from Disclosure Under 10CFR2.790.Rept Must Not Be Placed in PDR ML19318B9751980-06-20020 June 1980 Advises That List of Matls to Be Used in Const of Fire Stops & Characteristics Re Flammability & Fire Retardancy Will Be Provided 1 Yr Subsequent to Receipt of CP ML19326D6371980-05-0505 May 1980 Opposes Const of Facilities Until Adequate Emergency Response Plan Can Be Developed.Recommends Responsibility for Emergency Response Plan Be Placed W/Independent Consulting Svc,Not State of Ok ML20126D3201980-04-0404 April 1980 Forwards Corp Commission of State of Ok 800403 Order Denying Request for Approval to Sell Bonds.Psc of Ok Presently Reviewing Order W/View of Filing Appeal W/Ok Supreme Court ML19309G5071980-04-0202 April 1980 Notifies That Representative of Intervenor State of Ok Will Attend NRC 800403 Meeting W/Cp Owners Group.Deplores Fact That Meeting Is First Interaction Between NRC & Applicants Re Development of Generic Policy ML20126D4031980-03-26026 March 1980 Forwards D Plant Expressing Concern Re Possible Meltdown at Facilities.Requests Response ML19309H4781980-03-26026 March 1980 Requests Response to Encl D&D Plant Request That Environ & Site Suitability Hearings in Licensing Proceeding Be Reopened to Address Class 9 Accidents ML18082A1641980-03-24024 March 1980 Forwards Licensee Supplemental Brief Re Motion for Directed Certification & for Stay.Pendency of Class 9 Issue Before Commission Noted in Licensee Motion for Directed Certification & for Stay.Discussed on Pages 7-10 1992-03-13 Category:INCOMING CORRESPONDENCE MONTHYEARML20094K9541992-03-13013 March 1992
[Table view]Forwards Supplemental Info Addressing Reasons for Delays Which Have Occurred in Schedule for Const of fossil-fueled Electric Generating Facility at Inola Station Site ML20092M4001992-02-20020 February 1992 Submits Addresses for DM Saunders & Jg Aronson,Per Request in Connection w/920226 Meeting.Addresses for R Butkin & M Graham W/Ok State Government Also Listed ML20092K4941992-02-14014 February 1992 Confirms 920205 Telcon Requesting Meeting Between NRC & Util on 920226 for Util to Present Matl Re Status of Inola Station Site to Demonstrate That Owner Have Satisfied Conditions Contained in 830307 Order ML20207L1381986-11-10010 November 1986 FOIA Request for Info Between Connelly & Officials at NRC Technical Training Ctr in Chattanooga,Tn Re Requirements for Training of NRC Inspectors & for Info Re IE Investigation Into NRC Inspector Training Requirements CY-85-367, FOIA Request for SECY-85-367A & SECY-85-3711985-12-13013 December 1985 FOIA Request for SECY-85-367A & SECY-85-371 ML20134E3211985-08-14014 August 1985 Advises of Corporate Approval of Change in Planned Dates for Commercial Operation for coal-fired Inola Station,To Be Built on Site of Canceled Black Fox Station.Units 1 & 2 Scheduled for Completion in Dec 1996 & 1998,respectively ML20127A9961985-06-14014 June 1985 Forwards Application for Waiver of Withdrawal Fees Under 10CFR170.12(b) & Brief in Support of Application,Per 850129 Meeting ML20132B4151985-06-12012 June 1985 Forwards Application for Waiver of Withdrawal Fees Under 10CFR170.12(b).NRC Delays in Issuance of CPs Deprived Util of Opportunity to Effect Withdrawal Before 1981 Operative Date of Regulation Charging Withdrawal Fees ML20097C3231984-08-0909 August 1984 Responds to Questions Re Beam Stops ML20091R5721984-06-0808 June 1984 Requests Precise Delineation of Applicable Regulations & Accounting of Prof Staff Hours Expended Re Review Costs Charged for Withdrawal of CP Application.Waiver of Any Interest Penalty Requested ML20088A1641984-04-10010 April 1984 Reiterates 840322 Request for Return of Reed Rept Under 10CFR2.790(b)(5).Reconsideration of Positions Taken in Oct 1980 Split Vote Re Release of GE Repts Requested. Certificate of Svc Encl ML20087K0001984-03-22022 March 1984 Requests Reconsideration of 801009 Split Vote to Release Reed Rept & Sub-Task Force Repts.Return of Repts Requested. Separate Views of Commissioner Hendrie & Certificate of Svc Encl ML20080F8011984-02-0303 February 1984 Requests Deletion of Gw Muench & Rl Range from Address Label ML20069D8691982-09-20020 September 1982 Forwards Black Fox Station Soil Stabilization & Erosion Control Program, Per ASLB 820618 Memorandum & Order.Plan Addresses Concerns Raised in NRC 820602 Submittal ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects ML20053D1821982-05-28028 May 1982 Forwards JB West 820527 Affidavit on NRC Concerns Expressed During 820517 Site Visit Re Potential Offsite Environ Impact of Erosion & Siltation in Areas of Inclined Reactor Pressure Vessel Haul Road from Barge Slip Facilities ML20041A5611982-02-16016 February 1982 Announces Cancellation of Black Fox Station,Confirming 820216 Verbal Notification.Site Will Be Preserved for Const of Future Power Generation Projects ML20040A9621982-01-18018 January 1982 Forwards Ok Corporation Commission 820115 Decision in Cause 27068 Re Util Application for Rate Increase ML20039E8561982-01-0606 January 1982 Forwards DF Guyot Affidavit & Interim Containment Loads Rept,Mark III Containment, Revisions 3 & 4.Matls Pertinent to Contentions 3 & 16 Litigated in Dec 1978 & Feb 1979 ML20039B7051981-12-11011 December 1981 Forwards Response to NRC 811203 Ltr Requesting Updated Info on Generic Issues A-10,A-31,A-36,A-42,A-43,A-44,A-45,A-46, A-47 & A-48 for SER Suppl.Svc List Encl ML20039C6051981-12-0909 December 1981 Suppls Response to 810912 & 0603 Ltrs Re Nonconformance Noted in QA Program Insp Rept 99900526/80-01.Revised Drawing List for Black Fox Facility Will Not Be Completed Until Apr 1982 ML20005C1001981-11-0505 November 1981 Forwards Amend 18 to Psar.Amend Contains Matl Responsive to Two Hydrogen Control Requirements of near-term Cp/Mfg License Regulations Which Were Adopted by NRC on 810827. Related Correspondence ML20140B2771981-09-0909 September 1981 Forwards Amend 16 to Psar.Review Copies Forwarded w/810901 Ltr ML20010H4021981-09-0808 September 1981 Forwards Ok Corp Commission,Black Fox Station Economic Viability Study. Related Correspondence ML20140B2851981-09-0101 September 1981 Forwards Amend 16 to Psar.Remaining Copies Forthcoming.Amend Begins New Vol of Psar,Designated as Addendum I ML20010D1641981-08-18018 August 1981 Requests Svc List Be Revised Per Encl ML20009D9311981-07-0808 July 1981 Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). ML20005A2541981-05-25025 May 1981 Responds to NRC 810423 Ltr Re Nonconformance Noted in QA Program Insp Rept 99900039/81-01.Corrective Actions:Quality Procedures Established to Ensure Control of Insp Activities in Accordance W/Ansi Requirements ML20005A2301981-05-18018 May 1981 Responds to NRC 810416 Ltr Requesting Info Re Status of Black Fox Unit 2 Reactor Vessel.No Activities Performed Since Last Visit ML20003E2571981-03-0202 March 1981 Forwards Ok Association of Electric Cooperatives 810122 Ltr Re Streamlining of Nuclear Plant Licensing & Development of Nuclear Power.Doe 810302 Response Encl ML20126E6991981-02-10010 February 1981 Opposes Facility ML20002D3261980-12-10010 December 1980 FOIA Request for Extracts of 27 safety-related Issues Identified by GE in Reed Rept ML19345C2711980-10-29029 October 1980 Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants ML19340B8331980-10-21021 October 1980 Petitions Govt Representatives to Promote Use of Solar & wind-powered Energy & Phase Out Operation of Nuclear Plants as Quickly as Possible ML19343A9241980-10-21021 October 1980 Petition Urging Support for Wide Use of Solar & Wind Power, & Phasing Out of Nuclear Power Plants,Especially Black Fox, as Soon as Possible ML19347B5701980-10-10010 October 1980 Demands,On Behalf of Ge,That NRC Return GE Reed Rept Immediately Due to NRC Denial of Request That Rept Be Withheld from Disclosure Under 10CFR2.790.Rept Must Not Be Placed in PDR ML19318B9751980-06-20020 June 1980 Advises That List of Matls to Be Used in Const of Fire Stops & Characteristics Re Flammability & Fire Retardancy Will Be Provided 1 Yr Subsequent to Receipt of CP ML19326D6371980-05-0505 May 1980 Opposes Const of Facilities Until Adequate Emergency Response Plan Can Be Developed.Recommends Responsibility for Emergency Response Plan Be Placed W/Independent Consulting Svc,Not State of Ok ML20126D3201980-04-0404 April 1980 Forwards Corp Commission of State of Ok 800403 Order Denying Request for Approval to Sell Bonds.Psc of Ok Presently Reviewing Order W/View of Filing Appeal W/Ok Supreme Court ML19309G5071980-04-0202 April 1980 Notifies That Representative of Intervenor State of Ok Will Attend NRC 800403 Meeting W/Cp Owners Group.Deplores Fact That Meeting Is First Interaction Between NRC & Applicants Re Development of Generic Policy ML20126D4031980-03-26026 March 1980 Forwards D Plant Expressing Concern Re Possible Meltdown at Facilities.Requests Response ML19309H4781980-03-26026 March 1980 Requests Response to Encl D&D Plant Request That Environ & Site Suitability Hearings in Licensing Proceeding Be Reopened to Address Class 9 Accidents ML18082A1641980-03-24024 March 1980 Forwards Licensee Supplemental Brief Re Motion for Directed Certification & for Stay.Pendency of Class 9 Issue Before Commission Noted in Licensee Motion for Directed Certification & for Stay.Discussed on Pages 7-10 ML19344D6921980-03-18018 March 1980 Submits Addl Info in Support of 800206 Request for Extension to Review ALAB-573 Class 9 Accident Issue.Lack of NRC Opposition to Ok Request & Recent Proliferation of Info Support Extension ML19309B5141980-03-15015 March 1980 Suggests Hearings on Const of Reactor Did Not Address Meltdown Issues.Tulsa Should Not Be Made Site for Potential Nuclear Mistake.Utils Should Build Plants Away from Populated Areas.Requests Reopening of Hearings ML19309B5241980-03-15015 March 1980 Requests That NRC Hold Meetings in Tulsa,Ok Re Emergency Evacuation Zone Around Nuclear Plants.Plans Should Be More Thorough to Protect People If Meltdown Should Occur ML20126C6161980-03-15015 March 1980 Expresses Concern Re NRC Refusal to Address Meltdown Issue at Hearings.Class 9 Accident Is Distinct Possibility & Should Be Thoroughly Examined.Environ & Site Suitablity Hearings Should Be Reopened ML20126C5581980-03-15015 March 1980 Suggests Local self-reliant,self-sufficient Communities Are Solution to Present Problems.Opposes All Forms of Nuclear Power.Min Amount of Energy from Coal & Gas Should Be Needed for Mfg Useful Tools,Bicycles & Efficient Tractors ML19312D4881980-02-29029 February 1980 Requests Reopening of Environ & Site Suitability Hearings for Facilities to Explore Issue of Meltdown ML20126C0301980-02-29029 February 1980 Urges Meetings in Tulsa,Ok Re Emergency Evacuation Area Around Facility.Current Plans Are Inadequate 1992-03-13 Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC MONTHYEARML20207L1381986-11-10010 November 1986
[Table view]FOIA Request for Info Between Connelly & Officials at NRC Technical Training Ctr in Chattanooga,Tn Re Requirements for Training of NRC Inspectors & for Info Re IE Investigation Into NRC Inspector Training Requirements ML20126E6991981-02-10010 February 1981 Opposes Facility ML20002D3261980-12-10010 December 1980 FOIA Request for Extracts of 27 safety-related Issues Identified by GE in Reed Rept ML19345C2711980-10-29029 October 1980 Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants ML19343A9241980-10-21021 October 1980 Petition Urging Support for Wide Use of Solar & Wind Power, & Phasing Out of Nuclear Power Plants,Especially Black Fox, as Soon as Possible ML19340B8331980-10-21021 October 1980 Petitions Govt Representatives to Promote Use of Solar & wind-powered Energy & Phase Out Operation of Nuclear Plants as Quickly as Possible ML19326D6371980-05-0505 May 1980 Opposes Const of Facilities Until Adequate Emergency Response Plan Can Be Developed.Recommends Responsibility for Emergency Response Plan Be Placed W/Independent Consulting Svc,Not State of Ok ML20126C5581980-03-15015 March 1980 Suggests Local self-reliant,self-sufficient Communities Are Solution to Present Problems.Opposes All Forms of Nuclear Power.Min Amount of Energy from Coal & Gas Should Be Needed for Mfg Useful Tools,Bicycles & Efficient Tractors ML20126C6161980-03-15015 March 1980 Expresses Concern Re NRC Refusal to Address Meltdown Issue at Hearings.Class 9 Accident Is Distinct Possibility & Should Be Thoroughly Examined.Environ & Site Suitablity Hearings Should Be Reopened ML19309B5141980-03-15015 March 1980 Suggests Hearings on Const of Reactor Did Not Address Meltdown Issues.Tulsa Should Not Be Made Site for Potential Nuclear Mistake.Utils Should Build Plants Away from Populated Areas.Requests Reopening of Hearings ML19309B5241980-03-15015 March 1980 Requests That NRC Hold Meetings in Tulsa,Ok Re Emergency Evacuation Zone Around Nuclear Plants.Plans Should Be More Thorough to Protect People If Meltdown Should Occur ML20126C0301980-02-29029 February 1980 Urges Meetings in Tulsa,Ok Re Emergency Evacuation Area Around Facility.Current Plans Are Inadequate ML19312D4881980-02-29029 February 1980 Requests Reopening of Environ & Site Suitability Hearings for Facilities to Explore Issue of Meltdown ML19309B7311980-02-24024 February 1980 Requests That NRC Reopen Environ & Site Suitability Hearings to Fully Explore Meltdown Possibilities at Facility.Const Should Stop Until Problems Re Nuclear Waste Disposal & Safety Are Resolved ML20126C6341980-02-21021 February 1980 Requests NRC Permission to Address Meltdown Issue During Hearings Affecting Const & Operation of Facility.Questions Should Be Fully Answered & Thoroughly Researched.Ok Citizens Have Right to Be Heard ML19344D4401980-02-21021 February 1980 Requests Environ & Site Suitability Hearings Be Reopened to Address Potential Meltdown at Proposed Facility ML19312D5111980-02-21021 February 1980 Requests That Group Be Allowed to Address Issue of Meltdown at CP Hearings ML19322E2611980-02-19019 February 1980 Urges Meeting Re Proposed Increase of Emergency Evacuation Zone Around facilities.Ten-mile Radius Is Not Adequate Protection ML20126B8671980-02-19019 February 1980 Requests That NRC Convene in Tulsa,Ok for Meetings on Proposed Increase in Emergency Evacuation Zone Around Nuclear Power Plants ML20126C0221980-02-19019 February 1980 Urges Hearing in Tulsa,Ok Re Emergency Evacuation Plans Around Facility.Nrc Should Develop an Effective Plan in Case of Meltdown ML19309B5211980-02-19019 February 1980 Requests That NRC Reopen Environ & Site Suitability Hearings to Consider Possible Meltdown & Related Emergencies Associated W/Nuclear Power Plants ML19296D9411980-02-18018 February 1980 Comments on Emergency Evacuation zone.Ten-mile Radius Is Inadequate.Requests That NRC Hold Hearings in Tulsa,Ok on Emergency Plans ML19296D9511980-02-18018 February 1980 Comments That Proposed Increase of Emergency Evacuation Area Around Plant Is Inadequate.Requests That NRC Hold Public Meetings in Tulsa,Ok ML20126C0001980-02-17017 February 1980 Urges Meetings Re Emergency Evacuation Zone Around Facilities.Existing Plans Are Inadequate ML20126C6221980-02-15015 February 1980 Requests That NRC Reopen Environ & Site Suitability Hearings.Meltdown Issue Should Be Fully Explored ML19344D4321980-02-15015 February 1980 Requests Environ & Site Suitability Hearings Be Reopened to Address Potential Meltdown at Proposed Facility ML19296D9531980-02-15015 February 1980 Requests That NRC Hold Meetings in Tulsa,Ok on Proposed Increase in Emergency Evacuation Zone ML20126B5651980-02-14014 February 1980 Requests Reopening of Environ & Site Suitability Hearings to Discuss Meltdown Issue ML20126B9991980-02-14014 February 1980 Urges Meetings Re Proposed Increase in Radius of Emergency Evacuation Area Around Facilities.Present Plans Are Ineffective ML19312D3721980-02-14014 February 1980 Requests That NRC Hold Meetings in Tulsa,Ok on Proposed Expansion of Emergency Evacuation Zone Around Nuclear Power Plants.Current Plans Ineffective for Protection in Event of Meltdown ML19312D3761980-02-14014 February 1980 Requests That NRC Hold Meetings in Tulsa,Ok on Proposed Expansion of Emergency Evacuation Zone Around Nuclear Power Plants.Current Plans Ineffective for Protection in Event of Meltdown ML19309B2571980-02-14014 February 1980 Requests Open Hearings on Facility Re Possibility of Major Accidents,Health Effects & Evacuation.Nrc & Utils Have Moral Responsibility to Insure Safety.People Have Right to Know Answers to Problems ML19296D9431980-02-14014 February 1980 Requests That NRC Hold Meetings in Tulsa,Ok on Proposed Increase Evacuation Zone.Plans Are Inadequate Protection in Event of Meltdown ML19296D9371980-02-14014 February 1980 Comments on Proposed Increase in Emergency Evacuation Zone. Ten-mile Radius Is Inadequate,Considering Strong & Variable Ok Winds & Possible Contamination of Major Body of Water. Requests Formal Hearings W/Citizen Input ML19296D9391980-02-14014 February 1980 Requests That NRC Hold Meetings in Tulsa,Ok on Increase in Emergency Evacuation Zone.Plans Are Not Effective Enough in Event of Meltdown ML19296D9421980-02-14014 February 1980 Comments That Emergency Evacuation Radius Is Inadequate. Requests That NRC Hold Public Meetings to Discuss & Give Further Consideration to Plan ML19312D3781980-02-13013 February 1980 Requests That NRC Hold Meetings in Tulsa,Ok on Proposed Expansion of Emergency Evacuation Zone Around Nuclear Power Plants.Current Plans Ineffective for Protection in Event of Meltdown or Other Nuclear Incidents ML20126B9931980-02-13013 February 1980 Requests Reopening of Environ & Site Suitability Hearings for Facilities to Explore Issue of Meltdown ML19312D3791980-02-12012 February 1980 Requests That NRC Hold Meetings in Tulsa,Ok on Proposed Expansion of Emergency Evacuation Zone Around Nuclear Power Plants.Current Plans Not Effective Enough in Event of Meltdown ML20126B5701980-02-10010 February 1980 Requests Meetings Be Held in Tulsa,Ok Re Proposed Increase in Emergency Evacuation Zone Around Nuclear Power Plants ML19312D5421980-02-0808 February 1980 Opposes Const of Facilities Due to Problems W/Disposal of Radwaste & Possibility of Damage by Tornado ML19296D9541980-02-0707 February 1980 Requests That NRC Hold Meetings in Tulsa,Ok on Proposed Increase in Emergency Evacuation Zone.Plan Is Inadequate in Event of Meltdown ML19296D9461980-02-0404 February 1980 Requests That NRC Hold Meetings in Tulsa,Ok on Proposed Increase in Emergency Evacuation Zone.Plan Is Inadequate in Event of Meltdown.Expresses Fear for Health of Family & Financial Burden of Maint of Nuclear Plants ML19290E0811980-01-30030 January 1980 Discusses Concern Re Evacuation Plan for Area Around Facility.Nrc Should Provide Public W/Detailed Emergency Instructions ML19211A1521979-11-25025 November 1979 Requests Revocation of CPs Due to Inherent Lack of Safety & Soaring Const Costs.Recommends Other Power Sources Be Used ML19296A6191979-11-23023 November 1979 Requests Current Info Re Status of Five Nuclear Power Plants Having CPs ML19276H6511979-11-20020 November 1979 Requests That CP Not Be Granted & Limited Work Order Be Canceled ML19207B8881979-08-16016 August 1979 FOIA Request for Specific Documents Discussed & Entered as Part of Record During Feb 1979 Licensing Hearings Conducted by ASLB ML19339C3971979-08-16016 August 1979 FOIA Request for GE Reed Rept & Related Abstracts ML19275A6041979-08-0606 August 1979 Petitions for Limited Appearance to Be Made During re-opening of Hearings.Requests Disclosure of Reed Rept & Demands Open Hearing Sessions.Supporting Info Re Decisions on re-opening of Hearings Requested 1986-11-10 |
Text
- - ..
."Y
.
,
Li t
PREEDOM OF IN?ORMATION ACT REQUE3T FREEDOM OF INFORMATION
,
Director, Office of Administration ACT REQUEST I
U. S. !!uclear Regulatory Commission Washington, D. C. 2055 /~O TA~ 7 9-8/
l
Dear Madam or Sir:
'd d-U3 '77 By. this letter, _I request disclosure of conies of the Reed Report which is in the possession of the.URC. The 3eed Report was com-piled by 'lestinghouse's own engineers and details 27 safety prob-lens with their boiling water reactor. This report came into the possession of the URO during the course of the licensing hearings concerning Black Fox 5tation 1_& 2 which are proposed to be con-
- structed near Inola, Oklahoma.
This-request is made pursuant to $ oSC sec. 552.
I am willing to pay reasonable standard charges for actual search time an6 copying fees. Houever, I would request uaiver or reduc-tion of the fee in that disclosure is in the public interest and primarily benefiting the general public. Jee sec. 352 (a)(4)(A).
I further request a response within ten days.
-
, It is my strong belief that this Reed Heport is available to the-Dublic and not exempt under the " trade secrets" or " commercial or financial matters" exemptions. Safety relates to safety, not bus-
, iness.
<l
!! If any portion of this request is deemed denied, I request a de-
'
tailed statement of reasons for the withholding.
l
! Sven if your agency feels exempt, I am asking you to invoke your discretionary powers which permit disclosure in the public inter-
,, est.
,
Brian D. Cunt 1534 3. 3 it.
"
Tulaa, Ok. 7ht20 "obruary ' 3, io79 "3
.
e
-
" "'
D" D 'D
.
_oo o .k:
-B011180 M - - -
. . _ _-