12/16/04 Conference Call Summary Re Verbal Authorization of Relief Requests
ML043620347
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 01/05/2005
From: Bo Pham
NRC/NRR/DLPM/LPD4
To: Gramm R
NRC/NRR/DLPM/LPD4
Pham B, NRR/DLPM, 415-8450
References
Download: ML043620347 (6)


Text

January 5, 2005 MEMORANDUM TO: Robert A. Gramm, Chief, Section 2 Project Directorate IV Division of Licensing Project Management FROM: Bo M. Pham, Project Manager, Section 2 /RA/

Project Directorate IV Division of Licensing Project Management

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION (SONGS) UNIT 3 -

CONFERENCE CALL

SUMMARY

REGARDING VERBAL AUTHORIZATION OF RELIEF REQUESTS On December 16, 2004, the NRC staff held a teleconference call with Southern California Edison (SCE) regarding the following three relief requests:

1. ISI-3-11, Revision 1, which seeks relief from the ASME Code for performing temperbead welds on the pressurizer heater sleeves, submitted October 15, 2004, and supplemented by letters dated October 25 and December 2, 2004.
2. ISI-3-12, which seeks relief from the ASME Code in characterizing flaws and performing successive inspections on the pressurizer heater sleeves, submitted October 15, 2004, and supplemented by letters dated October 25 and December 2, 2004.
3. ISI-3-13, which seeks relief for using the embedded flaw repair technique in lieu of requirements of the ASME Code, submitted October 26, 2004, and supplemented by letter dated December 2, 2004.

During the teleconference call, the licensee summarized the circumstances which led to their need for the relief requests and the nature of their urgent timeline. Based on their projected maintenance schedule, SCE estimates that the startup of SONGS Unit 3 could be as early as December 20, 2004.

The NRC staff asked and received a confirmation from the licensee regarding its ultrasonic examination (UT) procedure of weld pads, to ensure that UT was conducted to the maximum extent possible both before and after machining of the nozzle.

In accordance with NRR Office Instruction LIC-102, Relief Request Reviews, the NRC staff verbally authorized the implementation of relief requests ISI-3-11, 12, and 13 for SONGS Unit 3. The NRC technical staff has completed its review and determined that the licensees

R. Gramm three proposed alternatives are technically justified. Formal safety evaluations (SEs) will be documented within 30 days of this verbal authorization. The NRC staff noted that it may request further clarifications on the licensees submittals while completing the SEs.

A list of the teleconference call participants is attached.

Docket No. 50-362

Attachment:

As stated cc w/att: See next page

R. Gramm three proposed alternatives are technically justified. Formal safety evaluations (SEs) will be documented within 30 days of this verbal authorization. The NRC staff noted that it may request further clarifications on the licensees submittals while completing the SEs.

A list of the teleconference call participants is attached.

Docket No. 50-362

Attachment:

As stated cc w/att: See next page DISTRIBUTION:

PUBLIC RDavis PDIV-2 r/f JTsao RidsNrrDlpmLpdiv (HBerkow) TChan RidsNrrDlpmLpdiv2 (RGramm) SCoffin RidsNrrPMBPham RidsNrrLADBaxley ACCESSION NO: ML043620347 NRR-001 OFFICE PDIV-2/PM PDIV-1/LA PDIV-2/SC NAME BPham DBaxley RGramm DATE 1/5/05 1/5/05 1/5/05 OFFICIAL RECORD COPY

TELECONFERENCE CALL PARTICIPANTS December 16, 2004 SCE Mike Short Ed Scherer Jenifer Hedrick Jack Rainsberry Pete Wilkens Eric Schoonover Kirk Wells Nabil Elakily Bill Hermanns Tom Raidy Mike Wade (Westinghouse)

NRC Bo Pham Robert Gramm John Tsao Robert Davis

San Onofre Nuclear Generating Station, Units 2 and 3 cc:

Mr. Raymond Waldo, Plant Manager Mr. Ed Bailey, Chief Nuclear Generation Radiologic Health Branch Southern California Edison Company State Department of Health Services San Onofre Nuclear Generating Station Post Office Box 997414 (MS7610)

P. O. Box 128 Sacramento, CA 95899-7414 San Clemente, CA 92674-0128 Resident Inspector/San Onofre NPS Mr. Douglas K. Porter c/o U.S. Nuclear Regulatory Commission Southern California Edison Company Post Office Box 4329 2244 Walnut Grove Avenue San Clemente, CA 92674 Rosemead, CA 91770 Mayor Mr. David Spath, Chief City of San Clemente Division of Drinking Water and 100 Avenida Presidio Environmental Management San Clemente, CA 92672 P. O. Box 942732 Sacramento, CA 94234-7320 Mr. Dwight E. Nunn, Vice President Southern California Edison Company Chairman, Board of Supervisors San Onofre Nuclear Generating Station County of San Diego P.O. Box 128 1600 Pacific Highway, Room 335 San Clemente, CA 92674-0128 San Diego, CA 92101 Mr. James D. Boyd, Commissioner Eileen M. Teichert, Esq. California Energy Commission Supervising Deputy City Attorney 1516 Ninth Street (MS 31)

City of Riverside Sacramento, CA 95814 3900 Main Street Riverside, CA 92522 Mr. Joseph J. Wambold, Vice President Southern California Edison Company Mr. Gary L. Nolff San Onofre Nuclear Generating Station Power Projects/Contracts Manager P.O. Box 128 Riverside Public Utilities San Clemente, CA 92764-0128 2911 Adams Street Riverside, CA 92504 Mr. Steve Hsu Department of Health Services Regional Administrator, Region IV Radiologic Health Branch U.S. Nuclear Regulatory Commission MS 7610, P.O. Box 997414 611 Ryan Plaza Drive, Suite 400 Sacramento, CA 95899 Arlington, TX 76011-8064 Mr. Harold B. Ray Mr. Michael Olson Executive Vice President San Diego Gas & Electric Company Southern California Edison Company P.O. Box 1831 San Onofre Nuclear Generating Station San Diego, CA 92112-4150 P.O. Box 128, Mail Stop: D-3-F San Clemente, CA 92674-0128