Text

March 2, 2006

Southern Nuclear Operating Company, Inc.

ATTN: Mr. D. E. Grissette

Vice President - Vogtle Project

P. O. Box 1295

Birmingham, AL 35201-1295

SUBJECT:

ANNUAL ASSESSMENT LETTER - VOGTLE ELECTRIC GENERATING

PLANT (NRC INSPECTION REPORT 05000424/2006001 and

05000425/2006001)

Dear Mr. Grissette:

On February 7, 2006, the NRC staff completed its performance review of the Vogtle Electric

Generating Plant. Our technical staff reviewed performance indicators (PIs) for the most recent

quarter and inspection results for the period from January 1 through December 31, 2005. The

purpose of this letter is to inform you of our assessment of your safety performance during this

period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection

information. A separate letter, designated and marked as Official Use Only - Security-Related

Information, will include the physical protection performance review and resultant inspection

plan.

Overall, Vogtle Units 1 and 2 operated in a manner that preserved public health and safety and

fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as

for the first three quarters of the assessment cycle, was within the Licensee Response column

of the NRCs Action Matrix. We based this conclusion on the fact that all inspection findings

were classified as having very low safety significance (Green) and all PIs indicated performance

at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor

oversight process (ROP) baseline inspections at your facility. We also plan on conducting

several non-ROP inspections, which include containment emergency recirculation sump

blockage and reactor vessel head and head penetrations.

The enclosed inspection plan details the inspections, less those related to physical protection,

scheduled through September 30, 2007. The inspection plan is provided to allow for the

resolution of any scheduling conflicts and personnel availability issues well in advance of

inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and

continuous nature. The inspections in the last nine months of the inspection plan are tentative

and may be revised at the mid-cycle review. Although our intent is to maintain the enclosed

inspection plan fixed for the first nine months, a need may arise to conduct one or more

unanticipated inspections prior to issuing an updated inspection plan with the 2006 assessment

SNC

2

cycle mid-cycle letter. If an inspection of this type becomes necessary, we will notify you of the

planned inspection dates as soon as possible to resolve, as much as we can, any scheduling

and personnel availability conflicts you may have.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at (404) 562-4674 with any

questions you may have regarding this letter or the inspection plan.

Sincerely;

/RA/

Curtis W. Rapp, Acting Chief

Reactor Projects Branch 2

Division of Reactor Projects

Docket Nos. 50-424 and 50-425

License Nos. NPF-68 and NPF-81

Enclosure: Vogtle Inspection/Activity Plan

SNC

3

cc w/encl:.

J. T. Gasser

Executive Vice President

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

T. E. Tynan

General Manager, Plant Vogtle

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

N. J. Stringfellow

Manager-Licensing

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Bentina C. Terry

Southern Nuclear Operating Company, Inc.

Bin B-022

P. O. Box 1295

Birmingham, AL 35201-1295

Director, Consumers' Utility Counsel

Division

Governor's Office of Consumer Affairs

2 M. L. King, Jr. Drive

Plaza Level East; Suite 356

Atlanta, GA 30334-4600

Office of the County Commissioner

Burke County Commission

Waynesboro, GA 30830

Director, Department of Natural Resources

205 Butler Street, SE, Suite 1252

Atlanta, GA 30334

Manager, Radioactive Materials Program

Department of Natural Resources

Electronic Mail Distribution

Attorney General

Law Department

132 Judicial Building

Atlanta, GA 30334

Laurence Bergen

Oglethorpe Power Corporation

Electronic Mail Distribution

Resident Manager

Oglethorpe Power Corporation

Alvin W. Vogtle Nuclear Plant

Electronic Mail Distribution

Arthur H. Domby, Esq.

Troutman Sanders

Electronic Mail Distribution

Senior Engineer - Power Supply

Municipal Electric Authority

of Georgia

Electronic Mail Distribution

Reece McAlister

Executive Secretary

Georgia Public Service Commission

244 Washington Street, SW

Atlanta, GA 30334

Distribution w/encl: (See page 4)

_________________________

OFFICE

RII:DRP

SIGNATURE

RPC1

NAME

RCarrion:rcm

DATE

3/01/2006

3/ /2006

3/ /2006

3/ /2006

3/ /2006

3/ /2006

3/ /2006

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO