October 11, 2006 David Pilmer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128
SUBJECT:
TRANSMITTAL OF MEETING REPORT REGARDING SAN ONOFRE UNIT 1 COOLING WATER INTAKE AND DISCHARGE SYSTEM SAMPLING
Dear Mr. Pilmer:
Enclosed is the report for our meeting on August 22, 2006. If you have any questions on this matter, please contact me at: (301) 415-6712 or at: jcs2@nrc.gov.
Sincerely,
/RA/
J.C. Shepherd, Project Engineer Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No: 50-206 cc: See next page
cc:
Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, CA 92101 Gary L. Nolff Power Projects/Contracts Manager Riverside Public Utilities 2911 Adams Street Riverside, CA 92504 Eileen M. Teichert, Esq.
Supervising Deputy City Attorney City of Riverside 3900 Main Street Riverside, CA 92522 Raymond Waldo, Vice President, Nuclear Generation Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 David Spath, Chief Division of Drinking Water and Environmental Management California Department of Health Services P.O. Box 942732 Sacramento, CA 94234-7320 Michael R. Olson San Onofre Liaison San Diego Gas & Electric Company P.O. Box 1831 San Diego, CA 92112-4150 Ed Bailey, Chief Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414 Mayor City of San Clemente 100 Avenida Presidio San Clemente, CA 92672 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)
Sacramento, CA 95814 Douglas K. Porter, Esq.
Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 Dwight E. Nunn, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Daniel P. Breig, Station Manager Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 A. Edward Scherer Southern California Edison San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Brian Katz, Vice President, Nuclear Oversight and Regulatory Affairs Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92764-0128
October 11, 2006 David Pilmer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128
SUBJECT:
TRANSMITTAL OF MEETING REPORT REGARDING SAN ONOFRE UNIT 1 COOLING WATER INTAKE AND DISCHARGE SYSTEM SAMPLING
Dear Mr. Pilmer:
Enclosed is the report for our meeting on August 22, 2006. If you have any questions on this matter, please contact me at: (301) 415-6712 or at: jcs2@nrc.gov.
Sincerely,
/RA/
J.C. Shepherd, Project Engineer Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No: 50-206 cc: See next page DISTRIBUTION:
DURLD r/f ML062780366 OFFICE DCD DCD DCD NAME JShepherd TMixon CCraig DATE 10/10/06 10 /10/06 10 /11 /06
/ /06 OFFICIAL USE ONLY
Meeting Report DATE:
August 22, 2006 TIME:
1:00 pm - 4:00 pm PLACE:
One White Flint North Rm. 6B6 PURPOSE:
DISCUSS SOUTHERN CALIFORNIA EDISONS SAMPLING PLAN FOR THE FORMER COOLING SYSTEM INTAKE AND DISCHARGE PIPING FOR SAN ONOFRE NUCLEAR GENERATING STATION UNIT 1 ATTENDEES:
Refer to Attachment A BACKGROUND:
Southern California Edison (SCE), licensee for SONGS Unit 1, plans to release the former cooling system intake and discharge piping from the NRC license under provisions of 10 CFR 50.83 Release of part of a power reactor facility or site for unrestricted use prior to approval of a license termination plan. This piping is located off-shore from the plant, approximately seven and a half meters (~25') below the surface of the pacific ocean, and about one and a third meters (~4') below the top of the seabed. SCE presented it plans to survey this piping to demonstrate compliance with release criteria (Attachment B).
DISCUSSION:
The piping is classified as Class 3 in MARSSIM terminology - affected area not expected to have residual contamination above a fraction of the DCGLw. SCE presented it plans to sample the 30 meters (100') closest to shore of the intake piping and the last 30 meters (100') of the discharge piping because that is where residual contamination is most likely to be. The samples will comprise sediment, sea life, if present, and cores of the concrete pipes. A sufficient quantity of each sample will be taken to split with NRC, and other regulatory agencies if desired. NRC staff suggested SCE compare actual uptake in sea life, especially crustaceans, with calculated values.
Sampling is expected to begin about mid-September, 2006. After sample analyses demonstrate the pipes meet unrestricted release criteria, the western-most (off-shore) 2 meters
(~6') of each pipe will be plugged with concrete.
ACTIONS:
SCE will provide an updated schedule, including the submittal date of the request for partial site release, once sampling starts.
ATTACHMENTS:
A: Attendance log B: SCE Presentation