ML081210671

From kanterella
Revision as of 08:04, 7 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Summary of Meeting with the Connecticut Nuclear Energy Advisory Council (Neac) to Discuss Implementation of Reactor Oversight Process and to Answer Questions Regarding the Millstone Nuclear Power Plant Performance for Cy 2007
ML081210671
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/23/2008
From: Racquel Powell
NRC/RGN-I/DRP/PB5
To:
Powell R, RI/DRP/610-337-6967
References
Download: ML081210671 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 April 23, 2008 MEETING

SUMMARY

LICENSEE: DOMINION NUCLEAR CONNECTICUT, INC.

FACILITY: MILLSTONE POWER STATION

SUBJECT:

SUMMARY

OF APRIL 17, 2008, MEETING WITH THE CONNECTICUT NUCLEAR ENERGY ADVISORY COUNCIL (NEAC)

On April 17, 2008, at 6:00 p.m., a meeting was conducted at the Waterford Town Hall, Waterford, CT, between the Nuclear Regulatory Commission (NRC) and NEAC to discuss the implementation of the Reactor Oversight Process and to answer questions regarding the Millstone Nuclear Power Plant performance for calendar year 2007.

The NRC presented and discussed its assessment of the safety performance of Millstone for the period from January 1 through December 31, 2007. The NRC presentation included a discussion of the Reactor Oversight Process and the NRCs 2007 Millstone performance assessment results. As part of the meeting, the NRC provided NEAC with an overall assessment of plant performance and with specific information concerning selected inspection findings.

The public observed the meeting and was offered the opportunity to communicate with the NRC regarding Dominions performance at Millstone and the role of the agency in ensuring safe plant operations.

The NRC's assessment letter can be found in ADAMS with an Accession Number of ML080630630. The meeting notice, with the attached agenda, can be found in ADAMS with Accession Number ML080920844. The NRC slides of the meeting can be found with Accession Number ML080880083. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects

Enclosures:

1. Meeting Attendees
2. NRC Slides

Enclosure 1 Meeting Attendees Name Organization Ray Powell Nuclear Regulatory Commission (NRC)

Steve Shaffer Nuclear Regulatory Commission (NRC)

Jamie Benjamin Nuclear Regulatory Commission (NRC)

Jim Krafty Nuclear Regulatory Commission (NRC)

Barry Norris Nuclear Regulatory Commission (NRC)

Carleen Sanders Nuclear Regulatory Commission (NRC)

Juan Ayala Nuclear Regulatory Commission (NRC)

John Hughey Nuclear Regulatory Commission (NRC)

Bill Sheehan Nuclear Energy Advisory Council (NEAC)

John Markowicz Nuclear Energy Advisory Council (NEAC)

Gregg Dixon Nuclear Energy Advisory Council (NEAC)

Marjorie DeBold Nuclear Energy Advisory Council (NEAC)

Denny Hicks Nuclear Energy Advisory Council (NEAC)

Bob Klancko Nuclear Energy Advisory Council (NEAC)

Dr. Ed Wilds Nuclear Energy Advisory Council (NEAC)

Pat Daddona The Day Newspaper

Distribution R. Powell, DRP B. Norris, DRP N. Sieller, DRP S. Shaffer, DRP, SRI J. Benjamin, DRP, RI J. Krafty, DRP, RI C. Sanders, DRP J. Ayala, DRP J. Hughey, NRR C. Kowalyshyn, DRP, OA Region I Docket Room (with concurrences)

SUNSI Review Complete: BSN (Reviewer=s Initials)

DOCUMENT NAME: T:\DRP\BRANCH5\Annual Assessment Meeting Summaries\Millstone NEAC Meeting Summary.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy ML081210674 OFFICE RI/DRP RI/DRP NAME BNorris/BSN RPowell/RJP DATE 04/23/08 04/23/08 OFFICIAL RECORD COPY