ML11098A000

From kanterella
Jump to navigation Jump to search
Appendices a, B, C, and D - Palo Verde Nuclear Generating Station, Unit 2
ML11098A000
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/21/2011
From: Lisa Regner
License Renewal Projects Branch 2
To:
Regner, Lisa M. NRR/DLR/RPB2, 415-1427
Shared Package
ML110800448 List:
References
Download: ML11098A000 (5)


Text

Appendix A: Technical Specifications Palo Verde, Unit 2, uses the same Appendix A as Palo Verde, Unit 1. Please refer to Palo Verde, Unit 1, for Appendix A (ML110871955).

Appendix B: Environmental Protection Plan Palo Verde, Unit 2, uses the same Appendix B as Palo Verde, Unit 1. Please refer to Palo Verde, Unit 1, for Appendix B (ML110871955).

tfCBNiE *A,UTHOR1,-:y, FILE COP" 00 "NOTREMOVf APRIL 1986 APPENDIX C ANTITRUST CONDITIONS lICENSE NO. NPF~51 Arizona Public Service Company and the Salt River Project Agricultural Improvement and Power District shall comply with the following antitrust conditions:

1. In connection with the antitrust conditions, the following definitions are used herein:

A. "Bulk Power ll means the electric power, and any attendant energy, supplied or made available at transmission or subtransmission voltage by one entity to another.

B. "Entity" means a person, private or public corporation, a municipality, a cooperative, an association, a joint stock association or business trust owning, operating or proposing 1n good faith to own or operate equipment or facilities for the generation, transmission or distribution of electricity to or for the public as a utility.

c. "Joint Applicant(s)" means the Arizona Public Service Company and the Salt River Project Agricultural Improvement and Power District.
2. A. Each Joint Applicant will transmit Bulk Power over its transmission system, between or among two or more Entities with which it is interconnected, or will be interconnected in the future, without restrictions on use or resale of the power so transmitted, provided that such services can reasonably be accommodated from a technical standpoint without impairing each Joint Applicantls reliability or its own use of its facilities.

B. Each Joint Applicant is obligated under this condition to transmit 8ulk Power on the terms stated above, and in connection with each joint applicant's plan to construct new transmission facilities for its own use, to include in its planning and construction program sufficient transmission capacity for such Bulk Power transactions, provided that such applicant'has received sufficient advance notice as may be necessary from a technical standpoint to accommodate the requirements of any requesting entity, and further provided that such entity(ies) are obligated as may be agreed {i} to share the capital, operating and maintenance costs

'of such ne\'{ transmission facil ities to the extent that additional costs burdens would be imposed on such Joint Applicant or (ii) to compensate the Joint Applicant fully for the use of its system.

- 2

3. The foregoing shall be implemented in a manner consistent with the provisions of the Federal Power Act as applicable and all rates, charges or practices in connection herewith are to be subject to the approval of regulatory agencies having jurisdiction over them.

I

Appendix D: Additional Conditions Palo Verde, Unit 2, uses the same Appendix D as Palo Verde, Unit 1. Please refer to Palo Verde, Unit 1, for Appendix D (ML110871955).