ML070350042

From kanterella
Jump to navigation Jump to search

Technical Specification, Amendment Nos. 165, 165, & 165 - Increased Flexibility in Mode Restraints (TAC Nos. MD3153, MD3154, & MD3155)
ML070350042
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/21/2007
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Arizona Public Service Co
Markley, M T, NRR/DORL/LP4, 301-415-5723
Shared Package
ML070350039 List:
References
TAC MD3153, TAC MD3154, TAC MD3155
Download: ML070350042 (24)


Text

Frequency 1.4 1.4 Frequency EXAMPLES EXAMPLE 1.4-1 (continued)

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Example 1.4-1 contains the type of SR most often encountered in the Technical Specifications (TS). The Frequency specifies an interval (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) during which the associated Surveillance must be performed at least one time.

Performance of the Surveillance initiates the subsequent interval. Although the Frequency is stated as 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, an extension of the time interval to 1.25 times the stated Frequency is allowed by SR 3.0.2 for operational flexibility. The measurement of this interval continues at all times, even when the SR is not required to be met per SR 3.0.1 (such as when the equipment is inoperable, a variable is outside specified limits, or the unit is outside the Applicability of the LCO). If the interval specified by SR 3.0.2 is exceeded while the unit is in a MODE or other specified condition in the Applicability of the LCO. and the performance of the Surveillance is not otherwise modified (refer to Example 1.4-3), then SR 3.0.3 becomes applicable.

If the interval as specified by SR 3.0.2 is exceeded while the unit is not in a MODE or other specified condition in the Applicability of the LCO for which performance of the SR is required, then SR 3.0.4 becomes applicable. The Surveillance must be performed within the Frequency requirements of SR 3.0.2 prior to entry into the MODE or other specified condition, as modified by SR 3.0.3, or the LCO is considered not met (in accordance with SR 3.0.1) and LCO 3.0.4 becomes applicable.

(continued)

PALO VERDE UNITS 1.2,3 i1.4-2 AMENDMENT NO. 44-ý, 165

LCO Applicabi iity 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2 and LCO 3.0.7.

LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.

LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within I hour to place the unit, as applicable, in:

a. MODE 3 within 7 hour8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />s:
b. MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Exceptions to this Specification are stated in the individual Specifications.

Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.

LCO 3.0.3 is only applicable in MODES 1. 2, 3, and 4.

LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time:

(continued)

PALO VERDE UNITS 1,2,3 3.0-1 AMENDMENT NO. 444, 165

LCO Applicability S3.0 3.0 LCO APPLICABILITY LCO 3.0.4 b. After performance of a risk assessment addressing (conti nued) inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or

c. When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

[CO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.

LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered. Only the support system LCO ACTIONS are required to be entered. This is an exception to LCO 3.0.2 for the supported system. In this event, an evaluation shall be performed in accordance with Specification 5.5.15, "Safety Function Determination Program (SFDP)." If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions-of the LCO in which the loss of safety function exists are required to be entered, (continued)

PALO VERDE UNITS 1,2,3302AMN 3.0-2 ETNO AMENDMENT 4-4 165 NO. 44-ý, 16

SR Applicability 3.0 3.0 SR APPLICABILITY SR 3.0.3 When the Surveillance is performed within the delay period (continued) and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4. This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

PALO VERDE UNITS 1,2,3 3.0-5 AMENDMENT NO. 11-ý, 165

RPS Instrumentation - Operating (Before CPC Upgrade) 3.3.1 3.3 INSTRUMENTATION 3.3.1 Reactor Protective System (RPS) Instrumentation- Operating LCO 3.3.1 Four RPS trip and bypass removal channels for each Function in Table 3.3.1-1 shall be OPERABLE.

APPLICABILITY: According to Table 3.3.1-1. (Before CPC Upgrade)

ACTIONS


NOTE -------------------------

Separate Condition entry is allowed for each RPS Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Place channel in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with one automatic RPS bypass or trip.

trip channel inoperable. AND A.2 Restore channel to Prior to OPERABLE status. entering MODE 2 following next MODE 5 entry B. One or more Functions B.1 Place one channel in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with two automatic RPS bypass and the other trip channels in trip.

inoperable.

(continued)

PALO VERDE UNITS 1,2,3 3.3.1-1 AMENDMENT NO. !-54, 165

RPS Instrumentation - Operating (Before CPC Upgrade) 3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. One or more Functions C.1 Disable bypass I hour with one automatic channel, bypass removal channel inoperable. OR C.2.1 Place affected I hour automatic trip channel in bypass or trip.

AND C.2.2 Restore bypass Prior to removal channel and entering MODE 2 associated automatic following next trip channel to MODE 5.entry OPERABLE status.

D. One or more Functions D.1 Disable bypass 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with two automatic channels.

bypass removal channels inoperable. OR D.2 Place one affected I hour automatic trip channel in bypass and place the other in trip.

E. One or more core E.1 Perform CHANNEL 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> protection calculator FUNCTIONAL TEST on (CPC) channels with a affected CPC.

cabinet high temperature alarm.

(continued)

PALO VERDE UNITS 1.2.3 3.3.1-2 AMENDMENT NO. -ý99, 165

RPS Instrumentation - Operating (After CPC Upgrade) 3.3.1 3.3 INSTRUMENTATION 3.3.1 Reactor Protective System (RPS) Instrumentation - Operating LCO 3.3.1 Four RPS trip and bypass removal channels for each Function in Table 3.3.1-1 shall be OPERABLE.

APPLICABILITY: According to Table 3.3.1-1. (After CPC Upgrade)

ACTIONS


NOTE ---------------------------

Separate Condition entry is allowed for each RPS Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Place channel in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with one automatic RPS bypass or trip.

trip channel inoperable. AND A.2 Restore channel to Prior to OPERABLE status. entering MODE 2 following next MODE 5 entry B. One or more Functions B.1 Place one channel in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with two automatic RPS bypass and the other trip channels in trip.

inoperable (continued)

PALO VERDE UNITS 1,2,3 3.3.1-11 AMENDMENT NO. --50, 165

RPS Instrumentation - Operating (After CPC Upgrade) 3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. One or more Functions C.1 Disable bypass 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with one automatic channel.

bypass removal channel inoperable. OR C.2.1 Place affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> automatic trip channel in bypass or trip.

AND C.2.2 Restore bypass Prior to removal channel and entering MODE 2 associated automatic following next trip channel to MODE. 5 entry OPERABLE status.

D. One or more Functions D.1 Disable bypass 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with two automatic channels.

bypass removal channel s inoperable.

OR D.2 Place one affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> automatic trip channel in bypass and place the other in trip.

E. Required Action and E.1 Be in MODE 3 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

(continued)

PALO VERDE UNITS 1,2,3 3.3.1-12 AMENDMENT NO. 4-&4, 165

RPS Instrumentation - Shutdown 3.3.2 3.3 INSTRUMENTATION 3.3.2 Reactor Protective System (RPS) Instrumentation - Shutdown LCO 3.3.2 Four RPS trip and bypass removal channels for each Function in Table 3.3.2-1 shall be OPERABLE.

APPLICABILITY: According to Table 3.3.2-1.

ACTIONS


NOTE ------------------------- ------------

Separate condition entry is-allowed for each RPS Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more functions A.1 Place channel in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with one automatic RPS bypass or trip.

trip channel inoperable. AND A.2 Restore channel to Prior to OPERABLE status, entering MODE 2 following next MODE 5 entry B. One or more functions B.1 Place one channel in I hour with two automatic RPS bypass and place the trip channels other in trip.

inoperable.

(continued)

PALO VERDE UNITS 1,2,3 3.3.2-1 AMENDMENT NO. 4-14, 165

RPS Instrumentation - Shutdown 3.3.2 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. One or more functions C.1 Disable bypass 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with one automatic channel.

bypass removal channel inoperable. OR C.2.1 Place affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> channel in bypass or trip.

AND C.2.2 Restore bypass Prior to removal channel and entering MODE 2 associated automatic following next trip channel to MODE 5 entry OPERABLE status.

D. One or more functions D.1 Disable bypass I hour with two automatic channels.

bypass removal channels inoperable. OR D.2 Place one affected I hour automatic trip channel bypass and place the other in trip.

E. Required Action and E.1 Open all RTCBs. I hour associated Completion Time not met.

PALO VERDE UNITS 1,2,3 3.3.2-2 AMENDMENT NO. , 165

ESFAS Instrumentation 3.3.5 3.3 INSTRUMENTATION 3.3.5 Engineered Safety Features Actuation System (ESFAS) Instrumentation-LCO 3.3.5 Four ESFAS trip and bypass removal channels for each Function in Table 3,3.5-1 shall be OPERABLE.

APPLICABILITY: According to Table 3.3.5-1.

ACTIONS


NOTE- ----------------------------

Separate Condition entry is allowed for each ESFAS Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Place channel in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with one automatic bypass or trip.

ESFAS trip channel inoperable. AND A.2 Restore channel to Prior to OPERABLE status. entering MODE 2 following next MODE .5entry B. One or more Functions B.1 Place one channel in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with two automatic bypass and the other ESFAS trip channels in trip.

inoperable.

(continued)

PALO VERDE UNITS 1,2.3 3.3.5-1 AMENDMENT NO. 4 165

ESFAS Instrumentation 3.3.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. One or more Functions C.1 Disable bypass I hour with one automatic channel.

bypass removal channel inoperable. OR C.2.1 Place affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> automatic trip channel in bypass or trip.

AND C.2.2 Restore bypass Prior to removal channel and entering MODE 2 associated automatic following next trip channel to MODE 5 entry OPERABLE status.

D. One or more Functions D.1 Disable bypass 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with two automatic channels.

bypass removal channels inoperable. OR D.2 Place one affected I hour automatic trip channel in bypass and place the other in trip.

E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND E.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> PALO VERDE UNITS 1,2,3 3.3.5-2 AMENDMENT NO. 4---, 165

DG - LOVS 3.3.7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Two LOVS channels per B.1 Enter applicable 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> DG inoperable. Conditions and Required Actions for the associated DG made inoperable by DG - LOVS instrumentation.

OR B.2 Place one channel in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> bypass and the other channel in trip.

C. More than two LOVS C.1 Restore all but two I hour channels per DG channels to OPERABLE inoperable, status.

D. Required Action and D.1 Enter applicable Immediately associated Completion Conditions and Time not met. Required Actions for the associated DG made inoperable by DG - LOVS instrumentation.

PALO VERDE UNITS 1.2,3 3.3.7-2 AMENDMENT NO. 444, 165

PAM Instrumentation 3.3,10 3.3 INSTRUMENTATION 3.3.10 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.10 The PAM instrumentation for each Function in Table 3.3.10-1 shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS


NOTE ----------------------------

Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required 30 days with one required channel to OPERABLE channel inoperable, status.

B. Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A Specification 5.6.6.

not met.

C. --------- NOTE --------- C.1 Restore one channel 7 days Not applicable to to OPERABLE status.

hydrogen monitor channels.

One or more Functions with two required channels inoperable.

(continued)

PALO VERDE UNITS 1,2,3 3.3.10-1 AMENDMENT NO. 4;-1,165

Remote Shutdown System 3.3.11 3.3 INSTRUMENTATION 3.3.11 Remote Shutdown System LCO 3.3.11 The Remote Shutdown System Instrumentation Functions in Table 3,3.11-1 and each Remote Shutdown System disconnect switch and control circuit shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS


NOTE --------------------------

Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore required 30days Functions in Table Functions to OPERABLE 3.3.11.1 inoperable, status.

B. One or more remote B.1 Restore required 30 days shutdown system switch(s)/circuit(s) disconnect switches or to OPERABLE status control circuits inoperable. OR B.2 Issue procedure 30 days changes that identify alternate disconnect methods or control circuits C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> PALO VERDE UNITS 1,2,3 3.3.11-1 AMENDMENT NO. -, 165

LTOP System 3.4.13 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.13 Low Temperature Overpressure Protection (LTOP) System LCO 3.4.13 An LTOP System shall be OPERABLE consisting of:

a. Two OPERABLE Shutdown Cooling System suction line relief valves with lift settings 5 467 psig aligned to provide overpressure protection for the RCS; or
b. The RCS depressurized and an RCS vent of 16 square inches.

........................ NOTE ----------------------

No RCP shall be started unless the secondary side water temperature in each steam generator (SG) is 5 100 0 F above each of the RCS cold leg temperatures.

APPLICABILITY: MODE 4 when any RCS cold leg temperature is 5 214°F during cooldown, MODE 4 when any RCS cold leg temperature is S 291°F during heatup, MODE 5.

MODE 6 when the reactor vessel head is on.

-- NOTES- -------------------

1. When one or more cold legs reach 214 0 F.this LCO remains applicable during periods of steady state temperature

,conditions until all RCS cold leg temperature reach 291 0F. If a cooldown is terminated prior to reaching 214'F and a heatup is commenced, this LCO is applicable Until all RCS cold leg temperatures reach 291 0 F.

2. LCO 3.0.4.b is not applicable when entering MODE 4.

I ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.1 Restore required 7 days A. One required Shutdown Shutdown Cooling Cooling System suction System suction line line relief valve relief valve to inoperable in MODE 4. OPERABLE status.

(continued)

PALO VERDE UNITS 1,2,3 3.4.13-1 AMENDMENT NO. -1;4, 165

RCS Leakage Detection Instrumentation 3.4.16 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.16 RCS Leakage Detection Instrumentation LCO 3.4.16 Both of the following RCS leakage detection instrumentation shall be OPERABLE:

a. One containment sump monitor; and
b. One containment atmosphere radioactivity monitor (gaseous and particulate).

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required containment A.1 Perform SR 3.4.14.1. Once per sump monitor 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable. AND A.2 Restore containment 30 days sump monitor to OPERABLE status.

(conti nued)

PALO VERDE UNITS 1.2.334161AEDNT 3.4.16-1 O.b.15 AMENDMENT NO. 4-1-7. 165

RCS Leakage Detection Instrumentation 3.4.16 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Required. containment B.1.1 Analyze grab samples Once per

.atmosphere of the containment 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> radioactivity monitor atmosphere.

inoperable.

OR B.1.2 Perform SR 3.4.14.1. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND B.2 Restore required 30 days containment atmosphere radi oacti vi ty monitor to OPERABLE status.

C. Required Action and C.A Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> D. All required monitors 0.1 Enter LCO 3.0.3 Immediately inoperable.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.16.1 Perform CHANNEL CHECK of the required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> containment atmosphere radioactivity monitor.

SR 3.4.16.2 Perform CHANNEL FUNCTIONAL TEST of the 92 days required containment atmosphere radioactivity monitor.

(continued)

PALO VERDE UNITS 1,2,3 3.4.16-2 AMENDMENT NO. 44-ý, 165

RCS Specific Activity 3.4.17 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.17 RCS Specific Activity LCO 3.4.17 The specific activity Of the reactor coolant shall be within limits.

APPLICABILITY: MODES 1 and 2, MODE 3 with RCS cold leg temperature (ToCd) Ž 500'F.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. DOSE EQUIVALENT 1-131 ------------ NOTE--------

> 1.0 pCi/gm. LCO 3.0.4.c is applicable.

I A.1 Verify DOSE Once per EQUIVALENT 1-131 within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> the acceptable region of Figure 3.4.17-1.

AND A.2 Restore DOSE EQUIVALENT 1-131 to within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> limit.

(continued)

PALO VERDE UNITS 1,2.3 3.4.17-1 AMENDMENT NO. 44-ý. 165

ECCS - Shutdown 3.5.4 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.4 ECCS - Shutdown LCO 3.5.4 One High Pressure Safety Injection (HPSI) train shall be OPERABLE.

APPLICABILITY: MODE 3 with pressurizer pressure < 1837 psia and with RCS T, < 485 0 F.

MODE 4.

ACTIONS


NOTE -----------------------------

LCO 3.0.4.b is not applicable to ECCS High Pressure Safety Injection subsystem when entering MODE 4.

CONDITION REQUIRED ACTION COMPLETION TIME A. RequiredHPSI train A.1 Restore required HPSI 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable, train to OPERABLE status.

B. Required Action and B.1 Be in MODE 5. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.4.1 The following SRs are applicable: In accordance with applicable SR 3.5.3.1 SR 3.5.3:5 SRs SR 3.5.3.2 SR 3.5.3.7 SR 3.5.3.3 SR 3.5.3.8 SR 3.5.3.4 PALO VERDE UNITS 1.2.3 3.5.4-1 AMENDMENT NO. 4-4-, 165

Hydrogen Recombiners 3.6.7 3.6 CONTAINMENT SYSTEMS 3.6.7 Hydrogen Recombiners LCO 3.6.7 Two hydrogen recombiners shared among the three units shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS


NOTE -------------------------------------

All three PVNGS Units (Units 1, 2, and 3) shall simultaneously comply with the REQUIRED ACTION(s) when the shared portion of the hydrogen recombiner(s) is the cause of .a CONDITION.

CONDITION REQUIRED ACTION COMPLETION TIME A. One hydrogen A,1 Restore hydrogen 30 days recombiner inoperable. recombiner to OPERABLE status.

B. Two hydrogen B.1 Verify by 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> recombiners administrative means inoperable, that the hydrogen AND control function is maintained. Every. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> AND thereafter B.2 Restore one hydrogen 7 days recombiner to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

PALO VERDE UNITS 1.2,3 3.6.7-1 AMENDMENT NO. 1447, 165

ADVs 3.7.4 3.7 PLANT SYSTEMS 3.7.4 Atmospheric Dump Valves (ADVs)

LCO 3.7.4 One ADV line per steam generator shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, MODE 4 when steam generator is being relied upon for heat removal.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required ADV line A.1 Restore ADV line to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. OPERABLE status.

B. Two required ADV lines B.1 Restore one ADV line 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable, to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 4 without 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reliance on steam generator'for heat removal.

PALO VERDE UNITS 1.2.3 3.7.4-1 AMENDMENT NO. 4-14-, 165

AFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW) System LCO 3.7.5 Three AFW trains shall be OPERABLE.

......................... NOTE Only one AFW train, which includes a motor driven pump, is required to be OPERABLE in MODE 4.

APPLICABILITY: MODES 1, 2, and 3, MODE 4 when steam generator is relied upon for heat removal.

ACTIONS

-- NOTE -------------------------------------

LCO 3.0.4.b is not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A. One steam supply to A.1 Restore affected 7 days turbine driven AFW equipment to OPERABLE pump inoperable, status. AND OR 10 days from

-NOTE discovery of failure to Only applicable if meet the LCO MODE 2 has not been entered following refueling.

One turbine driven AFW pump inoperable in MODE 3 following refueling.

B. One AFW train B.1 Restore AFW train to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable for reasons OPERABLE status.

other than Condition A AND in MODE 1. 2, or 3.

10 days from discovery of failure to meet the LCO (continued)

PALO VERDE UNITS 1.2,3 3.7.5-1 AMENDMENT NO. 1-34, 165

AC Sources - Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources - Operating LCO 3.8.1 The following AC electrical sources shall be OPERABLE:

a. Two circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System:
b. Two diesel generators (DGs) each capable of supplying one train of the onsite Class 1E AC Electrical Power Distribution System; and
c. Automatic load sequencers for Train A and Train B.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS


NOTE ----------------------------------

LCO 3.0.4.b is not applicable to DGs.

CONDITION REQUIRED ACTION COMPLETION TIME A. One required offsite A.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> circuit inoperable, for required OPERABLE offsite AND circuit.

Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND A.2 Declare required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from feature(s) with no discovery of no offsite power offsite power to available inoperable one train when its redundant concurrent with required feature(s) inoperability of is inoperable, redundant required feature(s)

AND (continued)

PALO VERDE UNITS 1,2,3 3.8.1-1 AMENDMENT NO. 14-ý, 165