MONTHYEARML0627603672006-09-26026 September 2006 Application for Technical Specification Change Regarding Main Steam Isolation Valves (LCO 3.7.2) Project stage: Request ML0627006322006-09-28028 September 2006 Operating Station, Units 1, 2, and 3 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Sign. Hazards Consideration Determination, & Opportunity for a Hearing (TAC MD3066/3067/3068) Project stage: Other ML0631903232006-11-0303 November 2006 Supplement to Application for Technical Specification Change Regarding Main Steam Isolation Valves Project stage: Supplement ML0632400492006-11-17017 November 2006 Technical Specifications - Issuance of Amendments 163, 163, and 163, Revise TS 3.7.2, Main Steam Isolation Valves (Msivs), to Include Specific Requirements Project stage: Approval ML0631105052006-11-17017 November 2006 Issuance of Amendments 163, 163, and 163, Revise TS 3.7.2, Main Steam Isolation Valves (Msivs), to Include Specific Requirements for the MSIV Actuator Trains Project stage: Approval 2006-11-03
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A ML22334A0702022-12-15015 December 2022 Issuance of Amendment Nos. 220, 220, and 220, to Revise Technical Specifications to Adopt TSTF-487, Relocate DNB Parameters to the COLR ML22343A1152022-12-0909 December 2022 Transmittal of Technical Specification Bases Revision 75 ML22341A6132022-12-0707 December 2022 Application to Revise Technical Specifications to Adopt TSTF-107- a, Separate Control Rods That Are Untrippable Versus Inoperable ML22178A0042022-08-11011 August 2022 Issuance of Amendment Nos. 219, 219, and 219, to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump Ts to Address GSI-191 Issues ML20350B8032021-02-0808 February 2021 Issuance of Amendment Nos. 214, 214, and 214 to Make Administrative Changes to the Technical Specifications ML17254A4992017-09-27027 September 2017 Issuance of Amendment Nos. 204, 204, and 204 to Modify the Completion Date for Implementation of Milestone 8 of the Cyber Security Plan ML16358A6762016-12-23023 December 2016 Issuance of Amendment No. 199, Request for One-Time Extension of the Diesel Generator Completion Time (Emergency Circumstances) ML16004A0132016-02-19019 February 2016 Issuance of Amendment No. 197, 197, and 197, Adopt Technical Specification Task Force Traveler TSTF-439-A, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML16043A3612016-01-29029 January 2016 Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis ML15266A0052015-09-25025 September 2015 Issuance of Amendment No. 196, Revise Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 (Exigent Circumstances) ML15247A5182015-09-0404 September 2015 Exigent License Amendment Request to Amend Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 ML15070A1242015-03-30030 March 2015 Issuance of Amendment Nos. 195, 195, and 195, Adopt TSTF-486, Revision 2, Revise Mtc Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011) and TSTF-406, Revision 2 ML15065A0312015-02-27027 February 2015 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-439-A, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML14202A3782014-09-0909 September 2014 Issuance of Amendment Nos. 194, 194, and 194, Request to Revise TS 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip (TAC Nos. MF2879-81) ML14115A0452014-06-25025 June 2014 Issuance of Amendment Nos. 193, 193, and 193, Adopt Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML13294A5762013-11-25025 November 2013 Issuance of Amendment Nos. 192, 192, and 192, Adopt TSTF-490, Revision 0, Deletion of E-Bar Definition and Revision to RCS Specific Activity Technical Specifications ML13217A0562013-07-0303 July 2013 Enclosure 1 - Technical Requirements Manual, Revision 58 ML13217A0572013-07-0303 July 2013 Enclosure 1 - Technical Requirements Manual, Revision 58 ML1126202932011-12-15015 December 2011 Issuance of Amendment Nos. 188, 188, and 188, Adoption of TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b ML12193A0442011-11-17017 November 2011 Technical Requirements Manual, Revision 56, Replacement Pages and Insertion Instructions ML11287A0322011-09-0101 September 2011 Technical Requirements Manual, Revision 55 ML11287A0312011-09-0101 September 2011 Technical Requirements Manual (TRM) Revision 55 ML0531100452011-04-21021 April 2011 Current Facility Operating License NPF-41, Tech Specs, Revised 09/28/2017 ML11098A0012011-04-21021 April 2011 Appendices a, B, C, and D - Palo Verde Nuclear Generating Station, Unit 3 ML1108719552011-04-21021 April 2011 License Renewal - Appendices a, B, C, and D to the Renewed Operating License for Unit 1 (NPF-41) ML11098A0002011-04-21021 April 2011 Appendices a, B, C, and D - Palo Verde Nuclear Generating Station, Unit 2 ML1108802752011-03-29029 March 2011 Revised Technical Specifications from March 29, 2011 Pre-Licensing Meeting with Arizona Public Service Company to Discuss Potential Submittal of a License Amendment Request to Revise TS Pages ML1106107622011-01-26026 January 2011 PVNGS Insertion Instructions for Technical Specifications Bases Changed Pages, Revision 54 ML1012602112010-09-10010 September 2010 Issuance of Amendment Nos. 179, 179, and 179, Revise License Condition for Maximum Power Level and Miscellaneous Technical Specification Changes ML1013102242010-04-29029 April 2010 Request for Amendment to Technical Specification 5.5.8, Inservice Testing Program ML1013103962010-04-29029 April 2010 Application for Technical Specification Change TSTF-491, Removal of the Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using the Consolidated Line Item Improvement Process ML1013102252010-04-29029 April 2010 Supplement to Amendment Request Associated with Administrative Changes - New Retyped Technical Specification Page ML1005600232010-02-24024 February 2010 Response to Request for Updated Technical Specification Page ML1006400942010-02-23023 February 2010 Response to Request for Updated Technical Specification Page ML0934504852009-11-30030 November 2009 Request for Amendment to TS Table 3.3.5-1,Engineered Safety Features Actuation System Instrumentation, and Figure 3.5.5-1, Minimum Required Refueling Water Tank (RWT) Volume & Supporting Changes ML0906410142009-02-19019 February 2009 Request for Technical Specification Amendment and Exemption from 10 CFR 50, Appendix G, to Relocate the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection Enable Temperatures ML0802500682008-01-17017 January 2008 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0733811392007-11-28028 November 2007 Inservice Inspection Program, Third Interval - Snubber Program ML0719401202007-07-25025 July 2007 Technical Specifications, Revised Shutdown Control Element Assembly Insertion Limits ML0710603712007-05-16016 May 2007 Technical Specifications, Issuance of Amendment Nos. 167, 167, and 167 AC Sources - Operating Surveillance Requirements ML0709400842007-03-23023 March 2007 Special Report 3-SR-2006-001-01, 12th Refueling Outage, Steam Generator Eddy Current Examination ML0707801552007-03-0808 March 2007 Revision to Request for Amendment to Diesel Generator Technical Specification Surveillance Requirements 3.8.1.9, 3.8.1.10, and 3.8.1.14 ML0704702872007-02-22022 February 2007 Technical Specification Pages - Amendment Nos. 166, 166, and 166 Containment Isolation Valves ML0703500422007-02-21021 February 2007 Technical Specification, Amendment Nos. 165, 165, & 165 - Increased Flexibility in Mode Restraints (TAC Nos. MD3153, MD3154, & MD3155) ML0703901032007-01-25025 January 2007 Response to NRC Request for Additional Information Regarding Request for Amendment to Technical Specification Surveillance Requirements 3.8.1.9, 3.8.1.10, and 3.8.1.14 ML0633905302006-12-0505 December 2006 Tech Spec Pages for Amendments 164, 164, and 164 Extended Allowed Outage Time for Emergency Diesel Generators ML0632400492006-11-17017 November 2006 Technical Specifications - Issuance of Amendments 163, 163, and 163, Revise TS 3.7.2, Main Steam Isolation Valves (Msivs), to Include Specific Requirements ML0631905452006-11-14014 November 2006 Tech Spec Pages for Errata to Amendment No. 162, Dated October 31, 2006 Changes to Security Plan ML0628401112006-10-31031 October 2006 Technical Specification - License Pages - Issuance of Amendment 162 Changes to Security Plan 2024-06-14
[Table view] |
Text
(2) Technical Specifications and Environmental Protection Plan
, The Technical Specifications contained in Appendix A, as revised through Amendment No. 163, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
(3) Antitrust Conditions This license is subject to the antitrust conditions delineated in' Appendix C to this license.
(4) Operating Staff Experience Requirements Deleted (5) Post-FueI-Loading Initial Test Program (Section 14, SER and SSER 2)"
Deleted (6) Environmental Qualification Deleted (7) Fire Protection Program APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision:
APS may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(8) Emergency Preparedness Deleted The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
Amendment No. 163
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 163, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
(3) Antitrust Conditions This license is subject to the antitrust conditions delineated in Appendix C to this license.
(4) Operating Staff Experience Requirements (Section 13.1.2, SSER 9)
Deleted (5) Initial Test Program (Section 14, SER and SSER 2)
Deleted (6) Fire Protection Program APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision:
APS may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(7) Inservice Inspection Program (Sections 5.2.4 and 6.6, SER and SSER 9_)
Deleted (8) Supplement No. 1 to NUREG-0737 Requirements Deleted The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
Amendment No. 163
(1) Maximum Power Level Arizona Public Service Company (APS) is authorized to operate the facility-at reactor core power levels not in excess of 3876 megawatts thermal (100% power) through operating cycle 13, and 3990 megawatts thermal (100% power) after operating cycle 13, in accordance with the conditions specified herein.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 163, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. APS shall operate the -facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
(3) Antitrust Conditions This license is subject to the antitrust conditions delineated in Appendix C to this license.
(4) Initial Test Program (Section 14, SER and SSER 2)
Deleted (5) Additional Conditions Deleted D. APS has previously been.granted an exemption from Paragraph III.D.2(b)(ii) of Appendix J to 10 CFR Part 50. This exemption was previously granted in Facility Operating License NPF-65 pursuant to 10 CFR 50.12.
With the granting of this exemption, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E. The licensees shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palo Amendment No. 163
MSIVs 3.7.2 3.7 PLANT SYS"T*EMS 3.7.2 Main Steam Isolation Valves (MSIVs)
LCO 3.7.2 Four MSIVs and their associated actuator trains shall be OPERABLE.
APPLICABILITY: MODE 1, MODES 2, 3, and 4 except when all MSIVs are closed and deactivated.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One MSIV with a single A.1 Restore MSIV actuator 7 days actuator train train to OPERABLE status inoperable.
B. Two MSIVs each with a B.1 Restore one MSIV actuator 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> single actuator.train train to OPERABLE status inoperable such that the inoperable trains are not in the same instrumentation train.
C.. Two MSIVs each with a C.1 Restore one MSIV actuator 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> single actuator train train to OPERABLE status inoperable and both inoperable actuator
.trains are in the same instrumentation train.
D. Two actuator trains D.1 Declare the affected MSIV Immediately for one MSIV inoperable.
inoperable.
(continued)
PALO VERDE UNITS 1,2,3 3.7.2-1 AMENDMENT N0.4159,' 163
MSIVs 3.7.2 ACTIONS (continued)
CONDITION* REQUIRED ACTION COMPLETION TIME E. Three or more MSIV E.1 Declare each affected Immediately actuator trains MSIV inoperable.
inoperable.
OR Required Action and associated Completion Time of Condition A, B, or C not met.
F. One MSIV inoperable in F.1 Restore MSIV to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> MODE 1. OPERABLE status.
G. Required Action and G.1 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Associated Completion Time of Condition F not met.
H. -------- NOTE--------
Separate Condition H.1 Close MSIV. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> I entry is allowed for each MSIV.
AND H.2 Verify MSIV is I
Once per 7 days closed.
One or more MSIVs inoperable in MODE 2, 3, or 4..
I. Required Action and 1.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition H AND not met.
1.2 . Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I PALO VERDE UNITS 1,2.3 3.7.2-2 AMENDMENT NO. 163
MSIVs 3.7.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1 ----------------- NOTE---------------
Not required to be performed prior to entry into MODE 3.
Verify closure time of each MSIV is In accordance
< 4.6seconds with each actuator train on with the an actual or simulated actuation signal. Inservice Testing Program PALO VERDE UNITS 1,2,3 3.7.2-3 AMENDMENT NO. 163