Inspection/Activity Plan - Vogtle Electric Generating Plant (NRC Inspection Report 05000424-06-001 & 05000425-06-001)
ML060610476
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/02/2006
From:
NRC/RGN-II/DRP/RPB2
To:
Shared Package
ML060610464 List:
References
IR-06-001
Download: ML060610476 (3)


Text

Page 1 of 3 Vogtle 03/02/2006 13:08:32 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS2-EP - EP EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 03/20/2006 03/24/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 03/20/2006 03/24/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/20/2006 03/24/2006 Baseline Inspections EB3 PI&R - PI&R SAMPLE RHR WELD FAILURES 2 1, 2 IP 71152 Identification and Resolution of Problems 06/12/2006 06/16/2006 Baseline Inspections EB3-MR - MR EFFECTIVENESS 1 1, 2 IP 7111112B Maintenance Effectiveness 06/19/2006 06/23/2006 Baseline Inspections EB3-HS - HEAT SINK 2 1, 2 IP 7111107B Heat Sink Performance 07/17/2006 07/21/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSPECTION VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/28/2006 08/30/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE WK1 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/18/2006 09/22/2006 Baseline Inspections EB3-ISI - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 09/25/2006 09/29/2006 Baseline Inspections EB3TI150 - 2515/150 U-1: RPV & VHP NOZZLES 1 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA-03- 09/25/2006 09/29/2006 Safety Issues EB3SGISI - U1 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/02/2006 10/06/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE WK2 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/02/2006 10/06/2006 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 10/15/2006 10/20/2006 Baseline Inspections PB2-PI&R - BIENNIAL PI&R PROGRAM INSPECTION 4 1, 2 IP 71152B Identification and Resolution of Problems 01/29/2007 02/02/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 02/12/2007 02/16/2007 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 01/22/2007 01/26/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie Enclosure This report shows only on-site and announced inspection procedure Page 2 of 3 Vogtle 03/02/2006 13:08:32 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-MODS - MODIFICATIONS-10CFR50.59 3 1, 2 IP 7111117B Permanent Plant Modifications 01/22/2007 01/26/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 03/12/2007 03/16/2007 Baseline Inspections EB3TI150 - 2515/150 U-2: RPV & VHP NOZZLES 1 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA-03- 03/12/2007 03/16/2007 Safety Issues PS2-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/19/2007 03/23/2007 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 03/19/2007 03/23/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 04/01/2007 04/06/2007 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 6 1, 2 IP 7111121 Component Design Bases Inspection 04/09/2007 04/13/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 04/23/2007 04/27/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 05/07/2007 05/11/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 05/21/2007 05/25/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 4 1 V23228 VOGTLE/EXAM AT POWER FACILITIES 07/16/2007 07/20/2007 Not Applicable PSB1-RP - RP PUBLIC PRE-INSP VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/30/2007 08/01/2007 Baseline Inspections OL EXAM - INITIAL EXAM 4 1 V23228 VOGTLE/EXAM AT POWER FACILITIES 08/06/2007 08/17/2007 Not Applicable PSB1-RP - RP PUBLIC BASELINE INSP 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/20/2007 08/24/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/20/2007 08/24/2007 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/20/2007 08/24/2007 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 08/20/2007 08/24/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/20/2007 08/24/2007 Baseline Inspections EB2-TFP - TFP - INFORMATION TRIP 5 1, 2 IP 7111105T Fire Protection [Triennial] 09/11/2007 09/13/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Page 3 of 3 Vogtle 03/02/2006 13:08:32 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 09/17/2007 09/21/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.