TI177 Request for Information Njf
ML12145A772
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 05/24/2012
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Nestor Adorno
References
Download: ML12145A772 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 24, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2, NOTIFICATION OF AN NRC MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DEACY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS INSPECTION; AND REQUEST FOR INFORMATION 05000373/2012004; 05000374/2012004 (DRS)

Dear Mr. Pacilio:

On July 30, 2012, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site portion of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Temporary Instruction at your LaSalle County Station. This inspection will be performed in accordance with NRC Temporary Instruction (TI) 2515/177.

In order to minimize the impact the inspections have on the site and to ensure productive inspections, we have enclosed a request for documents needed for the inspection. The documents have been divided into three groups.

  • The first group lists information necessary for our initial inspection scoping activities.

This information should be available to the inspector no later than June 18, 2012. By June 29, 2012, the inspector will communicate the initial selected samples.

  • The second group is needed to support our in-office preparation activities. This set of documents should be available at the Regional Office no later than July 16, 2012. This information should be separated by information request number, especially if provided electronically (e.g., folder with the information request number). During the in-office preparation activities, the inspectors may identify additional information needed to support the inspection. The lead inspector will provide a list of the additional information needed during the week of July 23, 2012.
  • The last group includes the additional information above, as well as plant specific reference material. This information should be available to the inspector on July 30, 2012. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the inspector as the documents are generated.

M. Pacilio It is important these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the on-site inspection.

If no activities were accomplished associated with a specific request, please provide a statement indicating that the request is not applicable.

The lead inspector for this inspection is Néstor J. Féliz-Adorno. If there are questions about the material requested, or the inspection, please call Mr. Féliz-Adorno at (630) 829-9739. Please send the information to the following e-mail address nestor.feliz-adorno@nrc.gov. A hard-copy with the required information is also an acceptable option.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-373 and 50-374 License Nos. NPF-11 and NPF-18

Enclosures:

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSTRUCTION DOCUMENT REQUEST cc w/encl: Distribution via ListServ'

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION DOCUMENT REQUEST Inspection Report: 05000373/2012004; 05000374/2012004(DRS)

Onsite Inspection Dates: July 30 - August 3, 2012, and August 13 - 17, 2012 Inspection Procedure: Temporary Instruction (TI) 2515/177, Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Inspectors: Néstor J. Féliz Adorno (630) 829-9739 Nestor.feliz-adorno@nrc.gov Larry J. Jones (630) 829-9864 Larry.jones@nrc.gov I. Information Requested By June 18, 2012

1. Copy of the station response to Generic Letter (GL) 2008-01 and any supplemental report.
2. Copies of all the requests for additional information (RAIs) and the associated responses.
3. List of corrective action program documents (with a short description) associated with GL 2008-01, voids in piping, gas intrusion events, and pressure transients for the previous three years that affected the subject systems (i.e., emergency core cooling, decay heat removal, and containment spray systems).
4. List of the suction piping sections identified as susceptible to gas accumulation (the list should identify the corresponding system).
5. List of the discharge piping sections identified as susceptible to gas accumulation (the list should identify the corresponding system).
6. List of changes (with a short description and tracking number) to the Final Safety Evaluation Report (FSAR), Technical Specifications, Technical Specification Bases, and Technical Requirement Manual associated with the resolution of GL 2008-01.
7. List of calculations associated with GL 2008-01 (with a short description of the calculation and the change), including calculations that have been changed or created in response to GL 2008-01.

1 Enclosure

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION DOCUMENT REQUEST II. Information Requested By July 16, 2012

1. Copies of program documents and procedures developed to implement the resolution of GL 2008-01.
2. Copies of the selected corrective action program documents.
3. Copies of the selected licensing and design basis document changes.
4. Copies of the selected calculations.
5. List of commitments (with a description) done in response to GL 2008-01.
6. List of actions that were completed in response to GL 2008-01.
7. List of outstanding actions that will be completed in response to GL 2008-01 and the completion schedule (include the documents that are tracking their completion such as work orders or corrective action documents).
8. Copies of all the corrective actions identified in the nine-month response and supplemental reports.
9. List (with a short description) of gas intrusion mechanisms that apply to the plant and the affected system locations (e.g., identify the source, conditions, and expected void locations).
10. Design basis documents of the subject systems.
11. Design basis documents of keep-full systems of the subject systems.
12. Copies of the construction code pages of the subject systems that discuss waterhammer or flow-induced dynamic loading. Also, include the associated Design Specification pages.
13. Provide the following description for the pumps of the subject systems:

(1) flowrate at best efficiency point; (2) maximum and minimum flowrate during accident conditions and shutdown cooling; (3) number of pump stages; (4) if a pump is multi-stage, indicate if the shaft is stiff or flexible (include the basis for this determination); (5) pump head required to meet operability requirements; and (6) un-degraded pump head.

14. Copies of self-assessments associated with the implementation of the GL 2008-01 program and the associated corrective action program documents (include the attachments, if any).
15. Copies of corrective action program implementing procedures.

2 Enclosure

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION DOCUMENT REQUEST

16. Copies of the operability determination procedures.
17. Electronic copies of piping and instrumentation diagrams (P&IDs) of the subject systems.
18. If available, electronic copies of the current Technical Specifications, Technical Specifications Basis, Final Safety Analysis Report, and Technical Report Manual.

III. Information Requested to be Available on First Day of Inspection, July 30, 2012

1. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the results of the last two surveillances for the subject systems.
2. Copies of the modification packages for hardware modifications as part of the resolution of GL 2008-01.
3. Copies of procedures use for detecting and determining void volumes.
4. Copies of procedures use for filling and venting.
5. Copies of surveillance procedures that establish flow at the subject systems (e.g.,

surveillances where the pumps are operated)

6. Subject systems walkdown work documents associated with the resolution of GL 2008-01 and the results of these walkdowns.
7. Copies of the engineering evaluations performed for all identified voids.
8. Provide a list of all piping locations that are currently voided and their associated evaluation.
9. Copies of trends of periodic gas accumulation monitoring results (e.g., venting, UTs).
10. Copy of the design change review checklist.
11. Copies of training documents that ensure that personnel are aware of gas-related concerns. Include the schedule or attendance list for previously conducted training.
12. Copy of the void transport analysis.
13. Basis for the void acceptance criteria (e.g., calculation). If applicable, provide the justification for any deviation from the void acceptance criteria established by the Office of Nuclear Reactor Regulations (NRR).
14. Basis for horizontal pipe acceptance criteria (e.g., calculation).

3 Enclosure

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION DOCUMENT REQUEST

15. If applicable, provide a list of inaccessible locations where plant walkdowns of the subject systems have not been completed. Include an explanation of why each area is considered inaccessible.
16. Hardcopies of isometric drawings of the subject systems (11X17 or similar size is preferred if legible).
17. Hardcopies of piping and instrumentation diagrams (P&IDs) of the subject systems (11X17 or similar size is preferred if legible).

If there are questions about the material requested, or the inspection, please call Mr. Féliz-Adorno at (630) 829-9739.

4 Enclosure

M. Pacilio It is important these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the on-site inspection.

If no activities were accomplished associated with a specific request, please provide a statement indicating that the request is not applicable.

The lead inspector for this inspection is Néstor J. Féliz-Adorno. If there are questions about the material requested, or the inspection, please call Mr. Féliz-Adorno at (630) 829-9739. Please send the information to the following e-mail address nestor.feliz-adorno@nrc.gov. A hard-copy with the required information is also an acceptable option.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-373 and 50-374 License Nos. NPF-11 and NPF-18

Enclosures:

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSTRUCTION DOCUMENT REQUEST cc w/encl: Distribution via ListServ' DISTRIBUTION:

See next page DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\-Ltr 052412 LaSalle TI177 Request for Information NJF.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME NAdorno:ls AMStone DATE 05/24/12 05/24/12 OFFICIAL RECORD COPY

Letter to Mr. Michael Pacilio from Ms. Ann Marie Stone dated May 24, 2012.

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2, NOTIFICATION OF AN NRC MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DEACY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS INSPECTION; AND REQUEST FOR INFORMATION 05000373/2012004; 05000374/2012004 (DRS)

DISTRIBUTION:

Shawn Williams RidsNrrDorlLpl3-2 Resource RidsNrrPMLaSalle RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak