Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) 2024-09-27
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24068A2522024-03-0808 March 2024 License Amendment Request to Revise Technical Specifications 3.5.1 and 3.5.2 Using Risk-Informed Process for Evaluations ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML22341A6132022-12-0707 December 2022 Application to Revise Technical Specifications to Adopt TSTF-107- a, Separate Control Rods That Are Untrippable Versus Inoperable ML22116A2202022-04-26026 April 2022 Application for Technical Specification Improvement to Adopt TSTF-487-A, Revision 1, Relocate DNB Parameters to the COLR ML22053A2332022-02-22022 February 2022 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues ML21323A1702021-11-19019 November 2021 Technical Specifications Bases Revision 73 ML21210A3102021-07-29029 July 2021 Application to Revise Technical Specifications - Administrative Changes ML21139A3302021-05-19019 May 2021 Application for Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases ML21106A3002021-04-16016 April 2021 Technical Specification Bases Revisions 71 and 72 ML21022A4082021-01-22022 January 2021 License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20282A9532020-10-0808 October 2020 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML20183A4602020-07-0101 July 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19360A1552019-12-26026 December 2019 License Amendment Request (LAR) - Change in Implementation Date for Amendment Number 209 ML19291F7352019-10-18018 October 2019 Independent Spent Fuel Storage Installation (ISFSI) - License Amendment Request for Changes to Emergency Plan Staffing Requirements ML19225D1972019-08-13013 August 2019 Independent Spent Fuel Storage Facility - Application for Approval of Indirect Transfer of Control of Licenses ML18361A8452018-12-27027 December 2018 Application to Revise Technical Specifications to Adopt TSTF- 529, Revision 4, Clarify Use and Application Rules, Using the Consolidated Line Item Improvement Process ML18187A4172018-07-0606 July 2018 License Amendment Request and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel ML18145A3032018-05-25025 May 2018 License Amendment Request to Revise Technical Specifications Regarding Response Time Testing of Pressure Transmitters ML17307A1882017-11-0303 November 2017 License Amendment Request Supplement for Risk-Informed Completion Times ML17200D1622017-07-19019 July 2017 License Amendment Request to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML17173A8772017-06-22022 June 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17165A5552017-06-14014 June 2017 License Amendment Request for Revision to the Cyber Security Plan Implementation Schedule Completion Date ML17066A1832017-01-0404 January 2017 License Conditions Regarding Emergency License Amendment Request to Extend Diesel Generator 38 Completion Time ML16356A6892016-12-21021 December 2016 Emergency License Amendment Request for a One-Time Extension of Diesel Generator Completion Time ML16188A3322016-07-0101 July 2016 License Amendment Request and Exemption Request to Support the Implementation of Next Generation Fuel ML16188A3332016-07-0101 July 2016 Description and Assessment of Proposed License Amendment - Technical Analysis ML16182A1712016-06-29029 June 2016 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML16043A3612016-01-29029 January 2016 Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis ML15336A0842015-11-30030 November 2015 NET-300047-07 Revision 1, Material Qualification Report of Maxus for Spent Fuel Storage. ML15336A0872015-11-25025 November 2015 License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis ML15336A0832015-09-30030 September 2015 WCAP-18030-NP, Revision 0, Criticality Safety Analysis for Palo Verde Nuclear Generating Station, Units 1, 2, and 3. ML15247A5182015-09-0404 September 2015 Exigent License Amendment Request to Amend Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 ML15218A3002015-07-31031 July 2015 License Amendment Request to Revise Technical Specifications to Adopt TSTF-505-A, Revision 1, Risk-Informed Completion Times ML15065A0312015-02-27027 February 2015 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-439-A, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML13329A7002013-11-20020 November 2013 Transmittal of Proprietary Documents for Startup Test Activity Reduction (STAR) Program License Amendment Request ML13280A2642013-09-27027 September 2013 Request to Amend Technical Specification 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip ML13242A0872013-08-26026 August 2013 Response to Request for Additional Information Regarding License Amendment Request for Adoption of Technical Specifications Task Force Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML13002A1972012-12-26026 December 2012 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML12353A1582012-12-12012 December 2012 Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E-Bar Definition and Revision to RCS Specific Activity Technical Specifications ML11334A0462011-11-22022 November 2011 Request for Amendment to Various Technical Specifications to Implement Administrative Changes ML11182A9082011-06-22022 June 2011 Request for Amendment to Technical Specification 3.7.4, Atmospheric Dump Valves (Advs). ML11103A0532011-03-31031 March 2011 License Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program ML1035600882011-01-19019 January 2011 Issuance of Amendment Nos. 184, 184, and 184, Revise Technical Specification 5.5.8, Inservice Testing Program, to Implement TS Task Force (TSTF)-479-A as Modifed by TSTF-497-A ML1025101612010-08-27027 August 2010 Request for Operating License Amendment - Revision of Feedwater Line Break with Loss of Offsite Power and Single Failure Analysis ML1024500512010-08-25025 August 2010 Request for Amendment to Technical Specification 3.7.4, Atmospheric Dump Valves (Advs). 2024-08-28
[Table view] Category:Technical Specifications
MONTHYEARML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A ML22334A0702022-12-15015 December 2022 Issuance of Amendment Nos. 220, 220, and 220, to Revise Technical Specifications to Adopt TSTF-487, Relocate DNB Parameters to the COLR ML22343A1152022-12-0909 December 2022 Transmittal of Technical Specification Bases Revision 75 ML22341A6132022-12-0707 December 2022 Application to Revise Technical Specifications to Adopt TSTF-107- a, Separate Control Rods That Are Untrippable Versus Inoperable ML22178A0042022-08-11011 August 2022 Issuance of Amendment Nos. 219, 219, and 219, to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump Ts to Address GSI-191 Issues ML20350B8032021-02-0808 February 2021 Issuance of Amendment Nos. 214, 214, and 214 to Make Administrative Changes to the Technical Specifications ML17254A4992017-09-27027 September 2017 Issuance of Amendment Nos. 204, 204, and 204 to Modify the Completion Date for Implementation of Milestone 8 of the Cyber Security Plan ML16358A6762016-12-23023 December 2016 Issuance of Amendment No. 199, Request for One-Time Extension of the Diesel Generator Completion Time (Emergency Circumstances) ML16004A0132016-02-19019 February 2016 Issuance of Amendment No. 197, 197, and 197, Adopt Technical Specification Task Force Traveler TSTF-439-A, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML16043A3612016-01-29029 January 2016 Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis ML15266A0052015-09-25025 September 2015 Issuance of Amendment No. 196, Revise Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 (Exigent Circumstances) ML15247A5182015-09-0404 September 2015 Exigent License Amendment Request to Amend Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 ML15070A1242015-03-30030 March 2015 Issuance of Amendment Nos. 195, 195, and 195, Adopt TSTF-486, Revision 2, Revise Mtc Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011) and TSTF-406, Revision 2 ML15065A0312015-02-27027 February 2015 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-439-A, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML14202A3782014-09-0909 September 2014 Issuance of Amendment Nos. 194, 194, and 194, Request to Revise TS 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip (TAC Nos. MF2879-81) ML14115A0452014-06-25025 June 2014 Issuance of Amendment Nos. 193, 193, and 193, Adopt Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML13294A5762013-11-25025 November 2013 Issuance of Amendment Nos. 192, 192, and 192, Adopt TSTF-490, Revision 0, Deletion of E-Bar Definition and Revision to RCS Specific Activity Technical Specifications ML13217A0562013-07-0303 July 2013 Enclosure 1 - Technical Requirements Manual, Revision 58 ML13217A0572013-07-0303 July 2013 Enclosure 1 - Technical Requirements Manual, Revision 58 ML1126202932011-12-15015 December 2011 Issuance of Amendment Nos. 188, 188, and 188, Adoption of TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b ML12193A0442011-11-17017 November 2011 Technical Requirements Manual, Revision 56, Replacement Pages and Insertion Instructions ML11287A0322011-09-0101 September 2011 Technical Requirements Manual, Revision 55 ML11287A0312011-09-0101 September 2011 Technical Requirements Manual (TRM) Revision 55 ML0531100452011-04-21021 April 2011 Current Facility Operating License NPF-41, Tech Specs, Revised 09/28/2017 ML11098A0012011-04-21021 April 2011 Appendices a, B, C, and D - Palo Verde Nuclear Generating Station, Unit 3 ML1108719552011-04-21021 April 2011 License Renewal - Appendices a, B, C, and D to the Renewed Operating License for Unit 1 (NPF-41) ML11098A0002011-04-21021 April 2011 Appendices a, B, C, and D - Palo Verde Nuclear Generating Station, Unit 2 ML1108802752011-03-29029 March 2011 Revised Technical Specifications from March 29, 2011 Pre-Licensing Meeting with Arizona Public Service Company to Discuss Potential Submittal of a License Amendment Request to Revise TS Pages ML1106107622011-01-26026 January 2011 PVNGS Insertion Instructions for Technical Specifications Bases Changed Pages, Revision 54 ML1012602112010-09-10010 September 2010 Issuance of Amendment Nos. 179, 179, and 179, Revise License Condition for Maximum Power Level and Miscellaneous Technical Specification Changes ML1013102242010-04-29029 April 2010 Request for Amendment to Technical Specification 5.5.8, Inservice Testing Program ML1013103962010-04-29029 April 2010 Application for Technical Specification Change TSTF-491, Removal of the Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using the Consolidated Line Item Improvement Process ML1013102252010-04-29029 April 2010 Supplement to Amendment Request Associated with Administrative Changes - New Retyped Technical Specification Page ML1005600232010-02-24024 February 2010 Response to Request for Updated Technical Specification Page ML1006400942010-02-23023 February 2010 Response to Request for Updated Technical Specification Page ML0934504852009-11-30030 November 2009 Request for Amendment to TS Table 3.3.5-1,Engineered Safety Features Actuation System Instrumentation, and Figure 3.5.5-1, Minimum Required Refueling Water Tank (RWT) Volume & Supporting Changes ML0906410142009-02-19019 February 2009 Request for Technical Specification Amendment and Exemption from 10 CFR 50, Appendix G, to Relocate the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection Enable Temperatures ML0802500682008-01-17017 January 2008 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0733811392007-11-28028 November 2007 Inservice Inspection Program, Third Interval - Snubber Program ML0719401202007-07-25025 July 2007 Technical Specifications, Revised Shutdown Control Element Assembly Insertion Limits ML0710603712007-05-16016 May 2007 Technical Specifications, Issuance of Amendment Nos. 167, 167, and 167 AC Sources - Operating Surveillance Requirements ML0709400842007-03-23023 March 2007 Special Report 3-SR-2006-001-01, 12th Refueling Outage, Steam Generator Eddy Current Examination ML0707801552007-03-0808 March 2007 Revision to Request for Amendment to Diesel Generator Technical Specification Surveillance Requirements 3.8.1.9, 3.8.1.10, and 3.8.1.14 ML0704702872007-02-22022 February 2007 Technical Specification Pages - Amendment Nos. 166, 166, and 166 Containment Isolation Valves ML0703500422007-02-21021 February 2007 Technical Specification, Amendment Nos. 165, 165, & 165 - Increased Flexibility in Mode Restraints (TAC Nos. MD3153, MD3154, & MD3155) ML0703901032007-01-25025 January 2007 Response to NRC Request for Additional Information Regarding Request for Amendment to Technical Specification Surveillance Requirements 3.8.1.9, 3.8.1.10, and 3.8.1.14 ML0633905302006-12-0505 December 2006 Tech Spec Pages for Amendments 164, 164, and 164 Extended Allowed Outage Time for Emergency Diesel Generators ML0632400492006-11-17017 November 2006 Technical Specifications - Issuance of Amendments 163, 163, and 163, Revise TS 3.7.2, Main Steam Isolation Valves (Msivs), to Include Specific Requirements ML0631905452006-11-14014 November 2006 Tech Spec Pages for Errata to Amendment No. 162, Dated October 31, 2006 Changes to Security Plan ML0628401112006-10-31031 October 2006 Technical Specification - License Pages - Issuance of Amendment 162 Changes to Security Plan 2024-06-14
[Table view] |
Text
10 CFR 50.90 LA R S A subsidiaryof Pinnacle West CapitalCorporation Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Vice President Tel. 623-393-5403 P.O. Box 52034 Generating Station Regulatory Affairs and Plant Improvement Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-061 80-DCM/DLK April 29, 2010 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Application for Technical Specification Change TSTF-491, Removal of the Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using the Consolidated Line Item Improvement Process In accordance with the provisions of 10 CFR 50.90, Arizona Public Service Company (APS) is submitting a request for an amendment to the Technical Specifications (TS) for PVNGS Units 1,2, and 3.
The proposed amendment would modify the TS by removing the specific isolation time for the Main Steam and Main Feedwater isolation valves from the associated PVNGS TS Surveillance Requirements.
The changes are consistent with Nuclear Regulatory Commission (NRC) approved Industry Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-491, Revision 2, "Removal of the Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications." The availability of this TS improvement was announced in the Federal Register on December 29, 2006 (71 FR 78472) as part of the Consolidated Line Item Improvement Process (CLIIP). provides a description of the proposed change, the requested confirmation of applicability, and plant-specific verifications. Enclosure 2 provides the existing TS pages marked up to show the proposed change. Enclosure 3 provides revised (clean)
TS pages. Enclosure 4 provides the existing TS Bases pages marked up to show the proposed change (for information only).
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway 0 Comanche Peak 0 Diablo Canyon 0 Palo Verde
- San Onofre 0 South Texas 0 Wolf Creek -
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Application for Technical Specification Change TSTF-491, Removal of the Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using the Consolidated Line Item Improvement Process Page 2 APS requests approval of the proposed license amendment by December 31, 2010, with the amendment being implemented within 90 days.
No commitments are being made to the NRC by this letter.
In accordance with the PVNGS Quality Assurance Program, the Plant Review Board and the Offsite Safety Review Committee have reviewed and concurred with this proposed amendment. By copy of this letter, this submittal is being forwarded to the Arizona Radiation Regulatory Agency (ARRA) pursuant to 10 CFR 50.91 (b)(1).
Should you need further information regarding this amendment request, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on _______
(Date)
Sincerely, DMC/RAS/DLK
Enclosures:
- 1. Description and Assessment
- 2. Proposed Technical Specification Changes
- 3. Revised Technical Specification Pages
- 4. Marked up Existing TS Bases Changes cc: E. E. Collins Jr. NRC Region IV Regional Administrator J. R. Hall NRC NRR Project Manager L. K. Gibson NRC NRR Project Manager R. I. Treadway NRC Senior Resident Inspector for PVNGS A. V. Godwin Arizona Radiation Regulatory Agency (ARRA)
T. Morales Arizona Radiation Regulatory Agency (ARRA) 9
Enclosure 1 Description and Assessment
Subject:
Application for Technical Specification Change TSTF-491, Removal of the Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using the Consolidated Line Item Improvement Process
1.0 DESCRIPTION
2.0 ASSESSMENT 2.1 Applicability of TSTF 491 and Published Safety Evaluation 2.2 Optional Changes and Variations
3.0 REGULATORY ANALYSIS
3.1 No Significant Hazards Consideration Determination 3.2 Verification and Commitments 4.0 ENVIRONMENTAL EVALUATION
5.0 REFERENCES
1
Enclosure 1 License Amendment Request for Adoption of TSTF-491, Revision 2
1.0 DESCRIPTION
The proposed amendment would modify Technical Specifications (TS) by removing the specific isolation time for the Main Steam and Main Feedwater isolation valves from the associated Standard Technical Specifications (STS) Surveillance Requirements (SRs).
The changes are consistent with Nuclear Regulatory Commission (NRC) approved Industry/Technical Specification Task Force (TSTF) TSTF-491 Revision 2. The availability of this TS improvement was published in the Federal Register on December 29, 2006 (71 FR 78472) as part of the Consolidated Line Item Improvement Process (CLIIP).
2.0 ASSESSMENT 2.1 Applicability of TSTF-491 and Published Safety Evaluation Arizona Public Service Company (APS) has reviewed TSTF-491 (Reference 1),
and the NRC model Safety Evaluation (SE) (Reference 2) as part of the CLIIP.
APS has concluded that the information in TSTF-491, as well as the SE prepared by the NRC staff, are applicable to Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 and justify this amendment for the incorporation of the changes to the PVNGS TS.
2.2 Optional Changes and Variations APS is not proposing any deviations from the TS changes described in TSTF-491 or the NRC staff's model SE published in the Federal Register on October 5, 2006 (71 FR 58884).
3.0 REGULATORY ANALYSIS
3.1 No Significant Hazards Consideration Determination APS has reviewed the proposed No Significant Hazards Consideration Determination (NSHCD) published in the Federal Register as part of the CLIIP.
APS has concluded that the proposed NSHCD presented in the Federal Register notice is applicable to PVNGS Units 1, 2, and 3 and is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.91(a).
2
Enclosure 1 License Amendment Request for Adoption of TSTF-491, Revision 2 3.2 Verification and Commitments As discussed in the notice of availability published in the Federal Register on December 29, 2006 for this TS improvement, plant-specific verifications were performed as follows:
A review was performed of the affected systems as described in the Updated Final Safety Analysis Report to verify that TSTF-491 was applicable to PVNGS Units 1,2, and 3.
In addition, APS has proposed TS Bases consistent with TSTF-491 which provide guidance and details on how to implement the new requirements.
Finally, APS has a Bases Control Program consistent with Section 5.5 of the STS.
4.0 ENVIRONMENTAL EVALUATION The amendment changes requirements with respect to the installation or use of-a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment adopting TSTF-491; Rev 2, involves no significant increase in the amounts and no significant change in the types of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that TSTF-491, Rev 2, involves no significant hazards considerations, and there has been no -public comment on the finding in Federal Register Notice 71 FR 58884, October 5, 2006. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
5.0 REFERENCES
- 1. TSTF-491, Revision 2, "Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications."
- 2. NRC Model Safety Evaluation Report published on October 5, 2006 (71 FR 58884).
3
Enclosure 2 Proposed Technical Specification Changes Markup of Pages:
3.7.2-3 3.7.3-2
MSIVs 3.7.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1 ----------------- NOTE---------------
Not required to be performed prior to entry into MODE 3.
Verify closure timej*f each MSIV is In accordance 5 4.6 secnd withjin limits with each with the actuator train on an actual or simulated Inservice actuation signal. Testing Program PALO VERDE UNITS 1,2,3 3.7.2-3 AMENDMENT NO. 4-63
MFIVs 3.7.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify the closure time of each MFIV is In accordance
!59.6 secd within imits on an actual or with the simulated actuation signal. Inservice Testing Program PALO VERDE UNITS 1,2,3 3.7.3-2 AMENDMENT NO. 11-7
Enclosure 3 Revised Technical Specification Pages Page:
3.7.2-3 3.7.3-2
MSIVs 3.7.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1 ----------------- NOTE---------------
Not required to be performed prior to entry into MODE 3.
Verify closure time of each MSIV is In accordance within limits with each actuator train on with the an actual or simulated actuation signal. Inservice Testing Program PALO VERDE UNITS 1,2,3 3.7.2-3 AMENDMENT NO. 44ý
MFIVs 3.7.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify the closure time of each MFIV is In accordance within limits on an actual or simulated actuation signal.
with the Inservice I
Testing Program PALO VERDE UNITS 1,2,3 3.7.3-2 AMENDMENT NO. 44-ý ,
Enclosure 4 Marked up Existing TS Bases Changes Pages:
B 3.7.2-8 B 3.7.2-9 B 3.7.3-5
MSIVs B 3.7.2 BASES (continued)
ACTIONS H.1 and H.2 (continued)
(continued)
The 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Completion Time is consistent with that allowed in Condition F.
Inoperable MSIVs that cannot be restored to OPERABLE status within the specified Completion Time, but are closed, must be verified on a periodic basis to be closed. This is necessary to ensure that the assumptions in the safety analysis remain valid. The 7 day Completion Time is reasonable, based on engineering judgment, MSIV status indications available in the control room, and other administrative controls, to ensure these valves are in the closed position.
1.1 and 1.2 If the MSIVs cannot be restored to OPERABLE status, or closed, within the associated Completion Time, the unit must be placed in a MODE in which the LCO does not apply. To achieve this status, the unit must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from MODE 2 conditions in an orderly manner and without challenging unit systems.
SURVEILLANCE SR 3.7.2.1 REQUIREMENTS This SR verifies that the closure time of each MSIV is 4.6 seeonds within the limi giv en inReference 5 with each actuator train on an actual or simulated actuation signal-The M..V closure time is ,and .*swithinthat assumed in the accident and containment analyses. This SR alsoverifies the valve clsr timne i~sin accordance with the I1nservi~ce Testing Program. This SR is normally performed upon returning the unit to operation following .a refueling outage. The MSIVs should not. be full stroke tested at power.
(continued)
PALO VERDE UNITS 1,2,3 B 3.7.2-8 REVISION 40
MSIVs B 3.7.2 BASES (continued)
SURVEILLANCE SR 3.7.2.1 (continued)
REQUIREMENTS (continued) The Frequency for this SR is in accordance with the Inservice Testing Program. This Frequency demonstrates the valve closure time at least once per refueling cycle.
This test is conducted in MODE 3, with the unit at operating temperature and pressure, as discussed in the Reference 5 6 exercising requirements. This SR is modified by a Note that allows entry into and operation in MODE 3 prior to performing the SR. This allows a delay of testing until MODE 3, in order to establish conditions consistent with those under which the acceptance criterion was generated.
REFERENCES 1. UFSAR, Section 10.3.
- 2. CESSAR, Section 6.2.
- 3. UFSAR, Section 15.1.5.
- 4. 10 CFR 100.11.
- 5. ASME, Boiler and Pressure Vessel Code,Section X!,
Inservice Tnspectien, Article !W..r 3,00. UFSAR, Sd*i*on 5.1.5.~
PALO VERDE UNITS 1,2,3 B 3.7.2-9 REVISION 4G
MFIVs B 3.7.3 BASES (continued)
SURVEILLANCE SR 3.7.3.1 REQUIREMENTS This SR ve~rifies that closure tim~e ensures the actuation of each MFIV is < 9.6 seco-mnds, Wihntelmtgvni Reference 2 on an actual or simulated actuation signal. --- The MFJV closure time is anid is with*f*that assumed in the accident and containment analyses. ThisSR alaso verifies th av louetm is in accordance~ wihteInev Testing Program. This Su e*illa SR is normally performed upon returning the unit to operation following a refueling outage. The MFIVs should not be full stroke tested at power.
The Frequency is in accordance with the Inservice Testing Program. The Frequency for valve closure time is based on the refueling cycle. Operating experience has shown that these components usually pass the SR when performed at the specified Frequency.
REFERENCES 1. UFSAR, Section 10.4.7.
- 2. Q2<JFSAR, Section" .1.5.i PALO VERDE UNITS 1,2,3 B 3.7.3-5 REVISION G