March 9, 2006 LICENSEE: SOUTHERN CALIFORNIA EDISON (SCE)

FACILITIES: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 (SONGS 2 AND 3)

SUBJECT:

MEETING WITH REPRESENTATIVES OF SCE FOR SONGS 2 AND 3 A meeting was held on Thursday, March 2, 2006, between the Nuclear Regulatory Commission (NRC) staff and SCE, the licensee for SONGS 2 and 3. The meeting was held at the request of the licensee for it to present to the NRC staff its evaluation of the indications in the Unit 3 Control Element Drive Mechanism (CEDM) penetration 56 and repair alternatives. The notice for the meeting was issued on February 13, 2006.

During the Unit 3 outage in 2003, the inspection of the Unit 3 reactor vessel head (RVH) identified an indication on CEDM penetration 56 that was assumed to be a crack. Although SCE had approval to perform a weld overlay repair of RVH penetrations (ISI-3-8), this particular indication exceeded the generic 75 percent through-wall crack limit. Therefore, SCE submitted a specific relief request for CEDM penetration 56 (ISI-3-13). The NRC granted approval of this relief request for one cycle. SCE committed to evaluate repair alternatives for the long term.

With the Unit 3 refueling outage scheduled for October 2006, the licensee proposed its long-term disposition of penetration 56 by discussing repair alternatives, criteria for a contingency repair, appropriate contingency repair, planned actions, and implementation schedules. The NRC staff was appreciative of the presentation and stated it will perform a quick review on the general acceptability of SCEs approach and techniques and inform SCE of the staffs findings. is the list of attendees. Enclosure 2 is the material handed out by the licensee.

There was no handout from the NRC staff.

/RA/

N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 50-362

Enclosures:

1. List of Attendees
2. Licensees Handout cc w/encls: See next page

LICENSEE: SOUTHERN CALIFORNIA EDISON (SCE) March 9, 2006 FACILITIES: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 (SONGS 2 AND 3)

SUBJECT:

MEETING WITH REPRESENTATIVES OF SCE FOR SONGS 2 AND 3 A meeting was held on Thursday, March 2, 2006, between the Nuclear Regulatory Commission (NRC) staff and SCE, the licensee for SONGS 2 and 3. The meeting was held at the request of the licensee for it to present to the NRC staff its evaluation of the indications in the Unit 3 Control Element Drive Mechanism (CEDM) penetration 56 and repair alternatives. The notice for the meeting was issued on February 13, 2006.

During the Unit 3 outage in 2003, the inspection of the Unit 3 reactor vessel head (RVH) identified an indication on CEDM penetration 56 that was assumed to be a crack. Although SCE had approval to perform a weld overlay repair of RVH penetrations (ISI-3-8), this particular indication exceeded the generic 75 percent through-wall crack limit. Therefore, SCE submitted a specific relief request for CEDM penetration 56 (ISI-3-13). The NRC granted approval of this relief request for one cycle. SCE committed to evaluate repair alternatives for the long term.

With the Unit 3 refueling outage scheduled for October 2006, the licensee proposed its long-term disposition of penetration 56 by discussing repair alternatives, criteria for a contingency repair, appropriate contingency repair, planned actions, and implementation schedules. The NRC staff was appreciative of the presentation and stated it will perform a quick review on the general acceptability of SCEs approach and techniques and inform SCE of the staffs findings. is the list of attendees. Enclosure 2 is the material handed out by the licensee.

There was no handout from the NRC staff.

/RA/

N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 50-362

Enclosures:

1. List of Attendees
2. Licensees Handout cc w/encls: See next page DISTRIBUTION:

PUBLIC LPLIV Reading RidsNrrDorl (CHaney/CHolden)

RidsNrrDorlLplg (DTerao) RidsNrrLALFeizollahi KGruss RidsNrrDciCpnb (TChan) JCollins JTsao RidsNrrPMNKalyanam RidsOgcRp RidsRgn4MailCenter (TPruett)

RidsAcrsAcnwMailCenter RJasinski (Comm. Analyst) JDixon-Herrity, RIV ADAMS ACCESSION NO. ML060690154 OFFICE LPL4/PM LPL4/LA LPL4/BC NAME NKalyanam LFeizollahi DTerao DATE 3/8/06 3/8/06 3/9/06 DOCUMENT NAME: E:\Filenet\ML060690154.wpd OFFICIAL RECORD COPY

LIST OF ATTENDEES AT THE MARCH 2, 2006, MEETING NAME AFFILIATION M. Short SCE A.E. Scherer SCE J. Rainsberry SCE T. Raidy SCE M. Devitt SCE W. Bramford Westinghouse J. Lareau Westinghouse D. Terao NRR/DORL/LPLIV K. Gruss NRR/DCI/CFEB T. Chan NRR/DCI/CPNB J. Collins NRR/DCI/CPNB J. Tsao NRR/DCI/CFEB N. Kalyanam NRR/DORL/LPLIV Where: SCE = Southern California Edison NRR = Office of Nuclear Reactor Regulation DORL = Division of Operating Reactor Licensing LPLIV = Plant Licensing Branch IV DCI = Division of Component Integrity CFNB = Piping & NDE Branch CFEB = Flaw Evaluation & Welding Branch ENCLOSURE 1

LICENSEE'S HANDOUT FOR MARCH 2, 2006, MEETING LONG-TERM DISPOSITION OF CONTROL ELEMENT DRIVE MOTOR PENETRATION # 56 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 3 SOUTHERN CALIFORNIA EDISON ENCLOSURE 2

San Onofre Nuclear Generating Station Units 2 and 3 cc:

Mr. Daniel P. Breig Mr. Ed Bailey, Chief Southern California Edison Company Radiologic Health Branch San Onofre Nuclear Generating Station State Department of Health Services P. O. Box 128 Post Office Box 997414 (MS7610)

San Clemente, CA 92674-0128 Sacramento, CA 95899-7414 Mr. Douglas K. Porter, Esquire Resident Inspector/San Onofre NPS Southern California Edison Company c/o U.S. Nuclear Regulatory Commission 2244 Walnut Grove Avenue Post Office Box 4329 Rosemead, CA 91770 San Clemente, CA 92674 Mr. David Spath, Chief Mayor Division of Drinking Water and City of San Clemente Environmental Management 100 Avenida Presidio P. O. Box 942732 San Clemente, CA 92672 Sacramento, CA 94234-7320 Mr. James T. Reilly Chairman, Board of Supervisors Southern California Edison Company County of San Diego San Onofre Nuclear Generating Station 1600 Pacific Highway, Room 335 P.O. Box 128 San Diego, CA 92101 San Clemente, CA 92674-0128 Mark L. Parsons Mr. James D. Boyd, Commissioner Deputy City Attorney California Energy Commission City of Riverside 1516 Ninth Street (MS 31) 3900 Main Street Sacramento, CA 95814 Riverside, CA 92522 Mr. Ray Waldo, Vice President Mr. Gary L. Nolff Southern California Edison Company Assistant Director - Resources San Onofre Nuclear Generating Station City of Riverside P.O. Box 128 3900 Main Street San Clemente, CA 92764-0128 Riverside, CA 92522 Mr. Brian Katz Regional Administrator, Region IV Southern California Edison Company U.S. Nuclear Regulatory Commission San Onofre Nuclear Generating Station 611 Ryan Plaza Drive, Suite 400 P.O. Box 128 Arlington, TX 76011-8064 San Clemente, CA 92764-0128 Mr. Michael Olson San Diego Gas & Electric Company P.O. Box 1831 San Diego, CA 92112-4150 February 2006

San Onofre Nuclear Generating Station Units 2 and 3 cc:

Mr. Steve Hsu Department of Health Services Radiologic Health Branch MS 7610, P.O. Box 997414 Sacramento, CA 95899 Mr. A. Edward Scherer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 February 2006