MONTHYEARML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22011A1322022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan ML21012A4312021-01-13013 January 2021 Security Inspection Plan ML20017A2672020-01-15015 January 2020 Security Inspection Plan for Pilgrim Nuclear Power Station - 2020 IR 05000293/20180062019-03-0404 March 2019 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2018006) and Confirmatory Action Letter Closure IR 05000293/20180052018-08-28028 August 2018 Assessment Follow-up Letter and Updated Inspection Plan (Inspection Report 05000293/2018005) IR 05000293/20170062018-02-28028 February 2018 Annual Assessment Letter for Pilgrim Nuclear Power Station (Reports 05000293/2017006, 05000293/2017402, and 05000293/2017501) IR 05000293/20170052017-08-28028 August 2017 Quarterly Assessment and Updated Inspection Plan for Pilgrim Nuclear Power Station (Report 05000293/2017005) IR 05000293/20160062017-03-0101 March 2017 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2016006) IR 05000293/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2016005) IR 05000293/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2015006) ML15352A1282015-12-18018 December 2015 Notification of Inspection Procedure 95003 Phase a and Phase B Inspections IR 05000293/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2015005) IR 05000293/20140012015-03-0404 March 2015 2014 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2014001)(w/Inspection Plan) IR 05000293/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Pilgrim Nuclear Power Station (Report 05000293-14-006) IR 05000293/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2013001)(w/Inspection Plan) ML13242A2102013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Pilgrim Nuclear Power Station (Report 05000293-13-006) IR 05000293/20130062013-09-0303 September 2013 Revised Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station (Report 05000293-13-006) IR 05000293/20120012013-03-0404 March 2013 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2012001) ML12248A0752012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Pilgrim Nuclear Power Station IR 05000293/20110012012-03-0505 March 2012 Annual Assessment Letter (Report 05000293/2011001) ML1124400172011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Pilgrim Nuclear Power Station IR 05000293/20100012011-03-0404 March 2011 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2010001) ML1029100132010-10-18018 October 2010 Pre-Inspection Cover Sheet and Inspection Plan (10/18-10/21/2010) ML1024405932010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Pilgrim Nuclear Power Station ML1019300312010-07-12012 July 2010 Pre-Inspection Cover Sheet and Inspection Plan (7/12 - 7/16/10) ML1006214172010-03-0303 March 2010 Annual Assessment Letter ML0924401172009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station IR 05000293/20090012009-03-0404 March 2009 IR 05000293/09-001, Pilgrim Nuclear Power Station Annual Assessment Letter, Dated March 4, 2009 ML0824702322008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, Pilgrim IR 05000293/20080012008-03-0303 March 2008 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 05000293-08-001) ML0734709542007-12-13013 December 2007 ROP 8 - Pilgrim - Change to Inspection Plan, 12/13/07 ML0724309442007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Plant IR 05000293/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Pilgrim Station (IR 05000293-07-001) ML0706703702007-02-15015 February 2007 Pre-Inspection Cover Sheet and Inspection Plan - Pilgrim Nuclear Generating Station; 05000293/2006007 ML0704404302006-10-0606 October 2006 Interview Schedule - Region 1 Inspection ML0626101432006-09-14014 September 2006 Pre-Inspection Cover Sheet and Inspection Plan ML0624304432006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station IR 05000293/20060012006-03-0202 March 2006 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 05000293/2006001) ML0524207072005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Pilgrim Nuclear Power Station ML0506101562005-03-0202 March 2005 Annual Assessment Letter 2005001 - Pilgrim ML0424408492004-08-30030 August 2004 2004 Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station ML0406301792004-03-0202 March 2004 2003-04 Annual Assessment Letter - Pilgrim IR 05000293/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 50-293/03-001) IR 05000293/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 50-293/02-001) 2024-01-09
[Table view] |
Text
PRE-INSPECTION COVER SHEET AND INSPECTION PLAN INSPECTORS:
Lead: _Ronald Rolph FACILITY: Pilgrim Other: _ _ _ _ _ __ REPORT NO: _05000293/2010004 INSP DATES: 7/12-16/2010 DRP INSP END DATE:* 9/30/2010
- If feeder, include resident inspection period end date.
Check One:
Feeder ---X----_ DRS _----X----__ Team _ __
Type of Inspection: (Check One)
PIR Supplemental SSDI Exams Re-Qual (Feeders) EP Exercise _ __ EP Program _ __ OSRE _ __
SPA Baseline -----X-----
INSPECTION PLAN (ATTACHED OR SUMMARIZED BELOW): see attached
_ _ATTACHED_______________________________________________________
INSPECTION PROCEDURE DATA Procedure-Occ. Nos IPE Code Title of Procedure In RPSIIP (YIN) 71124 - 06 . . :;:B:;,.:.I__ Radioactive Gaseous and -L Liquid Effluent Treatment TI2515/173 BI Industry Ground Water Initiative Y IFS ITEMS ASSIGNED FOR REVIEW Procedure-Occ. Nos IPE Code IFS Number Brief Description None -
ALLEGATIONS ASSIGNED FOR REVIEW Procedure-Occ. Nos IPE Code ALG -Number Brief Description AF None AF AF Date Discussed with DRP Branch Chief:
COORDINATED: ~=-4-~===--
ACKNOWLEDGED: -A-P-P-R-O-V-~~.~r_ _ _ __
(Accomp. Insp. Super.) (Inspector's Supervisor)
ARRANGEMENTS:
Hotel: Hlton Garden Inn Phone: 508-830-0200
Contact:
Phone: _ _ __
Rev. 3/01
Radioactive gaseous and Liquid Effluent Treatment 71124.06 Inspection Plan Site: Pilgrim Dates: 7/12-16/2010
- 1) Review recent effluent release report radiological environmental operating report. (.06/2.01 a.)
- 2) Review the FSAR and ODCM. (.06/2.01 b.)
- 3) Review Groundwater Protection Initiative (GPI) Program. (.06/2.01 c.)
- 4) Review LER's, event reports, special reports, effluent program implementing procedures, and any third party evaluation reports. (.06/2.01 d.)
- 5) Walk down selected components of the gaseous and liquid discharge systems to verify configuration and material condition. (.06/2.02 a.)
- 6) Review surveillance records for those areas associated with the systems selected, that are not readily accessible due to radiological conditions. (.06/2.02 b.)
- 7) Walk down filtered ventilation systems to verify conditions. (.06/2.02 c.)
- 8) If possible, observe sample collection and analysis of gaseous waste processing. (.06/2.02 d.)
- 9) Verify if the licensee has made significant changes to their effluent release points. (10 CFR 50.59 review or require NRC approval) (.06/2.02 e.)
- 10) If possible, observe sample collection and analysis of the liquid waste processing. (.06/2.02 f.)
- 11) As available, observe three to five sampling activities to verify adequate controls are implemented to ensure representative samples are obtained. (.06/2.03 a.)
- 12) As available, for one to three effluent discharges made with inoperable effluent radiation monitors, verify the controls to ensure compensatory sampling are implemented to ensure that the release of unmonitored liquid and gaseous effluents are prevented. (.06/2.03 b.)
- 13) Review the frequency of the use of compensatory sampling in lieu of adequate system maintenance.
(.06/2.03 c.)
- 14) Review the results of the inter-laboratory comparison program. Verify the inter-laboratory comparison program include hard-to-detect isotopes. (.06/2.03 d.)
- 15) Review effluent and stack and vent flow rates and compare with the ODCM or FSAR values. (.06/
2.04 a.)
- 16) Verify surveillance test results meet Technical Specifications acceptance criteria. (.06/2.04 b.)
- 17) Review significant changes in reported dose values compared to the previous Radiological Environmental Release Report and the factors that could have resulted in the change. (.06/2.05 a.)
- 18) Review one to three liquid and one to five gaseous waste discharge permits. (.06/2.05 b.)
- 19) Review the Part 61 analysis and methods used to determine the isotopes that are included in the source term. (.06/2.05 c.)
- 20) Review changes to the ODCM since the last inspection. (.06/2.05 c.)
- 21) Review the latest Land Use Census and verify that the changes have been factored into the dose calculations. (.06/2.05 e.)
- 22) Verify calculated doses for the release permits reviewed are within the 10 CFR Part 50, Appendix I and Technical Specification dose criteria. (.06/2.05 f.)
23)As available, review any, up to three, abnormal gaseous or liquid discharges. Verifyevaluation(s) were performed to satisfy 10 CFR 20.1501 to account for the source term and projected dose to the public. (.06/2.05 g.)
- 24) Review monitoring results of the GPI and verify the licensee is implementing the program as intended and identify any anomalous results. (.06/2.06 a.)
- 25) Review leakage of spill events and entries made into 10 CFR 50.75 (G) records. (.06/2.06 b.)
- 26) Review actions taken for unmonitored spills, leaks, unexpected discharges. (.06/2.06 c.)
- 27) Review the evaluation of discharges from onsite surface water bodies. (.06/2.06 d.)
- 28) Verify that on-site ground water sample results are included in the Annual radiological Environmental Operating Report or the Annual Radiological Effluent Release Report. (.06/2.06 e.)
- 29) For significant, new effluent discharge points, verify the ODCM has been updated to include these points. (.06/2.06 f.)
- 30) Verify that problems associated with the effluent program are entered into the corrective action program. (.06/2.07)