ML121210192

From kanterella
Revision as of 04:23, 12 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Letter 2011 Annual Certification of Financial Assurance for Decommissioning
ML121210192
Person / Time
Site: 07000754, 07001113, 07002872, 07200001, Vallecitos
Issue date: 05/03/2012
From: Ryder C
NRC/NMSS/FCSS
To: Sherin K
General Electric Co
Ryder C 301-492-3189
References
Download: ML121210192 (3)


Text

May 3, 2012 Mr. Keith S. Sherin Vice Chairman and Chief Financial Officer General Electric Corporation 3135 Easton Turnpike Fairfield, CT 06828

SUBJECT:

2011 ANNUAL CERTIFICATION OF FINANCIAL ASSURANCE FOR DECOMMISSIONING

Dear Mr. Sherin:

General Electric (GE) submitted the 2011 annual certification of financial assurance for decommissioning on March 18, 2011. The U.S. Nuclear Regulatory Commissions (NRCs) staff had several rounds of requests for additional information; the first by letter dated June 2, 2011, and the second by letter dated December 20, 2011. GE responded to the requests in letters dated August 17, 2011, and January 19, 2012. The NRC staff also had a conference call on June 17, 2011.

The NRC staff finds that GE has submitted the required information in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 70.25(f)(2) and Part 30, Appendix A,Section II.C.1. The NRC staff has no additional questions at this time. This letter concludes the action on the 2011 annual certification and closes the assigned Technical Assignment Control Number L33125.

In accordance with 10 CFR 2.390 of the NRC's "Rule of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

K. Sherin 2 If you have any questions regarding this matter, please contact me at 301-492-3189, or via e-mail to Christopher.Ryder@nrc.gov.

Sincerely,

/RA/

Christopher Ryder, Licensing Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards Docket Nos.:

50-18, 50-73, 50-70, 50-183,70-754, 70-1113, 70-2872, 72-01 License No.:

R-33, DPR-1, TR-1, DR-10, SNM-960, SNM-1097, SNM-1826, SNM-2500 cc: Scott Murray, GE-Hitachi

K. Sherin 2 If you have any questions regarding this matter, please contact me at 301-492-3189, or via e-mail to Christopher.Ryder@nrc.gov.

Sincerely,

/RA/

Christopher Ryder, Licensing Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards Docket Nos.:

50-18, 50-73, 50-70, 50-183,70-754, 70-1113, 70-2872, 72-01 License No.:

R-33, DPR-1, TR-1, DR-10, SNM-960, SNM-1097, SNM-1826, SNM-2500 cc: Scott Murray, GE-Hitachi DISTRIBUTION:

FMB, r/f CRegan, NRR LChang, FSME ML121210192 OFFICE FMB FMB FMB NAME CRyder LAllen RJohnson DATE 04/30/12 05/01/12 05/03/12 OFFICIAL RECORD COPY