ML071980101

From kanterella
Jump to navigation Jump to search

Summary of Meeting with Representatives of Southern California Edison Re San Onofre Nuclear Generating Station, Units 2 and 3 Re Amendment Request PCN-548, Rev. 2 - Battery and DC Sources Upgrades and Cross-Tie
ML071980101
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/18/2007
From: Kalyanam N
NRC/NRR/ADRO/DORL/LPLIV
To:
NRC/NRR/ADRO/DORL/LPLIV
Kalyanam N, NRR/DORL/LP4, 415-1480
References
TAC MD5140, TAC MD5141
Download: ML071980101 (5)


Text

July 18, 2007 LICENSEE: SOUTHERN CALIFORNIA EDISON (SCE)

FACILITIES: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 (SONGS 2 AND 3)

SUBJECT:

MEETING WITH REPRESENTATIVES OF SCE FOR SONGS 2 AND 3 A meeting was held on Wednesday, July 12, 2007, between the Nuclear Regulatory Commission (NRC) staff and SCE, the licensee for SONGS 2 and 3. The meeting was held at the request of the licensee to provide to the NRC staff an overview of the various aspects of its Amendment Request PCN-548, Revision 2: Battery and DC Sources Upgrades and Cross-Tie.

The notice for the meeting was issued on June 29, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML071800205).

After the review of the amendment application dated March 3, 2007 (ADAMS Accession No. ML070930597), the NRC staff, in its Request for Additional Information (RAI) dated May 15, 2007 (ADAMS Accession No. ML071300500), listed 12 questions. The meeting was to clarify the information requested in the RAI, address the concerns raised, discuss the template for the next submittal, and understand schedules for submitting the additional information. The responses to all the 12 questions were discussed. Additional clarifications, as explained below, for Questions 7, 9, 10, and 11 and the schedules are provided below.

  • Question 4 requested basis for the proposed 7-day battery charger Completion Time (CT) when using a non-1E battery charger. The licensee will detail the "alternate means" that are being credited and decide the appropriate location (i.e., Technical Specifications/License Condition/Commitment/Bases).
  • In its response to Question 9 which requests description of the "margins available" for specific Actions and CTs, the licensee will use the wording from an appropriate like-application (e.g., LaSalle).
  • In response to Question 10, the licensee will provide the needed justification and basis for the listed Limiting Conditions for Operation instead of saying "consistency with TSTF-360 or IEEE 350".
  • With reference to the discrepancy between the license amendment request and the Updated Final Safety Analysis Report (UFSAR) in the area of Class 1E battery chargers, addressed in Question 11, the licensee will provide the basis and technical impact for the "24-hour" statement and change other documents (such as the UFSAR), as needed.
  • The licensee's schedule for submitting its response to the RAI, addressing all the 12 questions in the RAI, is 3 weeks from the date of the meeting (by August 3),

and the next submittal, a total revamp superceding the March 30, 2007, submittal, in mid-September, 2007. is the list of attendees. Enclosure 2 is the agenda for the meeting, included in the meeting notice. There was no handout from the NRC staff.

/RA/

N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-361 and 50-362

Enclosures:

1. List of Attendees
2. Agenda cc w/encls: See next page

Pkg ML071980235 (Mtg Notice ML071800205, Mtg Summary ML071980101)

OFFICE DORL/LPL4/PM DORL/LPL4/LA DORL/LPL4/BC NAME NKalyanam JBurkhardt THiltz DATE 7/18/07 7/18/07 7/18/07 ATTENDANCE LIST JULY 12, 2007 BATTERY AND DC SOURCES UPGRADES AND CROSS-TIE NAME ORGANIZATION TEL. NO.

Linda Conklin SCE/SONGS 949-368 9443 Joanne Appel SCE/SONGS 949-368-7443 Ashok Wadhwa SCE/SONGS 949-368-2847 Ken Johnson SCE/SONGS 949-368-2638 Erwin Hatzler SCE/SONGS 949-368-9120 Tom Hiltz NRR/DORL 301-415-4052 George Wilson NRR/DE/EEEB 301-415-1711 Matt McConnell NRR/DE/EEEB 301-415-1597 Cliff Doutt NRR/DRA/APLA 301-415-2847 N. Kalyanam NRR/DORL 301-415-1480 ENCLOSURE 1

AGENDA BATTERY AND DC SOURCES UPGRADES AND CROSS-TIE AMENDMENT REQUEST SOUTHERN CALIFORNIA EDISON SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 JULY 12, 2007

1. Address the concerns raised in Nuclear Regulatory Commission letter dated May 3, 2007, Request for Additional Information (RAI).
2. Reviewers' Preference/Facilitate Ease of Review
  • Revising Enclosure 2 (Licensee's Evaluation) Section 2 (Proposed Change) and Section 4 (Evaluation).
  • Template for the submittal.
  • Type of re-submittal, supersede previous submittals as against replacing affected pages in sections where few changes are made.
3. Clarifications on the RAIs to ensure that all concerns are fully addressed.

ENCLOSURE 2

San Onofre Nuclear Generating Station Units 2 and 3 cc:

Mr. Raymond W. Waldo, Vice President, Director, Radiologic Health Branch Nuclear Generation State Department of Health Services Southern California Edison Company P.O. Box 997414, MS 7610 San Onofre Nuclear Generating Station Sacramento, CA 95899-7414 P.O. Box 128 San Clemente, CA 92674-0128 Resident Inspector San Onofre Nuclear Generating Station Mr. Douglas K. Porter, Esquire c/o U.S. Nuclear Regulatory Commission Southern California Edison Company Post Office Box 4329 2244 Walnut Grove Avenue San Clemente, CA 92674 Rosemead, CA 91770 Mayor Dr. David Spath, Chief City of San Clemente Division of Drinking Water and 100 Avenida Presidio Environmental Management San Clemente, CA 92672 California Dept. of Health Services 850 Marina Parkway, Bldg P, 2nd Floor Mr. James T. Reilly Richmond, CA 94804 Southern California Edison Company San Onofre Nuclear Generating Station Chairman, Board of Supervisors P.O. Box 128 County of San Diego San Clemente, CA 92674-0128 1600 Pacific Highway, Room 335 San Diego, CA 92101 Mr. James D. Boyd, Commissioner California Energy Commission Mark L. Parsons 1516 Ninth Street (MS 31)

Deputy City Attorney Sacramento, CA 95814 City of Riverside 3900 Main Street Brian Katz Riverside, CA 92522 Southern California Edison Company San Onofre Nuclear Generating Station Mr. Gary L. Nolff P.O. Box 128 Assistant Director - Resources San Clemente, CA 92764-0128 City of Riverside 3900 Main Street, 4th Floor Mr. Steve Hsu Riverside, CA 92522 Department of Health Services Radiologic Health Branch Regional Administrator, Region IV MS 7610, P.O. Box 997414 U.S. Nuclear Regulatory Commission Sacramento, CA 95899-7414 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Mr. A. Edward Scherer Southern California Edison Company Mr. Michael J. DeMarco San Onofre Nuclear Generating Station San Diego Gas & Electric Company P.O. Box 128 8315 Century Park Ct. CP21G San Clemente, CA 92674-0128 San Diego, CA 92123-1548 May 2007