Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 17 / Refuel 17
ML11229A026
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/10/2011
From: Steelman W
Entergy Nuclear South
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2011-0068
Download: ML11229A026 (6)


Text

Entergy Nuclear South Entergy Operations, Inc.

17265 River Road

-ýEntergy Killona, LA 70057-3093 Tel 504 739 6685 Fax 504 739 6698 wsteelm@entergy.com William J. Steelman Licensing Manager Waterford 3 W3F1-2011-0068 August 10, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Submittal of Owner's Activity Report Form for Inservice Inspection Performed During Operating Cycle 17 / Refuel 17 Waterford Steam Electric Station, Unit 3 Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

Attached is the subject report which covers the Owner's Activity Report Form, OAR-i, for Waterford 3 Operating Cycle 17 / Refuel 17, enclosed as Attachment 1. This report is being submitted in accordance with ASME Code Case N-532-4, "Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission," which was adopted for use at Waterford 3 commencing with the new Ten-Year Inservice Inspection (ISI) interval on June 1, 2008.

The OAR-1 form is prepared and certified upon completion of each refueling outage and submitted within 90 calendar days of the completion of the refueling outage. This OAR-1 form provides: (1) a listing of items with flaws or relevant conditions that exceeded the acceptance criteria of Division 1 and that required evaluation to determine acceptability for continued service and (2) an abstract for repair/replacement activities that were required due to an item containing a flaw or relevant condition that exceeded Division 1 acceptance criteria. A copy of this letter and the attached report is also being submitted to the office of the Louisiana State Fire Marshall.

There are no new commitments contained in this submittal.

Please contact William J Steelman, Manager, Licensing at (504) 739-6685 should you have any questions regarding this submittal.

Sincerely, WJS/RJ P/ssf

Attachment:

1. Owner's Activity Report for Inservice Inspection Performed During Operating Cycle 17 / Refuel 17

/4bc17

W3F1 -2010-0023 Page 2 cc: Mr. Elmo E. Collins, Jr. RidsRgn4MailCenter@nrc.gov Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Marlone.Davis@nrc.gov Waterford Steam Electric Station Unit 3 Dean.Overland@nrc.gov P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Kaly.Kalyanam@nrc.gov Attn: Mr. N. Kalyanam Mail Stop O-07D1 Washington, DC 20555-0001 Mr. H. "Butch" Browning, Jr.

Office of the State Fire Marshall 8181 Independence Blvd.

Baton Rouge, LA 70806

ATTACHMENT 1 To W3FI-2011-0068 Owner's Activity Report for Inservice Inspection Performed During Operating Cycle 17/ Refuel 17

CASES OF ASME BOILER AND PRESSURE VESSEL CODE FORM OAR-1 OWNERS ACTIVITY REPORT Report Number Cycle 17/ Refuel 17 Plant Waterford Steam Electric Station, 17265 River Road, Killona, La. 70057 Unit No. 3 Commercial service date 09/24/1985 Refueling outage no. 17 (If applicable)

Current inspection interval 3rd (1',2"',3'~4"f, other)

Current inspection period 1st Edition and Addenda of Section Xl applicable to the Inspection plans 2001 Edition, Through 2003 Addenda Date and revision of inspection plans 6/22/2011 Revision 5 of CEP-ISI-104 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans Same as above.

Code Cases used: N-532-4, N-474-1 (If applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of Refuel 17 conform to the requirements of Section Xl. (refueling outage number)

Signed an4 or DieTt Date 91J0 II

~~ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Louisiana and employed by HSB CT of Hartford, CT have inspected the items described in this Owner's Activity Report and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in Accordance with the requirements of Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/

replacement activities and evaluation described in this report Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this Inspection.

"fr** Commissions LA 1184 (A, N, I) A,*o/, 1 Inspector's Signature National Board, State, Province, and Endorsements Date X- 6/

CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE I ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number C-B Nozzle-to-Top Head Dome Weld for SG#2 (ISI Reference C2.21 component 04-030) was not completed in the Second CR-WF3-2011-1748, ISI Program Interval as required by ASME Section Xl and CR-WF3-2010-00352 C-H Piping contained within the L-Wall pipe chase is Reference C7.10 identified as being inaccessible per the ASME CR-WF3-2011-5599 Section Xl Pressure Testing program at Waterford 3 and is therefore exempt from pressure testing. This was done through Revision 15 to NOECP-253 that incorporated a definition which clarified that removal of a portion of wall was a modification of a plant component and therefore inaccessible and exempt per the ASME Section Xl Code. The ANII has challenged this position based on previous inspection by removal of concrete and lead blocks (a portion of the L-wall) to gain access to this normally enclosed area. If removal of the wall is better characterized as a hardship rather than inaccessible, then the ASME Section Xl relief request process would need to be used. Drawings G763 and G765 Sheet 2 depict the portion of the L-wall that is constructed of blocks and has been removed.

CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Date Repair/Replacement Work Completed Plan Number SG MSG0001 Plug Identified 4/30/2011 Work Order HTEXCH Tubes 259182-01 SG MSG0002 Plug Identified 4/30/2011 Work Order HTEXCH Tubes 259183-01 1 SI MVAAA405 A Implement EC 4/27/2011 Work Order VALVE 14766 for SI-405A 231632-01 1 SI MVAAA405 B Implement EC 4/20/2011 Work Order VALVE 14767 for SI-405B 231633-01