Tech Spec Pages for Errata to Amendment No. 162, Dated October 31, 2006 Changes to Security Plan
ML063190545
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 11/14/2006
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Fields M, NRR/DORL/LP4, 415-3062
References
TAC MC9158
Download: ML063190545 (2)


Text

(1) Maximum Power Level Arizona Public Service Company (APS) is authorized to operate the facility at reactor core power levels not in excess of 3876 megawatts thermal (100% power) through operating cycle 13, and 3990 megawatts thermal (100% power) after operating cycle 13, in accordance with the conditions specified herein.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 162, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

(3) Antitrust Conditions This license is subject to the antitrust conditions delineated in Appendix C to this license.

(4) Initial Test Program (Section 14, SER and SSER 2)

Deleted (5) Additional Conditions Deleted D. APS has previously been granted an exemption from Paragraph IIl.D.2(b)(ii) of Appendix J to 10 CFR Part 50. This exemption was previously granted in Facility Operating License NPF-65 pursuant to 10 CFR 50.12.

With the granting of this exemption, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E. The licensees shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palo Amendment No. 162

Verde Nuclear Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program Revision 2," submitted by letter dated September 29, 2005.

F. APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision:

APS may make changes to the approved fire protection program without approval of the Commission only if those changes would not adversely affect the ability'to achieve and maintain safe shutdown in the event of a fire.

G. Deleted H. The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims; and I. This license is effective as of the date of issuance and shall expire at midnight on November 25, 2027.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By Thomas E. Murley, Director Office of Nuclear Reactor Regulation Attachments:

1. [Requirements for Initial Mode 1 Entry] - Deleted
2. Appendix A -

Technical Specifications

3. Appendix B -

Environmental Protection Plan

4. Appendix C -

Antitrust Conditions

5. Appendix D - [Additional Conditions] - Deleted Date of Issuance: November 25, 1987 Amendment No. 83, 87, 42-8, 44-7, 45, 162 Revised by letter dated September 29, 2005