Category:Annual Operating Report
MONTHYEARML24057A2742024-02-26026 February 2024 GE-Hitachi Nuclear Energy Americas, LLC, 2023 GEH Morris Operation Annual Effluent Report ML20343A3852020-12-0808 December 2020 GE Hitachi Nuclear Energy Morris Operation Submittal of Biennial Report 10CFR72.48; Changes, Tests, and Experiments 2024-02-26
[Table view] Category:Environmental Monitoring Report
MONTHYEARML24057A2742024-02-26026 February 2024 GE-Hitachi Nuclear Energy Americas, LLC, 2023 GEH Morris Operation Annual Effluent Report ML22054A0292022-02-22022 February 2022 GE-Hitachi Nuclear Energy Americas, LLC, 2021 Morris Operation Annual Effluent Report ML21060B4582021-03-0101 March 2021 (Vnc) - Effluent Monitoring and Environmental Surveillance Programs 2020 Annual Report ML21055A7602021-02-24024 February 2021 GE Hitachi Nuclear Energy - 2020 GEH Morris Operation Annual Effluent Report 2024-02-26
[Table view] Category:Letter
MONTHYEARML24299A0682024-10-25025 October 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML24284A1182024-10-10010 October 2024 GEH - Notification of GE Company Stock Beneficial Ownership Filing ML24296B1562024-07-0303 July 2024 GE-Hitachi Nuclear Energy Americas, LLC - Updated GEH Morris Operation Decommissioning Funding Plan, Revision 6 (Redacted Version of ML24185A193) ML24156A0752024-06-10010 June 2024 Application for Exemption from Select Requirements of Title 10 of the Code of Federal Regulations Part 73 for the Morris Operation - Acknowledgement of Withdrawal and Notification of the U.S. Nuclear Regulatory Commission Staff Efforts Clos ML24145A1292024-05-24024 May 2024 Morris Operation Request to Withdraw Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation IR 07200001/20230012024-03-0707 March 2024 GE Hitachi Morris (Gehmo) Independent Spent Fuel Storage Installation NRC Inspection Report 07200001/2023001 ML24057A2742024-02-26026 February 2024 GE-Hitachi Nuclear Energy Americas, LLC, 2023 GEH Morris Operation Annual Effluent Report ML24032A1082024-02-0101 February 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML24004A1652024-01-0404 January 2024 Morris Operation (Mo) Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23345A0812023-12-11011 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23283A3292023-11-30030 November 2023 NRC Issuance of Order Consenting to Indirect Transfer of Control of Ge/Geha/Gnfa Licenses ML23334A2222023-11-30030 November 2023 GE Hitachi Nuclear Energy - NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed IR 07200001/20234012023-11-28028 November 2023 GE Hitachi Morris (Gehmo) Independent Spent Fuel Storage Installation NRC Security Inspection Report 07200001/2023401 ML23276B3952023-10-13013 October 2023 The U.S. Nuclear Regulatory Commission Staff Assessment of Ge/Geha/Gnfa Reponses to Acceptance Observations Application for the U.S. Nuclear Regulatory Commission Consent to Indirect Transfer of Licenses ML23229A5122023-08-17017 August 2023 GE-Hitachi Nuclear Energy Americas, LLC, Response to NRC Staff Observations Enclosed with NRC Acceptance Letter (Reference 2) Related to GE, Geha and GNF-A Application (Reference 1) ML23191A8592023-07-27027 July 2023 Acceptance Letter GE GNFA and Geha Application for NRC Consent to Indirect Transfer of Licenses ML23177A0892023-06-26026 June 2023 Geha and GNF-A Application for Indirect Transfer of Control - Revision 2 ML23171A9762023-06-20020 June 2023 Geha and GNF-A Application for Indirect Transfer of Control - Revision 1 ML23152A1162023-05-30030 May 2023 Application for Order Consenting to Indirect Transfer of Control with Respect to Reactor Licenses, Materials Licenses, and Export Licenses, and Notification Regarding Other Approvals ML23104A4172023-03-31031 March 2023 GNF-AGEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML23054A3332023-02-23023 February 2023 GEH Notification of GE Company Stock Beneficial Ownership Filing ML23044A3282023-02-10010 February 2023 GEH Morris Operation Submittal of Updated Consolidated Safety Analysis Report (CSAR, Rev 15A, Feb 2023) ML22350A4702022-12-12012 December 2022 GEH Morris Operation Submittal of Biennial Report 10CFR72.48; Changes, Tests, and Experiments ML22242A0162022-11-22022 November 2022 Cover Letter for GEH Morris Operation ISFSI Subsequent License Renewal ML22313A1452022-11-0909 November 2022 Usfws Illinois-Iowa Ecological Services Field Office - Species List for Proposed License Renewal for GE-Hitachi Morris Operation Independent Spent Fuel Storage Installation - Project Code: 2022-0044583 ML22249A0952022-09-0808 September 2022 Proprietary Determination Letter for GEH-Morris License Renewal Application Submittals ML22249A3652022-09-0606 September 2022 GEH Notification of GE Company Stock Beneficial Ownership Filing ML22146A3512022-05-19019 May 2022 Usfws Illinois-Iowa Ecological Services Field Office - Species List for Proposed License Renewal for Morris Operation Independent Spent Fuel Storage Installation - Project Code: 2022-0044583 ML22132A0722022-05-12012 May 2022 GEH Morris Operation (Mo) Response to NRC Request for Additional Information for the Technical Review of the Application for Renewal of the Morris Operation License No. SNM-2500 ML22084A5782022-03-23023 March 2022 GNF-A/GEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML22068A1322022-03-0909 March 2022 GE-Hitachi Nuclear Energy Americas, LLC, Notification of Stock Beneficial Ownership Filing ML22054A0292022-02-22022 February 2022 GE-Hitachi Nuclear Energy Americas, LLC, 2021 Morris Operation Annual Effluent Report ML22042A4152022-02-11011 February 2022 GE-Hitachi Nuclear Energy Americas, LLC - GEH Notification of GE Company Stock Beneficial Ownership Filings ML22027A5162022-01-27027 January 2022 GEH - Morris Operation (Mo) Response to Request for Additional Information for the Technical Review of the Application for Renewal of the Morris Operation License No. SNM-2500 ML21216A2752022-01-0505 January 2022 GEH Morris DFP Close-out Letter ML21326A2662021-11-22022 November 2021 GEH Notification of GE Company Stock Beneficial Ownership Filing ML21319A2202021-11-17017 November 2021 Letter - Proprietary Determination for GEH Morris DFP Submittals ML21340A2432021-09-28028 September 2021 Illinois Threatened and Endangered Species by County, as of December 2020 IR 07200001/20214012021-09-27027 September 2021 GE-Hitachi Morris (Gehmo) Independent Spent Fuel Storage Installation - NRC Security Inspection Report 07200001/2021401 ML21252A1382021-09-0909 September 2021 GEH - Morris Operation (Mo) Decommissioning Funding Plan (DFP) Redacted Versions ML22063B1752021-08-30030 August 2021 Email and Letter from D. Hunter of Miami Tribe NRC Preliminary Determination Under Section 106 of the NHPA for Proposed GE-Hitachi Morris Operation ISFSI License Renewal ML21214A3102021-08-30030 August 2021 Request for Additional Information for the Technical Review of the Application for Renewal of the Morris Operation License No. SNM-2500 (Cac/Epid Nos. 001028/L-2020-RNW-0024) ML21138A9052021-08-0202 August 2021 Letter to Hannahville Indian Community Re NRC Preliminary Determination Under Section 106 of the National Historic Preservation Act ML21186A0082021-08-0202 August 2021 Letter to Citizen Potawatomi Nation Re NRC Preliminary Determination Under Section 106 of the NHPA ML21186A0092021-08-0202 August 2021 Letter to Forest County Potawatomi Re NRC Preliminary Determination Under Section 106 of the NHPA ML21186A0112021-08-0202 August 2021 Letter to Ho-Chunk Nation Re NRC Preliminary Determination Under Section 106 of the NHPA ML21188A2052021-08-0202 August 2021 Letter to Kickapoo Tribe in Kansas Re NRC Preliminary Determination Under Section 106 of the NHPA ML21189A2312021-08-0202 August 2021 Letter to Little Traverse Bay Bands of Odawa Indians Re NRC Preliminary Determination Under Section 106 of the NHPA ML21189A2522021-08-0202 August 2021 Letter to Match-E-Be-Nash-She-Wish Band of Potawatomi Indians Re NRC Preliminary Determination Under Section 106 of the NHPA ML21189A2602021-08-0202 August 2021 Letter to Menominee Indian Tribe of Wisconsin Re NRC Preliminary Determination Under Section 106 of the NHPA 2024-07-03
[Table view] |
Text
GE Hitachi Nuclear Energy
- HITACHI GEH Morris Operation 7555 East Collins Rd Morris, IL 60450
M240036
February 26, 2024
ATTN: Document Control Desk Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Regional Administrator U.S. Nuclear Regulatory Commission, Region Ill 2443 Warrenville Road, Ste 210 Lisle, IL 60532-4352
Subject:
2023 GEH Morris Operation Annual Effluent Report
References:
- 1) NRC License SNM-2500, Docket 72-01
- 2) NRC Regulation 1 0CFR72.44
Dear Sir or Madam,
In accordance with 1 0CFR72.44(d)(3) and SNM-2500 license condition 8.2.1, this report documents an estimate of quantities of principal radionuclides released to the environment by the GE-Hitachi Morris Operation in 2023. This report also provides an estimate of the maximum potential dose to the public resulting from GE-Hitachi Morris Operation effluents for 2023.
Particulate and gaseous radionuclides above minimum detectable levels were used in calculations. Particulates present on the stack monitor filters were C-14, Cm-242, NP-237, Ni-63, Sr-89, Pu-239 & 240. Gaseous radionuclides evaluated were H-3 and Kr-85. The quantity of tritium released was calculated by multiplying basin water evaporative losses, by the average tritium levels in the fuel basins. The amount of Kr-85 released was calculated by multiplying the concentration found in samples taken directly over the basin water, by the airflow through the basin area.
COMPLY V1.7.1 (the EPA software program) was used to calculate the Committed Effective Dose Equivalent from the release of principle radionuclides. The quantities released and the estimated dose to the public is shown in the following table:
Nuclide Activity Discharged (Ci/Yr)
C-14 5.778E-6 Sr-89 3.654E-7 Pu-239 & 240 9.187E-8 Cm-242 7.052E-8 Np-237 1.418E-7 Ni-63 1.166E-6 H-3 7. 135E-3 Kr-85 1.088E-0 U.S. NRC 2023 GEH Morris Operation Annual Effluent Report M240036 February 26, 2024 Page 2 of2
Committed Effective Dose Equivalent: 4.0 E-6 mRem/year
There are no liquid effluents from the site. Surface and groundwater water tritium levels were below minimum detectable levels and are conservatively reported as the minimum detectable level.
The maximum potential Committed Effective Dose Equivalent to the public that could occur from surface water was calculated to be 7.5 E-3 mRem - based on a person consuming water all year from the Sanitary Lagoons (MDA of 164 pCi/I H-3).
The maximum potential Committed Effective Dose Equivalent to the public that could occur from groundwater was calculated to be 7.8 E-3 mRem - based on a person consuming water all year from any of the following wells: DM-1, 2, 3, 4, 5, 6, 7, and 8 (MDA of 170 pCi/1 H-3).
Measurement of direct radiation at the GE-Hitachi Morris Operation owner control boundary is accomplished using TLDs prepared and processed by a NVLAP certified laboratory using direct measurement techniques. The calculated maximum potential Deep Dose Equivalent to the public that could occur from direct radiation at the boundary of the owner-controlled area was calculated to be 0.164 mRem assuming the maximum time spent at the boundary is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per year.
The maximum potential radiation dose to the public, for 2023, would result from the sum of the stack effluent releases, the dose from drinking surface water from the Sanitary Lagoons,
ground water from monitoring wells DM-1, 2, 3, 4, 5, 6, 7, and 8, and from direct radiation at the owner-controlled boundary. The maximum potential Total Effective Dose Equivalent (TEDE) to the public estimated from these sources for 2023 is: 0.179 mRem.
Sincerely,
.,ll,///~/V"~~ a~i6 t>~ /4 u /
Plant Manager
Commitments: None
Cc : K. Banovac, USNRC DFM D. Sargis, USNRC RIil PM 24-005