ML061230091

From kanterella
Revision as of 20:12, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Response to Mark Jacobs Letter Contaminated Groundwater Conditions at IPEC
ML061230091
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 05/03/2006
From: Jason White
NRC/RGN-I/DRS/PSB2
To: Jacobs M
Indian Point Safe Energy Coalition
White J, RI/DRS/PSB2, (610) 337-5114
References
Download: ML061230091 (3)


Text

May 3, 2006 Mr. Mark Jacobs Indian Point Safe Energy Coalition 46 Highland Drive Garrison, NY 10524

Dear Mr. Jacobs:

In the course of a public meeting held on March 28, 2006, to discuss the contaminated groundwater conditions at the Indian Point Energy Center, Entergy committed to provide you with a list of the potential sources of radioactive materials that were being considered in their investigation. Entergy recently provided our office with the enclosed information in response to your request. This information will also be made publicly available in our ADAMS Document System as Accession No. ML061170648 and posted on our public website for Indian Point issues, http://www.nrc.gov/reactors/plant-specific-items/indian-point-issues.html As we indicated at the public meeting, NRC is continuing to closely monitor Entergys efforts to characterize the extent of groundwater contamination, identify the cause of the contamination, and resolve this condition.

If you have further questions relative to this matter, please contact Mr. Richard Barkley of our office at 610-337-5065.

Sincerely,

/RA/

John R. White, Chief Plant Support Branch 2 Division of Reactor Safety

Enclosure:

As Stated

M. Jacobs 2 Distribution:

A. Blough, DRS R. Barkley, ORA J. White, DRS E. Cobey, DRP D. Jackson, DRP J. Boska, NRR SUNSI Review Complete: JRW (Reviewers Initials)

DOCUMENT NAME: E:\Filenet\ML061230091.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS RI/ORA RI/DRS NAME JWhite (JRW) RBarkley (RSB) MGamberoni (MKG)

DATE 05/02/06 05/02/06 05/03/06 OFFICIAL RECORD COPY

Potential Sources of Groundwater Contamination at Indian Point Tanks and Pools Unit 1, 2 & 3 Fuel Pools Unit 2 & 3 Refueling Water Storage Tanks Unit 2 & 3 Chemical Volume Control System Tanks Unit 2 & 3 Waste Hold-up Tanks Above and below ground Piping Unit 1 Waste Transfer Line Unit 2 and 3 RWST Lines Unit 3 to Unit 2 Blowdown Transfer Line Unit 2 and 3 Vapor Containment (VC) foundation drain Unit 1 foundation drain Miscellaneous drains between buildings Building Sumps Unit 2 & 3 Primary Auxiliary Building sumps Enclosure