|
---|
Category:Fuel Cycle Reload Report
MONTHYEARW3F1-2023-0052, Core Operating Limits Report (COLR) - Cycle 26, Revision O2023-11-0707 November 2023 Core Operating Limits Report (COLR) - Cycle 26, Revision O ML22123A3322022-05-0303 May 2022 Core Operating Limits Report (COLR) - Cycle 25, Revision 0 W3F1-2020-0066, Core Operating Limits Report (COLR) - Cycle 24, Revision 22020-11-11011 November 2020 Core Operating Limits Report (COLR) - Cycle 24, Revision 2 W3F1-2020-0064, Core Operating Limits Report (COLR) - Cycle 24, Revision 12020-10-27027 October 2020 Core Operating Limits Report (COLR) - Cycle 24, Revision 1 W3F1-2020-0058, Core Operating Limits Report (COLR) - Cycle 24, Revision 02020-10-15015 October 2020 Core Operating Limits Report (COLR) - Cycle 24, Revision 0 W3F1-2019-0015, Core Operating Limits Report (COLR) - Cycle 23, Revision 12019-03-13013 March 2019 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 W3F1-2019-0014, Core Operating Limits Report-Cycle 23 Revision 02019-02-14014 February 2019 Core Operating Limits Report-Cycle 23 Revision 0 W3F1-2017-0045, Core Operating Limits Report - Cycle 22 Revision 02017-05-0909 May 2017 Core Operating Limits Report - Cycle 22 Revision 0 W3F1-2017-0034, Submittal of Core Operating Report for Cycle 21, Rev. 12017-04-0505 April 2017 Submittal of Core Operating Report for Cycle 21, Rev. 1 W3F1-2015-0088, Submits Core Operating Limits Report - Cycle 21 Revision 02015-11-18018 November 2015 Submits Core Operating Limits Report - Cycle 21 Revision 0 W3F1-2014-0047, Core Operating Limits Report - Cycle 20, Revision 12014-07-29029 July 2014 Core Operating Limits Report - Cycle 20, Revision 1 W3F1-2014-0033, Core Operating Limits Report Cycle 20 Revision 0, Waterford Steam Electric Station, Unit 32014-05-12012 May 2014 Core Operating Limits Report Cycle 20 Revision 0, Waterford Steam Electric Station, Unit 3 W3F1-2013-0074, Core Operating Limits Report - Cycle 19 Revision 22013-12-18018 December 2013 Core Operating Limits Report - Cycle 19 Revision 2 W3F1-2013-0026, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 18 / Refuel 182013-04-18018 April 2013 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 18 / Refuel 18 W3F1-2012-0103, Core Operating Limits Report - Cycle 19 Revision 02012-12-14014 December 2012 Core Operating Limits Report - Cycle 19 Revision 0 W3F1-2011-0084, Core Operating Limits Report - Cycle 18 Revision 02011-11-23023 November 2011 Core Operating Limits Report - Cycle 18 Revision 0 ML11229A0262011-08-10010 August 2011 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 17 / Refuel 17 W3F1-2009-0030, Response to Amendment Request NPF-38-276, Core Protection Calculator Power Calibration Adjustment Limit2009-06-30030 June 2009 Response to Amendment Request NPF-38-276, Core Protection Calculator Power Calibration Adjustment Limit W3F1-2008-0057, Startup Power Escalation Report for Cycle 162008-08-25025 August 2008 Startup Power Escalation Report for Cycle 16 W3F1-2008-0041, Core Operating Limits Report - Cycle 16 Revision 02008-05-20020 May 2008 Core Operating Limits Report - Cycle 16 Revision 0 W3F1-2006-0068, Core Operating Limits Report - Cycle 15 Revision 02006-12-14014 December 2006 Core Operating Limits Report - Cycle 15 Revision 0 W3F1-2006-0063, 10 CFR 50.46 Thirty-Day Report for Changes to the Plant Emergency Core Cooling System Performance Analysis2006-12-0606 December 2006 10 CFR 50.46 Thirty-Day Report for Changes to the Plant Emergency Core Cooling System Performance Analysis ML0513902172005-05-17017 May 2005 Core Operating Limits Report for Cycle 14, Revision 0 W3F1-2004-0022, Core Operating Limits Report - Cycle 13 Revision 1, Change 22004-04-19019 April 2004 Core Operating Limits Report - Cycle 13 Revision 1, Change 2 W3F1-2003-0097, Core Operating Limits Report, Cycle 13, Revision 1, Change 12003-11-20020 November 2003 Core Operating Limits Report, Cycle 13, Revision 1, Change 1 W3F1-2003-0094, Core Operating Limits Report, Cycle 13, Revision 12003-11-17017 November 2003 Core Operating Limits Report, Cycle 13, Revision 1 W3F1-2003-0086, Core Operating Limits Report - Cycle 13, Revision 02003-11-0505 November 2003 Core Operating Limits Report - Cycle 13, Revision 0 W3F1-2002-0064, Ses Startup and Power Escalation Report for Cycle 122002-07-12012 July 2002 Ses Startup and Power Escalation Report for Cycle 12 W3F1-2002-0034, Ses Core Operating Limits Report for Cycle 122002-04-0404 April 2002 Ses Core Operating Limits Report for Cycle 12 2023-11-07
[Table view] Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31
[Table view] |
Text
Entergy Nuclear South Entergy Operations, Inc.
17265 River Road
-ýEntergy Killona, LA 70057-3093 Tel 504 739 6685 Fax 504 739 6698 wsteelm@entergy.com William J. Steelman Licensing Manager Waterford 3 W3F1-2011-0068 August 10, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Submittal of Owner's Activity Report Form for Inservice Inspection Performed During Operating Cycle 17 / Refuel 17 Waterford Steam Electric Station, Unit 3 Docket No. 50-382 License No. NPF-38
Dear Sir or Madam:
Attached is the subject report which covers the Owner's Activity Report Form, OAR-i, for Waterford 3 Operating Cycle 17 / Refuel 17, enclosed as Attachment 1. This report is being submitted in accordance with ASME Code Case N-532-4, "Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission," which was adopted for use at Waterford 3 commencing with the new Ten-Year Inservice Inspection (ISI) interval on June 1, 2008.
The OAR-1 form is prepared and certified upon completion of each refueling outage and submitted within 90 calendar days of the completion of the refueling outage. This OAR-1 form provides: (1) a listing of items with flaws or relevant conditions that exceeded the acceptance criteria of Division 1 and that required evaluation to determine acceptability for continued service and (2) an abstract for repair/replacement activities that were required due to an item containing a flaw or relevant condition that exceeded Division 1 acceptance criteria. A copy of this letter and the attached report is also being submitted to the office of the Louisiana State Fire Marshall.
There are no new commitments contained in this submittal.
Please contact William J Steelman, Manager, Licensing at (504) 739-6685 should you have any questions regarding this submittal.
Sincerely, WJS/RJ P/ssf
Attachment:
- 1. Owner's Activity Report for Inservice Inspection Performed During Operating Cycle 17 / Refuel 17
/4bc17
W3F1 -2010-0023 Page 2 cc: Mr. Elmo E. Collins, Jr. RidsRgn4MailCenter@nrc.gov Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Marlone.Davis@nrc.gov Waterford Steam Electric Station Unit 3 Dean.Overland@nrc.gov P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Kaly.Kalyanam@nrc.gov Attn: Mr. N. Kalyanam Mail Stop O-07D1 Washington, DC 20555-0001 Mr. H. "Butch" Browning, Jr.
Office of the State Fire Marshall 8181 Independence Blvd.
Baton Rouge, LA 70806
ATTACHMENT 1 To W3FI-2011-0068 Owner's Activity Report for Inservice Inspection Performed During Operating Cycle 17/ Refuel 17
CASES OF ASME BOILER AND PRESSURE VESSEL CODE FORM OAR-1 OWNERS ACTIVITY REPORT Report Number Cycle 17/ Refuel 17 Plant Waterford Steam Electric Station, 17265 River Road, Killona, La. 70057 Unit No. 3 Commercial service date 09/24/1985 Refueling outage no. 17 (If applicable)
Current inspection interval 3rd (1',2"',3'~4"f, other)
Current inspection period 1st Edition and Addenda of Section Xl applicable to the Inspection plans 2001 Edition, Through 2003 Addenda Date and revision of inspection plans 6/22/2011 Revision 5 of CEP-ISI-104 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans Same as above.
Code Cases used: N-532-4, N-474-1 (If applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of Refuel 17 conform to the requirements of Section Xl. (refueling outage number)
Signed an4 or DieTt Date 91J0 II
~~ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Louisiana and employed by HSB CT of Hartford, CT have inspected the items described in this Owner's Activity Report and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in Accordance with the requirements of Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/
replacement activities and evaluation described in this report Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this Inspection.
"fr** Commissions LA 1184 (A, N, I) A,*o/, 1 Inspector's Signature National Board, State, Province, and Endorsements Date X- 6/
CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE I ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number C-B Nozzle-to-Top Head Dome Weld for SG#2 (ISI Reference C2.21 component 04-030) was not completed in the Second CR-WF3-2011-1748, ISI Program Interval as required by ASME Section Xl and CR-WF3-2010-00352 C-H Piping contained within the L-Wall pipe chase is Reference C7.10 identified as being inaccessible per the ASME CR-WF3-2011-5599 Section Xl Pressure Testing program at Waterford 3 and is therefore exempt from pressure testing. This was done through Revision 15 to NOECP-253 that incorporated a definition which clarified that removal of a portion of wall was a modification of a plant component and therefore inaccessible and exempt per the ASME Section Xl Code. The ANII has challenged this position based on previous inspection by removal of concrete and lead blocks (a portion of the L-wall) to gain access to this normally enclosed area. If removal of the wall is better characterized as a hardship rather than inaccessible, then the ASME Section Xl relief request process would need to be used. Drawings G763 and G765 Sheet 2 depict the portion of the L-wall that is constructed of blocks and has been removed.
CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Date Repair/Replacement Work Completed Plan Number SG MSG0001 Plug Identified 4/30/2011 Work Order HTEXCH Tubes 259182-01 SG MSG0002 Plug Identified 4/30/2011 Work Order HTEXCH Tubes 259183-01 1 SI MVAAA405 A Implement EC 4/27/2011 Work Order VALVE 14766 for SI-405A 231632-01 1 SI MVAAA405 B Implement EC 4/20/2011 Work Order VALVE 14767 for SI-405B 231633-01