Technical Specification - License Pages - Issuance of Amendment 162 Changes to Security Plan
ML062840111
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/31/2006
From: Fields M
NRC/NRR/ADRO/DORL/LPLIV
To: James M. Levine
Arizona Public Service Co
Fields, M B, NRR/DORL/LPL4, 415-3062
Shared Package
ML062840116 List:
References
TAC MC9156, TAC MC9157, TAC MC9158
Download: ML062840111 (3)


Text

(9) Results of Piping Vibration Test Program (Section 3.9.2, SER)

Deleted (10) Response to Salem ATWS Event (Section 7.2, SSER 7, and Section 1.11, SSER 8)

Deleted (11) Supplement No. 1 to NUREG-0737 Requirements Deleted (12) Radiochemistry Laboratoy (Section 7.3.1.5(3), Emergency Plan)

Deleted (13) RCP Shaft Vibration Monitoring Program (Section 5.4.1, SSER 12)

Deleted (14) Additional Conditions Deleted D. The facility requires an exemption from Paragraph III.D.2(b)(ii) of Appendix J to 10 CFR Part 50 (Section 6.2.6, SSER 7). This exemption is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest. This exemption is, therefore, hereby granted pursuant to 10 CFR 50.12. With the granting of this exemption, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E. The licensees shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palo Verde Nuclear Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program Revision 2, submitted by letter dated September 29, 2005.

Amendment No. 32, 33, 84, 111, 115, 128 162 Revised by letter dated September 29, 2005

(9) Additional Conditions Deleted D. (1) APS has previously been granted an exemption from Paragraph III.D.2(b)(ii) of Appendix J to 10 CFR Part 50. This exemption was previously granted in Facility Operating License NPF-46 pursuant to 10 CFR 50.12.

(2) Deleted With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E. The licensees shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palo Verde Nuclear Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program Revision 2, submitted by letter dated September 29, 2005.

F. Deleted Amendment No. 103, 108, 128 162 Revised by letter dated September 29, 2005

(1) Maximum Power Level Arizona Public Service Company (APS) is authorized to operate the facility at reactor core power levels not in excess of 3876 megawatts thermal (100% power) in accordance with the conditions specified herein.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. , and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

(3) Antitrust Conditions This license is subject to the antitrust conditions delineated in Appendix C to this license.

(4) Initial Test Program (Section 14, SER and SSER 2)

Deleted (5) Additional Conditions Deleted D. APS has previously been granted an exemption from Paragraph III.D.2(b)(ii) of Appendix J to 10 CFR Part 50. This exemption was previously granted in Facility Operating License NPF-65 pursuant to 10 CFR 50.12.

With the granting of this exemption, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E.

The licensees shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palo Verde Nuclear Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program Revision 2, submitted by letter dated September 29, 2005.

Amendment No. 80, 83, 128 162 Revised by letter dated September 29, 2005